Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 21, 23, 24, 25, 26, 33, 35

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy8 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files8

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of UPA-025_Final.pdf

Extracted from the file · 5 pages · 14,152 characters

Words on different pagesRead the text of UPA-025_Final.pdf

Text of UPA-026_Final.pdf

Extracted from the file · 5 pages · 13,285 characters

Words on different pagesRead the text of UPA-026_Final.pdf

Text of UPA-033_Final.pdf

Extracted from the file · 5 pages · 15,217 characters

Words on different pagesRead the text of UPA-033_Final.pdf

Text of UPA-035_Final.pdf

Extracted from the file · 1 page · 870 characters

Words on different pagesRead the text of UPA-035_Final.pdf
Words on different pages
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 UPA-035 Attachment 1 Page 1 of 1 ASHRAE Energy Audit Levels 1 & 2 Comparison with QGM Energy Efficiency Scoping Studies ASHRAE Audit Component Data Review Utility Consumption Energy Use Intensity Benchmark End Use Consumption Review of Facility Drawings/Ops Logs Site Inspection Walkthru of Major mechanical, electrical and lighting systems Name plate inventory Operating parameters Spot measurements Interviews Brief discussion with building staff on operating hours and obvious comfort/system issues In depth interviews with key operational and maintenance staff to uncover hidden control strategies, scheduling gaps, or recurring complaints Deliverables Potential Energy Efficiency Measures (EEM's) ROM of cost savings Complete list of practical EEM's Engineering calculations Implementation costs Simple payback ASHRAE Level 1 ASHRAE Level 2 QGM Scoping Study x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

As listed on the current system

Question(s) Answered 21, 23, 24, 25, 26, 33, 35 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/07/2026

This filing on the current system (opens in a new tab)