Response to Motion No. 040
Response type: Supplemental Filing
Filed by Allco Renewable Energy Limited1 file
Part of docket 26-05-10Files1
Allco_Second_Supplement_Motion40_EL26-5_Filings_26-05-10 tm.pdf
PDF · 13 MB · 212 pagesText searchable
Download Allco_Second_Supplement_Motion40_EL26-5_Filings_26-05-10 tm.pdfRead the text of Allco_Second_Supplement_Motion40_EL26-5_Filings_26-05-10 tm.pdf
Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Page 33 of 212
wholesale market invoices under the ISO‑NE Tariff, and DOER alone determines suppliers’ annual compliance obligations under the state RPS program. NSTAR’s role is limited to the submission of meter data—data that ISO‑NE or DOER then applies through their own administrative frameworks. As the Complaint itself recognized, the billing discrepancies BPERC challenges arose in the context of ISO‑NE settlement processes and DOER’s state compliance program, not through any adjudicatory or settlement authority of Eversource or NSTAR.7 DOER’s recalculations to the RPS compliance obligations confirm this structure. DOER was able to issue new compliance obligations precisely because DOER, as the administering authority, has the statutory and regulatory mechanisms to recalculate supplier obligations when it receives corrected data. BPERC’s filing makes clear that it understands that NSTAR’s role in this update was limited to providing revised meter data inputs to DOER.8 The recalculation and resulting determination of new supplier obligations was undertaken entirely by DOER. DOER’s undertaking confirms the position Eversource and NSTAR have taken throughout this proceeding: when the entity responsible for administering the program receives revised inputs, it—not the meter reader—has the authority and responsibility to apply its governing rules and processes to effectuate any revisions. If the Commission determines that BPERC is entitled to relief, 7 Complaint at 2. 8 Supplement at 2 (“BPERC understands that the load redetermination for establishing BPERC’s MA renewable portfolio standard (‘RPS’) obligation was based on updated data the Department of Energy Resources received from Eversource Energy and NSTAR Electric Company (‘Eversource’).”). 5Page 34 of 212
the only entity capable of implementing it is ISO‑NE, not Eversource or NSTAR. NSTAR stands ready—as it did in the DOER proceeding—to provide ISO‑NE with the updated meter data for July, August, and September 2024. But only ISO‑NE can modify or rerun wholesale settlement results under its tariff. The DOER recalculation also exposes the fundamental flaw in ISO‑NE’s repeated assertions that BPERC’s remedy lies in a “bilateral” contractual process between BPERC and NSTAR.9 Nothing in the agreement between NSTAR and BPERC provides, or could provide, a mechanism for NSTAR to revise or nullify ISO‑NE wholesale settlement invoices or to reopen settlement data after ISO‑NE Tariff deadlines have passed. 10 Nor does that agreement give NSTAR authority to alter DOER’s compliance determinations. As DOER’s recalculation shows, adjustments must be implemented by the administrative body responsible for the program at issue. ISO‑NE’s mistaken interpretation of the BPERC–NSTAR relationship lacks merit. There is no alternative “contractual” path for correcting state compliance obligations or ISO‑NE invoices. While BPERC’s update validates the limits of NSTAR’s ability to provide the relief requested by BPERC, it also highlights the limits to ISO-NE’s authority to do so. DOER 9 See, e.g., BP Energy Retail Co., Motion for Leave to Answer and Additional Answer of ISO New England Inc., Docket No. EL26-5 at 3 (filed Jan. 8, 2026). 10 The supplier agreement between BPERC and NSTAR is consistent with NSTAR’s form Competitive Electric Supplier Service Agreement, which is publicly available on Eversource’s website here: https://www.eversource.com/residential/about/doing-business-with-us/energysuppliers/electric-massachusetts. While that agreement in Section F provides a process for correcting billing errors or other miscalculations on bills issued by NSTAR to the supplier, that process does not extend to correcting errors on the wholesale invoices issued by ISO-NE based on load estimates provided by NSTAR. 6Page 35 of 212
