Interrogatory responses

Answers to questions 82

Files25

Search terms highlighted
Eversource rate increase is on 78 pages across 25 files of the text below, highlighted. Go to the first matchClear highlighting
6 pages match
1 page match
1 part match

Text of UPA-082 Attachment 2.pdf

Extracted from the file · 23 pages · 67,705 characters

Text of UPA-082 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of UPA-082 Attachment 3.pdf

Extracted from the file · 9 pages · 27,920 characters

Text of UPA-082 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of UPA-082 Attachment 4.pdf

Extracted from the file · 21 pages · 52,991 characters

Text of UPA-082 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

4 pages match
  1. Page 1 of 21

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-14 Date Issued October 20, 2026 UPA-082 Attachment 5 Page 1 of 21 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 PBMRP # (PBR Only) Rate Year within PBMRP Rate Year Beginning Rate Year Ending (A) (B) (C) RY 1 7/1/2027 6/30/2028 Return on Equity Utility Operating Income Average non-storm investment base Return on Rate Base Weighted Average Cost of Debt & Preferred Equity Component of Return Equity portion of capitalization Return on Equity Rolling Cumulative Average Annual Return on Equity Additional Revenue/Cost savings to earn allowed ROE Illustrative Utility Financial Results ($ Millions) 21-05-15RE01 x=-1.39% (D) (E) (F) (G) PBMRP 2 PBMRP 1 RY 2 RY 3 RY 4 RY 1 7/1/2028 7/1/2029 7/1/2030 7/1/2031 6/30/2029 6/30/2030 6/30/2031 6/30/2032 (H) 464 6,889 6.73% 2.26% 4.47% 53.00% 8.44% 8.44% 41 484 7,270 6.66% 2.26% 4.40% 53.00% 8.30% 8.37% 51 499 7,680 6.50% 2.26% 4.24% 53.00% 8.00% 8.25% 70 512 8,111 6.31% 2.26% 4.05% 53.00% 7.63% 8.09% 96 560 8,562 6.54% 2.26% 4.28% 53.00% 8.08% 8.09% 73 Line 41 Customer and Other Operating Revenue 1,826 1,906 1,980 2,049 2,173 Line 54 Less: O&M and payroll taxes Depreciation Property Taxes Regulatory Asset Amortization Uncollectible Expense Gross earnings taxes Income Taxes Utility Operating Income Interest costs supporting non-storm rate base Utility Net Income 588 369 159 3 19 129 97 464 153 311 604 391 168 3 20 135 101 484 161 323 620 415 178 3 20 140 104 499 170 329 636 441 187 3 21 145 104 512 180 332 653 467 196 3 21 154 119 560 190 370 Revenue, Uncollectible, and Gross Earnings Tax Rate Year Beginning Rate Year Ending 7/1/2027 6/30/2028 7/1/2028 6/30/2029 7/1/2029 6/30/2030 7/1/2030 6/30/2031 7/1/2031 6/30/2032 $ 1,471 20 336 $ $ $ $ 1,826 29 1,798 $ Worksheet 'COS-1 Total' Line 55 Line 17 / Line 18 Worksheet 'RE01-6 Going-In Capital RR' Line 79 Line 19 - Line 20 Worksheet 'RE01-6 Going-In Capital RR' Line 75 Line 21 / Line 22. = Realized (per books) Return on Equity [(1 + Current ROE) x (1 + Prior Cumulative Average ROE)]^(1/# Years Elapsed) -1 (9.25% less Line 22) x (Line 17 x Line 21) x 1.3796 Income Tax Gross-up Utility Financial Results (Excludes Catastrophic Storm): Prior Period Revenue Annual Incremental PBR Rate Case #1 (Docket No. 26-05-10) Subsequent rate cases Current Period Revenue Other Revenue Included Above Distribution Revenue $ Uncollectible Expense Going In Uncollectible Expense Incremental Uncollectible Expense, Total 0.58% Gross earnings taxes Going In Gross earnings taxes Incremental Gross earnings taxes, Total 7.05% $ 19.2 0.1 19.4 $ 127.7 1.4 129.0 1,826 80 1,906 73 1,980 69 2,049 Sum Worksheet 'COS-1 Total' Lines 17 through 20 Worksheet 'COS-1 Total' Line 22 Worksheet 'COS-1 Total' Line 23 Worksheet 'COS-1 Total' Line 21 Line 60 Line 64 (Line 30 less sum Lines 34 through 39 less Line 42) x .2752 Line 30 less sum Lines 34 through 40 Worksheet 'COS-1 Total' Line 25 Line 41 - Line 42 Revenue Requirement t-1 + Other Revenue Worksheet 'RE01-1 Total PBRA' Line 41 Exhibit CLP-REVREQ-2, Schedule C-1.0, Column D, Line 19, Adjusted (See Note) 1,906 29 1,878 $ 19.2 0.6 19.8 $ 127.7 7.0 134.7 $ 1,980 29 1,951 $ 19.2 1.0 20.3 $ 127.7 12.2 139.9 $ 2,049 29 2,020 $ 19.2 1.4 20.7 $ 127.7 17.1 144.7 125 2,173 29 2,144 Worksheet 'COS-1 Total' Line 97 less Line 49 Exhibit CLP-REVREQ-2-A,B,C,D Schedules $ 19.2 2.1 21.4 $ 127.7 25.8 153.5 $ Revenue Requirement t + Other Revenue Exhibit CLP-REVREQ-2, Schedule C-3.1, Line 42 Line 54 - Line 55 Lines 50, 53 cumulatively x Line 59 column B Line 58 + Line 59 Exhibit CLP-REVREQ-2-A,B,C,D Schedules Lines 50, 53 cumulatively x Line 63 column B Line 62 + Line 63 Note: for analytical purposes in this illustrative model, the Company has adjusted the revenue requirement to use the currently approved ROE (9.25%) and currently approved equity capitalization (53.0%) and for capital investment placed in-service after 12/31/2026
  2. Page 2 of 21

