Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 1 thru 1

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy14 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files14

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of UPA-001-SP01 Attachment 11 REDACTED.pdf

Extracted from the file · 24 pages, 4 without text · 36,138 characters

Text of UPA-001-SP01 Attachment 10 REDACTED.pdf

Extracted from the file · 19 pages, 4 without text · 27,484 characters

Text of UPA-001-SP01 Attachment 9 REDACTED.pdf

Extracted from the file · 24 pages, 5 without text · 30,898 characters

Text of UPA-001-SP01 Attachment 8 REDACTED.pdf

Extracted from the file · 17 pages, 5 without text · 22,701 characters

Text of UPA-001-SP01 Attachment 7 REDACTED.pdf

Extracted from the file · 14 pages, 4 without text · 17,187 characters

Text of UPA-001-SP01 Attachment 6 REDACTED.pdf

Extracted from the file · 13 pages, 3 without text · 14,512 characters

Text of UPA-001-SP01 Attachment 5 REDACTED.pdf

Extracted from the file · 14 pages, 4 without text · 17,555 characters

Words on different pages
  1. Page 1 of 16

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  2. Page 2 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 4 REDACTED Page 2 of 16 Eversource Energy – Stamford, CT Service Center QGM Scoping Study Febuary 2026, page 2 of 16 General Facility Description The Glenbrook Road Stamford facility was originally constructed in 1962 and consists of ~57,000 SF and contains offices, conference rooms, operations centers, workrooms, and shop areas. The main building has had recent renovations, including installing a new chiller, (2) new boilers, and (2) new hot water (HW) pumps. RTUs and AHUs are controlled with an up-to-date Automated Logic Building Management System (BMS), with occupied/unoccupied scheduling, adaptive/optimal startup, and demand control ventilation. Additional spot heating and cooling for operations center areas is achieved with split system heat pumps, unit heaters (UHs) and packaged terminal air conditioners (PTAC) units. Lighting systems are LED with motion/occupancy controls. Lighting controls are reported to be commissioned and working well. Typical building occupancy is 6:00 AM – 3:30 PM, Monday through Friday with limited weekend hours for garage and shop areas, with office areas occupied until ~6:00 PM. 24-hour occupancy occurs during emergency and storm events. Occupied building operations are estimated to be 3,700 annual hours. Monthly Billing Analysis Historical energy data was received in the form of a natural gas bill. This information included the most recent natural gas billing rates and quantity of natural gas used, along with the previous 12 months of natural gas use. Electric use is metered but not billed at this site, with annual use provided; monthly use was modeled based on annual use, the site’s footprint, hours of operation, equipment and estimated utilization, and an example monthly load profile from a similar site. The most recent 12 months are summarized below: Most Recent 12 Month Summary Costs $ kWh/CCF Electric (kWh) $ 71,615 501,504 Energy Usage and Costs N. Gas (CCF) $ Total $ 22,106 93,720 16,610 Energy MT CO2 mmBTU % of total Emitted 1,711 50% 123.0 1,724 3,435 50% 100% 91.5 214.5 Unit Costs $ 0.14 $ 1.33 $0.1428/kWh was used as an electric rate based upon Eversource Facilities’ third-party electric supply costs for similar type facilities. A monthly summary of electric and thermal use is shown below:
  3. Page 3 of 16

