Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 1 thru 1

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy14 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files14

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of UPA-001-SP01 Attachment 11 REDACTED.pdf

Extracted from the file · 24 pages, 4 without text · 36,138 characters

Text of UPA-001-SP01 Attachment 10 REDACTED.pdf

Extracted from the file · 19 pages, 4 without text · 27,484 characters

Text of UPA-001-SP01 Attachment 9 REDACTED.pdf

Extracted from the file · 24 pages, 5 without text · 30,898 characters

Text of UPA-001-SP01 Attachment 8 REDACTED.pdf

Extracted from the file · 17 pages, 5 without text · 22,701 characters

Text of UPA-001-SP01 Attachment 7 REDACTED.pdf

Extracted from the file · 14 pages, 4 without text · 17,187 characters

Text of UPA-001-SP01 Attachment 6 REDACTED.pdf

Extracted from the file · 13 pages, 3 without text · 14,512 characters

Text of UPA-001-SP01 Attachment 5 REDACTED.pdf

Extracted from the file · 14 pages, 4 without text · 17,555 characters

Text of UPA-001-SP01 Attachment 4 REDACTED.pdf

Extracted from the file · 16 pages, 4 without text · 19,788 characters

Words on different pages
  1. Page 2 of 12

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 3 REDACTED Page 2 of 12 Eversource Energy – Madison, CT QGM Scoping Study - May 2026, page 2 of 12 The garage building used for fleet vehicle maintenance An aerial view of the campus is shown below: Maintenance Garage Main Building Total facility footprint is ~59,000 SF across all buildings. Typical occupancy is 7:30 AM – 4:00 PM Monday through Friday, with equipment scheduled for occupancy 5:00 AM – 7:00 PM. Additionally, the garage building has a second shift. Total site operating hours are estimated to be ~4,000 annually. Approximately 30% of the main building is occupied by a tenant, with utilities billed pro-rata. Tenant occupancy is understood to be similar to the service center, and the tenant is likely to leave the space in the summer of 2027. HVAC is provided through a mix of packaged rooftop units (RTUs), electric unit heaters (UHs), a low-utilization electric resistance radiant floor system, and some spot use of split systems. HVAC equipment is controlled with a modern Building Management System (BMS) from Automated Logic. Lighting systems are modern LED with integrated controls and were observed to be functioning well.
  2. Page 3 of 12

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 3 REDACTED Page 3 of 12 Eversource Energy – Madison, CT QGM Scoping Study May 2026, page 3 of 12 Monthly Billing Analysis Electric use is metered but not billed at this site with annual use provided; monthly electric use was modeled based on annual use, the site’s footprint, hours of operation, equipment power density and estimated utilization, and example monthly load profiles from similar sites. Annual Site Summary Energy Energy Usage Costs and Costs $ kWh mmBTU Electric (kWh) $ 185,516 1,299,129 4,433 MT CO2 Unit Costs Emitted 378.0 $0.14 $0.1428/kWh was used as an electric rate based upon Eversource Facilities’ third-party electric supply costs for similar type facilities. The most recent 12 months are summarized below: Monthly Utility Bill Summary Estimated Monthly Electric Month Electrical Estimated Use (kWh) Cost ($) Jan-25 157,153 Feb-25 125,722 Mar-25 94,292 Apr-25 62,861 May-25 52,384 Jun-25 115,245 Jul-25 146,676 Aug-25 125,722 Sep-25 104,768 Oct-25 52,384 Nov-25 115,245 Dec-25 146,676 TOTAL 1,299,129 $22,441 $17,953 $13,465 $8,977 $7,480 $16,457 $20,945 $17,953 $14,961 $7,480 $16,457 $20,945 $185,516 Estimated Blended Rate ($/kWh) $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 The energy use intensity (EUI) shown below is an indicator of building performance in terms of energy use (kbtu) per building square foot: Building Energy Use Intensity (EUI) Utility Site EUI Source EUI Unit Electricity 75 209 kbtu/sf Source-site ratio per national average, source: https://portfoliomanager.energystar.gov/pdf/reference/Source%20Energy.pdf
  3. Page 4 of 12

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 3 REDACTED Page 4 of 12 Eversource Energy – Madison, CT QGM Scoping Study May 2026, page 4 of 12 Energy Star publishes median data by building type for overall comparison by general category but does not include this type of building (mixed use: general office space/shop/garage). However, the EUI metric can be used to baseline existing energy use for future comparison or to compare this building to similar buildings of this type. For electrical consumption, weather data for the site was utilized to help generate a monthly site profile. Below are graphs for the estimated monthly site electrical use and cooling degree days: The regression above was developed to help model monthly building electrical use. Visual summer cooling electrical peaks line up with CDD but also peak in the winter due to the presence of electric heat. The first pass regression does not show a statistically significant relationship to CDD, with an R 2 value of 0.089. The Department of Energy Superior Energy Performance (SEP) program qualifies that a statistical relationship exists with an R 2 value of 0.75. Next, electrical use was compared to heating degree days to investigate any statistical relationship between kWh and seasonal heating: As above for CDD, visual kWh peaks to coincide with increases in HDD; however, the regression indicates no statistical relationship. The combination of two correlations makes initial regression difficult.
  4. Page 5 of 12

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 3 REDACTED Page 5 of 12 Eversource Energy – Madison, CT QGM Scoping Study May 2026, page 5 of 12 As an additional aid to modeling monthly electric use, CDD and HDD were next compared to only the relevant months: summer and shoulder months for CDD and winter and shoulder months for HDD, with the resulting graphs shown below: R2 values of 0.96 for separated cooling electric use and 0.95 for separated heating electric use indicate good model fits for the estimated electric use at this site. Mechanical System Energy Use Breakdown Electric Use Based on the initial walk-through, the following electric energy use breakdown was developed. These results should be considered high level and were sourced from motor nameplates, typical load factors, and estimated operational hours. Actual data logging is required to confirm these assumptions.
  5. Page 6 of 12

