Interrogatory responses
Answers to questions 20, 22, 27, 28, 29, 30, 31, 34
Files10
UPA-020_Final.pdf
PDF · 198 KB · 5 pagesText searchable
Download UPA-020_Final.pdfRead the text of UPA-020_Final.pdf
UPA-022_Final.pdf
PDF · 225 KB · 9 pagesText searchable
Download UPA-022_Final.pdfRead the text of UPA-022_Final.pdf
UPA-022 Attachment 1.pdf
PDF · 89 KB · 3 pagesText searchable
Download UPA-022 Attachment 1.pdfRead the text of UPA-022 Attachment 1.pdf
UPA-022 Attachment 1.xlsx
Excel · 126 KBText searchable
Download UPA-022 Attachment 1.xlsxRead the text of UPA-022 Attachment 1.xlsx
UPA-027_Final.pdf
PDF · 201 KB · 8 pagesText searchable
Download UPA-027_Final.pdfRead the text of UPA-027_Final.pdf
UPA-028_Final.pdf
PDF · 125 KB · 2 pagesText searchable
Download UPA-028_Final.pdfRead the text of UPA-028_Final.pdf
UPA-029_Final.pdf
PDF · 182 KB · 7 pagesText searchable
Download UPA-029_Final.pdfRead the text of UPA-029_Final.pdf
UPA-030_Final.pdf
PDF · 241 KB · 6 pagesText searchable
Download UPA-030_Final.pdfRead the text of UPA-030_Final.pdf
UPA-031_Final.pdf
PDF · 184 KB · 4 pagesText searchable
Download UPA-031_Final.pdfRead the text of UPA-031_Final.pdf
UPA-034_Final.pdf
PDF · 186 KB · 3 pagesText searchable
Download UPA-034_Final.pdfRead the text of UPA-034_Final.pdf
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-07 Date Issued September 22, 2026 UPA-022 Page 1 of 9 Date Filed: October 06, 2026 Witness: Donald J. Scacco Jr., Digaunto Chatterjee, Douglas P. Horton, Matthew Nelson and Michael Goldman Request from: Public Utilities Regulatory Authority Question: Reference Application, Ex. CLP-IAP-1, p. 25. Identify the evidence Eversource relies upon to conclude that the proposed capital plan is affordable from the customer perspective and quantify the bill or energy-burden impact attributable to the proposed capital investment. Provide all supporting calculations and workpapers. Response: To conclude that the proposed capital plan is affordable, the Company followed the Three B’s discussed in response to UPA-021, i and relied on the following evidence: (1) the cost benchmarking performed by LEI (Exhibit CLP-PBR-3); (2) the Company's benefit-cost modeling of reliability investment (Exhibit CLP-TSP-1 & CLP-TSP-3); (3) application of the RE08 affordability test (notwithstanding the Company’s stated concerns with the methodological basis for this alleged threshold); (4) alignment with RE011; and (5) data showing that the distribution costs are not significantly impacting the volatility of customer bills (Exhibit CLP-IAP-1,atpage. 21–22; 48-49; Figures 2 and 4). Using the proposed “Three B’s Framework”, Eversource has provided the following evidence that the proposed capital plan is affordable: 1. “Burden” or impact on customers: a. The distribution portion of a typical residential bill has grown modestly in real terms -- about 9 percent from January 2015 to 2026 (about 0.8 percent per year), and about 0.2 percent in real terms from 2019 to 2026 (page 22, line. 11–17; page 48, line. 5–16; Figure 4). b. The bill volatility customers have experienced since 2021 came from supply and public-benefits charges, not distribution (page 21, line 3; page 22, line 7; Figure 2). c. Under the current multi-year plan, the ESI limited the bill impact of $2.7 billion of capital investment to less than $2 per month each year, on average, over 2018–2025 (page 60, line 12–16)Page 2
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-07 Date Issued September 22, 2026 UPA-022 Page 2 of 9 d. The most direct quantitative measure of customer affordability available to PURA is energy burden under the RE011 framework. The Company's five-tier lowincome discount is designed to hold participating customers' energy burden to roughly six percent (Exhibit CLP-IAP-1, at page 86, ll. 8–12; Exhibit CLPCUSTOMER-1). 2. “Budget” a. Structural protections in the proposal -- the Capital Funding Mechanism caps the level of capital revenue support during the PBMRP at the approved forecast in this proceeding and reconciles annually, but only downward, so customers pay the lesser of forecast or actual plant in service (page 61, line 14–18; page 87, line 3– 13; Exhibit CLP-ELP-1, at page 101–102). Amounts expended above the cap would be allowed in rates only prospectively from the date of a future prudence review and forward (in the context of a future rate case), imposing an element of regulatory lag on capital investments above the cap, and above forecasted levels. b. The proposed reliability investment satisfies the RE08 affordability test, notwithstanding the Company's concerns with the methodological basis for that threshold (UPA-021) (Exhibit CLP-IAP-7; Exhibit CLP-IAP-1, page 23, line 1– 19). 