  1. Page 20 of 39Match

    ALLCO-053: With respect to the forecasted plant additions and retirements reported by FERC account on Schedule B-2.2 of Exhibit CLP-REVREQ-2 for the periods January 1, 2026 through June 30, 2027 and July 1, 2027 through June 30, 2028: (a) provide, in native (Excel) format, a project-level itemization of the forecasted additions in each period for each FERC account — at minimum for Account 362 (Station Equipment: $181,989 thousand and $147,907 thousand), Account 365 (Overhead Conductors and Devices: $154,720 thousand and $122,938 thousand), Account 367 (Underground Conductors and Devices), Account 364 (Poles, Towers and Equipment), and every other account whose forecasted additions exceed $10 million in either period — showing for each project the project name or work-order identifier, description, forecasted cost by period, forecasted in-service date, and the driver category (e.g., load growth, asset condition, reliability, storm hardening, interconnection, AMI, fleet); (b) identify each project in subpart (a) that increases substation or circuit capacity or hosting capacity, stating the substation or circuit affected and whether any pending distribution interconnection application would be enabled by it; (c) state where the capital costs of the advanced metering infrastructure program are reflected — identifying the amounts, if any, included in the Schedule B-2.2 additions, the amounts proposed for recovery through the F-Factor or any other mechanism, and the schedule or workpaper where each appears — given that Account 370 (Meters) additions total only $45.8 million across both periods; (d) for the transportation and power-operated equipment accounts (392-series and 396), which reflect forecasted additions of approximately $76 million including $47.9 million of Class 4 heavy trucks against a $112.9 million test-year balance, produce the fleet plan, replacement schedule, or other analysis supporting the forecasted additions, and state the number of units to be acquired by vehicle class and the assumed cost per unit; and (e) state whether each project or category identified in subpart (a) was subjected to a documented business-case or cost-benefit analysis before inclusion in the forecast, and produce each such analysis for projects exceeding $25 million. ALLCO-215: (Follow-up to ALLCO-099 capital plans for 2027 and 2028.) The response states that the Company is currently engaged in its 2027 Annual Planning Process and produces no project-level plan beyond 2026. State: (a) the multi-year capital expenditure forecast for the Company that Eversource Energy has disclosed to investors in its most recent Annual Report on Form 10-K and in investor presentations since January 1, 2026, by year and by category (distribution, transmission, AMI, other), and produce the internal schedule from which those disclosed figures were drawn; (b) a reconciliation of that forecast, for 2026 through 2028, to the forecasted plant additions on Schedule B-2.2 and to the Rate Year and subsequent-year additions underlying the proposed multi-year rate plan; (c) the date on which the 2027 Annual Planning Process will produce a project-level plan and the Companys commitment to produce it in this docket upon completion; and (d) the five largest projects by projected spend in each of 2027 and 2028 as currently identified in that process, with projected spend and status.
  2. Page 21 of 39

    Previously Served ALLCO-099: (Follow-up to ALLCO-053.) The response states that [p]lant additions and retirements are not forecasted by project at a FERC account level and answers every remaining subpart N/A. That position cannot be reconciled with the Companys own filings: on September 15, 2026, the Company filed Exhibit CLP-ADDITIONS-4 Supplemental, whose 2026 Plan Update tab presents the Companys projected 2026 capital spend PROJECT BY PROJECT project number, name, projected spend, and a narrative project description totaling approximately $605 million. State: (a) how the project-level 2026 capital plan in CLPADDITIONS-4 Supplemental was developed and by whom, and produce the equivalent project-level plans for 2027 and 2028 (or the most recent capital budget or five-year plan covering those years, however titled); (b) a reconciliation of the project-level 2026 plan to the January 2026-June 2027 forecasted additions by FERC account on Schedule B-2.2; (c) the answers to subparts (b) through (e) of ALLCO-053, none of which depends on the premise the response rejected: subpart (c) asks where AMI capital is reflected a question about the Companys own schedules; subpart (d) asks for the fleet plan supporting approximately $76 million of forecasted transportation additions including $47.9 million of Class 4 heavy trucks; and subpart (e) asks whether documented business cases exist for projects exceeding $25 million answer each, or state affirmatively that no fleet plan and no business-case analyses exist; and (d) if the Company maintains that its $1.51 billion of forecasted additions is supported only by historical precedent and anticipated projects, identify every document in which the anticipated projects are listed. Successive Request
  3. Page 22 of 39