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-14 Date Issued October 20, 2026 UPA-082 Attachment 5 Page 2 of 21 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 ILLUSTRATIVE PERFORMANCE-BASED RATE ADJUSTMENTS (PBRA) Revenue Summary ($, Millions) Description MRP 1 Per Docket No. 26-05-10 PBRA 1 PBRA 2 PBRA 3 July 1, 2027 July 1, 2028 July 1, 2029 July 1, 2030 (A) Going-In Revenue Requirements Operating Revenue Requirement Less: Other Revenues Distribution Revenue Requirement (C) (B) $ $ Total Performance Based Revenue Adjustment: Total Performance Based Revenue Adjustment, $ Total Performance Based Revenue Adjustment, % Target Base Revenue Requirement: Total PBRF Revenue Requirement Adjustment Target Base Revenue Requirement, Prior Year Target Base Distribution Revenue Requirement, Current Year $ $ 19.6 (G) $ $ 1,799.3 (19.6) (3.8) (64.0) 1,711.9 3.50% 59.9 19.6 19.6 Reference (F) (E) 1,808.6 28.9 1,779.8 I-X Adjustment: Going-In RR / Prior-Year RR thereafter Exclude CT-Bar Exclude Regulatory Assets & Liabilities Exclude Catastrophic Storm Costs Revenue Base for I-X-CD Adjustment I-X-CD percentage adjustment I-X-CD Adjustment CT-Bar Adjustment: Cumulative CT-Bar Revenue Adjustment, $, prior Incremental CT-Bar Revenue Adjustment, $ Cumulative CT-Bar Revenue Adjustment, $ (D) MRP 2 Rate Case #2 Effective July 1, 2031 $ $ $ $ 19.6 $ $ 1,799.3 $ 19.6 20.1 39.6 1,879.3 (39.6) (3.8) (64.0) 1,771.8 2.90% 51.3 $ $ 80.0 $ 4.4% 80.0 1,799.3 1,879.3 $ $ 39.6 21.9 61.5 1,952.5 (61.5) (3.8) (64.0) 1,823.1 2.48% 45.2 Exhibit CLP-REVREQ-2, Schedule C-1.0, Column D, Line 19, Adjusted. Column F per COS-1 Total, Line 97. (See Note) Exhibit CLP-REVREQ-2, Schedule C-3.1, Line 42 Line 18 - 19 Line 20 (Going-In RR) for PBRA 1, thereafter Line 43, prior period Line 34, prior period Exhibit CLP-REVREQ-2, Schedule C-3.0, Column F, Line 58, including return on rate base Exhibit CLP-REVREQ-2, Schedule C-3.0, Column F, Line 43+44. See Note XXX Line 23 + Line Line 24 + Line 25 + Line 26 Worksheet 'RE01-2 Inflation', Line 27 Line 27 x Line 28 Line 34, prior period $ 61.5 23.9 85.4 73.2 $ 3.9% 69.1 3.5% Line 29 + Line 33 73.2 1,879.3 1,952.5 $ 2,173.3 28.9 2,144.4 $ $ 69.1 1,952.5 2,021.6 Worksheet 'RE01-3 CT-Bar Summary', Line 50 Line 32 + Line 33 Line 37 / Line 43, prior period Line 37 Line 43, prior period Line 41 + Line 42 Note: for analytical purposes in this illustrative model, the Company has used the currently approved Return on Equity (9.25%) and currently approved equity capitalization (53.0%) Due to RE01's treatment of interim-period and rate year 1 capital in CT-bar, Going-In revenue requirements are also adjusted to exclude investment after 12/2026, which is assumed to be the cutoff for investment included in base rates. Amount shown for MRP 2 (Column F), effective July 1, 2031, per Worksheet 'COS-1 Total', Line 97.
  3. Page 3 of 21Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-14 Date Issued October 20, 2026 UPA-082 Attachment 5 Page 3 of 21 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ILLUSTRATIVE PERFORMANCE-BASED RATE ADJUSTMENTS (PBRA) Annual I-X-CD Percent Change GDP (66.9% Share)* Q1 Q2 Q3 Q4 Year-end average Annual Growth Annual Inflation % Change Productivity Factor Consumer Dividend ** Total, for use July 1 following year Impose cap if Inflation >5% Capped Total, for use July 1 following year 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 121.3 121.9 122.9 123.4 122.4 124.4 125.2 125.7 126.5 125.4 2.5% 127.6 128.3 129.5 130.6 129.0 2.8% 131.8 133.9 134.8 135.5 134.0 3.9% 136.2 136.9 137.6 138.2 137.2 2.4% 138.8 139.5 140.0 140.5 139.7 1.8% 141.0 141.4 141.9 142.3 141.6 1.4% 142.8 143.2 143.7 144.1 143.4 1.3% 144.6 145.0 145.5 145.9 145.3 1.3% 146.4 146.9 147.3 147.8 147.1 1.3% Rates Effective 7/2028 7/2029 7/2030 2.41% 1.81% 1.39% 1.39% 1.39% 1.39% -0.30% -0.30% -0.30% 3.50% 2.90% 2.48% 0.00% 0.00% 0.00% 3.50% 2.90% 2.48% 1.26% 1.39% -0.30% 2.35% 0.00% 2.35% 1.27% 1.39% -0.30% 2.36% 0.00% 2.36% 1.27% 1.39% -0.30% 2.36% 0.00% 2.36% 3.88% * Forecast per Moody's. Forecast used for analytical purposes only within this model. See Worksheet "RE01-7 GDP". Actual PBR annual rate adjustments rely on actual figures published by the Bureau of Economic Analysis, not projected ** Consumer dividend used for this analysis is 30 basis points for simplicity. It does not capture the Company's proposal to increase as the Company achieves operating efficiencies nor a tiered approach contemplated in the PFD
  4. Page 4 of 21