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  4. Page 4 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 4 REDACTED Page 4 of 16 Eversource Energy – Stamford, CT Service Center QGM Scoping Study Febuary 2026, page 4 of 16 The first graph indicates a visual relationship between natural gas use and HDD, suggesting a majority of the natural gas is used for building heating. Minor summer month natural gas use can likely be attributed to service hot water. The regression further shows that site natural gas use has a strong, statistically significant relationship to HDD, with an R2 value of 0.96. For electrical consumption, weather data for the site was utilized similarly to help generate a monthly site profile. Below are graphs for the estimated monthly site electrical use and cooling degree days: The regression above was developed to help model site monthly electrical use. The R 2 regression shows a statistically significant relationship to CDD, with an R2 value of 0.76 as the site’s usage is driven by the outside weather. The Department of Energy Superior Energy Performance (SEP) program qualifies that a statistical relationship exists with an R2 value of 0.75, indicating this is a strong statistical model fit. Mechanical System Energy Use Breakdown Electric Use Based on the initial walk-through, the following electric energy use breakdown was developed. These results should be considered high level and were sourced from motor nameplates, typical load factors, and estimated operational hours. Actual data logging is required to confirm these assumptions.
  5. Page 5 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 4 REDACTED Page 5 of 16 Eversource Energy – Stamford, CT Service Center QGM Scoping Study Febuary 2026, page 5 of 16 Estimated End Use Breakdown - Electricity Electric End Use Energy Use (kWh) HVAC - Fans, Pumps, and Cooling 289,000 Lighting 118,000 Air Compressor 9,000 Plug and Process 86,000 TOTAL 502,000 Natural Gas Use Based on the initial walk-through, the following site natural gas use breakdown was developed. As above, these results should be considered high level and were sourced from equipment nameplates, typical load factors, and estimated operational hours. Actual data logging is required to confirm these assumptions.
  6. Page 6 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 4 REDACTED Page 6 of 16 Eversource Energy – Stamford, CT Service Center QGM Scoping Study Febuary 2026, page 6 of 16 Estimated End Use Breakdown - Natural Gas Natural Gas End Use Energy Use (CCF) Comfort Heating 15,000 Service Hot Water 1,200 TOTAL 16,200 Equipment Inventory: Site equipment was surveyed and inventories were created to better understand the current equipment, as shown below. HVAC Equipment:
  7. Page 7 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 4 REDACTED Page 7 of 16 Eversource Energy – Stamford, CT Service Center QGM Scoping Study Febuary 2026, page 7 of 16 Eversource Stamford Service Center HVAC Equipment Inventory Tag Type Manufacturer Model AHU 1 AHU 2 AHU 3 AHU 6A RTU RTU-2 RTU-3 RTU-4 RTU-5 RTU-6 Air Handling Unit Air Handling Unit Air Handling Unit Air Handling Unit Packaged Roof Top Unit- Natural Gas Packaged Roof Top Unit- Natural Gas Packaged Roof Top Unit- Natural Gas Packaged Roof Top Unit- Natural Gas Packaged Roof Top Unit- Natural Gas Packaged Roof Top Unit- Natural Gas Wall Unit Condenser Condenser Condenser Condenser Condenser Exhaust Fan Exhaust Fan Exhaust Fan Exhaust Fan HW Boiler HW Boiler Trane Trane Trane Trane Trane Trane Trane Trane Trane Trane Mitsubishi Mitsubishi Mitsubishi Mitsubishi Mitsubishi Mitsubishi Greenheck Greenheck CSAA006UAL00 CSAA010UAL00 CSAA030UAL00 CCDBG3ABOC YSC090A4EHA001 YHC048E4RZA2F YHC074F4RHA27H YHC060F4RHA2EC OABD030A4-C1B100AB YHC074F4RHA27H PKA-A30KA7 PUZ-A30NHA7 PUY-A30NHA7 SUZ-KA12NAHZ PUZ-HA24NHA1 PUY-A12NKA7 EXH-4 EXH-5 B-1 B-2 Cooling Ton MBH 7.5 4 6 5 2.5 6 134 96 122 104 60 122 Total Fan HP 2 3 10 0.75 3.1 0.75 3.5 1.4 6 3.5 Rated Notes CFM 3,000 Serves the offices 5,000 Serves locker rooms 15,000 1,500 2,475 1,200 1,860 2,000 1,100 1,860 0.1 CUE-090-E-1-19-X 0.1 903 850 850 Eversource Stamford Service Center Unit Heaters Location Type Quantity Service Garage Fan Coil 2 Service Garage Electric 2 Warehouse Fan Coil 3 Locker Room Fan Coil 2 Compressed Air Equipment: Eversource Stamford Compressor Inventory Estimated Compressor Estimated Make Model HP Capacity Control Cooling Voltage Annual Run (CFM) Type Hours Quincy QTH-15-120AM 15 51 Recip Air Cooled 460 1,000 *Annual run hours estimated Eversource Stamford Dryer Inventory Rated Make Model Type CFM Quincy QRHT-50 50 Non-Cycling
  8. Page 8 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 4 REDACTED Page 8 of 16 Eversource Energy – Stamford, CT Service Center QGM Scoping Study Febuary 2026, page 8 of 16 Eversource Stamford Air Receivers Location Capacity (Gallon) Integrated with Compressor 150 Chiller Summary: Eversource Stamford Chiller Summary Manufacturer Model Cooling Ton Volts Trane CGAM 080F 80 460 Best Practices The Stamford Service Center facility was observed during the assessment walkthrough to be following several energy Best Practices: Use of LED lighting in most/all areas with aggressive controls Variable Frequency Drive (VFD) control of HW and CHW Pumps VFD control of some AHU fans Scheduled nighttime/weekend temperature setback in most/all areas Demand Control Ventilation and Adaptive/Optimal Startup HVAC control strategies in place Recent Energy Efficiency Projects Overview The campus has completed several energy efficiency projects in recent years. Listed below are some of the various completed energy projects: New Chiller New HW and CHW pumps with VFDs With the projects described above, QGM Consulting was challenged to find additional energy efficiency measures (EEMs) and sustainability projects. Potential recommendations are outlined below, some of which may require some additional analysis and monitoring. Site Energy Efficiency Measures/Recommendations EEM – 01 – Consider Building Shell Gap Remediation Gaps and cracks were noted at door and window seals and are suspected at roof/wall transitions in multiple areas throughout the facility. Insulation and air sealing are understood to be original construction and have likely degraded over time. Envelope gaps are thus allowing the infiltration/exfiltration of untempered air and increasing the load on HVAC equipment.
  9. Page 9 of 16

