Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Response to Motion No. 084

Response type: Supplemental Filing

Files3

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
  1. Page 1 of 39

    Attachment 1: Duplicative or Substantially Similar Interrogatories Propounded by ALLCO Previously Served ALLCO-022: State, for each year 2018 through 2025, the Test Year, and the proposed Rate Year, the total annual cost of the internal legal function (including compensation, benefits, occupancy, technology, library/research services, and allocated overheads), and the amount of that cost charged or allocated to the Company; identify the allocation methodology and allocation factor(s) used (referencing, as applicable, the cost allocation methodologies produced in response to EOE-066); and identify the FERC account(s) and the specific revenue requirement schedules and workpapers in this docket in which the amounts allocated to the Company appear. ALLCO-023: State, for each year 2018 through 2025, the Test Year, and the proposed Rate Year, the Company’s total legal spend (direct and allocated), separated into (a) internal/ESC legal function costs, (b) outside counsel fees, and (c) other legal-related vendors (e.g., ediscovery, court reporters, expert witnesses, claims administrators); and state the total legal expense included in the proposed Rate Year revenue requirement, identifying the schedule and line. Successive Request ALLCO-074: (Follow-up to ALLCO-022.) The response provided only the proposed Rate Year legal-function compensation of $4.940 million and a confidential attachment limited to 2025. Provide the information the interrogatory called for: for each calendar year 2018 through 2025 and the Test Year, (a) the total annual cost of the internal legal function stated separately for compensation, benefits, occupancy, technology, library/research services, and allocated overheads and (b) the amount of that cost charged or allocated to the Company each year; (c) the FERC account(s) in which the allocated amounts are recorded; and (d) for the Rate Year, the non-compensation components of the legal-function cost included in the revenue requirement, with the schedule and line for each. ALLCO-076: (Follow-up to ALLCO-023.) The response omitted 2018 through 2020 entirely and provided no breakdown by vendor category. State, for each calendar year 2018 through 2025 and the Test Year: (a) the Companys total outside counsel fees (direct and allocated), by firm for the ten highest-billing firms each year; (b) total other legal-related vendor costs, stated separately for e-discovery and litigation-support vendors, court reporters, expert witnesses and consultants engaged through counsel, and claims administrators; and (c) the amounts of (a) and (b) allocated to the Company, with the FERC accounts used; and reconcile the 20212025 amounts to Exhibit CLP-REVREQ-3, identifying page and line.
  2. Page 2 of 39