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-14 Date Issued October 20, 2026 UPA-082 Attachment 5 Page 4 of 21 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 ILLUSTRATIVE PERFORMANCE-BASED RATE ADJUSTMENTS (PBRA) Illustratve CT-Bar Calculation Summary (A) CT-Bar Depreciation Offset Going-In Depreciation Expense I-X-CD I-X-CD, cumulative CT-Bar Depreciation Offset (B) (C) (D) (E) (F) Interim Period $ 137 Rate Year 1 $ 348 Rate Year 2 $ 348 3.50% 3.50% $ 360 Rate Year 3 $ 348 2.90% 6.50% $ 370 Rate Year 4 $ 348 2.48% 9.14% $ 379 $ 137 CT-Bar Plant Additions Plant Additions Depreciation Offset CT-Bar Additions CT-Bar Additions, Monthly Per Worksheet 'PBR-6 Capital Forecast' 2027 Jan 1 Jun 30 317 (137) 180 30 317.1 Revenue Requirement Depreciation Expense Property Taxes Pretax Return on Rate Base CT-Bar Revenue Requirement, excl Uncol & GET Uncollectible Gross Earnings Tax Total CT-Bar Revenue Requirement Rates Effective Cumulative Revenue Requirement, inc. GET/Uncoll Annual Incremental Revenue Requirement, inc. GET/Uncoll $ 348 Rate Year 1 2027 2028 Jul 1 Jan 1 Dec 31 Jun 30 317 348 (174) (174) 143 174 24 29 317.1 347.9 Rate Year 2 2028 2029 Jul 1 Jan 1 Dec 31 Jun 30 348 367 (180) (180) 168 188 28 31 347.9 367.4 Rate Year 1 2027 2028 Jul 1 Jan 1 Dec 31 Jun 30 4.7 7.7 2.2 3.5 6.9 11.2 0.0 0.1 0.5 0.9 7.4 12.1 Rate Year 2 2028 2029 Jul 1 Jan 1 Dec 31 Jun 30 10.9 14.2 5.0 6.5 15.9 20.7 0.1 0.1 1.2 1.6 17.2 22.4 Rate Year 1 Rate Year 2 Rate Year 3 Rate Year 4 7/1/2027 $ 19.6 19.6 7/1/2028 $ 39.6 20.1 7/1/2029 $ 61.5 21.9 7/1/2030 $ 85.4 23.9 (G) (H) (I) (J) (K) Amounts shown are in 6-month increments to bridge the capital forecast provided on a calendar year basis with revenue requirement calculations on a rate year basis Interim period per Worksheet 'COS-2 Capital' Line 38, thereafter per Worksheet 'RE01-6 Going-In Capital RR' Line 13 Worksheet 'RE01-2 Inflation' Line 27 (1 + Line 17) x (1 + Line 18 prior period) minus 1 Line 16 x (1 + Line 18) Rate Year 3 2029 2030 Jul 1 Jan 1 Dec 31 Jun 30 367 390 (185) (185) 182 205 30 34 367.4 390.3 Rate Year 3 2029 2030 Jul 1 Jan 1 Dec 31 Jun 30 17.7 21.3 8.1 9.7 25.8 31.1 0.2 0.2 2.0 2.4 27.9 33.6 Rate Year 4 2030 2031 Jul 1 Jan 1 Dec 31 Jun 30 390 405 (190) (190) 201 216 33 36 390.3 405.3 Rate Year 4 2030 2031 Jul 1 Jan 1 Dec 31 Jun 30 25.1 29.0 11.5 13.2 36.6 42.3 0.2 0.3 2.8 3.2 39.6 45.8 Worksheet 'RE01-6 Going-In Capital RR' Line 24 Line 19 Line 26 + Line 27 Line 28/6 i.e. "Capital Plan" as referenced in RE01 PFD. Excludes COR. Assumes plant additions equals expenditure (less COR). Worksheet 'RE01-4 CT-Bar' Line 22 Worksheet 'RE01-4 CT-Bar' Line 23 Worksheet 'RE01-4 CT-Bar' Line 24 Line 38 + Line 39 Worksheet 'RE01-4 CT-Bar' Line 26 Worksheet 'RE01-4 CT-Bar' Line 27 Line 42 + Line 43 Sum Line 44 by rate year Line 49 less Line 49 prior period
  5. Page 5 of 21