    Previously Served ALLCO-096: Quantify, or produce the data sufficient to quantify, the wholesale cost reductions realized by licensed third-party suppliers by reason of load-reducer treatment for each calendar year 2020 through 2025, stated separately for: (a) energy the reduction in suppliers settled load valued at applicable locational marginal prices; (b) capacity the reduction in suppliers capacity load obligations valued at applicable capacity prices; (c) regional transmission the reduction in the coincidentpeak determinants underlying RNS, LNS, and TAC charges attributable to load served by suppliers; and (d) reserves and ancillary services; and state, for each category, whether any statute, regulation, tariff, or contractual mechanism requires third-party suppliers to pass those savings through to their retail customers or to compensate the host customers whose generation produced them. If no such mechanism exists, so state. ALLCO-098: With respect to the interaction of net metering costs and load-reducer benefits:(a) confirm that the NBFMCC is a non-bypassable charge assessed on all of the Companys distribution customers, including customers served by third-party suppliers; (b) confirm that, accordingly, the net metering and virtual net metering amounts included in the NBFMCC (described in the Companys response to ALLCO-043) are recovered from all distribution customers, while the wholesale energy, capacity, transmission, and reserve savings produced by the same behind-the-meter generation accrue to each host customers load-serving entity including third-party suppliers with no obligation to pass them through; (c) identify any analysis the Company has performed of this costbenefit asymmetry, and produce it; and (d) state whether the Company has ever proposed to the Authority or to ISO-New England any mechanism to credit load-reducer savings against the NBFMCC or otherwise to align the parties who bear net metering costs with the parties who receive the corresponding wholesale savings, identifying each proposal or confirming there has been none. Successive Request ALLCO-197: (Who receives the value of exported generation the Company pays for.) With respect to facilities whose entire output the Company purchases or credits under a PURA-approved tariff or contract and whose cost is recovered from all distribution customers through the Non-Bypassable Federally Mandated Congestion Charge or otherwise: (a) confirm that, under the treatment described in ALLCO-095(a), the wholesale energy value of that output is distributed to every load-serving entity in the load zone, including third-party suppliers that bear none of the tariff cost, in proportion to their load; (b) state, for each calendar year 2020 through 2025, the total megawatt-hours of such exported output in the Companys Metering Domain, the share distributed to Load Assets held by third-party suppliers, and the value of that share at the applicable hourly real-time locational marginal prices; (c) state whether the Companys Standard Service and Last Resort Service procurement and reconciliation reflect any credit for that output, and where; and (d) state whether any portion of the capacity value, forward-reserve value, or regional network service reduction associated with that output accrues to third-party suppliers, and quantify it. If the Company contends that it cannot perform any of these calculations, state what data would be required, whether the Company possesses it, and why the calculation was not performed before the Company asserted in ALLCO-098(c) and (d) that [t]here is no costbenefit asymmetry and that existing mechanisms already align costs and savings.
  4. Page 23 of 39