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 3 REDACTED Page 6 of 12 Eversource Energy – Madison, CT QGM Scoping Study May 2026, page 6 of 12 Estimated End Use Breakdown - Electricity Electric End Use Energy Use (kWh) Plug & Process 83,000 HVAC - Heating & Cooling 1,020,000 Lighting 190,000 CAIR 4,000 TOTAL 1,297,000 Lighting Equipment The entire site has been retrofitted with LED lighting and controls that appears to be in good working order. Equipment Inventory: Site equipment inventories were created to catalog the current equipment, as shown below: Tag Type AHU-1 AHU-2 Chiller 1 Air Handling Unit Air Handling Unit Chiller Condenser Condenser Variable Air Volume Box Exhaust Fan Air Handling Unit Packaged Roof Top Unit Exhaust Fan Exhaust Fan Electric Unit Heater Chilled Glycol Pump 1 Chilled Glycol Pump 2 VAV-1 EUH Eversource Madison CT HVAC Equipment Inventory Cooling Pump/ Manufacturer Model Serial # MBH CFM Notes Ton Fan HP Trane CSAA035UAC00 K11B16530 9.8 17,500 Buffalo Model G 10 20,000 Trane CGAM120F2R02A U18L71609 120 Mitsubishi Mr. Slim Trane XR Price SDV 12 0.25 1,300 Typical of mult. Cook 135 C15D 135 ACE 140PL45174 0.5 1,500 AAON RN-016-3 16 182 5 Trane TSC036G4RGA 202910323L 3 1 No heat Greenheck G-090-DGEX-QD 15402439 1 Centri Master P36L 1 5.1 Typical of 11 10 VFD control 10 VFD Site Energy Efficiency Measures/Recommendations EEM – 01 – Consider Building Management System Upgrade – Adaptive Optimal Start Adaptive/Optimal Start/Stop (AOS) is a control sequence available within modern Building Management Systems that allows the control system to iteratively “learn” the most optimal times to start up heating or cooling equipment so that the space is conditioned the minimum period of time required by occupancy. The example below is historical data from an example building, with the blue curve representing outdoor air temperature, the red curve, space temperature, and the green series lighting intensity (indicating occupancy). The blue rectangles highlight the unnecessarily long equipment ramp up and cool down periods in the “before” graph, while in the “after” graph with AOSS enabled, the equipment runs only as long as needed to meet occupied setpoints:
  6. Page 7 of 12

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  7. Page 8 of 12

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  8. Page 9 of 12

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 3 REDACTED Page 9 of 12 Eversource Energy – Madison, CT QGM Scoping Study May 2026, page 9 of 12 Next Steps: - It is recommended that the site discusses building shell survey and remediation with a specialized vendor. Sustainability Considerations Background Site and portfolio sustainability is best guided by the framework and methodology set forth in ASHRAE Standard 228-2023 Standard Method of Evaluating Zero Net Energy and Zero Net Carbon Building Performance (available for purchase here: https://www.ashrae.org/technical-resources/bookstore/ansi-ashrae-standard-228-standardmethod-of-evaluating-zero-net-energy-and-zero-net-carbon-building-performance). The site is not known to have a present net-zero strategy; however, the ASHRAE standard presents a strong method to: - Assess current building energy use and carbon emissions Establish a baseline Develop milestones Develop a plan to reach milestones The data and information shown below are intended to help develop an understanding of where current portfolio sustainability goal aligns with current position. Emissions Scopes Emissions reporting is generally addressed across three Emissions Scopes, as seen below:
  9. Page 10 of 12

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 3 REDACTED Page 10 of 12 Eversource Energy – Madison, CT QGM Scoping Study May 2026, page 10 of 12 An important aspect of developing a sustainability plan is the determination of which emissions scopes will be targeted for reduction. The majority of sustainability planning at the time of this report is focused on Scopes 1 and 2, although large corporations with significant supply and delivery chains have begun to address Scope 3 as well. The focus of the sustainability plan in this report is on Scope 1 and 2 emissions. ASHRAE Standard 228-2023 Standard Method of Evaluating Zero Net Energy and Zero Net Carbon Building Performance ASHRAE 228-2023 includes the following diagram illustrating energy flows into, from, and out of a site: The difference between energy flow into a site, and energy flow out, is site net energy. The primary goal of sustainability is to reduce this net energy, and therefore, net carbon emissions associated with the site and its operation. Sustainability Plan With a carbon baseline established and a goal and timeframe put in place, the next step is to develop a sustainability plan to reduce site net energy and carbon. A four-step plan, as outlined in an article from CBRE (Decarbonizing Commercial Real Estate | CBRE) and shown in the chart below, is recommended:
  10. Page 11 of 12

    No text on this page. It may be a picture of a page, such as a scan or a chart.

Text of UPA-001-SP01 Attachment 2 REDACTED.pdf

Extracted from the file · 11 pages, 4 without text · 10,526 characters

Text of UPA-001-SP01 Attachment 1 REDACTED.pdf

Extracted from the file · 13 pages, 3 without text · 17,141 characters

As listed on the current system

Question(s) Answered 1 thru 1 (Connecticut Light and Power Company dba Eversource Energy)(Supplemental/Revision) Date Filed: 10/07/2026

This filing on the current system (opens in a new tab)