Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Response to Motion No. 040

Response type: Supplemental Filing

Files1

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
  1. Page 184 of 212

    Document Accession #: 20251014-5331 Filed Date: 10/14/2025
  2. Page 185 of 212

    Document Accession #: 20251014-5331 Filed Date: 10/14/2025
  3. Page 186 of 212

    Document Accession #: 20251014-5331 Filed Date: 10/14/2025 Exhibit 30
  4. Page 187 of 212

    Document Accession #: 20251014-5331 Filed Date: 10/14/2025
  5. Page 188 of 212

    Document Accession #: 20251014-5331 Filed Date: 10/14/2025 Revised CY2024 Total Load Obligation: MWH Net Change in CY2024 Total Load Obligation: MWh If BP Energy Retail Company LLC wants a monthly breakout by utility of its load, please contact [email removed] with that request. The following refers only to ACP payments owed to MassCEC for RPS, APS, and CPS. Any payments owed to MassDEP for CES and/or CES-E will be addressed in a separate communication by MassDEP after your revised CY2024 Compliance Workbook is received by DOER. Shown below are the original total ACP payment made to MassCEC, the estimated revised total ACP that would be owed under the revised Eversource RBA-adjusted Load Obligation and the estimated net change between the two. Actual revised ACPs and the difference between the two will be taken from the Revised Compliance Workbook that is submitted. Original CY2024 ACP Payment: Revised CY2024 ACP: Net Change in CY2024 ACP: $2,789,997.60 $1,068,981.80 $-1,721,015.80 If the difference is positive, BP Energy Retail Company LLC would owe additional ACP. Please remit the additional payment to MassCEC as per normal. Payments will be due by Monday, October 21, 2025. If the difference is negative, DOER will owe a refund to BP Energy Retail Company LLC. DOER is in the process of instructing MassCEC to return any excess ACP funds. Please contact DOER at [email removed] if you have any question or require more information regarding RPS, APS or the CPS Alternative Compliance Payments. Please contact MassDEP at [email removed] if you have any questions or require more information regarding the CES/CES-E Alternative Compliance Payments. Regards,
  6. Page 189 of 212

    Document Accession #: 20251014-5331 Filed Date: 10/14/2025 Samantha Meserve (she/her) Director, Renewable and Alternative Energy Division Massachusetts Department of Energy Resources 100 Cambridge Street, 9th Floor, Boston, MA 02114 Phone:
  7. Page 190 of 212

    Document Accession #: 20251014-5331 Filed Date: 10/14/2025 Exhibit 31 (FILED SEPARATELY IN EXCEL FORMAT – PRIVILEGED AND CONFIDENTIAL PURSUANT TO 18 C.F.R. § 388.112 (2025), NOT AVAILABLE TO COMPETITIVE DUTY PERSONNEL)
  8. Page 191 of 212

    Document Accession #: 20251014-5331 Filed Date: 10/14/2025 Form of Notice of Complaint
  9. Page 192 of 212

    Document Accession #: 20251014-5331 Filed Date: 10/14/2025 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION BP Energy Retail Company LLC Complainant, v. ISO New England Inc., Eversource Energy, and NSTAR Electric Company ) ) ) ) ) ) ) ) ) Docket No. EL26-__-000 Respondents. NOTICE OF COMPLAINT ( October [__], 2025 ) Take notice that on October 14, 2025, BP Energy Retail Company LLC (“Complainant”) filed a formal complaint against the ISO New England Inc, Eversource Energy, and NSTAR Electric Company, seeking a Commission order nullifying charges to Complainant for phantom load allocated to Complainant in the SEMA Zone during the months of July, August, and September 2024 and seeking alternative relief in the form of a mandatory limited waiver of the 101 day limit for adjustments to meter data errors under Market Rule 1 and Manual M-28 to effectuate the elimination of charges to Complainant for phantom load allocated during the months at issue. Complainant certifies that copies of the complaint were served on the contacts for ISO-NE, Eversource Energy and NSTAR Electric Company as listed on the Commission’s list of Corporate Officials. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the “eFiling” link at http://www.ferc.gov. Persons unable to file
  10. Page 193 of 212

    Document Accession #: 20251014-5331 Filed Date: 10/14/2025 electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. This filing is accessible on-line at http://www.ferc.gov, using the “eLibrary” link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an “eSubscription” link on the web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email [email removed], or call (866) 2083676 (toll free). For TTY, call [phone removed]. Comment Date: 5:00 pm Eastern Time on (insert date). Debbie-Anne A. Reese, Secretary.

As listed on the current system

Response to Motion No.: 040 - 10/19/2026 (Allco Renewable Energy Limited) - Type Response = Supplemental Filing [26-05-10]

This filing on the current system (opens in a new tab)