Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 1 thru 1

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy14 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files14

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of UPA-001-SP01 Attachment 11 REDACTED.pdf

Extracted from the file · 24 pages, 4 without text · 36,138 characters

Text of UPA-001-SP01 Attachment 10 REDACTED.pdf

Extracted from the file · 19 pages, 4 without text · 27,484 characters

Text of UPA-001-SP01 Attachment 9 REDACTED.pdf

Extracted from the file · 24 pages, 5 without text · 30,898 characters

Text of UPA-001-SP01 Attachment 8 REDACTED.pdf

Extracted from the file · 17 pages, 5 without text · 22,701 characters

Text of UPA-001-SP01 Attachment 7 REDACTED.pdf

Extracted from the file · 14 pages, 4 without text · 17,187 characters

Text of UPA-001-SP01 Attachment 6 REDACTED.pdf

Extracted from the file · 13 pages, 3 without text · 14,512 characters

Text of UPA-001-SP01 Attachment 5 REDACTED.pdf

Extracted from the file · 14 pages, 4 without text · 17,555 characters

Text of UPA-001-SP01 Attachment 4 REDACTED.pdf

Extracted from the file · 16 pages, 4 without text · 19,788 characters

Text of UPA-001-SP01 Attachment 3 REDACTED.pdf

Extracted from the file · 12 pages, 4 without text · 11,899 characters

Text of UPA-001-SP01 Attachment 2 REDACTED.pdf

Extracted from the file · 11 pages, 4 without text · 10,526 characters

Words on different pages
  1. Page 2 of 13

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 1 REDACTED Page 2 of 13 Eversource Energy – Norwalk, CT QGM Scoping Study March 2026, page 2 of 13 General Facility Description Original construction of the building is dated to 1930. The main building has had recent renovations, including window replacements (3 of 4 sides of the building complete as of the date of this report) and door evaluation/replacement. Heating, ventilation, and air conditioning is provided by: - (1) packaged rooftop unit (RTU (2) direct fire natural gas Makeup Air Units (MAUs) (3) hanging hot water/chilled water (HW/CHW) Air Handling Units (AHUs) (16) HW/CHW Fan Coil Units (FCUs) in office perimeter areas (5) HW and (2) electric unit heaters (UHs) (3) Mitsubishi split systems for spot cooling Hot water is provided by (2) boiler plants: - (2) Fulton electric boilers (capacity unclear, rarely used) (2) 199 MBH Munchkin 199M R2 natural gas hot water boilers Chilled water is provided by (1) Trane CGAM040A2Q02 40-ton air cooled chiller. HW and CHW pumping is achieved through a constant volume duplex 1.5hp 2-pipe pumping system with seasonal changeover. Lighting systems are LED with motion/occupancy controls. Lighting controls are reported to be commissioned and functioning well. The maintenance garage/shop area is heated with direct-fire natural gas UHs and natural gas fired radiant heaters. Process equipment in the garage area includes (1) 10hp Hertz HBD7 high pressure air compressor, serving the pneumatic lifts and shop tools (regulated down to low pressure for tools). Typical building occupancy is 6:00 AM – 5:30 PM, Monday through Friday with limited to no weekend hours. 24hour occupancy occurs during emergency and storm events. Occupied building operations are estimated to be 3,400 annual hours. Monthly Billing Analysis Historical energy data was received in the form of natural gas bills for (2) accounts/meters on site, both listed as 9 Tindall Ave Norwalk, CT: - Eversource natural gas account 5713 584 0015 Eversource natural gas account 5772 893 0041 Bill examples included the past 13 months of natural gas metered use and billed cost, and all accounts were summed for overall site gas use. Electric use is metered but not billed at this site with annual use provided; use was modeled based on annual use, the site’s footprint, hours of operation, equipment and estimated utilization, and an example monthly load profile from a similar site.
  2. Page 3 of 13

