Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Response to Motion No. 040

Response type: Supplemental Filing

Files1

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
  1. Page 28 of 212

    EXHIBIT B
  2. Page 29 of 212

    UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION BP Energy Retail Company LLC Complainants v. ISO New England Inc., Eversource Energy, and NSTAR Electric Company Respondents ) ) ) ) ) ) ) ) ) Docket No. EL26-5-000 MOTION FOR LEAVE TO ANSWER AND ANSWER OF EVERSOURCE ENERGY AND NSTAR ELECTRIC COMPANY Pursuant to Rules 212 and 213 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission (“FERC” or the “Commission”),1 Eversource Energy (“Eversource”), on its own behalf and on behalf of NSTAR Electric Company (“NSTAR”), submits this motion for leave to answer and answer (“Answer”) to the Motion for Leave to File Supplement and Supplement to Prior Filings filed by BP Energy Retail Company LLC (“BPERC”) on March 3, 2026, in the above-captioned proceeding.2 On October 14, 2025, BPERC filed a Complaint with the Commission to seek relief from the invoices issued by ISO New England Inc. (“ISO-NE”) based on load allocated to BPERC by NSTAR for July, August, and September 2024.3 BPERC also alleged that, if 1 18 C.F.R. §§ 385.212, 385.213 (2025). 2 BP Energy Retail Co., Motion for Leave to File Supplement and Supplement to Prior Filings, Docket No. EL26-5 (filed March 3, 2026) (“Supplement”). 3 BP Energy Retail Co., Complaint Seeking Relief from Phantom Load Allocations, Docket No. EL26-5 (filed Oct. 14, 2025) (“Complaint”). 1
  3. Page 30 of 212

    the Renewable Portfolio Standard (“RPS”) obligations related to BPERC’s load were not corrected, it could increase the financial impact to BPERC “by an estimated additional $3,566,372 for a total impact of $9,502,044.”4 Recognizing the implications of corrected load data for state RPS compliance, NSTAR initiated discussions with the Massachusetts Department of Energy Resources (“DOER”). As confirmed in BPERC’s Supplement, DOER has now revised BPERC’s and other retail suppliers’ RPS compliance obligations based on updated meter data provided by NSTAR. This development reinforces a central point Eversource and NSTAR have made consistently: to the extent BPERC seeks relief from invoicing or RPS compliance payments, that relief must come from the entities that administer those obligations— ISO-NE and DOER. Neither Eversource nor NSTAR has the authority to reopen or modify ISO‑NE settlement invoices or to alter DOER’s compliance determinations. DOER’s recent action also underscores the fundamental flaw in ISO‑NE’s assertion that BPERC’s remedy lies in a “bilateral” contractual process with NSTAR. Nothing in the parties’ agreement provides—or could provide—a mechanism for NSTAR to revise ISO‑NE’s wholesale settlement invoices, reopen settlement data after tariff deadlines have passed, or alter suppliers’ RPS obligations. DOER’s recalculations confirm that corrections must be implemented by the entity charged with administering the relevant program, and there is no alternative contractual path for correcting either state compliance obligations or ISO‑NE invoices. At the same time, DOER’s ability to apply updated meter data highlights 4 Id. at 2. 2
  4. Page 31 of 212

    the limits of ISO‑NE’s authority. DOER could revise BPERC’s RPS obligations, whereas ISO‑NE’s ability to incorporate updated data is constrained by Market Rule 1’s deadlines. Once those deadlines have run and final invoices have issued, only the Commission has the power to compel ISO‑NE to reopen charges. Accordingly, if the Commission determines—as ISO‑NE argues—that the filed‑rate doctrine and Market Rule 1’s finality provisions bar reopening past invoices, then the Complaint must be dismissed. Under ISO‑NE’s own theory, no retroactive adjustment to prior settlement results is legally permissible. If ISO‑NE cannot lawfully grant relief, BPERC likewise cannot obtain relief from Eversource or NSTAR, which have no authority to provide what the tariff forbids. In that circumstance, the filed‑rate doctrine compels dismissal of the Complaint in its entirety. I. MOTION FOR LEAVE TO ANSWER Eversource and NSTAR move for leave to answer BPERC’s Supplement. Although the Commission’s rules generally prohibit answers to answers, the Commission has accepted such an answer for good cause, such as where it clarifies the issues or provides information that will “assist[] the Commission in its decision-making process.”5 This Answer provides additional information that will help ensure a more complete record and will assist the Commission in its decision-making process in this proceeding.6 Accordingly, the Commission should accept this Answer. See, e.g., 18 C.F.R. § 385.213; Mid-Am. Pipeline Co., 165 FERC ¶ 61,046, at P 18 (2018); Enbridge Energy, Ltd. P’ship, 141 FERC ¶ 61,246, at P 5 (2012); Tuscarora Gas Trans. Co., 120 FERC ¶ 61,022, at P 4 (2007). 5 6 See United Illuminating Co., 167 FERC ¶ 61,126, at P 18 (2019). 3
  5. Page 32 of 212