has resolved the RPS component of BPERC’s concerns by applying updated meter data provided by NSTAR to calculate new RPS compliance obligation. This recalculation should parallel the federal process—NSTAR provides updated meter data and ISO‑NE applies that data to issue new invoices to suppliers. However, there is a fundamental difference between the two processes: the ISO-NE Tariff imposes deadlines on ISO-NE’s ability to implement meter data corrections.11 Once those tariff’s deadlines have run and ISO‑NE has issued final invoices under Market Rule 1, neither NSTAR nor BPERC has the power to require ISO‑NE to reopen those invoices. Only the Commission may do so. ISO‑NE itself has repeatedly emphasized this finality principle in its filings, and both NSTAR and BPERC have requested Commission relief of the limiting deadlines. If the Commission determines—as ISO‑NE argues—that the filed‑rate doctrine and Market Rule 1’s finality provisions prohibit reopening wholesale settlement invoices, then Eversource and NSTAR agree the Complaint must be dismissed. ISO‑NE has argued extensively that the filed rate prevents any retroactive adjustment to prior settlement results, even when later-discovered errors exist. If that interpretation is correct, then BPERC cannot obtain relief from Eversource or NSTAR for the same reason. Eversource and NSTAR have no authority to grant relief that the ISO‑NE Tariff itself forbids. The only legally permissible outcome under the filed rate is dismissal of the Complaint in its entirety. 11 See ISO-NE Tariff, Market Rule 1, Section III.3.8. 7Page 36 of 212
IV. CONCLUSION DOER’s recalculations of the RPS compliance obligations confirm the core principles that Eversource and NSTAR have articulated since the beginning. NSTAR supplies meter data inputs, DOER and ISO‑NE administer their respective programs. Any corrective action must occur through those administering entities. And to the extent the Commission determines that a remedy is available, its implementation must be directed to ISO‑NE—not Eversource or NSTAR—with NSTAR fully prepared to provide the updated meter data necessary to effectuate the Commission’s decision. Respectfully submitted, /s/ Karen Bruni Karen Bruni Daniel Mullen Steptoe LLP 1330 Connecticut Avenue, NW Washington, DC 20036 [phone removed] [email removed] [email removed] Mary Grover Thomas Lemon Eversource Energy Service Company 247 Station Drive, SE100 Westwood, MA 02090-9030 [phone removed] [email removed] [email removed] Counsel for Eversource Energy and NSTAR Electric Company 8Page 37 of 212
CERTIFICATE OF SERVICE I hereby certify that I have this day served the foregoing document upon each person designated on the official service list compiled by the Secretary in this proceeding. Dated at Washington, DC this 6th day of March 2026. /s/ Joe Bower Joe Bower Steptoe LLP 1330 Connecticut Avenue, NW Washington, DC 20036 [phone removed] [email removed] 9Page 38 of 212
EXHIBIT CPage 39 of 212
Document Accession #: 20251014-5331 Filed Date: 10/14/2025 1825 Eye Street NW |Washington, D.C. 20006 blankrome.com Phone: [phone removed] Fax: [phone removed] Email: [email removed] October 14, 2025 BY ELECTRONIC FILING Ms. Debbie-Anne A. Reese Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 RE: Complaint of BP Energy Retail Company LLC v. ISO New England, Inc., Eversource Energy and NSTAR Electric Company, Docket No. EL26- Dear Ms. Reese: BP Energy Retail Company LLC (“BPERC”) is submitting a Complaint pursuant to Sections 206 and 306 of the Federal Power Act (“FPA”) 1, Rule 206 of the Federal Energy Regulatory Commission’s (“FERC” or “Commission”) Rules of Practice and Procedure, 2 and to the extent, applicable, Section 6.3.6 of Exhibit ID of the ISO New England Inc. (“ISO-NE”) Billing Policy against ISO New England, Inc., Eversource Energy and NSTAR Electric Company in Docket No, EL26- . The complaint seeks relief from certain invoices issued by ISO-NE based on phantom load incorrectly assigned to BPERC by Eversource Energy (“Eversource”) and NSTAR Electric Company (“NSTAR”) (together, “Eversource/NSTAR”). Portions of the material in this submission contain proprietary and competitively sensitive commercial information including (a) personal identifiable information (phone numbers) in email correspondence; (b) account information and related confidential business information; and (c) certain communications made to BPERC representatives by Eversource/NSTAR that may arguably be subject to formal or informal confidentiality claims. Therefore, portions of this submission consist of privileged materials, which have been redacted in the public volume of the filing, with unredacted versions submitted in a separate privileged volume. In accordance with Section 388.112 of the Commission’s regulations, 18 C.F.R. § 388.112 (2025), BPERC hereby requests privileged treatment for this material and states that this volume contains material the Commission routinely treats as privileged and exempt from mandatory disclosure under the Freedom of Information Act. The privileged material has been labeled as “Contains Privileged 1 2 16 U.S.C. § 824(e) & 825(e). 18 C.F.R. § 385.206 (2024).Page 40 of 212