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  3. Page 4 of 13

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 1 REDACTED Page 4 of 13 Eversource Energy – Norwalk, CT QGM Scoping Study March 2026, page 4 of 13 Source-site ratio per national average, source: https://portfoliomanager.energystar.gov/pdf/reference/Source%20Energy.pdf The EUI metric can be used to baseline existing energy use for future comparison or to compare this building to similar buildings of this type. Energy Star publishes median data by building type for overall comparison. Additionally, data was analyzed to understand the impact of weather (heating degree days (HDD)) and natural gas use (actual metered use) and heating degree days (HDD), as seen below: The first graph indicates a strong visual relationship between natural gas use and HDD, suggesting the majority of natural gas is used for building heating. Minor summer month natural gas use can likely be attributed to service hot water. The regression further shows that site natural gas use has a strong, statistically significant relationship to HDD, with an R2 value of 0.89. Similar analysis was used with Cooling Degree Days (CDD) to further estimate monthly electrical use. Below are graphs modeling a relationship between site electrical use and cooling degree days: The regression above was developed to help model monthly site electrical use. The R 2 regression shows a statistically significant relationship to CDD, with an R2 value of 0.89 as the sites’ usage is driven by the outside weather. The Department of Energy Superior Energy Performance (SEP) program qualifies that a statistical relationship exists with an R2 value of 0.75, suggesting this is a strong model fit.
  4. Page 5 of 13

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 1 REDACTED Page 5 of 13 Eversource Energy – Norwalk, CT QGM Scoping Study March 2026, page 5 of 13 Mechanical System Energy Use Breakdown Electric Use The following electric energy use breakdown was developed. These results should be considered high level and were sourced from motor nameplates, typical load factors, and estimated operational hours. Actual data logging is required to confirm these assumptions. The modeled profile accounts for all estimated electrical use. Estimated End Use Breakdown - Electricity Electric End Use Energy Use (kWh) Plug and Process Load 71,000 HVAC - Fans & Cooling 239,000 Lighting 120,000 TOTAL 430,000 Natural Gas Use The following site natural gas use breakdown was developed. As above, these results should be considered high level and were sourced from equipment nameplates, typical load factors, and estimated operational hours. Actual data logging is required to confirm these assumptions.
  5. Page 6 of 13

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 1 REDACTED Page 6 of 13 Eversource Energy – Norwalk, CT QGM Scoping Study March 2026, page 6 of 13 End Use Breakdown - Natural Gas Natural Gas End Use Energy Use (CCF) Comfort Heating 17,000 Service Hot Water 1,000 TOTAL 18,000 Equipment Inventory: Site equipment inventories were created based on data gathered during the study walkthrough and provided by facility staff: Boilers and Pumps: Eversource Tindall Ave Norwalk Boiler Equipment Quantity 1 2 Type Make Model Hydronic Boiler Fulton Hydronic Boiler Munchkin 199M R2 Max Max Input Output (MBH) (MBH) 199 Eversource Tindall Ave Norwalk Boiler Pumps Description Quantity HP Circulation Pump 2 3 Compressed Air: 159
  6. Page 7 of 13