    II. BACKGROUND ON DOER RPS RECALCULATIONS Recognizing the implications of corrected load data for state RPS compliance, NSTAR initiated discussions with DOER in October 2025. Between October and December 2025, NSTAR and DOER met multiple times. During this period, NSTAR developed and executed a detailed workplan to reconcile loads for July, August, and September 2024. NSTAR’s reconciliation work included establishing a dedicated processing environment, rerunning settlement data for the three months at issue using updated source data, and conducting extensive integrity checks to ensure alignment across metering, billing, and load‑settlement systems. These checks included validating interval meter data, reconciling billed and settlement loads, verifying account‑level consistency, benchmarking against ISO‑NE system totals, and confirming weather‑related correlations. NSTAR completed the reconciliation effort on December 24, 2025, and notified DOER the same day that updated load data was available. NSTAR transmitted the revised loads to DOER on January 8, 2026, and met with DOER that day to review the updated data and discuss next steps. On February 13, 2026, NSTAR informed suppliers that corrected load data had been provided to DOER and that DOER indicated it would soon issue updated compliance obligations. NSTAR understands that DOER issued those updated obligations on February 23, 2026. III. ANSWER From the outset, BPERC’s Complaint has challenged charges appearing on ISO‑NE settlement invoices and state-issued RPS compliance obligations. But Eversource and NSTAR do not administer either of those processes. ISO‑NE alone issues and settles 4
  6. Page 33 of 212

    wholesale market invoices under the ISO‑NE Tariff, and DOER alone determines suppliers’ annual compliance obligations under the state RPS program. NSTAR’s role is limited to the submission of meter data—data that ISO‑NE or DOER then applies through their own administrative frameworks. As the Complaint itself recognized, the billing discrepancies BPERC challenges arose in the context of ISO‑NE settlement processes and DOER’s state compliance program, not through any adjudicatory or settlement authority of Eversource or NSTAR.7 DOER’s recalculations to the RPS compliance obligations confirm this structure. DOER was able to issue new compliance obligations precisely because DOER, as the administering authority, has the statutory and regulatory mechanisms to recalculate supplier obligations when it receives corrected data. BPERC’s filing makes clear that it understands that NSTAR’s role in this update was limited to providing revised meter data inputs to DOER.8 The recalculation and resulting determination of new supplier obligations was undertaken entirely by DOER. DOER’s undertaking confirms the position Eversource and NSTAR have taken throughout this proceeding: when the entity responsible for administering the program receives revised inputs, it—not the meter reader—has the authority and responsibility to apply its governing rules and processes to effectuate any revisions. If the Commission determines that BPERC is entitled to relief, 7 Complaint at 2. 8 Supplement at 2 (“BPERC understands that the load redetermination for establishing BPERC’s MA renewable portfolio standard (‘RPS’) obligation was based on updated data the Department of Energy Resources received from Eversource Energy and NSTAR Electric Company (‘Eversource’).”). 5
  7. Page 34 of 212