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-14 Date Issued October 20, 2026 UPA-082 Attachment 5 Page 5 of 21 ILLUSTRATIVE PERFORMANCE-BASED RATE ADJUSTMENTS (PBRA) Illustrative Monthly CT-Bar Revenue Requirement Calculation ($, Millions) Test Year 2025 December 12/31/2025 CT-Bar Additions Gross Plant - Beginning CT-Bar Additions Gross Plant - Ending Capital Revenue Requirement Calculation Depreciation Expense Property Tax Expense Pretax Return on Rate Base Subtotal before GET & Uncollectible Uncollectible Expense Gross Earnings Tax Monthly Revenue Requirement Interim Period 2026 December 12/31/2026 2027 2027 2027 2027 2027 2027 2027 2027 2027 January February March April May June July August September 1/31/2027 2/28/2027 3/31/2027 4/30/2027 5/31/2027 6/30/2027 7/31/2027 8/31/2027 9/30/2027 - See Note 3.748% 1.710% 0.000% 0.631% 7.635% 2027 October 10/31/2027 2027 November 11/30/2027 RATE YEAR 1 2027 2028 2028 2028 2028 2028 2028 December January February March April May June 12/31/2027 1/31/2028 2/29/2028 3/31/2028 4/30/2028 5/31/2028 6/30/2028 30 30 30 30 60 60 30 90 90 30 120 120 30 150 150 30 180 180 24 204 204 24 228 228 24 252 252 24 276 276 24 300 300 24 324 324 29 353 353 29 382 382 29 411 411 29 440 440 29 469 469 29 498 0.1 0.0 0.1 0.0 0.0 0.3 0.1 0.1 0.2 0.0 0.0 0.4 0.2 0.1 0.3 0.0 0.0 0.7 0.3 0.1 0.5 0.0 0.0 1.0 0.4 0.2 0.6 0.0 0.0 1.3 0.5 0.2 0.8 0.0 0.1 1.6 0.6 0.3 0.9 0.0 0.1 1.8 0.7 0.3 1.0 0.0 0.1 2.0 0.7 0.3 1.1 0.0 0.1 2.3 0.8 0.4 1.2 0.0 0.1 2.5 0.9 0.4 1.3 0.0 0.1 2.7 1.0 0.4 1.4 0.0 0.1 3.0 1.1 0.5 1.5 0.0 0.1 3.2 1.1 0.5 1.7 0.0 0.1 3.5 1.2 0.6 1.8 0.0 0.1 3.8 1.3 0.6 1.9 0.0 0.1 4.0 1.4 0.6 2.1 0.0 0.2 4.3 1.5 0.7 2.2 0.0 0.2 4.6 Note: cost percentages per Worksheet 'RE01-6 Going-In Capital RR'. Costs shown are as proposed in this proceeding.
  6. Page 6 of 21