    Previously Served ALLCO-028: Describe the Company’s policies and practices for determining whether legal costs (internal and outside) are (a) charged to the Company or to another Eversource affiliate, (b) recorded above or below the line for ratemaking purposes, and (c) charged to expense, capitalized, or charged to a deferred or storm-related account; state whether the costs of litigation in which the Company or its affiliates is the plaintiff or claimant, and of proceedings in which the Company defends the prudence or lawfulness of its own conduct, are included in the Test Year or Rate Year revenue requirement, and if so, identify the amounts and matters (by category if privilege is asserted as to specific matters). ALLCO-030: Conn. Gen. Stat. § 16-243p(b), as amended by Public Act 23-102, § 2, provides that for any rate proceeding initiated on or after January 1, 2024, no electric distribution company with more than seventy-five thousand customers "shall recover through rates its direct or indirect costs" associated with its attendance in, participation in, preparation for, or appeal of any rate proceeding, including attorneys’ fees, expert witness and consultant fees, and the portion of employee salaries associated with such activities — a prohibition the Company itself quotes in Exhibit CLP-REVREQ-1 at 147148 while nonetheless including approximately $3.1 million of rate case expense in the proposed revenue requirement (Exhibit CLPREVREQ-9). Identify every direct or indirect cost associated with the Company’s attendance in, participation in, preparation for, or any appeal of this proceeding (or any other rate proceeding initiated on or after January 1, 2024) that is included anywhere in the Test Year or proposed Rate Year revenue requirement — including the $3.1 million of Exhibit CLP-REVREQ-9, any outside counsel or consultant fees recorded elsewhere, and the portion of the salaries, incentive compensation, and benefits of each Company or ESC employee (by title) associated with such activities and included in payroll, A&G, or service-company charges — stating the amount and revenue requirement schedule and line for each; and state the Company’s legal basis, if any, for recovering each such cost from ratepayers notwithstanding § 16-243p(b). Successive Request ALLCO-077: (Follow-up to ALLCO-028.) The response did not answer the second half of the interrogatory. State whether the costs of (a) litigation or other proceedings in which the Company or any affiliate is the plaintiff or claimant, and (b) proceedings in which the Company defends the prudence or lawfulness of its own conduct, are included anywhere in the Test Year or proposed Rate Year revenue requirement; if so, identify the amounts, the matters (by category if privilege is asserted as to specific matters), and the schedule and line where each amount appears; and if not, identify where and how such costs are excluded. ALLCO-078: (Follow-up to ALLCO-030.) The response cross-referenced OCC-438, which contains no itemization. Itemize the approximately $3.1 million of rate case expense in Exhibit CLP-REVREQ-9 by vendor or firm, matter or workstream, and amount; identify each Company or ESC position (by title) whose Test Year or Rate Year payroll, incentive compensation, or benefits include time associated with attendance in, participation in, or preparation for rate proceedings, and the amounts included; state whether any rateproceeding-associated costs are recorded outside Exhibit CLP-REVREQ-9 including in payroll, A&G, service-company charges, or any deferral and identify the amounts and locations; and state the total of all costs associated with rate proceedings initiated on or after January 1, 2024 that are included anywhere in the proposed revenue requirement.
  3. Page 3 of 39

    Previously Served ALLCO-034: The Company’s September 1, 2026 "Redacted Bulk Material" filing describes the preparation of public, redacted versions of Exhibit CLP-STORM-ACCT-2(A) as "a manual, labor-intensive process involving a crossfunctional team of external vendors and Company personnel." With respect to all redaction and confidentiality-designation work performed in connection with this proceeding (including the storm invoice compilations and all other exhibits and discovery responses): (a) identify each external vendor engaged and each category of Company or ESC personnel involved (by title); (b) state the costs incurred to date and the estimated total cost, separately for vendor fees and for the allocated time of Company/ESC personnel; (c) identify the account(s) to which such costs have been or will be charged, and state whether any portion is included in, or will be sought for recovery through, the Test Year or Rate Year revenue requirement, rate case expense, or any deferral; and (d) if any such recovery is or will be sought, state the Company’s legal basis for recovering such costs from ratepayers notwithstanding Conn. Gen. Stat. § 16-243p(b). ALLCO-035: For each year 2019 through 2025 and year-todate 2026, state: (a) the quantity (MWh) of energy and other products the Company purchased under the Millstone PPA; (b) the average price per MWh paid; (c) the manner of disposition of those products (e.g., resale into the ISO-New England day-ahead or real-time markets, bilateral sales, or use to serve the Company’s standard service or supplier of last resort service load), with quantities for each; (d) the revenues realized from each manner of disposition; and (e) the resulting net cost or net revenue charged or credited to customers through the NBFMCC (or any other rate mechanism), by year. Produce the supporting workpapers in native format. Successive Request ALLCO-079: (Follow-up to ALLCO-034.) Supplement the response as the Company committed: produce the Keegan Werlin LLP invoices for redaction and confidentialitydesignation services as they are rendered, and state the amounts billed to date; provide the Companys best estimate of the internal Company and ESC personnel time (by title, with hours and loaded cost) devoted to redaction and confidentiality-designation work in this proceeding, notwithstanding that such time is not separately tracked; identify the account(s) to which all such costs have been charged; and state the amount included in, or to be sought through, the Test Year or Rate Year revenue requirement, rate case expense, or any deferral, with the schedule and line. ALLCO-080: (Follow-up to ALLCO-035.) The referenced annual RAM filings do not contain the requested year-by-year presentation. Provide, in a single native-format table for each calendar year 2019 through 2025 and year-todate 2026: (a) the MWh of energy and quantities of other products purchased under the Millstone PPA; (b) the average price per MWh paid; (c) the disposition of those products by category and quantity; (d) the revenues realized from each disposition category, including the Companys buyers percentage entitlement of ISO-NE settlement proceeds and CES-E sales proceeds; and (e) the resulting net cost or net revenue charged or credited to customers through the NBFMCC, by year. If any component appears in an existing filing, cite the docket, filing, exhibit, and page where the specific annual figure appears.
  4. Page 4 of 39

