Response to Motion No. 084
Response type: Supplemental Filing
Files3
26-05-10 ES Supplemental Response to Motion No. 084 10.27.26.pdf
PDF · 247 KB · 8 pagesText searchable
Download 26-05-10 ES Supplemental Response to Motion No. 084 10.27.26.pdfRead the text of 26-05-10 ES Supplemental Response to Motion No. 084 10.27.26.pdf
26-05-10 ES Supplemental Response - Attachment 1.pdf
PDF · 460 KB · 39 pagesText searchable
Download 26-05-10 ES Supplemental Response - Attachment 1.pdfRead the text of 26-05-10 ES Supplemental Response - Attachment 1.pdf
26-05-10 ES Supplemental Response - Attachment 2.pdf
PDF · 142 KB · 11 pagesText searchable
Download 26-05-10 ES Supplemental Response - Attachment 2.pdfRead the text of 26-05-10 ES Supplemental Response - Attachment 2.pdf
Page 30 of 39
Previously Served ALLCO-060: For each calendar year 2017 through 2025 and for the test year, state: the total dollar amount of overhead charges — meaning every percentagebased loader, markup, or "CIAC"/overhead component applied to interconnection study, upgrade, or construction costs, including without limitation project management, engineering and supervision, administrative and general expense, employee compensation or benefits loaders, insurance, and Eversource Energy Service Company charges — billed to or collected from interconnecting customers of every kind (distributed generation, qualifying facility, commercial, municipal, or other), stating separately for each year the total base costs against which the overheads were applied and the effective overall overhead percentage; the total dollar amount credited, refunded, or otherwise returned to interconnecting customers in each such year on account of overhead charges — whether through final accountings, true-ups, reconciliations, billing corrections, settlements, or otherwise — stating separately any interest paid; the resulting net amount of overhead charges retained by the Company for each year and cumulatively for the full period; the FERC account(s) in which the retained amounts are recorded, and whether and where those amounts are reflected as an offset, credit, or reduction in the rate base, revenue requirement, or cost of service presented in this Application; and if the Company cannot provide any component of the foregoing from its books and records, a description of each system or record set that would contain the information and the specific reason the total cannot be derived. Successive RequestPage 31 of 39
Previously Served ALLCO-059: For each project or interconnection for which the Company collected, billed, or recorded contributions in aid of construction ("CIAC") — including any percentage overhead or "CIAC" charge applied to interconnection study, upgrade, or construction costs, and any SHARE or other prepaid capital contribution treated as CIAC — in each year 2018 through 2025 and in the test year, provide a schedule, in native (Excel) format, identifying: the project or interconnection name and work-order number; the customer or counterparty type (distributed generation, qualifying facility, third-party attacher, municipal, or other); the construction or upgrade cost of the project; the CIAC amount collected or billed, stating separately the base construction component, each overhead or loader component and the percentage applied, and any tax gross-up; the FERC account(s) in which each amount was recorded and the amount, if any, netted against or offsetting plant in service; and whether the amount has been the subject of any final accounting, true-up, reconciliation, or refund, and if so the amount and date of any refund and any interest paid. Reconcile the annual totals in this schedule to (i) the annual CIAC totals provided in response to QALLCO-002, and (ii) the "Deferred Taxes on CIAC, Net of Gross-up" amounts included in rate base on Schedule B-1.0 ($35,961,000 for the test year), identifying the CIAC balances from which those deferred tax amounts are derived. ALLCO-063: For each month of the test year, produce the ISO New England settlement statements (including any resettlements) for the Company’s load asset(s), showing the kilowatt-hours of Real-Time Load Obligation charged or settled to the Company, and state the monthly and annual settled kilowatt-hour totals. Reconcile the annual ISO-NE settled kilowatthours to the total retail kilowatt-hours billed to all customers (Q-ALLCO-061) and (b) the kilowatt-hours billed to standard-service customers (Q-ALLCO-062), separately itemizing and quantifying each reconciling item — including distribution losses, transmission losses, unaccounted-for energy, company use, station service, unbilled or estimated usage, and any other category — and stating the loss factor(s) applied at each stage and their source. Identify the system(s) and process by which the Company performs retail load settlement, and identify (by title, date, and custodian) every internal load-settlement, unaccounted-forenergy, or loss-study report