3. “Balance” a. The Company prioritizes reliability investment using a benefit-cost model that ranks work by customer benefit per dollar, so that the investment delivers the reliability it is meant to buy at an appropriate cost relative to alternatives (Exhibit CLP-TSP-1, page 34–35; Exhibit CLP-TSP-3, slide 34). See, also, the responses to UPA-024 ii through UPA-026. iii b. National and peer comparisons point the same way. LBNL's national study shows that 20 of 22 sampled utilities plan more spending on managing the existing system than on capacity expansion, and indirectly that Eversource is at the low end of planned capital growth among peers, and that New England's distribution rate pressure reflects a contracting sales base more than capital spending growth (Exhibit CLP-IAP-1, at page 46–47, 52–53; Exhibit CLP-IAP-4, at page 19, 21– 22, 30). LEI's benchmarking places CL&P's capital cost per customer below the national average and below the model-predicted benchmark (Exhibit CLP-PBR-3, at page 9 and 17). Once the plan is in place, the Company proposes to measure its performance against its own plan, accounting, territory and customer (Exhibit CLPIAP-1, at page 57, line 3–16; please refer to the response to UPA-031 iv).Page 3
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-07 Date Issued September 22, 2026 UPA-022 Page 3 of 9 Exhibit CLP-IAP-1 does not independently calculate the bill impact of the ongoing capital plan. However, the Company has provided total bill impacts by rate class in response to AMTRAK012 v. In that response, the total average bill impacts are 1.3%, 1.3% and 1.4% for Rate Years 2, 3, and 4 (UPA-022 Attachment 1, Line 66). For Rate Years 2 through 4, the revenue requirement associated with the proposed capital plan is recovered through the Capital Funding Mechanism. The table below isolates that component from the total revenue increases. The capital plan adds $67.2 million, $71.4 million and $74.5 million of incremental distribution revenue in Rate Years 2, 3 and 4 which represent 87%, 88%, and 89% of the estimated total distribution revenue increase for each Rate Year 2, 3, and 4. These are forecast amounts. Under the Capital Funding Mechanism, recovery is reconciled annually to the lesser of forecast or actual and can be adjusted downward only. ($ Millions) F-Factor Revenue Total Revenue Increase (F-Factor + I-X) F-Factor % of Total Rate Year 2 $67.2 $77.6 87% Rate Year 3 $71.4 $81.1 88% Rate Year 4 $74.5 $83.0 89% Prior Referenced Responses: i UPA-021 Question: Reference Application, Ex. CLP-IAP-1, p. 25. State whether Eversource proposes that the Authority consider the “Three Bs” (Budget, Burden, and Balance) and Investment Calibration Framework as the standard for evaluating affordability in this proceeding. If not, identify the existing Authority affordability standard Eversource believes should continue to govern and explain how Eversource proposes to apply the “Three Bs” and Investment Calibration Framework in conjunction with that standard. UPA-021 Response Yes, the Company is proposing that PURA consider the “Three B’s” and the “Investment Calibration Framework” as the standard for evaluating affordability in this proceeding. This framework is designed to: (1) retain the definition of customer affordability and low-income discount rate standards established in Docket No. 17-12-03RE11 (“RE11”), as further refined in subsequent proceedings; and (2) modifies and replaces the “unaffordability”i threshold from Docket 17-12-03RE08 (“RE08”) with a valid analytical framework, utilizing the Company’s benefit-cost analysis. The Company developed the benefit-cost analysis following Docket No. 17-12-03RE08 in combination with the prioritization of reliability investment, the inherent PBMRP design, and PURA’s balanced review of costs and benefits, applying the statutory standard of “just and reasonable rates” for safe and reliable service. This is an integrated framework that brings together the customer affordability, capital cost and reliability considerations that PURA already weighs so that these elements are assessed together.Page 4
