Interrogatory responses
Answers to questions 1 thru 1
Files14
UPA-001-SP01_Final.pdf
PDF · 109 KB · 1 pageText searchable
Download UPA-001-SP01_Final.pdfRead the text of UPA-001-SP01_Final.pdf
UPA-001-SP01 Attachment 13 REDACTED.pdf
PDF · 4.6 MB · 14 pagesText searchable
Download UPA-001-SP01 Attachment 13 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 13 REDACTED.pdf
UPA-001-SP01 Attachment 12 REDACTED.pdf
PDF · 3.3 MB · 15 pagesText searchable
Download UPA-001-SP01 Attachment 12 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 12 REDACTED.pdf
UPA-001-SP01 Attachment 11 REDACTED.pdf
PDF · 3.9 MB · 24 pagesText searchable
Download UPA-001-SP01 Attachment 11 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 11 REDACTED.pdf
UPA-001-SP01 Attachment 10 REDACTED.pdf
PDF · 3.7 MB · 19 pagesText searchable
Download UPA-001-SP01 Attachment 10 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 10 REDACTED.pdf
UPA-001-SP01 Attachment 9 REDACTED.pdf
PDF · 3.9 MB · 24 pagesText searchable
Download UPA-001-SP01 Attachment 9 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 9 REDACTED.pdf
UPA-001-SP01 Attachment 8 REDACTED.pdf
PDF · 4.0 MB · 17 pagesText searchable
Download UPA-001-SP01 Attachment 8 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 8 REDACTED.pdf
UPA-001-SP01 Attachment 7 REDACTED.pdf
PDF · 3.7 MB · 14 pagesText searchable
Download UPA-001-SP01 Attachment 7 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 7 REDACTED.pdf
UPA-001-SP01 Attachment 6 REDACTED.pdf
PDF · 3.3 MB · 13 pagesText searchable
Download UPA-001-SP01 Attachment 6 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 6 REDACTED.pdf
UPA-001-SP01 Attachment 5 REDACTED.pdf
PDF · 3.6 MB · 14 pagesText searchable
Download UPA-001-SP01 Attachment 5 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 5 REDACTED.pdf
UPA-001-SP01 Attachment 4 REDACTED.pdf
PDF · 3.6 MB · 16 pagesText searchable
Download UPA-001-SP01 Attachment 4 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 4 REDACTED.pdf
UPA-001-SP01 Attachment 3 REDACTED.pdf
PDF · 3.7 MB · 12 pagesText searchable
Download UPA-001-SP01 Attachment 3 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 3 REDACTED.pdf
UPA-001-SP01 Attachment 2 REDACTED.pdf
PDF · 3.7 MB · 11 pagesText searchable
Download UPA-001-SP01 Attachment 2 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 2 REDACTED.pdf
UPA-001-SP01 Attachment 1 REDACTED.pdf
PDF · 2.8 MB · 13 pagesText searchable
Download UPA-001-SP01 Attachment 1 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 1 REDACTED.pdf
Text of UPA-001-SP01 Attachment 11 REDACTED.pdf
Extracted from the file · 24 pages, 4 without text · 36,138 characters
Text of UPA-001-SP01 Attachment 10 REDACTED.pdf
Extracted from the file · 19 pages, 4 without text · 27,484 characters
Text of UPA-001-SP01 Attachment 9 REDACTED.pdf
Extracted from the file · 24 pages, 5 without text · 30,898 characters
Text of UPA-001-SP01 Attachment 8 REDACTED.pdf
Extracted from the file · 17 pages, 5 without text · 22,701 characters
Text of UPA-001-SP01 Attachment 7 REDACTED.pdf
Extracted from the file · 14 pages, 4 without text · 17,187 characters
Text of UPA-001-SP01 Attachment 6 REDACTED.pdf
Extracted from the file · 13 pages, 3 without text · 14,512 characters
Page 5 of 14
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 5 REDACTED Page 5 of 14 Eversource Energy – Torrington, CT QGM Scoping Study March 2026, page 5 of 14 Estimated End Use Breakdown - Electricity Electric End Use Energy Use (kWh) Plug Load 65,000 HVAC - Fans & Cooling 179,000 Compressed Air 7,000 Lighting 109,000 TOTAL 360,000 Natural Gas Use Additionally, the following site natural gas use breakdown was developed. As above, these results should be considered high level and were sourced from equipment nameplates, typical load factors, and estimated operational hours. Actual data logging is required to confirm these assumptions.Page 6 of 14