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-14 Date Issued October 20, 2026 UPA-082 Attachment 5 Page 6 of 21 ILLUSTRATIVE PERFORMANCE-BASED RATE ADJUSTMENTS (PBRA) Illustrative Monthly CT-Bar Revenue Requirement Calculation ($, Millions) 2028 2028 2028 July August September 7/31/2028 8/31/2028 9/30/2028 CT-Bar Additions Gross Plant - Beginning CT-Bar Additions Gross Plant - Ending Capital Revenue Requirement Calculation Depreciation Expense Property Tax Expense Pretax Return on Rate Base Subtotal before GET & Uncollectible Uncollectible Expense Gross Earnings Tax Monthly Revenue Requirement See Note 3.748% 1.710% 0.000% 0.631% 7.635% Note: cost percentages per Worksheet 'RE01-6 Going-In Capital RR'. C 2028 October 10/31/2028 2028 November 11/30/2028 RATE YEAR 2 2028 2029 2029 2029 2029 2029 2029 December January February March April May June 12/31/2028 1/31/2029 2/28/2029 3/31/2029 4/30/2029 5/31/2029 6/30/2029 498 28 526 526 28 554 554 28 582 582 28 610 610 28 638 638 28 666 666 31 697 697 31 728 728 31 759 759 31 791 791 31 822 822 31 853 1.6 0.7 2.3 0.0 0.2 4.8 1.7 0.8 2.5 0.0 0.2 5.1 1.8 0.8 2.6 0.0 0.2 5.4 1.9 0.8 2.7 0.0 0.2 5.6 1.9 0.9 2.8 0.0 0.2 5.9 2.0 0.9 3.0 0.0 0.2 6.2 2.1 1.0 3.1 0.0 0.2 6.5 2.2 1.0 3.2 0.0 0.2 6.8 2.3 1.1 3.4 0.0 0.3 7.0 2.4 1.1 3.5 0.0 0.3 7.3 2.5 1.1 3.7 0.0 0.3 7.6 2.6 1.2 3.8 0.0 0.3 7.9
  7. Page 7 of 21