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 1 REDACTED Page 7 of 13 Eversource Energy – Norwalk, CT QGM Scoping Study Make Model Hertz HBD 7 March 2026, page 7 of 13 Eversource Tindall Ave Compressor Inventory Estimated Estimated Compressor HP Capacity Cooling Voltage Annual Run Control Type (CFM) Hours 10 39.2 Recip Air Cooled 460 1,000 Eversource Tindall Ave Dryer Inventory Rated Type Make Model CFM Hertz HRD-US 40 40 Non-Cycling HVAC: Eversource Tindall Ave Equipment Inventory Tag Type RTU-1 Package Roof Top Unit - Natural Gas Heat MAU-1 Makeup Air Unit MAU-2 Makeup Air Unit AHU-1 Air Handling Unit AHU-2 Air Handling Unit AHU-3 Air Handling Unit Hot Water Heater Chiller Split System - Outdoor Condesor Split System - Indoor Wall Unit Split System - Outdoor Condesor Split System - Indoor Wall Unit Split System - Outdoor Condesor Split System - Indoor Wall Unit Exhaust Fan EXH-2 Exhaust Fan EF-18 Exhaust Fan EF-1 Exhaust Fan EF-2 Exhaust Fan Exhaust Fan EF-5 Exhaust Fan EF-8 Exhaust Fan EF-6 Exhaust Fan Manufacturer Model Serial # Trane Greenheck Greenheck Trane SFHLF25EHU10C5EF7 C20J06187 DG-109-H10 18525918 DG-110-H10 18525925 BCHC072E2B0A2 T07L75438 Carrier Rheem Ruud Trane Mitsubishi Mitsubishi Mitsubishi Mitsubishi Mitsubishi Mitsubishi Car-Mon ACME Greenheck Greenheck Greenheck Greenheck Greenheck Greenheck Greenheck 40RUSA12A1 E85-12-G CGAM040A 2Q02 PUZ-A12NKA7 PKA-A12HA7 SUZ-KA36NAHZ SVZ-KP36NA PUY-A24NHA7 PKA-A24FA CMB-20 PR11A8 G-180-B-6-1-19-X CUBE-141-3 GB-141-7 G-090-06 GB-180-7-1-30-X GB-180-3-1-30-x GB-180-20-1-30-x 251OU14606 CN0502RR0402E00105 U18F58895 Cooling Ton 25 MBH Fan HP CFM 2 0.75 6 2 2.4 60 40 2.5 0.06 1,590 0.1 0.33 0.12 3,880 910 635 81965 AN1775 3 2,400 18526714 18526800 21052806 18527120 18527176 18527168 0.33 0.75 0.17 0.75 0.33 2 1 14 3 40 29U04372 8YU11435A 2
  7. Page 8 of 13

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 1 REDACTED Page 8 of 13 Eversource Energy – Norwalk, CT QGM Scoping Study March 2026, page 8 of 13 Site Energy Efficiency Measures/Recommendations EEM – 01 – Continue Building Shell Gap Remediation Discussion with facility staff indicates there are ongoing projects to replace aged windows, as well as evaluate and replace deficient exterior doors (both man doors and bay doors) and door seals. Window replacement is complete on 3 sides of the building, and door seals have been replaced on 1 st floor exterior doors and bay doors. It is recommended that the facility continue with window replacement and door seal replacement, as well as consider survey for the building roof/wall intersections and any exterior wall penetrations: - Window replacement includes both higher R-value modern glass, as well as new air sealing Door seals wear out quickly, allowing outdoor air infiltration Roof/wall intersection, especially in aged buildings, allows significant outdoor air infiltration and thermal loss due to the stack effect where pressure differential due to roof elevation drives air movement Savings were estimated assuming improvements in thermal envelope as well as a reduction in outdoor air infiltration during both heating and cooling seasons, considering the already completed replacement of window systems and door seals: Estimated Annual Energy Savings: 4,500 kWh and 750 CCF Estimated Annual Cost Savings: $1,000 Estimated Implementation Costs: $20,000 including survey costs Next Steps: - Site staff are recommended to continue with ongoing building projects such as window replacement. - Site staff are encouraged to discuss additional building shell survey and remediation with a specialized vendor. - The site should also discuss this effort with a utility representative for possible incentives to offset some of the survey and implementation costs through the custom program. EEM – 02 – Consider Upgrading CHW and DHW Pumps & Install VFDs Hot water and chilled water distribution at the building is accomplished with a single duplex pumping plant on a 2-pipe system with seasonal changeover. The pumps are aged and run without controls as a constant volume system. It is recommended that the site consider replacing the existing pump motors with new higher efficiency motors and VFD controls. VFD control would allow the pumps to modulate power based on actual space heating and cooling demand. The addition of new two-way control valves at the terminal equipment would be required: existing three-way valves allow bypass of the equipment without reducing the flow, while recommended twoway valves would close flow to equipment not calling for heating or cooling, reducing actual system flow, and allowing pumps to modulate speed down to maintain a differential pressure setpoint.
  8. Page 9 of 13

