Interrogatory responses

Answers to questions 1 thru 1

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy14 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files14

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of UPA-001-SP01 Attachment 11 REDACTED.pdf

Extracted from the file · 24 pages, 4 without text · 36,138 characters

Text of UPA-001-SP01 Attachment 10 REDACTED.pdf

Extracted from the file · 19 pages, 4 without text · 27,484 characters

Text of UPA-001-SP01 Attachment 9 REDACTED.pdf

Extracted from the file · 24 pages, 5 without text · 30,898 characters

Text of UPA-001-SP01 Attachment 8 REDACTED.pdf

Extracted from the file · 17 pages, 5 without text · 22,701 characters

Text of UPA-001-SP01 Attachment 7 REDACTED.pdf

Extracted from the file · 14 pages, 4 without text · 17,187 characters

Text of UPA-001-SP01 Attachment 6 REDACTED.pdf

Extracted from the file · 13 pages, 3 without text · 14,512 characters

Words on different pages
  1. Page 1 of 14

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  2. Page 2 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 5 REDACTED Page 2 of 14 Eversource Energy – Torrington, CT QGM Scoping Study - March 2026, page 2 of 14 Harwinton Ave Building contains workrooms, conference rooms, and offices Gas Transmission Center contains warehouse/storage space and work areas Garage building used for fleet vehicle maintenance Main Building (Franklin Ave) consists of offices, conference rooms, workrooms, and a warehouse Total facility footprint is ~53,000 SF across all buildings. Typical occupancy is 7:30 AM – 4:00 PM Monday through Friday, with equipment scheduled for occupancy 6:00 AM – 5:00 PM. Additionally, the garage building has a second shift. Total site operating hours are estimated to be ~4,000 annually. HVAC is provided through a mix of packaged rooftop units (RTUs), electric/hot water unit heaters (UHs), spot use of split systems, and direct-fire natural gas heating. HVAC equipment is controlled with a modern Building Management System (BMS) from Automated Logic, including demand control ventilation (DCV) and adaptive/optimal startup. Lighting systems are modern LED with integrated controls and were observed to be functioning well. Building systems such as doors and windows were observed to be aged, with air and moisture infiltration (significant in some areas) taking place. Monthly Billing Analysis Historical energy data was received in the form of natural gas bills for (4) accounts/meters on site: - Eversource natural gas account 5753 552 9077 (174 Franklin St Garage) Eversource natural gas account 5772 284 0063 (174 Franklin St) Eversource natural gas account 5715 601 0092 (174 Franklin St, additional meter) Eversource natural gas account 5717 541 0000 (44 Harwinton Ave) Bill examples included the past 13 months of natural gas metered use and billed cost, and all accounts were summed for overall site gas use. Electric use is metered but not billed at this site, with annual use provided; use was modeled based on annual use, the site’s footprint, hours of operation, equipment and estimated utilization, and an example monthly load profile from a similar site. The most recent 12 months are summarized below: Most Recent 12 Month Summary Energy Usage and Costs Electric (kWh) N. Gas (CCF) Costs $ kWh/CCF $ 51,273 359,056 $ Total $ 23,281 74,554 13,427 Energy MT CO2 mmBTU % of total Emitted 1,225.1 47% 88.1 1,393.7 2,618.8 53% 100% 74.0 162.0 Unit Costs $ 0.14 $ 1.73
  3. Page 3 of 14