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 5 REDACTED Page 6 of 14 Eversource Energy – Torrington, CT QGM Scoping Study March 2026, page 6 of 14 Estimated End Use Breakdown - Natural Gas Natural Gas End Use Energy Use (CCF) Comfort Heating 12,000 Service Hot Water 1,000 TOTAL 13,000 Lighting Equipment The entire site was retrofitted with LED lighting that appears to be in good working order. Equipment Inventory: Site equipment inventories were created to annotate equipment data gathered during the assessment, as seen below: Compressed Air: Eversource Torrington Compressor Inventory Make Model HP Capacity Compressor (CFM) Control Type Curtis CT10 10 30 *Annual run hours estimated Recip Cooling Air Cooled Estimated Voltage Annual Run Hours 460 1,000Page 7 of 14
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 5 REDACTED Page 7 of 14 Eversource Energy – Torrington, CT QGM Scoping Study March 2026, page 7 of 14 Eversource Torrington Dryer Inventory Rated Type Make Model CFM Hankison SPX 35 Non-Cycling Refrigerated Pumps: Well Pump Summary Quantity Horsepower 2 1/6 HVAC: Eversource Torrington HVAC Equipment Inventory Tag Type RTU-1 Manufacturer Packaged Roof Top Unit AAON Air Handling Unit LPL2 #4 Exhaust Fan Cook Split System - Condenser American Standard Packaged Roof Top Unit Trane Exhaust Fan Cook Split System - Condenser Mitsubishi Split System - Wall Unit Mitsubishi Split System - Wall Unit Mitsubishi Natural Gas Makeup Air Unit RUPPAIR Exhaust Fan Greenheck Exhaust Fan Greenheck EF 9 - D.D Exhaust Fan Dayton EF 16 Exhaust Fan Jenn Air RTU2 Packaged Roof Top Unit Lennox EF 6 - Warehouse Exhaust Fan Jenn Air EF 5 - Warehouse Exhaust Fan Jenn Air Packaged Roof Top Unit Trane Exhaust Fan Greenheck Packaged Roof Top Unit Trane Jenn Air EF 11- Locker Roo Exhaust Fan EF 12 Exhaust Fan Jenn Air Packaged Roof Top Unit Trane Packaged Roof Top Unit Trane Cooling Ton RN-013-8-O-HAOA-3G4 202311-ANGK112368 13 Model 100C17DEC 100 ACEH 4A7A7048B YHC102F4RHA27C9 7C10WTW10 MXZ-3C24NAHZ2 MSZ-GL12NA MSZ-GL12NA RAM-M 12 G-123-V65X-CD G-130-B-6-1-19 6KWK5 142 BCR KGB074S4TU2G 3 02 BCRE 3 02 BCRE YHC036E1EM YHC060F4RLA1TD 182 BCRA 101CRAFL YHC092F4RHA YHC092F4RHA Serial # 140PK69655 213545T35F 213614331L 2805615 8ZPQ4985 93E37324 93E36898 4852304 17013708 18786601 15967390 4 8.5 MBH Fan HP CFM Notes 3 160 227 0.25 450 4.6 2.75 6,800 0.03 0.12 0.04 0.04 2 2,800 0.17 0.25 Serves 44 Harwington Ave Serves Substation Serves Garage 248 864 5622H10029 6 86 2 182515373L 17004284 202710426L 3 80 0.75 3,064 5 48 1 203010143L 220410172L 7.5 7.5 160 160 2.75 6,800 2.75 6,800 Serve Main building 3,953 Best Practices The Torrington Service Center facility was observed during the assessment walkthrough to be following several energy Best Practices: Use of LED lighting in most/all areas with aggressive controls Scheduled nighttime/weekend temperature setback in most/all areas Demand Control Ventilation and Adaptive/Optimal Startup HVAC control strategies in place Garage exhaust fans controlled by VFD and interlocked with MAUsPage 8 of 14
No text on this page. It may be a picture of a page, such as a scan or a chart.Page 9 of 14
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 5 REDACTED Page 9 of 14 Eversource Energy – Torrington, CT QGM Scoping Study March 2026, page 9 of 14 EEM – 02 – Consider Installing an Air Curtain for Loading Dock Door A loading dock door in the warehouse area was noted to be constantly open for frequent loading/offloading of meter materials for transportation. Below is a photo of the door: With this door open most/all hours of the day, significant conditioned air is lost to the outdoors. It is recommended that facility staff consider installing an air curtain on the loading dock door (as has been installed in another similar area at the site. The air curtain would act as a barrier between the outside air and inside conditioned air (for a small fan penalty), reducing conditioned air leaving the space but maintaining ease of access for forklift travel. Savings are estimated assuming average airflow through the open doorway and a (conservative) 50% reduction factor from the installation of an air curtain. Additionally, air curtain fan capacity is estimated at 0.5hp for all operating hours. Estimated Annual Energy Savings: 12,000 kWh and 1,000 CCF Estimated Annual Cost Savings: $3,000 Estimated Implementation Costs: $20,000 Next Steps: - The site is encouraged to discuss potential control upgrades with a reputable local vendor or pursue internally. Facility staff may wish to enquire with natural gas utility representatives to determine if this kind of air barrier would qualify for incentives to offset some of the installation costs.Page 10 of 14