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-14 Date Issued October 20, 2026 UPA-082 Attachment 5 Page 7 of 21 ILLUSTRATIVE PERFORMANCE-BASED RATE ADJUSTMENTS (PBRA) Illustrative Monthly CT-Bar Revenue Requirement Calculation ($, Millions) 2029 2029 2029 July August September 7/31/2029 8/31/2029 9/30/2029 CT-Bar Additions Gross Plant - Beginning CT-Bar Additions Gross Plant - Ending Capital Revenue Requirement Calculation Depreciation Expense Property Tax Expense Pretax Return on Rate Base Subtotal before GET & Uncollectible Uncollectible Expense Gross Earnings Tax Monthly Revenue Requirement See Note 3.748% 1.710% 0.000% 0.631% 7.635% Note: cost percentages per Worksheet 'RE01-6 Going-In Capital RR'. C 2029 October 10/31/2029 2029 November 11/30/2029 RATE YEAR 3 2029 2030 2030 2030 2030 2030 2030 December January February March April May June 12/31/2029 1/31/2030 2/28/2030 3/31/2030 4/30/2030 5/31/2030 6/30/2030 853 30 884 884 30 914 914 30 944 944 30 975 975 30 1,005 1,005 30 1,036 1,036 34 1,070 1,070 34 1,104 1,104 34 1,138 1,138 34 1,172 1,172 34 1,207 1,207 34 1,241 2.7 1.2 4.0 0.0 0.3 8.2 2.8 1.3 4.1 0.0 0.3 8.5 2.9 1.3 4.2 0.0 0.3 8.8 3.0 1.4 4.4 0.0 0.3 9.1 3.1 1.4 4.5 0.0 0.3 9.4 3.2 1.5 4.6 0.0 0.4 9.7 3.3 1.5 4.8 0.0 0.4 10.0 3.4 1.5 4.9 0.0 0.4 10.3 3.5 1.6 5.1 0.0 0.4 10.6 3.6 1.6 5.3 0.0 0.4 10.9 3.7 1.7 5.4 0.0 0.4 11.3 3.8 1.7 5.6 0.0 0.4 11.6
  8. Page 8 of 21