prepared or updated for any period including the test year. Successive Request ALLCO-226: (Exhibit CLP-Additions-4 Supplemental 2 distributed-generation interconnection projects.) Exhibit CLP-Additions-4 Supplemental 2 (filed October 19, 2026) reports, for projects categorized as New Customer distributed-generation interconnections, negative life-to-date direct costs but positive total costs and in-service additions for example CD01237 (Bristol Solar One Interconnection: direct −$104,968; total $209,423), CD00450 (Lisbon/Preston 20 MW Solar: −$421,868; $443,186), CD00794 (Pawcatuck Solar Center: −$81,796; $530,316), CD01242 (SRLitchfield Interconnection: −$879,493; $352,781), CD01244 (SR N Stonington Interconnection: −$751,160; −$132,892), and CD01594 (Haddam Qtr Solar: −$191,799; −$6,523). For each project in that exhibit whose description or project type indicates a generator interconnection, state in native format: (a) the gross direct cost, the customer contribution credited, each overhead or indirect loader applied (by name, rate, and dollar amount), and the resulting total cost; (b) the amount placed in rate base and the amount of the customer contribution recorded as CIAC, by account; (c) whether the overhead charged to the interconnection customer on the same work order was credited against the overhead capitalized, and if not, why not; and (d) the final accounting status of the project under Guidelines 1.2 and the amount of any refund due or paid. ALLCO-227: (Follow-up to ALLCO-152 loss factors.) The response states that for ISO-NE load settlement the Company does not apply a static value to convert metered retail sales to wholesale loads. State: (a) the method the Company does apply, step by step, including each loss factor, allocation, or estimation used, and its source; (b) the most recent distribution loss study the Company or Eversource Energy Service Company has prepared or commissioned for the Connecticut system, by title, date, and author, and produce it; (c) the annual 2025 totals of the hourly wholesale loads in ALLCO-063, Attachment 1, for Standard Service, Last Resort Service, and competitive supply, and the annual 2025 retail kWh billed in CIEC020, Attachment 2 stated as numbers, not by crossreference and the difference; and (d) the Companys best estimate of the components of that difference (technical losses, unaccounted-for energy, company use, unbilled usage, and other), with the basis for each.Page 32 of 39
Previously Served ALLCO-033: With respect to the outside legal expense itemized by vendor in the Company’s response to OCC-309, Attachment 1: for each vendor listed, provide a breakdown of the Test Year (2025) expense by matter, stating for each matter: (a) a description of the matter sufficient to identify its nature — for litigation, the court and caption (or, if privilege is asserted as to a caption, the category of dispute and the adverse party’s relationship to the Company, e.g., customer, developer, contractor, employee, regulator); for regulatory matters, the agency and docket number; and for transactional, collections, employment, or other matters, the category; (b) the amount billed to or allocated to the Company for that matter in the Test Year; (c) whether the Company (or an affiliate) is the plaintiff/claimant or the defendant/respondent in the matter; (d) whether the matter has been concluded or remains pending; and (e) the FERC account charged and whether the amount is included in the proposed Rate Year revenue requirement (including through the GDP-PI escalation applied in Schedule C-3.20). This interrogatory seeks matter-level detail for the Test Year amounts only and does not repeat OCC-309 or QALLCO-019. ALLCO-062: For the test year, state the actual kilowatt-hours billed to customers who did not take generation service from a licensed third-party electric supplier — that is, customers taking standard service or supplier-of-last-resort service from the Company: in total; (b) by month; and (c) by rate class, together with the corresponding monthly customer counts. State separately the monthly kilowatt-hours billed to customers served by third-party suppliers, so that the two categories sum to the totals provided in response to Q-ALLCO-061. Provide the data in native (Excel) format. Successive Request ALLCO-228: (Follow-up to ALLCO-149 outside legal expense by matter.) The response states that [f]or all outside counsel legal matters there is a legal matter number maintained in the Thomson Reuters Legal Tracker e-billing system. Using that system, state in native format for the Test Year and for 2023, 2024, and 2026 year to date: (a) for each outside-counsel matter with billings exceeding $10,000, the matter number, the vendor, the amount billed, the amount charged or allocated to the Company, the FERC account, the category of matter (litigation, regulatory, transactional, employment, collections, other), and, for litigation, the forum and the adverse partys