    Previously Served ALLCO-040: Describe the Company’s policy, practice, and decision-making process for determining whether a distribution-connected resource under five megawatts is registered in the ISO-New England markets or treated as an unregistered load reducer, including who (by title) makes that determination, the criteria applied, any ISO-New England or NEPOOL rules the Company contends require registration, and every analysis the Company has performed of the customer-cost consequences of registering versus not registering such resources. Produce all such analyses. ALLCO-087: (Follow-up to ALLCO-040.) The response omitted the decision-making the interrogatory asked about. Identify, by title, each person or group who determines whether a distribution-connected resource under five megawatts is registered in ISONew England or treated as an unregistered load reducer, and state the criteria applied; identify and produce every analysis, evaluation, or quantification the Company has performed of the customer-cost consequences of registering versus not registering such resources including any analysis underlying the position PURA approved in Docket No. 20-07-01 and any quantification of the benefits for customers the response describes or state that no such analysis exists; and identify each exception to the Companys general practice, i.e., each distribution-connected resource under five megawatts that is or has been registered in the ISO-New England markets since 2020, stating its size, program, and the reason for registration. ALLCO-095: The Companys responses to ALLCO040 and ALLCO-041 state that treating distributionconnected resources under five megawatts as unregistered load reducers produces benefits for customers by reducing wholesale load obligations and reduce[s] the load and capacity supply obligations of all load serving entities. For each calendar year 2020 through 2025: (a) describe how the Companys retail load settlement process allocates the output of a host customers behind-the-meter generation to the loadserving entity serving that customer i.e., confirm that when the host customer is served by a licensed thirdparty supplier, the resulting reduction in settled load accrues to that suppliers wholesale position rather than to the Companys standard service load; (b) state the number of net-metered, virtually net-metered, and other load-reducer host customers served by third-party suppliers versus taking standard service or supplier-oflast-resort service, by year, and the associated behindthe-meter output in MWh for each group (or the best available estimate, identifying the estimation method); and (c) state the aggregate MWh by which loadreducer output reduced the settled Real-Time Load Obligation of the Company and of third-party suppliers, respectively, by year, in native format. Successive Request ALLCO-198: (The claimed ratepayer benefit of loadreducer treatment.) The Company stated in ALLCO040 and ALLCO-041 that treating distributionconnected resources under five megawatts as unregistered load reducers produces benefits for customers by reducing wholesale load obligations, and in ALLCO-087 that it is the general Company practice to not register such resources with ISO-NE and that this practice has been acknowledged and accepted by PURA. Explain how the Companys treatment of projects under 5 MW as load reducers results in benefits to ratepayers, and in doing so: (a) identify the customers who receive the benefit the Companys Standard Service and Last Resort Service customers, customers of third-party suppliers, all distribution customers, or some other group and quantify the benefit to each group for each year 2020 through 2025 in megawatt-hours, in capacity megawatts, and in dollars; (b) identify the docket, decision, or ruling in which the Authority acknowledged and accepted the practice of not registering resources under 5 MW, and produce it; (c) compare the treatment in (a) with the treatment that would result if a facility whose output the Company purchases were registered as a Settlement Only Resource in which case its metered output would be settled at the locational marginal price to the account of the Company as purchaser and state whether the Company has ever evaluated registering, as Settlement Only Resources or otherwise, facilities whose output it purchases under buy-all tariffs or power purchase agreements, so that the energy and capacity value of that output accrues to the customers who pay for it; produce each such evaluation or state that none exists; (d) state whether the Companys load forecasts used for Standard Service procurement, and the Standard Service bids it receives, reflect the loadreducing effect of behind-the-meter generation, and if so how, so that the Authority can determine whether the claimed benefit reaches Standard Service customers in the price they pay; and (e) state whether the Companys statement in ALLCO-087 that no individual or group determines whether a resource under 5 MW is registered with ISO-NE remains accurate, and if so identify the person or group responsible for the Companys compliance with ISO-NE registration and metering requirements for distributed resources.
  5. Page 24 of 39

