Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 86, 88, 91, 92, 95, 98, 99

Files7

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of UPA-092_Final.pdf

Extracted from the file · 2 pages · 5,369 characters

Words on different pages
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-15 Date Issued October 23, 2026 UPA-095 Page 1 of 1 Date Filed: November 06, 2026 Witness: Lavelle A. Freeman and Elli Ntakou Request from: Public Utilities Regulatory Authority Question: Reference Ex. CLP-ELP-1, p. 107. Provide the annual System Reliability PIMs (Blue-Sky SAIDI and SAIFI) values for 2022 through 2026 used to calculate the proposed fixed-year averages and standard deviations. Include the resulting average, standard deviation, one-standard-deviation threshold, and two-standard-deviation cap for each metric. Response: The historical data for 2021-2025, including an illustrative example of the average, standard deviation, one standard deviation threshold, and two standard deviation cap, is included in Exhibit CLP-TSP-1, at page 79. Reliability performance data for year-end 2026 is not yet available. Averages for 2022 through 2026, including standard deviations and penalty threshold and cap values will be available once 2026 reporting has been finalized. The Company typically reports performance of the previous year in March of the next year, therefore the Company expects to report 2026 reliability performance to PURA as part of TDRP in March 2027.

Text of UPA-098_Final.pdf

Extracted from the file · 1 page · 1,981 characters

Words on different pagesRead the text of UPA-098_Final.pdf

Text of UPA-099_Final.pdf

Extracted from the file · 2 pages · 5,124 characters

Words on different pagesRead the text of UPA-099_Final.pdf

As listed on the current system

Question(s) Answered 86, 88, 91, 92, 95, 98, 99 (The Connecticut Light and Power Company) Date Filed: 11/06/2026

This filing on the current system (opens in a new tab)