relationship to the Company (customer, developer or interconnection customer, contractor, employee, regulator, other); (b) the amounts in (a) billed by Day Pitney LLP, Cowdery Murphy & Healy LLC, Keegan Werlin LLP, and Steptoe & Johnson LLP for matters involving Allco or its affiliates, Windham Solar LLC, any distributedgeneration interconnection dispute, FERC Docket No. EL25-117-000, Civil Action No. 3:26-cv-01277, PURA Docket No. 25-03-12, or the SCEF program, by matter; (c) whether any amount in (b) is included in the Test Year cost of service, the Rate Year revenue requirement (including through the escalation applied in Schedule C-3.20), or Exhibit CLP-REVREQ-9, and where; and (d) if the Company contends that the Legal Tracker system cannot produce the report described in (a), the person who made that determination and the steps taken to test it. ALLCO-229: (Follow-up to ALLCO-151 corrected billing-determinant data.) Produce ALLCO-062, Attachment 1 corrected for the January 2025 Rate 35 input error acknowledged in ALLCO-151(a), and for each other monthly figure in that attachment that is negative or that departs from the rate classs other months by a factor of two or more, state whether the figure reflects a billing correction, a cancel-and-rebill, a customer migration between standard service and competitive supply, or an input error, and provide the corrected figure where applicable; state whether any figure in the attachment was used, directly or through the annual totals in OCC-365, Attachment 1, in deriving the Test Year or Rate Year billing determinants; and identify the person who verified the corrected attachment.Page 33 of 39
Previously Served ALLCO-108: For the $257,260.19 of net refunds computed in the December 2024 Final Accounting Reports, and separately for every other interconnection refund computed but unpaid at any time from 2017 through the present: (a) state the account in which each computed refund is or was recorded as a liability, the date recorded, and the current balance; (b) state whether and where those liabilities are reflected in the test year and rate year cost of service and balance sheet presented in this proceeding, including any offset to rate base; (c) state the amounts of interest or earnings the Company has realized on interconnection-related funds held in FERC Account 252500 or elsewhere, by year, and how those earnings are treated in the cost of service; and (d) provide, in native format, a schedule of every interconnection refund computed from 2017 through the present showing the customer (by anonymized identifier for non-Allco customers), the amount computed, the date computed, the date paid, and the amount outstanding. Successive Request ALLCO-230: (Accounting treatment of developer funds held by the Company.) For each of the following sums, state, by general-ledger account number and title, how the Company recorded the receipt, and each subsequent reclassification, of the funds; the date of each entry; whether the funds were at any time recorded as a liability to the developer, as forfeited security, as a credit to ratepayers or to the LREC/ZREC, SCEF, or interconnection cost-recovery mechanisms, or as revenue; the FERC account and rate-case schedule, if any, in which the balance appears; and the person who authorized each entry: (a) the $257,260.19 of interconnection-cost refunds computed in the Final Accounting Reports issued in December 2024 for the Allco-affiliate projects and confirmed in the Companys January 16, 2025 correspondence; (b) the $225,000 of SCEF Year 6 bid deposits posted by Allco affiliates in 2025; (c) the $734,339.76 of Performance Assurance posted under the LREC/ZREC contracts terminated in 2024; and (d)Page 34 of 39
ALLCO: 207: (Follow-up to OCC-894 performance assurance sacrifices credited to the NBFMCC.) OCC894 states that [p]erformance assurance amounts which are forfeited under the terms of customer contracts or tariff agreements are listed as sacrifices within itemized clean energy program costs submitted for recovery through the Non-Bypassable Federally Mandated Congestion Charge, and reports LREC/ZREC sacrifices of $714,166 (2021), $676,023 (2022), $820,564 (2023), $652,334 (2024) and $68,156 (2025), SCEF sacrifices of $40,000 (2023), $374,750 (2024) and $424,975 (2025), and NRES sacrifices of $3,400, $239,793 and $412,918 for 20232025. For each calendar year 2021 through 2026 (year to date) and each program, state in native format for every amount treated as a sacrifice: (a) the contract or tariff agreement identifier, the counterparty (which may be anonymized other than Allco and its affiliates), the date the amount was received, the date and amount of the forfeiture, the contract or tariff provision invoked, and the Company officer who approved the forfeiture; (b) whether the counterparty had, before the forfeiture, declared force majeure, requested an extension, invoked a dispute-resolution provision, or otherwise disputed the