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 1 REDACTED Page 9 of 13 Eversource Energy – Norwalk, CT QGM Scoping Study March 2026, page 9 of 13 Existing pumps are believed to run cycling year-round in a lead-lag setup. Savings assume an average 45% reduction pump motor demand and annual electrical energy use. This measure should be considered as an operational improvement as well as for energy savings. Estimated Annual Energy Savings: 4,000 kWh Estimated Annual Cost Savings: $600 Estimated Implementation Costs: $27,000 Next Steps: - Datalogging is recommended to confirm equipment loading assumptions and schedules. - The site is encouraged to discuss potential control upgrades with a reputable mechanical/controls vendor. EEM – 03 – Electrification - Convert Hot Water Unit Heaters with Split Systems Existing supplemental heating-only equipment consists of multiple HW unit heaters. It is recommended that facility staff consider replacement of these older units with split system heating and cooling or air source heat pumps. In addition to replacing the heating source for greenhouse gas reduction and reducing maintenance requirements, cooling could also be added to these spaces. Savings assume an estimated annual heating load to these units only of ~5,000 CCF: Estimated Annual Energy Savings: 5,000 CCF and -41,000 kWh Estimated Annual Cost Savings: n/a Estimated Implementation Costs: $75,000 Next Steps: - Eversource should review equipment selection with a mechanical vendor or local supplier if planning to self-install. - The site should also discuss this effort with a utility representative to determine potential electrification incentives. Additional Considerations Solar Generation Rooftop solar generation was considered for recommendation, offering a net reduction in site electrical use as well as renewable energy “curb appeal” visible from the street, but due to regulatory limitations from historical corporate mergers, Eversource CT sites are not able to have solar arrays on company buildings. Sustainability Considerations Background
  9. Page 10 of 13

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 1 REDACTED Page 10 of 13 Eversource Energy – Norwalk, CT QGM Scoping Study March 2026, page 10 of 13 Site and portfolio sustainability is best guided by the framework and methodology set forth in ASHRAE Standard 228-2023 Standard Method of Evaluating Zero Net Energy and Zero Net Carbon Building Performance (available for purchase here: https://www.ashrae.org/technical-resources/bookstore/ansi-ashrae-standard-228-standardmethod-of-evaluating-zero-net-energy-and-zero-net-carbon-building-performance). The site is not known to have a present net-zero strategy; however, the ASHRAE standard presents a strong method to: - Assess current building energy use and carbon emissions Establish a baseline Develop milestones Develop a plan to reach milestones The data and information shown below are intended to help develop an understanding of where current portfolio sustainability goal aligns with current position. Emissions Scopes Emissions reporting is generally addressed across three Emissions Scopes, as seen below: An important aspect of developing a sustainability plan is the determination of which emissions scopes will be targeted for reduction. The majority of sustainability planning at the time of this report is focused on Scopes 1 and 2, although large corporations with significant supply and delivery chains have begun to address Scope 3 as well. The focus of the sustainability plan in this report is on Scope 1 and 2 emissions. ASHRAE Standard 228-2023 Standard Method of Evaluating Zero Net Energy and Zero Net Carbon Building Performance ASHRAE 228-2023 includes the following diagram illustrating energy flows into, from, and out of a site:
  10. Page 11 of 13

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 1 REDACTED Page 11 of 13 Eversource Energy – Norwalk, CT QGM Scoping Study March 2026, page 11 of 13 The difference between energy flow into a site, and energy flow out, is site net energy. The primary goal of sustainability is to reduce this net energy, and therefore, net carbon emissions associated with the site and its operation. Sustainability Plan With a carbon baseline established and a goal and timeframe put in place, the next step is to develop a sustainability plan to reduce site net energy and carbon. A four-step plan, as outlined in an article from CBRE (Decarbonizing Commercial Real Estate | CBRE) and shown in the chart below, is recommended: The table below details the four-step plan with narrative descriptions and progress to date for the target site. Note that the process is by nature to be repeated for continuous improvement and consideration of new technologies:

As listed on the current system

Question(s) Answered 1 thru 1 (Connecticut Light and Power Company dba Eversource Energy)(Supplemental/Revision) Date Filed: 10/07/2026

This filing on the current system (opens in a new tab)