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  4. Page 4 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 5 REDACTED Page 4 of 14 Eversource Energy – Torrington, CT QGM Scoping Study March 2026, page 4 of 14 The first graph indicates a visual relationship between natural gas use and HDD, suggesting a majority of the natural gas is used for building heating. Summer month natural gas use can likely be attributed to service hot water. The regression further shows that site natural gas use has a strong, statistically significant relationship to HDD, with an R 2 value of 0.99. For electrical consumption, weather data for the site was utilized similarly to help generate a monthly site profile. Below are graphs for the estimated monthly site electrical use and cooling degree days: The regression above was developed to help model site monthly electrical use. The R 2 regression shows a statistically significant relationship to CDD, with an R2 value of 0.78 as the site’s usage is driven by the outside weather. The Department of Energy Superior Energy Performance (SEP) program qualifies that a statistical relationship exists with an R2 value of 0.75, indicating a strong model fit. Mechanical System Energy Use Breakdown Electric Use The following electric energy use breakdown was developed based on data gathered during the assessment. These results should be considered high level and were sourced from motor nameplates, typical load factors, and estimated operational hours. Actual data logging is required to confirm these assumptions.
  5. Page 5 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 5 REDACTED Page 5 of 14 Eversource Energy – Torrington, CT QGM Scoping Study March 2026, page 5 of 14 Estimated End Use Breakdown - Electricity Electric End Use Energy Use (kWh) Plug Load 65,000 HVAC - Fans & Cooling 179,000 Compressed Air 7,000 Lighting 109,000 TOTAL 360,000 Natural Gas Use Additionally, the following site natural gas use breakdown was developed. As above, these results should be considered high level and were sourced from equipment nameplates, typical load factors, and estimated operational hours. Actual data logging is required to confirm these assumptions.
  6. Page 6 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 5 REDACTED Page 6 of 14 Eversource Energy – Torrington, CT QGM Scoping Study March 2026, page 6 of 14 Estimated End Use Breakdown - Natural Gas Natural Gas End Use Energy Use (CCF) Comfort Heating 12,000 Service Hot Water 1,000 TOTAL 13,000 Lighting Equipment The entire site was retrofitted with LED lighting that appears to be in good working order. Equipment Inventory: Site equipment inventories were created to annotate equipment data gathered during the assessment, as seen below: Compressed Air: Eversource Torrington Compressor Inventory Make Model HP Capacity Compressor (CFM) Control Type Curtis CT10 10 30 *Annual run hours estimated Recip Cooling Air Cooled Estimated Voltage Annual Run Hours 460 1,000
  7. Page 7 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 5 REDACTED Page 7 of 14 Eversource Energy – Torrington, CT QGM Scoping Study March 2026, page 7 of 14 Eversource Torrington Dryer Inventory Rated Type Make Model CFM Hankison SPX 35 Non-Cycling Refrigerated Pumps: Well Pump Summary Quantity Horsepower 2 1/6 HVAC: Eversource Torrington HVAC Equipment Inventory Tag Type RTU-1 Manufacturer Packaged Roof Top Unit AAON Air Handling Unit LPL2 #4 Exhaust Fan Cook Split System - Condenser American Standard Packaged Roof Top Unit Trane Exhaust Fan Cook Split System - Condenser Mitsubishi Split System - Wall Unit Mitsubishi Split System - Wall Unit Mitsubishi Natural Gas Makeup Air Unit RUPPAIR Exhaust Fan Greenheck Exhaust Fan Greenheck EF 9 - D.D Exhaust Fan Dayton EF 16 Exhaust Fan Jenn Air RTU2 Packaged Roof Top Unit Lennox EF 6 - Warehouse Exhaust Fan Jenn Air EF 5 - Warehouse Exhaust Fan Jenn Air Packaged Roof Top Unit Trane Exhaust Fan Greenheck Packaged Roof Top Unit Trane Jenn Air EF 11- Locker Roo Exhaust Fan EF 12 Exhaust Fan Jenn Air Packaged Roof Top Unit Trane Packaged Roof Top Unit Trane Cooling Ton RN-013-8-O-HAOA-3G4 202311-ANGK112368 13 Model 100C17DEC 100 ACEH 4A7A7048B YHC102F4RHA27C9 7C10WTW10 MXZ-3C24NAHZ2 MSZ-GL12NA MSZ-GL12NA RAM-M 12 G-123-V65X-CD G-130-B-6-1-19 6KWK5 142 BCR KGB074S4TU2G 3 02 BCRE 3 02 BCRE YHC036E1EM YHC060F4RLA1TD 182 BCRA 101CRAFL YHC092F4RHA YHC092F4RHA Serial # 140PK69655 213545T35F 213614331L 2805615 8ZPQ4985 93E37324 93E36898 4852304 17013708 18786601 15967390 4 8.5 MBH Fan HP CFM Notes 3 160 227 0.25 450 4.6 2.75 6,800 0.03 0.12 0.04 0.04 2 2,800 0.17 0.25 Serves 44 Harwington Ave Serves Substation Serves Garage 248 864 5622H10029 6 86 2 182515373L 17004284 202710426L 3 80 0.75 3,064 5 48 1 203010143L 220410172L 7.5 7.5 160 160 2.75 6,800 2.75 6,800 Serve Main building 3,953 Best Practices The Torrington Service Center facility was observed during the assessment walkthrough to be following several energy Best Practices: Use of LED lighting in most/all areas with aggressive controls Scheduled nighttime/weekend temperature setback in most/all areas Demand Control Ventilation and Adaptive/Optimal Startup HVAC control strategies in place Garage exhaust fans controlled by VFD and interlocked with MAUs
  8. Page 8 of 14