Companys right to the funds, and whether any forfeited amount has since been returned, credited, or is the subject of a pending claim; (c) the RAM docket, exhibit, and line in which the sacrifice was submitted for recovery and the amount by which it reduced the NBFMCC revenue requirement; (d) the FERC account in which the funds were held before forfeiture and the account to which they were transferred, and whether interest was accrued or credited at any point; (e) specifically, whether any amount received from Allco Finance Limited, Ecos Energy LLC, PLH Vineyard Sky LLC f/k/a PLH LLC, Windham Solar LLC, or any project-level affiliate including the Performance Assurance of $367,169.88 posted under the October 21, 2020 REC contracts and the equal amount posted with the March 31, 2023 extension requests, the Development Period Security under the April 12, 2021 power purchase agreements, the Operating Period Security under the three agreements terminated March 31, 2023, the Development Period Security under the four agreements the Sellers terminated effective July 23, 2024, and the $225,000 of SCEF Year 6 bid deposits wired March 5, 2025 has been treated as a sacrifice, recorded as program revenue, or submitted for recovery in any docket, and if so the year, docket, exhibit, and amount; (f) with respect to the statement that [n]o amounts were returned to SCEF program customers because Development Period Security was applied toward and converted into the Operating Period Security, state how bid deposits for bids that were not selected which Section 3.5 of the SCEF Program the $559,907.00 of Development Period Security posted under the power purchase agreements that terminated on or about July 23, 2024. Produce the ledger detail and journal entries in native format.Page 35 of 39
Previously Served Manual requires the EDC to return are recorded, how many such deposits were received and returned in each SCEF solicitation year, the aggregate amount of unselected-bid deposits held at year-end 2025 and at the most recent date available, and the reason any such deposit has been held more than 60 days after selection results; and (g) whether the Company contends that a forfeiture it has credited to ratepayers through the NBFMCC must be reversed through the same mechanism if the counterparty prevails in a dispute over it, and how that contingency is reflected in the Companys accounts. Successive RequestPage 36 of 39
ALLCO-207: (Follow-up to OCC-894 performance assurance sacrifices credited to the NBFMCC.) OCC894 states that [p]erformance assurance amounts which are forfeited under the terms of customer contracts or tariff agreements are listed as sacrifices within itemized clean energy program costs submitted for recovery through the Non-Bypassable Federally Mandated Congestion Charge, and reports LREC/ZREC sacrifices of $714,166 (2021), $676,023 (2022), $820,564 (2023), $652,334 (2024) and $68,156 (2025), SCEF sacrifices of $40,000 (2023), $374,750 (2024) and $424,975 (2025), and NRES sacrifices of $3,400, $239,793 and $412,918 for 20232025. For each calendar year 2021 through 2026 (year to date) and each program, state in native format for every amount treated as a sacrifice: (a) the contract or tariff agreement identifier, the counterparty (which may be anonymized other than Allco and its affiliates), the date the amount was received, the date and amount of the forfeiture, the contract or tariff provision invoked, and the Company officer who approved the forfeiture; (b) whether the counterparty had, before the forfeiture, declared force majeure, requested an extension, invoked a dispute-resolution provision, or otherwise disputed the Companys right to the funds, and whether any forfeited amount has since been returned, credited, or is the subject of a pending claim; (c) the RAM docket, exhibit, and line in which the sacrifice was submitted for recovery and the amount by which it reduced the NBFMCC revenue requirement; (d) the FERC account in which the funds were held before forfeiture and the account to which they were transferred, and whether interest was accrued or credited at any point; (e) specifically, whether any amount received from Allco Finance Limited, Ecos Energy LLC, PLH Vineyard Sky LLC f/k/a PLH LLC, Windham Solar LLC, or any project-level affiliate including the Performance Assurance of $367,169.88 posted under the October 21, 2020 REC contracts and the equal amount posted with the March 31, 2023 extension requests, the Development Period Security under the April 12, 2021 power purchase agreements, the Operating Period Security under the three agreements terminated March 31, 2023, the Development Period Security under the four agreements the Sellers terminated effective July 23, 2024, and the $225,000 of SCEF Year 6 bid deposits wired March 5, 2025 has been treated as a sacrifice, recorded as program revenue, or submitted for recovery in any docket, and if so the year, docket, exhibit, and amount; (f) with