    Previously Served ALLCO-036: State whether the Company has at any time since 2019 analyzed, evaluated, or considered using the energy purchased under the Millstone PPA to serve its standard service and/or supplier of last resort service load, in whole or in part, rather than reselling that energy into the ISO-New England markets; produce every such analysis, evaluation, memorandum, presentation, or communication; identify, by title, each person who participated in the decision regarding the manner of resale; and state each reason for the disposition method chosen. If no such analysis exists, so state. ALLCO-037: In its September 18, 2019 Interim Decision in Docket No. 18-05-04, the Authority stated that "the manner in which these Products are resold can impact the value of the Agreements to ratepayers" and directed the EDCs "to thoughtfully consider their options in this area and to pursue those options that maximize such value." Describe each action the Company has taken in response to that directive from 2019 to the present; state whether the Company has ever changed its method of reselling Millstone PPA products; and state whether the disposition of Millstone PPA products is addressed in the Company’s current procurement plan or any pending or planned procurement-plan update. ALLCO-043: Describe how amounts associated with net metering and virtual net metering are calculated and recovered from other customers through the NBFMCC (including the "avoided bill" methodology described by Company witnesses in Docket No. 20-01-01), and state whether the amounts so charged to customers are reduced or offset by the corresponding reductions in regional transmission charges (RNS, LNS, TAC), capacity obligations, and standard service procurement quantities attributable to the same behind-the-meter generation; if no such offset is made, explain why not, and quantify the annual amount charged to customers through the NBFMCC for net metering for each year 2020 through 2025 without any such offset. Successive Request ALLCO-081: (Follow-up to ALLCO-036.) The response identified two dockets but did not answer the question. State, yes or no, whether the Company has at any time since 2019 analyzed, evaluated, or considered using the energy purchased under the Millstone PPA to serve its standard service or supplier of last resort load in whole or in part; if yes, identify and produce each analysis, evaluation, memorandum, presentation, or communication, and identify by title each person who participated in the decision regarding disposition; if the presentations in Docket Nos. 17-12-03RE10 and 12-06-02RE04 are the only responsive materials, produce them in this docket and confirm that no analysis has been performed since. ALLCO-082: (Follow-up to ALLCO-037.) The response described the current arrangement but not the actions the interrogatory asked about. Describe each action the Company has taken from 2019 to the present in response to the Authoritys September 18, 2019 directive in Docket No. 18-05-04 to thoughtfully consider their options in this area and to pursue those options that maximize such value; state whether the Company has ever changed the manner of disposition of Millstone PPA products, and if not, whether any change was ever evaluated; and state whether the disposition of Millstone PPA products is addressed in the Companys current procurement plan or any pending or planned update, identifying the relevant section or stating that it is not addressed. ALLCO-083: (Follow-up to ALLCO-043.) The response described the calculation of net metering amounts but did not answer subparts (b) and (c). State, yes or no, whether the amounts charged to customers through the NBFMCC for net metering and virtual net metering are reduced or offset by the corresponding reductions in regional transmission charges (RNS, LNS, TAC), capacity obligations, and standard service procurement quantities attributable to the same behind-the-meter generation; if no such offset is made, explain why not; and state the annual amount charged to customers through the NBFMCC for net metering and virtual net metering for each calendar year 2020 through 2025, in native format.
  5. Page 5 of 39