    the only entity capable of implementing it is ISO‑NE, not Eversource or NSTAR. NSTAR stands ready—as it did in the DOER proceeding—to provide ISO‑NE with the updated meter data for July, August, and September 2024. But only ISO‑NE can modify or rerun wholesale settlement results under its tariff. The DOER recalculation also exposes the fundamental flaw in ISO‑NE’s repeated assertions that BPERC’s remedy lies in a “bilateral” contractual process between BPERC and NSTAR.9 Nothing in the agreement between NSTAR and BPERC provides, or could provide, a mechanism for NSTAR to revise or nullify ISO‑NE wholesale settlement invoices or to reopen settlement data after ISO‑NE Tariff deadlines have passed. 10 Nor does that agreement give NSTAR authority to alter DOER’s compliance determinations. As DOER’s recalculation shows, adjustments must be implemented by the administrative body responsible for the program at issue. ISO‑NE’s mistaken interpretation of the BPERC–NSTAR relationship lacks merit. There is no alternative “contractual” path for correcting state compliance obligations or ISO‑NE invoices. While BPERC’s update validates the limits of NSTAR’s ability to provide the relief requested by BPERC, it also highlights the limits to ISO-NE’s authority to do so. DOER 9 See, e.g., BP Energy Retail Co., Motion for Leave to Answer and Additional Answer of ISO New England Inc., Docket No. EL26-5 at 3 (filed Jan. 8, 2026). 10 The supplier agreement between BPERC and NSTAR is consistent with NSTAR’s form Competitive Electric Supplier Service Agreement, which is publicly available on Eversource’s website here: https://www.eversource.com/residential/about/doing-business-with-us/energysuppliers/electric-massachusetts. While that agreement in Section F provides a process for correcting billing errors or other miscalculations on bills issued by NSTAR to the supplier, that process does not extend to correcting errors on the wholesale invoices issued by ISO-NE based on load estimates provided by NSTAR. 6
  8. Page 35 of 212

    has resolved the RPS component of BPERC’s concerns by applying updated meter data provided by NSTAR to calculate new RPS compliance obligation. This recalculation should parallel the federal process—NSTAR provides updated meter data and ISO‑NE applies that data to issue new invoices to suppliers. However, there is a fundamental difference between the two processes: the ISO-NE Tariff imposes deadlines on ISO-NE’s ability to implement meter data corrections.11 Once those tariff’s deadlines have run and ISO‑NE has issued final invoices under Market Rule 1, neither NSTAR nor BPERC has the power to require ISO‑NE to reopen those invoices. Only the Commission may do so. ISO‑NE itself has repeatedly emphasized this finality principle in its filings, and both NSTAR and BPERC have requested Commission relief of the limiting deadlines. If the Commission determines—as ISO‑NE argues—that the filed‑rate doctrine and Market Rule 1’s finality provisions prohibit reopening wholesale settlement invoices, then Eversource and NSTAR agree the Complaint must be dismissed. ISO‑NE has argued extensively that the filed rate prevents any retroactive adjustment to prior settlement results, even when later-discovered errors exist. If that interpretation is correct, then BPERC cannot obtain relief from Eversource or NSTAR for the same reason. Eversource and NSTAR have no authority to grant relief that the ISO‑NE Tariff itself forbids. The only legally permissible outcome under the filed rate is dismissal of the Complaint in its entirety. 11 See ISO-NE Tariff, Market Rule 1, Section III.3.8. 7
  9. Page 36 of 212

    IV. CONCLUSION DOER’s recalculations of the RPS compliance obligations confirm the core principles that Eversource and NSTAR have articulated since the beginning. NSTAR supplies meter data inputs, DOER and ISO‑NE administer their respective programs. Any corrective action must occur through those administering entities. And to the extent the Commission determines that a remedy is available, its implementation must be directed to ISO‑NE—not Eversource or NSTAR—with NSTAR fully prepared to provide the updated meter data necessary to effectuate the Commission’s decision. Respectfully submitted, /s/ Karen Bruni Karen Bruni Daniel Mullen Steptoe LLP 1330 Connecticut Avenue, NW Washington, DC 20036 [phone removed] [email removed] [email removed] Mary Grover Thomas Lemon Eversource Energy Service Company 247 Station Drive, SE100 Westwood, MA 02090-9030 [phone removed] [email removed] [email removed] Counsel for Eversource Energy and NSTAR Electric Company 8
  10. Page 37 of 212

    CERTIFICATE OF SERVICE I hereby certify that I have this day served the foregoing document upon each person designated on the official service list compiled by the Secretary in this proceeding. Dated at Washington, DC this 6th day of March 2026. /s/ Joe Bower Joe Bower Steptoe LLP 1330 Connecticut Avenue, NW Washington, DC 20036 [phone removed] [email removed] 9

As listed on the current system

Response to Motion No.: 040 - 10/19/2026 (Allco Renewable Energy Limited) - Type Response = Supplemental Filing [26-05-10]

This filing on the current system (opens in a new tab)