respect to the statement that [n]o amounts were returned to SCEF program customers because Development Period Security was applied toward and converted into the Operating Period Security, state how bid deposits for bids that were not selected which Section 3.5 of the SCEF Program ALLCO-233: (Treatment of forfeited developer security in rates.) State the total amount of developer security, bid deposits, and interconnection-cost overpayments retained or treated as forfeited by the Company in each year 2019 through the Rate Year; the mechanism (LREC/ZREC reconciliation, SCEF reconciliation, FMCC, base rates, or other) through which each amount was credited to or otherwise reflected in rates, with the docket and schedule; whether any such amount is reflected in the revenue requirement, rate base, or reconciliation balances proposed in this Docket; and whether the Company has ever returned security or deposits after first treating them as forfeited, identifying each instance.Page 37 of 39
Previously Served Manual requires the EDC to return are recorded, how many such deposits were received and returned in each SCEF solicitation year, the aggregate amount of unselected-bid deposits held at year-end 2025 and at the most recent date available, and the reason any such deposit has been held more than 60 days after selection results; and (g) whether the Company contends that a forfeiture it has credited to ratepayers through the NBFMCC must be reversed through the same mechanism if the counterparty prevails in a dispute over it, and how that contingency is reflected in the Companys accounts. ALLCO-010: State the Test Year and projected Rate Year costs of administering the Company’s Connecticut distributed generation interconnection program (including employee and contractor headcount and costs, and any allocations from Eversource Energy Service Company or from Burns & McDonnell or other third-party project management vendors), and identify where those costs appear in the proposed revenue requirement. Successive Request ALLCO-055: Follow-up to the Company’s response to Q-ALLCO-010 (third-party and affiliate interconnection administration costs). The Company’s response quantified the labor($616,047 test year; $660,100 rate year) and outside-services ($640,960 test year; $682,263 rate year) components of its Connecticut DG interconnection program administration costs, but did not respond to the portion of Q-ALLCO-010 concerning amounts paid to, or allocated from, Burns & McDonnell and Eversource Energy Service Company. For the test year and each rate year: state the total amount paid to Burns & McDonnell (or any successor or affiliated engineering contractor) for services relating to the interconnection of distributed generation in Connecticut, and state whether that amount is included within the $640,960/$682,263 outside-services figures identified in the Company’s response; state the total amount of Eversource Energy Service Company costs allocated to CL&P for services relating to the interconnection of distributed generation in Connecticut, identify the allocation method, and state whether that amount is included within the figures identified in the Company’s response; and if any amount identified in (a) or (b) is not included in those figures, identify the schedule, account, and cost-of-service line item in which it is recovered.Page 38 of 39
Previously Served ALLCO-011: Produce the "preliminary analysis" referenced in Exhibit CLP-TSP-3 at 144 supporting the proposed "Avg. Interconnection Fee: < $500/kW," and the workpapers supporting the prospective SHARE fees of $392/kW (Tracy 14M group), $308/kW (Frybrook 13B group), and $192/kW (Campville 14R group) and the associated total distribution investment estimates of $180 million, $30 million, and $65 million (Exhibit CLP-TSP-3 at 146-149). ALLCO-016: State, for each year 2020 through 2025, the number and aggregate MW of DER interconnection applications that would be excluded from the proposed Level 1 DER Interconnection Processing metric because they "require electric power system modifications" (Exhibit CLP-CUSTOMER-1 at 34 n.22), as a count and as a percentage of all applications and of all applied-for MW, and explain the basis for excluding such projects from a metric intended to measure interconnection performance. Successive Request ALLCO-056: Follow-up to the Company’s response to Q-ALLCO-011 (basis for SHARE program fees). The Company’s response states that the allocation of substation project costs to distributed energy resources for purposes of the SHARE fee is based on a "preliminary technical review," and the Company’s prefiled testimony references a preliminary analysis (Exhibit CLP-TSP-3 at 144). Produce the preliminary technical review and any preliminary analysis — including all workpapers, models, and calculations in native (Excel) format with formulas intact — supporting the allocation of $85.5 million of the Tracy substation project, $16.3 million of