    Previously Served ALLCO-035: For each year 2019 through 2025 and year-to-date 2026, state: (a) the quantity (MWh) of energy and other products the Company purchased under the Millstone PPA; (b) the average price per MWh paid; (c) the manner of disposition of those products (e.g., resale into the ISO-New England day-ahead or real-time markets, bilateral sales, or use to serve the Company’s standard service or supplier of last resort service load), with quantities for each; (d) the revenues realized from each manner of disposition; and (e) the resulting net cost or net revenue charged or credited to customers through the NBFMCC (or any other rate mechanism), by year. Produce the supporting workpapers in native format. ALLCO-038: For each year 2019 through 2025: state (a) the Company’s total standard service and supplier of last resort service load (MWh) and the average all-in supply cost per kWh the Company paid to wholesale suppliers for that load; (b) the average cost per kWh of energy purchased under the Millstone PPA; and (c) the net amount charged to customers through the NBFMCC in respect of the Millstone PPA for that year; and produce data sufficient to calculate, for each such year, the net impact on customers had the Company used Millstone PPA energy to serve standard service and supplier of last resort service load up to the lesser of the Millstone PPA quantities or that load (accounting for the residual quantities that would still have been resold into the market), including hourly standard service load data and hourly Millstone PPA delivery quantities in native format. Successive Request ALLCO-086: (Follow-up to ALLCO-038.) A referral to a public webpage and seven annual dockets is not an answer, and the remaining components are not public. Provide, in a single native-format table for each calendar year 2019 through 2025: (a) the Companys standard service and supplier of last resort load in MWh and the average all-in supply cost per kWh paid to wholesale suppliers for that load (the figures the Companys referral sources contain, compiled); (b) the MWh of the Companys Buyers Percentage Entitlement of Millstone PPA products actually delivered or settled, by month; (c) the effective all-in price per MWh actually paid under the Millstone PPA, identifying any component other than the $49.99/MWh contract price; and (d) the net amount charged or credited to customers through the NBFMCC in respect of the Millstone PPA, by year. Produce the hourly (or most granular available) Millstone delivery quantities and standard service load data in native format.
  6. Page 6 of 39

    Previously Served ALLCO-040: Describe the Company’s policy, practice, and decision-making process for determining whether a distribution-connected resource under five megawatts is registered in the ISO-New England markets or treated as an unregistered load reducer, including who (by title) makes that determination, the criteria applied, any ISO-New England or NEPOOL rules the Company contends require registration, and every analysis the Company has performed of the customer-cost consequences of registering versus not registering such resources. Produce all such analyses. ALLCO-087: (Follow-up to ALLCO-040.) The response omitted the decision-making the interrogatory asked about. Identify, by title, each person or group who determines whether a distribution-connected resource under five megawatts is registered in ISO-New England or treated as an unregistered load reducer, and state the criteria applied; identify and produce every analysis, evaluation, or quantification the Company has performed of the customer-cost consequences of registering versus not registering such resources including any analysis underlying the position PURA approved in Docket No. 20-07-01 and any quantification of the benefits for customers the response describes or state that no such analysis exists; and identify each exception to the Companys general practice, i.e., each distribution-connected resource under five megawatts that is or has been registered in the ISO-New England markets since 2020, stating its size, program, and the reason for registration. Successive Request ALLCO-087: (Follow-up to ALLCO-040.) The response omitted the decision-making the interrogatory asked about. Identify, by title, each person or group who determines whether a distribution-connected resource under five megawatts is registered in ISO-New England or treated as an unregistered load reducer, and state the criteria applied; identify and produce every analysis, evaluation, or quantification the Company has performed of the customer-cost consequences of registering versus not registering such resources including any analysis underlying the position PURA approved in Docket No. 20-07-01 and any quantification of the benefits for customers the response describes or state that no such analysis exists; and identify each exception to the Companys general practice, i.e., each distribution-connected resource under five megawatts that is or has been registered in the ISO-New England markets since 2020, stating its size, program, and the reason for registration. ALLCO-089: (Follow-up to ALLCO-042.) Identify each resource constituting an exception to substantially all that is, each eligible resource under five megawatts that was registered in ISO-New England rather than treated as an unregistered load reducer at any time during 2020 through 2025 stating for each its nameplate capacity, program or contract, the period of registration, and the reason; and state whether the Company has ever evaluated, or been requested by any customer, developer, or agency to evaluate, changing the registration status of any category of such resources, identifying each evaluation or request and its disposition.
  7. Page 7 of 39