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-07 Date Issued September 22, 2026 UPA-022 Page 4 of 9 The “Three Bs” are built on existing constructs and map to: “Budget” (a budgetary inflationary test, discussed in CLPIAP-1 as the affordability threshold in RE08, but also an element of the PBMRP design itself, as well as the RE08 benefit-cost analysis – discussed further below), “Burden” (low-income discount rates established under RE11), and Balance (general ratemaking principles). The framework organizes how those standards are applied together -- it does not replace these mechanisms with a single test. The framework has three steps, as discussed in Exhibit CLP-IAP-1, at page 17-20: 1. Budget: Is the cost reasonable? In this step, PURA first establishes whether the proposed level of spending is in a reasonable range, taking into account historical spending, input-cost escalation and the Company’s prioritization of investment (page 18, line 5–12). 2. Burden: What is the effect on customers? PURA then evaluates the resulting bill impacts and whether customers, particularly low-income customers, are protected. The Company does not propose to change PURA’s approach here. The low-income discount framework established in Docket No. 17-12-03RE11 continues to govern, as addressed in Exhibit CLP-CUSTOMER-1 (page 24, line 10–19). The RE11 energyburden analysis is also the most direct quantitative measure available to PURA of whether customers can bear the resulting bills. 3. Balance: Does the investment deliver safe and reliable service at the right level and pace? Lastly, PURA determines whether the investment avoids both underinvestment and overinvestment, so that each dollar buys a commensurate reliability or service benefit (page19, line 4–11; page 25, line 11–18). This is the step the framework adds, and it is where the Investment Calibration Framework applies (page 20, line 7–9). The Company supports the Reliability and Resilience Frameworks established in RE08, pursuant to which the Company has planned its reliability and resilience capital investment plan. The frameworks rely on and utilize the benefit-cost analysis the Company developed for that purpose, and a standardized case planning for a five percent SAIDI and SAIFI improvement, which the decision describes as an evaluation tool rather than an implementation directive (Exhibit CLP-TSP-1, at page 13, line 1–4; page 84, line 8; page. 85, line 3). The Company supports those frameworks, and the Balance step relies on them. The Company does not support the “unaffordability” threshold from RE08, as it is fundamentally flawed from a legal and factual perspective. Aside from the legal flaws, this threshold is unable to account for multiple drivers of cost over time, including changes in system need, asset age, weather exposure, electrification, or equipment prices that move differently from the chosen index. Moreover, its results vary materially depending on which inflation index is used (page 23, line 20; page 24, line 9). The Company proposes that, for capital planning, the RE08 benefit-cost framework, together with the PBMRP, serves the purpose potentially contemplated by PURA in Docket No. 17-1203RE08. The PBMRP escalates O&M by an inflation index net of productivity, and it caps capital at an approved forecast, which together provide disciplined budgets with predictable customer impacts. The benefit-cost framework measures that spending against the reliability benefits the investment is meant to buy. As the name implies, the Balance step is a balancing test, not a single numeric threshold, and it requires PURA’s judgment and discretion. The framework supplies the guideposts for that judgment, including a budget review of the Company’s benefit-cost analysis and prioritization of reliability investment (Exhibit CLP-ELP-1, at page 67, line 17– 19; Exhibit CLP-TSP-1); the RE011 energy-burden analysis; and a ratemaking mechanism that governs the pace of recovery and holds the Company accountable for results, which in this proceeding is the proposed PBMRP with its capital cap and reliability PIMs (Exhibit CLP-ELP-1, at page 50, line 1–9; page 101–102). Please refer also to the Company’s responses to UPA-024i, UPA-025i, and UPA-026i. This framework brings together multiple analyses thatPage 5