    Previously Served ALLCO-096: Quantify, or produce the data sufficient to quantify, the wholesale cost reductions realized by licensed third-party suppliers by reason of load-reducer treatment for each calendar year 2020 through 2025, stated separately for: (a) energy the reduction in suppliers settled load valued at applicable locational marginal prices; (b) capacity the reduction in suppliers capacity load obligations valued at applicable capacity prices; (c) regional transmission the reduction in the coincident-peak determinants underlying RNS, LNS, and TAC charges attributable to load served by suppliers; and (d) reserves and ancillary services; and state, for each category, whether any statute, regulation, tariff, or contractual mechanism requires third-party suppliers to pass those savings through to their retail customers or to compensate the host customers whose generation produced them. If no such mechanism exists, so state. ALLCO-097: State whether the Company has ever analyzed, tracked, estimated, or reported internally, to ISO-New England, to the Authority, or otherwise the division of load-reducer benefits between (a) the Companys standard service and supplier-of-last-resort customers and (b) third-party suppliers and their customers; identify and produce each such analysis or report; and state whether the Company has taken any action to measure, capture, credit, or claim for its standard service customers, for the host customers whose generation produces the savings, or for ratepayers generally the value that accrues to thirdparty suppliers from load-reducer treatment, and if it has taken no such action, state each reason why not. Successive Request
  6. Page 25 of 39

    Previously Served ALLCO-114: For every interconnection project completed from 2017 through 2025 for which no final accounting or reconciliation has been performed: (a) state the number of such projects by year and the aggregate amounts collected from the interconnecting customers for them, including the aggregate percentage overhead components; (b) state the aggregate amount of those collections the Company still holds and the account or accounts in which they are recorded; (c) state whether the Company contends that no refunds would be due on those projects if final accountings were performed, and the basis for that contention; and (d) state each reason final accountings were not performed for those projects and who is responsible for deciding whether and when they are performed. Successive Request ALLCO-208: (Follow-up to ALLCO-114 completed projects without a final accounting.) The response restates the Companys obligation under Section 1.2 of the Guidelines and Section 5.3.2 of the form Interconnection Agreement and answers none of subparts (a) through (d). Answer them: (a) for each calendar year 2017 through 2025, the number of interconnection projects first connected to the electric power system in that year for which no final accounting report had been issued as of September 30, 2026, and the aggregate amounts collected from the interconnecting customers for those projects, stated separately for construction deposits and for percentage overhead or CIAC components; (b) the aggregate amount of those collections the Company still holds and the account(s) in which it is recorded; (c) whether the Company contends that no refunds would be due on those projects if final accountings were performed, and the basis; and (d) each reason final accountings have not been performed, the person by title responsible for deciding whether and when they are performed, and the Companys plan and schedule for clearing the backlog. If the Company contends that it cannot answer subpart (a) because, as stated in ALLCO-103, final accounting is not tracked or maintained in PowerClerk, identify the systems in which project completion dates and final accounting dates are recorded, and state the number of completed projects (from PowerClerk permission-to-operate records) and the number of final accounting reports issued (from the system in which they are prepared) for each year, which together answer the question.
  7. Page 26 of 39

    Previously Served ALLCO-052: With respect to the Company’s outstanding preferred stock and the requested 10.25% return on common equity: (a) for each outstanding series of the Company’s preferred stock, state the shares outstanding, par or stated value, carrying value, annual dividend rate, whether the series is callable (and at what price), and whether the series is publicly traded, identifying the ticker symbol or trading venue; (b) for each publicly traded series (including the $3.24 Series G, ticker CNLPL), state the most recent available market price and the resulting current dividend yield as of the most recent practicable date, and provide the source; (c) state the risk premium, in basis points, implied by the requested 10.25% return on common equity over (i) the current market yield of each traded preferred series, (ii) the Company’s embedded cost of preferred stock (4.75%), (iii) the Company’s embedded cost of long-term debt (4.81%), and (iv) the current market yield on seasoned Baa-rated corporate bonds; (d) produce every analysis, calculation, or workpaper in which the Company or any of its cost-of-capital witnesses considered the market prices or yields of the Company’s own outstanding securities — preferred stock or long-term debt — or those of Eversource Energy, in developing the recommended return on common equity in this proceeding; if no such analysis exists, state that fact and explain why company-specific market evidence was not considered while proxy-group estimates for other companies were; (e) state whether the Company contends that the difference in risk between its preferred stock (senior to common, fixed cumulative dividend, no maturity) and its common equity justifies a premium of approximately 400 basis points, and produce every analysis supporting that contention, including any analysis of how revenue decoupling, the proposed Storm Cost Recovery Adjustment Factor, and the proposed multi-year rate plan affect the riskiness of the Company’s common equity relative to its preferred stock; and (f) if the Company contends that the market yields on its preferred stock understate the pre-tax return required by investors (for example, because of the corporate dividends-received deduction), quantify that effect in basis points and produce the supporting calculation. Successive Request ALLCO-214: (Follow-up to ALLCO-100 the Companys own traded securities.) Subpart (c) asked the Company to confirm that it does not dispute the accuracy of publicly available market prices and yields for its traded preferred series; the response states that the Company will review and if it can, will confirm the accuracy of that data at the appropriate time. The appropriate time is now. State: (a) whether the Company disputes that the $3.24 Series G preferred (CNLPL) closed at $51.82 on October 16, 2026, for a current yield of 6.25 percent, and if it does, the price and yield it contends are correct and the source; (b) whether Ms. Bulkley or the Company contends that the investor-required return on the Companys common equity exceeds the yield at which investors hold the Companys own cumulative preferred stock by approximately 400 basis points, and each reason the difference is justified by the difference in risk between those two securities of the same issuer; and (c) the yield to maturity on each series of the Companys outstanding first mortgage bonds as of the date of Ms. Bulkleys analysis and as of the date of the response, and the source.
  8. Page 27 of 39