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-14 Date Issued October 20, 2026 UPA-082 Attachment 5 Page 8 of 21 ILLUSTRATIVE PERFORMANCE-BASED RATE ADJUSTMENTS (PBRA) Illustrative Monthly CT-Bar Revenue Requirement Calculation ($, Millions) 2030 2030 July August 7/31/2030 8/31/2030 CT-Bar Additions Gross Plant - Beginning CT-Bar Additions Gross Plant - Ending Capital Revenue Requirement Calculation Depreciation Expense Property Tax Expense Pretax Return on Rate Base Subtotal before GET & Uncollectible Uncollectible Expense Gross Earnings Tax Monthly Revenue Requirement See Note 3.748% 1.710% 0.000% 0.631% 7.635% Note: cost percentages per Worksheet 'RE01-6 Going-In Capital RR'. C 2030 September 9/30/2030 2030 October 10/31/2030 2030 November 11/30/2030 RATE YEAR 4 2030 2031 2031 2031 2031 2031 2031 December January February March April May June 12/31/2030 1/31/2031 2/28/2031 3/31/2031 4/30/2031 5/31/2031 6/30/2031 1,241 33 1,274 1,274 33 1,308 1,308 33 1,341 1,341 33 1,374 1,374 33 1,408 1,408 33 1,441 1,441 36 1,477 1,477 36 1,513 1,513 36 1,549 1,549 36 1,585 1,585 36 1,621 1,621 36 1,657 Line 19 prior period Worksheet 'RE01-4 CT-Bar' Line 28 Line 17 + Line 18 3.9 1.8 5.7 0.0 0.4 11.9 4.0 1.8 5.9 0.0 0.4 12.2 4.1 1.9 6.0 0.0 0.5 12.5 4.2 1.9 6.2 0.0 0.5 12.9 4.3 2.0 6.3 0.0 0.5 13.2 4.4 2.0 6.5 0.0 0.5 13.5 4.6 2.1 6.6 0.0 0.5 13.8 4.7 2.1 6.8 0.0 0.5 14.2 4.8 2.2 7.0 0.0 0.5 14.5 4.9 2.2 7.1 0.0 0.5 14.8 5.0 2.3 7.3 0.0 0.6 15.2 5.1 2.3 7.5 0.0 0.6 15.5 Line 19 monthly average balance x 3.748% / 12 Line 19 monthly average balance x 1.710% / 12 Line 22 + Line 23 Line 25 monthly average balance x 0.631% Line 25 monthly average balance x 7.635% Line 25 + Line 26 + Line 27
  9. Page 9 of 21Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-14 Date Issued October 20, 2026 UPA-082 Attachment 5 Page 9 of 21 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 ILLUSTRATIVE PERFORMANCE-BASED RATE ADJUSTMENTS (PBRA) Forecast Capital Investment, per Company Financial Forecast ($, Millions) Total Core Capital Expenditure: Basic Business $ Reliability New Customer Peak Load / Capacity Regulatory Commitments Facilities Information Technology Total Core Capital Expenditures (See Note) $ Cost of removal expenditure included above Install expenditure included above 2027 First six months of rate year Second six months of rate year Total Core Capital Expenditures, rate year For CT-Bar Install Only First six months of rate year Second six months of rate year Total for CT-Bar Note: 2027-2031 Source: Exhibit CLP-ELP-1, Figure 7 2032 increases annually by 7% for illustrative purposes 2028 264 254 75 50 6 23 18 690 56 634 $ $ 2029 269 280 77 67 31 24 10 758 62 696 $ Rate Year 1 345 379 724 $ Rate Year 1 317 348 665 $ $ 2030 252 319 80 84 36 25 5 800 65 735 $ Rate Year 2 379 400 779 $ Rate Year 2 348 367 715 $ $ 2031 231 350 82 96 46 47 1 853 72 781 $ Rate Year 3 400 427 827 $ Rate Year 3 367 390 758 $ $ 2032 226 378 86 96 61 36 1 884 73 811 $ Rate Year 4 427 442 869 $ Rate Year 4 390 405 796 $ $ 242 404 92 103 65 39 1 946 79 867 $ Rate Year 5 442 473 915 $ Rate Year 5 405 434 839
  10. Page 10 of 21