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-07 Date Issued September 22, 2026 UPA-022 Page 5 of 9 PURA already considers and is intended to provide the framework through which affordability is evaluated in this proceeding. ii UPA-024 Question: Reference Application, Ex. CLP-IAP-1, pp. 27–28. Explain how the Authority should determine whether a proposed capital investment is efficient for affordability purposes. Also, provide the following: a. b. Identify the specific cost, benefit, performance, or alternative-investment information Eversource recommends that the Authority considers in that evaluation; and explain how that comparison distinguishes an efficient investment from one that is “prudent and effective but not highly efficient.” UPA-024 Response: Exhibit CLP-IAP-1, uses three distinct terms (p. 28, ll. 9–18): prudent, effective and efficient. An investment is prudent if the decision was reasonable when made. It is effective if it delivers the reliability or service benefit it was meant to achieve. It is efficient if it delivers that benefit at an appropriate cost relative to the alternatives. The concept is that PURA should determine efficiency at three levels: (1) whether each project is the lower-cost way to meet its need; (2) whether the portfolio as a whole funds the highest-value work first within the approved budget; and (3) whether one investment can meet several needs. A. This approach asks that PURA consider the following in determining whether a proposed capital investment is efficient for affordability purposes: • Cost: Project cost estimates, unit costs compared with the Company’s own history and a lifecycle cost, including the O&M the investment avoids or adds. • Benefit: Expected reliability improvement (SAIDI, SAIFI, customer minutes of interruption avoided), monetized customer interruption costs, safety and risk reduction, and capacity needed to meet State policy such as electrification. • Performance: Historical results after installation compared with the forecast benefit (p. 57, ll. 3–8). Those results also feed back into the Company’s benefit-cost model, recalibrating its estimates of reliability benefit per dollar over time. • Alternatives: Repair versus replacement, non-wires alternatives, deferral with a stated risk, different technology, and bundling of work to reduce mobilization and outage costs. • Prioritization: The rationale for ranking work, such as customer benefit per dollar within the budget. The Company’s benefit-cost model evaluates historic outages zone by zone rather than circuit by circuit, uses the Company’s data on upgrades made over the past 20 years to estimate SAIDI and SAIFI benefits per dollar, and can be run against a stated reliability objective (Ex. CLP-TSP-1, p. 34, ll. 6–16). The Company’s model compares work types at the device level, including reconductoring and backbone and lateral automation (TSP-1 p. 60, ll. 3–7). Resiliency work is ranked using an All-In SAIDI model that combines blue-sky and grey-sky SAIDI with a 1-in-10-year catastrophic storm (Ex. CLP-ELP-1, p. 62, ll. 16–22; p. 72, ll. 10–18).Page 6
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-07 Date Issued September 22, 2026 UPA-022 Page 6 of 9 • Multi-Needs: Efficiency also includes whether one investment can meet several needs. Replacing an aging asset with one sized for expected load, such as electrification, can avoid a second investment later, while like-for-like replacement can be the lower-cost choice where that need is not expected. The Company’s plan targets locations with multiple needs, such as asset health, capacity, voltage and reliability, so that one investment resolves them together (Ex. CLP-TSP-3, slide 34). • Metrics: The Company’s plan also uses cost-efficiency metrics such as dollars per customer-minute of interruption saved, risk-based analytics that weigh the probability and consequence of failure, and planning at the protection-device (zone) level (Ex. CLP-TSP-3, slide 34). To track efficiency after investments are made, the Company has also proposed reporting metrics for capital expense per customer and per line mile, alongside its reliability performance incentive mechanisms, as sponsored by the Leadership Panel (Ex. CLP-ELP-1, p. 103, ll. 10–16; Ex. CLP-ELP-3). The Company’s planning applies this comparison. For each zone, the model identifies the most cost-effective upgrade, which could be anything from tree trimming to a full rebuild (Ex. CLP-TSP-1, p. 34, ll. 16–18). For capacity projects, planners use every available load transfer among stations before upgrading a substation transformer (TSP-1 p. 34, l. 21 – p. 35, l. 3). The Company’s resiliency proposal illustrates the comparison. Spacer cable reconductoring delivers nearly two-thirds of the resiliency benefit of undergrounding for about one-third of the cost (Ex. CLP-ELP-1, p. 63, ll. 14–18). The hardening program is projected to avoid approximately 12.4 million customer-minutes of interruption per