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  9. Page 9 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 5 REDACTED Page 9 of 14 Eversource Energy – Torrington, CT QGM Scoping Study March 2026, page 9 of 14 EEM – 02 – Consider Installing an Air Curtain for Loading Dock Door A loading dock door in the warehouse area was noted to be constantly open for frequent loading/offloading of meter materials for transportation. Below is a photo of the door: With this door open most/all hours of the day, significant conditioned air is lost to the outdoors. It is recommended that facility staff consider installing an air curtain on the loading dock door (as has been installed in another similar area at the site. The air curtain would act as a barrier between the outside air and inside conditioned air (for a small fan penalty), reducing conditioned air leaving the space but maintaining ease of access for forklift travel. Savings are estimated assuming average airflow through the open doorway and a (conservative) 50% reduction factor from the installation of an air curtain. Additionally, air curtain fan capacity is estimated at 0.5hp for all operating hours. Estimated Annual Energy Savings: 12,000 kWh and 1,000 CCF Estimated Annual Cost Savings: $3,000 Estimated Implementation Costs: $20,000 Next Steps: - The site is encouraged to discuss potential control upgrades with a reputable local vendor or pursue internally. Facility staff may wish to enquire with natural gas utility representatives to determine if this kind of air barrier would qualify for incentives to offset some of the installation costs.
  10. Page 10 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 5 REDACTED Page 10 of 14 Eversource Energy – Torrington, CT QGM Scoping Study March 2026, page 10 of 14 EEM – 03 – Control Variable Use Spaces Heating and Cooling via Occupancy An innovative control strategy noted in use at other Eversource sites is the control of auditorium and conference room HVAC equipment based on an occupancy schedule. These spaces see highly variable occupancy, particularly post-COVID. Setting these large and intermittently occupied spaces to unoccupied setpoints for significant periods of non-use (much as many sites do with lighting) reduces the associated energy expenditure, while still allowing a quick recovery for occupancy. Multiple areas such as conference rooms at the Torrington Service Center were noted that could benefit from this strategy. The example below summarizes a potential before and after schedule – assuming average consistent use in the 10 AM – 2 PM period of weekdays: HVAC Schedule - Existing and Proposed with Occupancy Control Sunday 12:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM 10:00 PM 11:00 PM Occ Hrs UnOcc Hrs Existing Schedule Tuesday Wednesday Thursday Monday X X X X X X X X X X X X X X 0 24 X X X X X X X X X X X X X X 14 10 X X X X X X X X X X X X X X 14 10 Friday X X X X X X X X X X X X X X 14 10 Saturday X X X X X X X X X X X X X X 14 10 14 10 Proposed Schedule - Estimated Reduced Hours Monday Tuesday Wednesday Thursday Sunday 0 24 12:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM 10:00 PM 11:00 PM Occ Hrs UnOcc Hrs X X X X X 0 24 X X X X X 5 19 X X X X X 5 19 Friday X X X X X 5 19 Saturday X X X X X 5 19 5 19 Implementation of this strategy may be possible via programming within the existing controls or require the installation of new thermostats or local controls and occupancy sensors. The table below shows estimated costs and savings from the implementation of this type of control. Note that the AHU serving this space utilizes electric heat. Estimated Annual Energy Savings: 700 kWh and 100 CCF Estimated Annual Cost Savings: $300 Estimated Implementation Costs: $1,000 Next Steps: - Review of BMS is recommended to confirm equipment loading assumptions and schedules. - The site is encouraged to discuss potential control upgrades with an ALC representative or internal resources. 0 24

Text of UPA-001-SP01 Attachment 4 REDACTED.pdf

Extracted from the file · 16 pages, 4 without text · 19,788 characters

Text of UPA-001-SP01 Attachment 3 REDACTED.pdf

Extracted from the file · 12 pages, 4 without text · 11,899 characters

Text of UPA-001-SP01 Attachment 2 REDACTED.pdf

Extracted from the file · 11 pages, 4 without text · 10,526 characters

Text of UPA-001-SP01 Attachment 1 REDACTED.pdf

Extracted from the file · 13 pages, 3 without text · 17,141 characters

As listed on the current system

Question(s) Answered 1 thru 1 (Connecticut Light and Power Company dba Eversource Energy)(Supplemental/Revision) Date Filed: 10/07/2026

This filing on the current system (opens in a new tab)