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 5 REDACTED Page 10 of 14 Eversource Energy – Torrington, CT QGM Scoping Study March 2026, page 10 of 14 EEM – 03 – Control Variable Use Spaces Heating and Cooling via Occupancy An innovative control strategy noted in use at other Eversource sites is the control of auditorium and conference room HVAC equipment based on an occupancy schedule. These spaces see highly variable occupancy, particularly post-COVID. Setting these large and intermittently occupied spaces to unoccupied setpoints for significant periods of non-use (much as many sites do with lighting) reduces the associated energy expenditure, while still allowing a quick recovery for occupancy. Multiple areas such as conference rooms at the Torrington Service Center were noted that could benefit from this strategy. The example below summarizes a potential before and after schedule – assuming average consistent use in the 10 AM – 2 PM period of weekdays: HVAC Schedule - Existing and Proposed with Occupancy Control Sunday 12:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM 10:00 PM 11:00 PM Occ Hrs UnOcc Hrs Existing Schedule Tuesday Wednesday Thursday Monday X X X X X X X X X X X X X X 0 24 X X X X X X X X X X X X X X 14 10 X X X X X X X X X X X X X X 14 10 Friday X X X X X X X X X X X X X X 14 10 Saturday X X X X X X X X X X X X X X 14 10 14 10 Proposed Schedule - Estimated Reduced Hours Monday Tuesday Wednesday Thursday Sunday 0 24 12:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM 10:00 PM 11:00 PM Occ Hrs UnOcc Hrs X X X X X 0 24 X X X X X 5 19 X X X X X 5 19 Friday X X X X X 5 19 Saturday X X X X X 5 19 5 19 Implementation of this strategy may be possible via programming within the existing controls or require the installation of new thermostats or local controls and occupancy sensors. The table below shows estimated costs and savings from the implementation of this type of control. Note that the AHU serving this space utilizes electric heat. Estimated Annual Energy Savings: 700 kWh and 100 CCF Estimated Annual Cost Savings: $300 Estimated Implementation Costs: $1,000 Next Steps: - Review of BMS is recommended to confirm equipment loading assumptions and schedules. - The site is encouraged to discuss potential control upgrades with an ALC representative or internal resources. 0 24Page 11 of 14
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 5 REDACTED Page 11 of 14 Eversource Energy – Torrington, CT QGM Scoping Study March 2026, page 11 of 14 EEM – 04 – Remove Bypasses and Enable Fan VFDs on Trane RTUs Discussion with site staff indicates that (3) total RTUs have factory fan VFDs that are not currently in use, with the units relying on bypass ducting to modulate supply air temperature to spaces to meet demand. RTUs include (2) Trane units serving the Main Building, and (1) Trane unit serving the Substation Maintenance building. The spaces under consideration are already served by variable air volume (VAV) boxes, thus conditioned air could be provided by an RTU modulating fan speed to maintain a static pressure setpoint, reducing fan energy required to maintain space setpoints. It is recommended that the facility consider removing any bypass ducting and associated controls and enable the existing RTU VFDs. Savings assume an average 45% reduction in supply fan energy for each RTU across its annual operation: Estimated Annual Energy Savings: 12,000 kWh Estimated Annual Cost Savings: $2,000 Estimated Implementation Costs: $5,000 Next Steps: - Site should review equipment modifications with a mechanical vendor or internal staff. Sustainability Considerations Background Site and portfolio sustainability is best