year, about $37.1 million per year at the Company’s estimate of $3 per customer-minute (ELP-1 p. 64, ll. 8–11). Both undergrounding and spacer cable would be effective; spacer cable is the more efficient choice for most zones. B. Distinguishing “efficient” from “prudent.” The benefit of an investment is harder to measure than its cost. Refer to Ex. CLP-TSP-1, p. 86, ll. 4–7. The benefitcost analysis reduces uncertainty; it does not eliminate it. Distribution assets serve customers for decades, and decisions about them are made with the information available today. Not every capital investment is made to improve measured reliability. Connecting new customers, adding capacity to serve load growth or to host distributed generation, and relocating facilities for public works projects are required to provide service, and their benefit does not appear in outage metrics. Further the benefits of a reliability or resiliency investment depend on events whose location and timing cannot be known in advance, so a sound investment may show little measurable benefit over a narrow period. For that reason, effectiveness is better assessed over time and across the system than project by project. The reliability metrics the Company proposes measure performance at the system level (Ex. CLP-ELP-3). The Company refines its estimates as performance data accumulate. The benefits of an asset that may be in service for decades are spread across the many outages it helps avoid. Efficiency asks the further question of whether the same benefit could have been obtained at lower cost, or whether a higher-value project was displaced. An investment can be prudent and effective but not highly efficient where, for example, an asset is replaced when a targeted repair would have maintained performance, or where a project with lower benefit per dollar is funded ahead of one with higher benefit per dollar. The comparison that distinguishes efficient from effective is therefore made when the work is planned: the ranking of projects by benefit per dollar and the consideration of lower-cost alternatives. Cost-efficiency must also be looked at with a long-term lens. Without programmatic or technological changes, PURA should expect the marginal benefit per dollar to decline over time as the highest-value work is completed. A declining ratio across the plan is not by itself evidence of inefficiency; the relevant check is that the portfolio remains ordered by value and that funded projects continue to produce net benefits. Two factors offset that decline. As performancePage 7
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-07 Date Issued September 22, 2026 UPA-022 Page 7 of 9 results feed back into the model, its estimates become more precise, allowing investment to be targeted more exactly. And the model becomes more important, not less, once the most obvious opportunities have been completed. When reviewing this model, three features safeguard against a benefit-cost model being tilted toward more spending. First, the model’s benefit estimates come from the Company’s own data on upgrades made over the past 20 years (Ex. CLP-TSP-1, p. 34, ll. 10–12; Ex. CLP-ELP-1, p. 67, ll. 17–19). Second, customer outage costs are valued using Lawrence Berkeley National Laboratory’s Interruption Cost Estimate calculator, an independent source (Ex. CLPTSP-1, p. 39, ll. 9–13), and inputs such as the value per customer-minute are on the record for review. Third, results are checked after the fact: the amount of revenue support provided for ongoing capital investments for the duration of the PBMRP capital is capped at the approved forecast, reliability is measured through the proposed SAIDI, SAIFI and customer reliability PIMs, and performance is reported annually (Ex. CLP-ELP-1, p. 50, ll. 1–9; pp. 101–102). The Company has also noted that AMI data would improve its ability to measure the benefit customers actually experience from automation investments (Ex. CLP-TSP-1, p. 86, ll. 4–11). iii UPA-026 Question: Reference Application, Ex. CLP-IAP-1, p. 54. Explain the analytical basis for concluding that CL&P’s below-average capital spending reflects a “drift toward under-investment.” Identify the specific reliability, asset-condition, performance, or investment-need used to distinguish efficient below-average spending from underinvestment. Provide all supporting calculations and workpapers. UPA-026 Response: Underinvestment and efficiency are separate questions. Underinvestment means investing less than the system needs, given its