    Previously Served ALLCO-100: (Follow-up to ALLCO-052.) The response states that Ms. Bulkley did not rely upon the requested information and has not compiled it. Two subparts did not ask what Ms. Bulkley relied upon. Subpart (d) asked the Company to state whether ANY analysis considering the market prices or yields of the Companys or Eversource Energys own outstanding securities exists, and if not, to explain why companyspecific market evidence was not considered while proxy-group estimates for other companies were. Subpart (e) asked whether the Company contends the risk difference between its preferred stock and its common equity justifies a premium of approximately 400 basis points. Answer both: (a) state affirmatively whether any such analysis exists anywhere in the Companys or its witnesses files, and if none exists, provide the requested explanation; (b) state the Companys position on subpart (e), or state that it has none; and (c) confirm that the Company does not dispute the accuracy of publicly available market prices and yields for its traded preferred series, including the $3.24 Series G (CNLPL), as of any date Allco may cite. Successive Request
  9. Page 28 of 39

    Previously Served ALLCO-088: (Follow-up to ALLCO-149 outside legal expense by matter.) The response states that [f]or all outside counsel legal matters there is a legal matter number maintained in the Thomson Reuters Legal Tracker e-billing system. Using that system, state in native format for the Test Year and for 2023, 2024, and 2026 year to date: (a) for each outside-counsel matter with billings exceeding $10,000, the matter number, the vendor, the amount billed, the amount charged or allocated to the Company, the FERC account, the category of matter (litigation, regulatory, transactional, employment, collections, other), and, for litigation, the forum and the adverse partys relationship to the Company (customer, developer or interconnection customer, contractor, employee, regulator, other); (b) the amounts in (a) billed by Day Pitney LLP, Cowdery Murphy & Healy LLC, Keegan Werlin LLP, and Steptoe & Johnson LLP for matters involving Allco or its affiliates, Windham Solar LLC, any distributedgeneration interconnection dispute, FERC Docket No. EL25-117-000, Civil Action No. 3:26-cv-01277, PURA Docket No. 25-03-12, or the SCEF program, by matter; (c) whether any amount in (b) is included in the Test Year cost of service, the Rate Year revenue requirement (including through the escalation applied in Schedule C-3.20), or Exhibit CLP-REVREQ-9, and where; and (d) if the Company contends that the Legal Tracker system cannot produce the report described in (a), the person who made that determination and the steps taken to test it. Successive Request ALLCO-220: (Distributed generation output at the Companys peaks follow-up to ALLCO-088, Attachment 1 and Q-ALLCO-185.) ALLCO-088, Attachment 1 estimates the Companys distributed solar output at the ISO-New England system-wide monthly peak hour. State in native format, for each month of 2020 through 2025: (a) the same estimate at the hour of the Companys monthly network-load peak identified in Q-ALLCO-217(a) and at the hour of the Companys own monthly system peak identified in Q-ALLCO219(a); (b) the estimated output at the ISO-New England annual peak hour identified in Q-ALLCO218(a); (c) the installed capacity (MW AC) of distributed generation under five megawatts in the Companys service territory assumed for each month, stated separately for generation that is behind a customer meter and generation that is separately metered, and reconciled to the 75,727 facilities and 742.5 MW reported in ALLCO-095; (d) the capacity factor or production profile applied to that installed capacity for each peak hour and its source (including any ISO-New England behind-the-meter photovoltaic forecast, PVWatts or PVsyst profile, or metered production data from the Companys own production meters), and why Attachment 1 reports zero output at the 18:00 and 19:00 peak hours of May through September in several years; and (e) whether the Company has, for any purpose, estimated the reduction in Regional Network Service or Local Network Service charges, or in Capacity Load Obligation, attributable to distributed generation in its service territory in any year since 2016, and if so produce each such estimate (ALLCO-088(e) answered only that the Company has not expressly done so; state whether it has done so in any other manner, including in load forecasts that net out behind-the-meter generation).
  10. Page 29 of 39