the Frybrook substation project, and $36.1 million of the Campville substation project to distributed energy resources. If no such review or analysis exists in documentary form, so state, and identify each person who performed the review, when it was performed, and the methodology and inputs used. ALLCO-057: Follow-up to the Company’s response to Q-ALLCO-016 (applications excluded from interconnection performance metrics). The Company’s response and Attachment 1 provided annual counts of interconnection applications excluded from the Company’s interconnection-timeline performance metrics because they require transformer upgrades (187 in 2020; 142 in 2021; 122 in 2022; 406 in 2023; 534 in 2024; 671 in 2025), but did not provide the percentage figures and total-application denominators requested. For each calendar year 2020 through 2025: state the total number of Connecticut DG interconnection applications received; state the total number of applications completed or otherwise closed; and state the excluded applications identified in the Company’s response as a percentage of each of (a) and (b). If the Company contends it cannot derive these figures from PowerClerk or any other system, describe each system of record for interconnection applications and state which data fields it maintains.Page 39 of 39
Previously Served ALLCO-019: With respect to the injuries and damages expense, judgments and settlements, and outside legal expense that are the subject of OCC-303, OCC-308, and OCC-309, identify the portion of each that relates to disputes with distributed generation developers, qualifying facilities, or interconnection customers (including disputes with Allco or its affiliates), stating the amount, FERC account, and matter; and state whether the Company proposes to recover through rates any judgment, settlement, refund, or interest obligation arising from such disputes. ALLCO-002: State the total dollar amount of CIAC and interconnection-related payments collected from DER and QF interconnection customers in each year 2018 through 2025, and explain precisely how those amounts are reflected in (a) rate base, (b) the Test Year revenue requirement, and (c) the Rate Year revenue requirement proposed in this docket, identifying the specific schedules and workpapers. Successive Request ALLCO-058: Follow-up to the Company’s response to Q-ALLCO-019 (recovery of DG dispute obligations through rates). The Company’s response did not answer the final portion of Q-ALLCO-019. State whether the Company proposes, in this proceeding, to recover through rates — whether in base rates, through any rate adjustment mechanism, or through any deferral or regulatory asset — any judgment, settlement payment, refund, or interest obligation arising from any dispute with a distributed generation or qualifying facility customer, including without limitation any refund or interest obligation to Allco or its affiliates arising from overcharges for interconnection-related costs. If so, identify each such amount, the schedule and line item in which it appears, and the witness sponsoring it. If not, state the accounting treatment the Company proposes for any such judgment, settlement, refund, or interest obligation that becomes payable during the rate plan term, including the account to be charged and whether shareholders or ratepayers would bear the cost. ALLCO-59: For each project or interconnection for which the Company collected, billed, or recorded contributions in aid of construction ("CIAC") — including any percentage overhead or "CIAC" charge applied to interconnection study, upgrade, or construction costs, and any SHARE or other prepaid capital contribution treated as CIAC — in each year 2018 through 2025 and in the test year, provide a schedule, in native (Excel) format, identifying: the project or interconnection name and work-order number; the customer or counterparty type (distributed generation, qualifying facility, third-party attacher, municipal, or other); the construction or upgrade cost of the project; the CIAC amount collected or billed, stating separately the base construction component, each overhead or loader component and the percentage applied, and any tax gross-up; the FERC account(s) in which each amount was recorded and the amount, if any, netted against or offsetting plant in service; and whether the amount has been the subject of any final accounting, true-up, reconciliation, or refund, and if so the amount and date of any refund and any interest paid. Reconcile the annual totals in this schedule to (i) the annual CIAC totals provided in response to QALLCO-002, and (ii) the "Deferred Taxes on CIAC, Net of Gross-up" amounts included in rate base on Schedule B-1.0 ($35,961,000 for the test year), identifying the CIAC balances from which those deferred tax amounts are derived.
As listed on the current system
Response to Motion No.: 084 - 10/27/2026 (Eversource Energy) - Type Response = Supplemental Filing [26-05-10]