age, condition, load, weather exposure and the reliability objectives set for it (see the response to UPA-025iii). Efficiency relates to whether each dollar spent buys a commensurate benefit (Ex. CLP-IAP-1, p. 85, ll. 5–7). A comparison of spending to an average, whether of peers or of the Company’s own history, does not by itself establish either one. In the near term, under-investment can also constitute cost discipline (Ex. CLP-IAP-1, p. 35, ll. 1–6). What indicates whether lower spending is meeting system need is how the system is performing, i.e., whether reliability is stable or improving, or declining. As explained in the response to UPA-025, this is a judgment based on several signals, not a single threshold: Reliability Stable or Improving Reliability Declining Spending below peer average Lower spending is meeting system need. Most likely where input prices are stable, the utility can lock in long-term procurement, load is changing slowly, and assets are not yet at end of life. Under-investment signal. Deferred work is showing up as reduced performance. Spending above peer average Investment catching up or improving performance. The test is whether each dollar buys a commensurate benefit. Over-investment signal. Spending is not producing results. CL&P is not operating in the stable environment described by the “spending below peer average” and “reliability stable or improving” quadrant above (the upper left quadrant). Rather, it is moving toward the “spending below peer average” and “reliability declining” quadrant. Distribution equipment prices have risen well above general inflation, are changing, and much of the asset base is at or near end of life (Ex. CLP-IAP-1, p. 45, l. 18 – p. 46, l. 9; Ex. CLPELP-1, p. 42, ll. 4–20). Blue-sky SAIDI was 77.5 minutes in 2025, against a 2021–2025 average of 71.1 minutes,Page 8
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-07 Date Issued September 22, 2026 UPA-022 Page 8 of 9 which indicates that SAIDI may be showing signals of decline (Ex. CLP-TSP-1, p. 76, Table 1), while SAIFI remained flat (Ex. CLP-ELP-1, p. 48, 11ll. 3-9). It is important to note, however, that external factors also affect SAIDI/SAIFI performance and this must be factored into the analysis. Below-average capital spending together with reliability showing initial signs of decline indicates that there is a need for elevated levels of investment in the future. The specific signs Exhibit CLP-IAP-1 relies upon are (page citations are to Ex. CLP-IAP-1 unless noted): 1. Constrained investment period. The Company refrained from increasing its distribution investment in recent years (Ex. CLP-IAP-1, p. 12, ll. 13–16). 2. Equipment cost inflation. Because of the equipment price increases noted above, a similar nominal budget supports less work over time (p. 45, l. 18 – p. 46, l. 9). 3. O&M pattern. Higher O&M relative to peers, alongside modest capital spending, can be consistent with an aging system that needs more maintenance to stay in service (p. 56, ll. 7–10), although cross-utility O&M comparisons also reflect differences in service territory characteristics, regulatory requirements, company capitalization policy, labor costs and policy-program accounting (pp. 54–56). Increasing emergent failures also take resources away from proactive replacement (Ex. CLP-TSP-1, p. 22, ll. 14–16). 4. Asset condition and reliability. The Company’s planning testimony documents an aging distribution system, with major asset classes at or beyond their expected service lives, rising equipment failures, and reliability that remains in the top quartile but has begun to slip, (Ex. CLP-ELP-1, pp. 42, 48–49; Ex. CLP-TSP-1, p. 35; Ex. CLP-TSP-3, slide 58). The asset-level detail is presented by the Leadership Panel and the System Engineering Panel. The point for the framework is the direction of those indicators. The data show a pattern associated with the underinvestment side of the calibrated range rather than one of stability or overinvestment. Taken together, these signs place CL&P within the calibrated range but moving toward its underinvestment side. Exhibit CLP-IAP-1’s opinion is directed at the framework and at whether the proposed plan sits within the calibrated range; it is not centered on the amount of investment the Company has identified (p. 16, ll. 10–15). The support for the specific amounts proposed is presented in the Company’s planning testimony (Exs. CLP-ELP-1; CLP-TSP-1 through TSP-3) Exhibit CLP-IAP-1 did not rely on separate calculations for this conclusion; it