    Previously Served ALLCO-042: Quantify the additional annual savings, by cost category (standard service procurement quantities, RNS, LNS, TAC, capacity, and reserves), that customers would realize (or would have realized in each year 2020 through 2025) if all eligible resources under five megawatts were treated as unregistered load reducers rather than registered in ISO-New England, and produce every study, analysis, or estimate the Company has made of that question. If the Company has never analyzed it, so state. Successive Request
  8. Page 8 of 39

    Previously Served ALLCO-053: With respect to the forecasted plant additions and retirements reported by FERC account on Schedule B-2.2 of Exhibit CLP-REVREQ-2 for the periods January 1, 2026 through June 30, 2027 and July 1, 2027 through June 30, 2028: (a) provide, in native (Excel) format, a project-level itemization of the forecasted additions in each period for each FERC account — at minimum for Account 362 (Station Equipment: $181,989 thousand and $147,907 thousand), Account 365 (Overhead Conductors and Devices: $154,720 thousand and $122,938 thousand), Account 367 (Underground Conductors and Devices), Account 364 (Poles, Towers and Equipment), and every other account whose forecasted additions exceed $10 million in either period — showing for each project the project name or work-order identifier, description, forecasted cost by period, forecasted in-service date, and the driver category (e.g., load growth, asset condition, reliability, storm hardening, interconnection, AMI, fleet); (b) identify each project in subpart (a) that increases substation or circuit capacity or hosting capacity, stating the substation or circuit affected and whether any pending distribution interconnection application would be enabled by it; (c) state where the capital costs of the advanced metering infrastructure program are reflected — identifying the amounts, if any, included in the Schedule B-2.2 additions, the amounts proposed for recovery through the F-Factor or any other mechanism, and the schedule or workpaper where each appears — given that Account 370 (Meters) additions total only $45.8 million across both periods; (d) for the transportation and power-operated equipment accounts (392-series and 396), which reflect forecasted additions of approximately $76 million including $47.9 million of Class 4 heavy trucks against a $112.9 million test-year balance, produce the fleet plan, replacement schedule, or other analysis supporting the forecasted additions, and state the number of units to be acquired by vehicle class and the assumed cost per unit; and (e) state whether each project or category identified in subpart (a) was subjected to a documented business-case or cost-benefit analysis before inclusion in the forecast, and produce each such analysis for projects exceeding $25 million. Successive Request ALLCO-099: (Follow-up to ALLCO-053.) The response states that [p]lant additions and retirements are not forecasted by project at a FERC account level and answers every remaining subpart N/A. That position cannot be reconciled with the Companys own filings: on September 15, 2026, the Company filed Exhibit CLP-ADDITIONS-4 Supplemental, whose 2026 Plan Update tab presents the Companys projected 2026 capital spend PROJECT BY PROJECT project number, name, projected spend, and a narrative project description totaling approximately $605 million. State: (a) how the project-level 2026 capital plan in CLPADDITIONS-4 Supplemental was developed and by whom, and produce the equivalent project-level plans for 2027 and 2028 (or the most recent capital budget or five-year plan covering those years, however titled); (b) a reconciliation of the project-level 2026 plan to the January 2026-June 2027 forecasted additions by FERC account on Schedule B-2.2; (c) the answers to subparts (b) through (e) of ALLCO-053, none of which depends on the premise the response rejected: subpart (c) asks where AMI capital is reflected a question about the Companys own schedules; subpart (d) asks for the fleet plan supporting approximately $76 million of forecasted transportation additions including $47.9 million of Class 4 heavy trucks; and subpart (e) asks whether documented business cases exist for projects exceeding $25 million answer each, or state affirmatively that no fleet plan and no business-case analyses exist; and (d) if the Company maintains that its $1.51 billion of forecasted additions is supported only by historical precedent and anticipated projects, identify every document in which the anticipated projects are listed.
  9. Page 9 of 39