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  10. Page 10 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 4 REDACTED Page 10 of 16 Eversource Energy – Stamford, CT Service Center QGM Scoping Study Febuary 2026, page 10 of 16 Estimated Implementation Costs: $10,000 Next Steps: - Spot readings are recommended to confirm equipment loading assumptions and schedules. - The site is encouraged to discuss potential control upgrades with a reputable mechanical/controls vendor. EEM – 03 – Control Main Conference Room Heating and Cooling via Occupancy An innovative control strategy noted in use at other Eversource sites is the control of auditorium and conference room HVAC equipment based on an occupancy schedule. These spaces see highly variable occupancy, particularly post-COVID. Setting these large and intermittently occupied spaces to unoccupied setpoints for significant periods of non-use (much as many sites do with lighting) reduces the associated energy expenditure, while still allowing a quick recovery for occupancy. An area of potential opportunity at the Stamford facility is the executive conference room and office suite. The example below summarizes a potential before and after schedule – assuming average consistent use in the 10 AM – 2 PM period of weekdays: HVAC Schedule - Existing and Proposed with Occupancy Control Sunday 12:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM 10:00 PM 11:00 PM Occ Hrs UnOcc Hrs Existing Schedule Tuesday Wednesday Thursday Monday X X X X X X X X X X X X X X 0 24 X X X X X X X X X X X X X X 14 10 X X X X X X X X X X X X X X 14 10 Friday X X X X X X X X X X X X X X 14 10 Saturday X X X X X X X X X X X X X X 14 10 14 10 Proposed Schedule - Estimated Reduced Hours Monday Tuesday Wednesday Thursday Sunday 0 24 12:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM 10:00 PM 11:00 PM Occ Hrs UnOcc Hrs X X X X X 0 24 X X X X X 5 19 X X X X X 5 19 Friday X X X X X 5 19 Saturday X X X X X 5 19 5 19 Implementation of this strategy may be possible via programming within the existing controls or require the installation of new thermostats or local controls and occupancy sensors. The table below shows estimated costs and savings from the implementation of this type of control. Note that the AHU serving this space utilizes electric heat. Estimated Annual Energy Savings: 10,200 kWh Estimated Annual Cost Savings: $1,500 Estimated Implementation Costs: $1,000 Next Steps: 0 24

Text of UPA-001-SP01 Attachment 3 REDACTED.pdf

Extracted from the file · 12 pages, 4 without text · 11,899 characters

Text of UPA-001-SP01 Attachment 2 REDACTED.pdf

Extracted from the file · 11 pages, 4 without text · 10,526 characters

Text of UPA-001-SP01 Attachment 1 REDACTED.pdf

Extracted from the file · 13 pages, 3 without text · 17,141 characters

As listed on the current system

Question(s) Answered 1 thru 1 (Connecticut Light and Power Company dba Eversource Energy)(Supplemental/Revision) Date Filed: 10/07/2026

This filing on the current system (opens in a new tab)