Document Accession #: 20251014-5331 Filed Date: 10/14/2025 and Confidential Information – Do Not Release Pursuant to 18 C.F.R. § 388.112 (2025),” and “CUI/PRIV.” The privileged version will be sent to parties executing the protective agreement filed with this complaint. BPERC notes further that the workpapers supporting its estimates of financial harm contain highly confidential competitive information that will only be available to reviewing representatives who are not competitive duty personnel, as more fully described in the attached protective agreement. Please contact the undersigned if there are any questions regarding this filing. Sincerely, /s/ Mark R. Haskell Mark R. Haskell Blank Rome LLP 1825 Eye Street, N.W. Washington, DC 20006 [phone removed] [email removed] Counsel to BPERC 2Page 41 of 212
Document Accession #: 20251014-5331 Filed Date: 10/14/2025 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) ) ) ) ) ) BP Energy Retail Company LLC Complainant, v. ISO New England Inc., Eversource Energy, and NSTAR Electric Company Respondents. Docket No. EL26-__-000 COMPLAINT SEEKING RELIEF FROM PHANTOM LOAD ALLOCATIONS Pursuant to Sections 206 and 306 of the Federal Power Act (“FPA”), 1 Rule 206 of the Federal Energy Regulatory Commission’s (“FERC” or “Commission”) Rules of Practice and Procedure, 2 and to the extent, applicable, Section 6.3.6 of Exhibit ID of the ISO New England Inc. (“ISO-NE”) Billing Policy, BP Energy Retail Company LLC (“BPERC” or “Complainant”) hereby submits a Complaint seeking relief from certain invoices issued by ISO-NE based on phantom load incorrectly assigned to BPERC by Eversource Energy (“Eversource”) and NSTAR Electric Company (“NSTAR”) (together, “Eversource/NSTAR”), apparently as a result of the implementation of a new information management system by Eversource/NSTAR called “Omni” in or around June of 2024. As described below, BPERC submits that billing BPERC for phantom load that it has not, does not and cannot serve would be unjust, unreasonable and unduly discriminatory and that equitable relief from this result is warranted. The allocation of phantom load to BPERC appears 1 2 16 U.S.C. §§ 824(e) & 825(e). 18 C.F.R. § 385.206 (2024). 1Page 42 of 212
Document Accession #: 20251014-5331 Filed Date: 10/14/2025 to be based solely on an extensive IT systems error across multiple months. BPERC properly challenged these errors as they arose. BPERC believes that Eversource/NSTAR reported the same basic issues to ISO-NE. ISO-NE corrected the overallocation in the Northeast Massachusetts (“NEMA”) zone through the Meter Data Error RBA Resettlements process; however, a second over-allocation arose in the South East Massachusetts (“SEMA”) zone for the first time that improperly tagged BPERC with a total of 144,000 MWh of new load, resulting in additional direct costs to BPERC of about $5,935,672 3 for the period July-September 2024. If the Renewable Portfolio Standard (“RPS”) obligations related to this phantom load are not corrected, that could increase the financial impact by an estimated additional $3,566,372 for a total impact of $9,502,044. 4 BPERC had no actual knowledge of this readjustment. 5 ISO-NE states that the Request for Billing Adjustment (“RBA”) is barred by the 101-day limit on billing adjustments under its Manual M-28 directing BPERC to resolve discrepancies outside of the ISO settlement framework. 6 BPERC had no notice or opportunity to correct this error, and as a result it has been saddled with millions of dollars in costs for load it does not serve, despite the fact that it timely objected to prior phantom load allocations. This is a result that is unjust, unreasonable, and unduly discriminatory, warranting corrective action by the Commission. Accordingly, BPERC respectfully requests that the Commission direct ISO-NE to nullify these phantom load charges, and to grant any and all necessary waivers of the ISO-NE tariff, operating procedures or protocols necessary to implement this result and to direct Eversource/NSTAR to provide to ISO-NE corrected data to fix the actual SEMA load for BPERC The inflated load amounts are 45,000 MWh in July 2024; 49,000 MWh in August 2024; and 47,000 MWh in September 2024. See Exhibit No. 31. 4 See Exhibit No. 31. 5 BPERC also had requested on multiple occasions that Eversource/NSTAR provide access to additional information to support any claimed allocation of load to BPERC; on information and belief, those requests were not met. Representative communications are attached as Exhibit 9. 6 See Exhibit Nos. 25, 26 and 27 and Exhibit No. 1. 3 2
As listed on the current system
Response to Motion No.: 040 - 10/19/2026 (Allco Renewable Energy Limited) - Type Response = Supplemental Filing [26-05-10]