    Previously Served ALLCO-044: With respect to each cost category included in the percentage overhead or "CIAC" rates applied to interconnection upgrade, study, and construction costs charged to distributed generation, qualifying facility, and other interconnection customers (including, without limitation, project management, engineering and supervision, administrative and general expense, employee benefits or compensation loaders, insurance, and Eversource Energy Service Company charges): (a) identify each such cost category and its share of the overhead rate in effect in each year 2018 through 2025; (b) state whether the costs in each such category were included, in whole or in part, in the test-year cost of service and revenue requirement approved in the Company’s most recent prior general distribution rate proceeding, Docket No. 17-10-46, and therefore recovered from all ratepayers through base distribution rates during 2018 through the present; (c) if the answer to any part of subpart (b) is affirmative, explain why applying overhead rates that include the same cost categories to amounts charged to interconnection customers does not result in the Company recovering the same costs twice — once from ratepayers generally and again from interconnection customers; (d) quantify, for each year 2018 through 2025, the total dollar amount of overheads collected from interconnection customers in cost categories that were also reflected in base rates; and (e) state whether amounts collected from interconnection customers through overhead rates are recorded as a credit or offset to the corresponding expense or plant accounts recovered in base rates and, if not, where those amounts are recorded, consistent with the Company’s description of its netting treatment of third-party attacher billings in its response to RRU002. Successive Request ALLCO-225: (Overheads recovered in base rates Docket No. 17-10-46.) State: (a) the amount of administrative and general expense, engineering and supervision, construction overhead, and other indirect cost included in the distribution revenue requirement approved in Docket No. 17-10-46, by FERC account, and the amount of each proposed in this docket; (b) the capitalized overhead and clearing-account rates (including the engineering, supervision, administrative, and construction-overhead loaders identified in ALLCO-102, Attachment 1) in effect in each year 2018 through 2026, and the dollar amount of overhead capitalized to distribution plant in each year; (c) for each year 2018 through 2025, the dollar amount of overhead charged to interconnection customers and other customer-funded work orders through those loaders, and whether that amount was credited against the overhead pool recovered through base rates, capitalized plant, or both identifying the account and the credit; (d) whether any portion of the overhead charged to interconnection customers consists of costs that are also recovered from all customers through base rates set in 17-10-46 or proposed here, and if the Company contends there is no such double recovery, the reconciliation that shows it; and (e) the percentage overhead rate applied to customer-funded interconnection work in 2018, when 17-10-46 rates took effect, and each change since, with the approval for each change.
Words on different pages

As listed on the current system

Response to Motion No.: 084 - 10/27/2026 (Eversource Energy) - Type Response = Supplemental Filing [26-05-10]

This filing on the current system (opens in a new tab)