guided by the framework and methodology set forth in ASHRAE Standard 228-2023 Standard Method of Evaluating Zero Net Energy and Zero Net Carbon Building Performance (available for purchase here: https://www.ashrae.org/technical-resources/bookstore/ansi-ashrae-standard-228-standardmethod-of-evaluating-zero-net-energy-and-zero-net-carbon-building-performance). The site is not known to have a present net-zero strategy; however, the ASHRAE standard presents a strong method to: - Assess current building energy use and carbon emissions Establish a baseline Develop milestones Develop a plan to reach milestones The data and information shown below are intended to help develop an understanding of where current portfolio sustainability goal aligns with current position. Emissions Scopes Emissions reporting is generally addressed across three Emissions Scopes, as seen below:Page 12 of 14
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 5 REDACTED Page 12 of 14 Eversource Energy – Torrington, CT QGM Scoping Study March 2026, page 12 of 14 An important aspect of developing a sustainability plan is the determination of which emissions scopes will be targeted for reduction. The majority of sustainability planning at the time of this report is focused on Scopes 1 and 2, although large corporations with significant supply and delivery chains have begun to address Scope 3 as well. The focus of the sustainability plan in this report is on Scope 1 and 2 emissions. ASHRAE Standard 228-2023 Standard Method of Evaluating Zero Net Energy and Zero Net Carbon Building Performance ASHRAE 228-2023 includes the following diagram illustrating energy flows into, from, and out of a site:Page 13 of 14
No text on this page. It may be a picture of a page, such as a scan or a chart.Page 14 of 14
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 5 REDACTED Page 14 of 14 Eversource Energy – Torrington, CT QGM Scoping Study March 2026, page 14 of 14 Offset of site electrical energy use via renewable energy: either generated onsite or through purchasing of renewable energy from sources such as community solar or solar farms as well as energy brokerage. Step 4: Offset Remaining Loads Lastly, the site may consider RECs and/or purchased carbon offsets to meet the remaining site net carbon. ASHRAE 228-2023 rigorously defines each of these categories and is strongly recommended as a guideline for these efforts and associated accounting. Repeat: Steps 1 – 4 A sustainability plan should be viewed as a process of continuous improvement. The site is encouraged to consider additional opportunities and technologies as they become available and more economical. Next Steps: Site to review suggestions in report (and calculation assumptions) and discuss internally if any interest to move forward with any of the recommended opportunities (and work closely with utility on potential offers/process). Most attractive measures in terms of energy savings, operational efficiencies, and potential utility incentives include: o Building shell remediation o BMS controls opportunities QGM would like to have a virtual report-out to discuss this report. The goal of the meeting is to determine which, if any, of the suggested ECMs are to be acted upon in the near to intermediate future. For those ECMs that require input from designers, site is suggested to initiate the process sooner than later. Site is encouraged to get contractors/vendors to site to review and provide budgetary costs.
Text of UPA-001-SP01 Attachment 4 REDACTED.pdf
Extracted from the file · 16 pages, 4 without text · 19,788 characters
Text of UPA-001-SP01 Attachment 3 REDACTED.pdf
Extracted from the file · 12 pages, 4 without text · 11,899 characters
Text of UPA-001-SP01 Attachment 2 REDACTED.pdf
Extracted from the file · 11 pages, 4 without text · 10,526 characters
Text of UPA-001-SP01 Attachment 1 REDACTED.pdf
Extracted from the file · 13 pages, 3 without text · 17,141 characters
As listed on the current system
Question(s) Answered 1 thru 1 (Connecticut Light and Power Company dba Eversource Energy)(Supplemental/Revision) Date Filed: 10/07/2026