    Previously Served ALLCO-003: Describe the methodology by which the Company sets the percentage "CIAC" or "overhead" rate applied to interconnection upgrade costs (including rates of 9.97%, 10.19%, 11.00%, 12.00%, and 13.00% applied to projects between 2018 and 2024), produce the workpapers deriving each such percentage, and state the actual project management and administration cost component, as a percentage of construction cost, realized on distributed generation interconnection projects completed in each year 2020 through 2025. Successive Request ALLCO-102: For the percentage overhead loaders applied to interconnection cost estimates, invoices, and contributions in aid of construction ("CIAC") for distributed-generation and qualifying-facility interconnections at any time from 2017 through the present: (a) identify each person who established, calculated, approved, or revised the loader percentages, and each person or group with authority to approve deviations from them; (b) identify the written policy, procedure, methodology document, or workpaper in which each loader percentage and its derivation is recorded, and produce each; (c) state, for each loader, whether it was developed by CL&P, ESC, Burns & McDonnell Engineering Company, Inc. ("Burns & McDonnell"), or another entity, and identify the entity and organizational unit; and (d) state whether any loader percentage applied to interconnection charges was ever reviewed for consistency with actual incurred costs before December 2024, and if so, identify each review, its date, its author, and its conclusion, and produce it.
  10. Page 10 of 39

    Previously Served ALLCO-045: Separately from EOE-140 and EOE-151, state whether the Company or Eversource Energy Service Company has performed, commissioned, or received, since January 1, 2018, any analysis, study, model, or evaluation — whether by employees, consultants, or vendors — of whether distribution-infrastructure investments (including, without limitation, system hardening, covered or spacer cable, strategic undergrounding, enhanced or resiliency-based vegetation management, animal guards, or accelerated replacement of aged poles, crossarms, or conductors) would reduce storm damage, storm outage frequency or duration, or storm restoration costs in Connecticut; produce each such analysis, study, model, or evaluation; identify each recommendation contained in any of them that the Company has not implemented, and state the reason it was not implemented and the estimated cost of implementation; and state whether any portion of the storm costs for which recovery is sought in this docket (including the costs compiled in the STORM-ACCT exhibits) arose on circuits, line segments, or assets that any such analysis had previously identified as candidates for hardening, undergrounding, resiliency vegetation management, or replacement, identifying each such circuit or asset and the associated storm cost. Successive Request ALLCO-094: The response to ALLCO-045 produced the requested analyses but did not answer the interrogatorys final subparts. (a) Identify each recommendation contained in ALLCO-045, Attachment 1, ALLCO-045, Attachment 2 (the September 2, 2021 Quanta Technology review), and the University of Connecticut studies referenced in the response that the Company has not implemented, and state the reason it was not implemented and the estimated cost of implementation. (b) State whether any portion of the storm costs for which recovery is sought in this docket arose on circuits, line segments, or assets that, before the storm at issue, (i) fell within the higher tree-exposure bands of bare-conductor construction analyzed in Attachment 1, (ii) had been identified through the Storm DEMI recurrence screen described in the response, or (iii) had been identified in any analysis as candidates for hardening, reconductoring, undergrounding, or enhanced vegetation management identifying each such circuit or asset and the associated storm cost. (c) If the Company contends it cannot perform that identification, produce the data from which it can be performed: the circuit or line-segment identifiers associated with the storm costs compiled in the STORM-ACCT exhibits, by storm event, and the segment-level construction-type and tree-exposure classification underlying Attachment 1.
Words on different pages

As listed on the current system

Response to Motion No.: 084 - 10/27/2026 (Eversource Energy) - Type Response = Supplemental Filing [26-05-10]

This filing on the current system (opens in a new tab)