relies on the record evidence cited above, including the LEI benchmarking results and workpapers (Ex. CLP-PBR-3) and the reliability data in Ex. CLP-TSP-1, Table 1. iv UPA-031 Question: Reference Application, Ex. CLP-IAP-1, pp. 56–57. Clarify the role Eversource recommends for peer benchmarking after implementation of a multi-year rate plan. Specifically, state whether Eversource recommends continuing peer benchmarking as an ongoing performance measure, using it periodically for comparative analysis, or relying primarily on CL&P’s approved plan and historical performance to measure performance over time. UPA-031 Response: The Company recommends relying primarily on CL&P's approved plan and its own historical performance to measure cost-efficiency performance over the plan term. While peer benchmarking may be used periodically for comparative analysis, such as in preparation for a future rate case, the Company does not recommend peer benchmarking as anPage 9
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-07 Date Issued September 22, 2026 UPA-022 Page 9 of 9 ongoing measure of cost efficiency or affordability performance, primarily due to the lack of a platform for establishing reliable comparability. However, the Company does and will continue to benchmark system and customer reliability metrics against peer utilities, as these industry-standard measures provide meaningful and actionable comparisons of service performance. Once a multi-year plan is established, the Company’s progress towards achieving additional cost efficiencies should be measured against a Company-specific baseline, including: Core Operating Expense per customer against a baseline escalated by an inflation-based benchmark, capital spending against the approved plan, and reliability against the plan's commitments, with regular public reporting (Ex. CLP-IAP-1, p. 57, ll. 3–8). Refer to the Company’s response to CLF-AC-005iv). These metrics reflect the Company’s efforts to improve cost efficiency during the PBR term. Peer benchmarking, however, is comparative so the Company’s comparative standing against its peers could be driven by changes outside the control of the Company, such as poorer cost control by other utilities. In addition, the expense of continuous cost efficiency peer benchmarking could negatively impact consumer dividend by adding expense throughout the PBR term without significant benefit to customers through improved cost efficiency. Therefore, while peer benchmarking is useful for assessing cost efficiency on a periodic basis, for the purpose of annually assessing cost efficiency and affordability performance during the PBR term the Company has proposed to measure performance against the proposed baselines. The Company continues to benchmark against peers in other areas, including reliability and customer satisfaction. The Company has also proposed reporting-only cost-efficiency metrics for the plan term (Ex. CLP-ELP-1, p. 112, Table 5; Ex. CLP-ELP-3). Also refer to the Company’s response to UPA-022iv. v AMTRAK-012 Question: Provide illustrative examples showing how a positive or negative adjustment under each mechanism identified in AMTRAK-11 would be reflected in customer rates and customer bills during the PBMRP term. AMTRAK-012 Response: Year 2 Total (Column AS) is due entirely to Rate Year 2 incremental distribution revenue (Column L) found on Page 1. All other rates and mechanisms (Columns O through AQ) are included for completeness of understanding the illustrative total bill, but do not impact the allocation of illustrative distribution revenue increases to customer classes. Therefore, all other mechanisms included in Attachment 1 are held constant. Lastly, Rate Year 3 Total differs from Rate Year 2 by the incremental Rate Year 3 distribution revenue only, while Rate Year 4 Total differs from Rate Year 3 by the incremental Rate Year 4 distribution revenue only.
Text of UPA-027_Final.pdf
Extracted from the file · 8 pages · 26,379 characters
Text of UPA-028_Final.pdf
Extracted from the file · 2 pages · 3,417 characters
Text of UPA-029_Final.pdf
Extracted from the file · 7 pages · 19,032 characters
Text of UPA-030_Final.pdf
Extracted from the file · 6 pages · 17,279 characters
Text of UPA-031_Final.pdf
Extracted from the file · 4 pages · 11,735 characters
Text of UPA-034_Final.pdf
Extracted from the file · 3 pages · 9,123 characters
As listed on the current system
Question(s) Answered 20, 22, 27, 28, 29, 30, 31, 34 (The Connecticut Light and Power Company) Date Filed: 10/07/2026