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 (A) Capital Costs: Depreciation Expense Property Tax Expense Pretax Return on Rate Base Total Revenue Requirement, excl GET/Uncol Going-In Capital Revenue Requirements ($ 000) MRP 1 (B) (C) (D) Total Rate Base Capital Only $ 347,568 $ 347,568 158,561 158,561 587,187 570,934 $ 1,093,316 $ 1,077,063 Rate Base: Utility Plant in Service Reserve For Depreciation Net Utility Plant In Service Plant Related ADIT Rate Base, excluding Working Capital and all other A/(L) Deferred Storm Working Capital and other A/(L) Rate Base Test Year Ended 12/31/2025 $ 8,827,942 (1,611,067) 7,216,875 (1,186,397) 6,030,478 726,707 167,979 $ 6,925,164 Depreciation Expense Gross Plant Depreciation expense as % of gross plant CT-BAR ONLY Property Tax Expense Gross Plant Property Tax expense as % of gross plant for CT-Bar Remove Storm (726,707) $ (726,707) 2026 Activity $ 444,416 (116,309) 328,107 (43,005) 285,102 $ 285,102 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-14 Date Issued October 20, 2026 UPA-082 Attachment 5 Page 10 of 21 (E) Exhibit CLP-REVREQ-2, Schedule C-3.0, Line 56, adjusted (see 'Note 1') Exhibit CLP-REVREQ-2, Schedule C-3.0, Line 62 Line 86 x Line 25 (Rate Year Balance) Sum Lines 13 through 15 Going-In Balance $ 9,272,358 (1,727,376) 7,544,982 (1,229,402) 6,315,580 $ $ $ (F) 179,787 6,495,367 347,568 9,272,358 3.75% 158,561 9,272,358 1.71% See 'Note 1' Exhibit CLP-REVREQ-2, Schedule B-1.0, Line 17, adjusted (see 'Note 1') Exhibit CLP-REVREQ-2, Schedule B-1.0, Line 18, adjusted (see 'Note 1') Line 21 + Line 22 Exhibit CLP-REVREQ-2, Schedule B-7.0, Line 17, adjusted (see 'Note 1') Line 23 + Line 24 Exhibit CLP-REVREQ-2, Schedule B-6.2, Lines 52+53 Line 28 - Line 26 - Line 25 Exhibit CLP-REVREQ-2, Schedule B-1.0, Line 36, adjusted (see 'Note 1') Line 13, column (C) Line 21, column (E) Line 30 / Line 31 Line 14, column (C) Line 21, column (E) Line 35 / Line 36 Note 1: for analytical purposes in this illustrative model, the Company has adjusted the revenue requirement to use the currently approved ROE (9.25%) and currently approved equity capitalization (53.0%) and for capital investment placed in-service after 12/31/2026

Text of UPA-082 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of UPA-082 Attachment 6.pdf

Extracted from the file · 21 pages · 53,356 characters

Text of UPA-082 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of UPA-082 Attachment 7.pdf

Extracted from the file · 2 pages · 7,150 characters

Text of UPA-082 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of UPA-082 Attachment 8.pdf

Extracted from the file · 23 pages · 67,698 characters

Text of UPA-082 Attachment 8.xlsx

Sheet names, column headings and text cells; numbers left out

Text of UPA-082 Attachment 9.pdf

Extracted from the file · 9 pages · 27,877 characters

Text of UPA-082 Attachment 9.xlsx

Sheet names, column headings and text cells; numbers left out

Text of UPA-082 Attachment 10.pdf

Extracted from the file · 21 pages · 53,010 characters

Text of UPA-082 Attachment 10.xlsx

Sheet names, column headings and text cells; numbers left out

Text of UPA-082 Attachment 11.pdf

Extracted from the file · 21 pages · 53,021 characters

Text of UPA-082 Attachment 11.xlsx

Sheet names, column headings and text cells; numbers left out

Text of UPA-082 Attachment 12.pdf

Extracted from the file · 21 pages · 53,367 characters

Text of UPA-082 Attachment 12.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

Question(s) Answered 82 (Connecticut Light and Power Company dba Eversource) Date Filed: 11/17/2026