Response to Motion No. 084
Response type: Comment
Filed by Allco Renewable Energy Limited1 file
Part of docket 26-05-10Files1
Allco_PURA_26-05-10_COMMENTS_Eversource_Additional_Information_Motions_084_099 TMM.pdf
PDF · 349 KB · 24 pagesText searchable
Download Allco_PURA_26-05-10_COMMENTS_Eversource_Additional_Information_Motions_084_099 TMM.pdfRead the text of Allco_PURA_26-05-10_COMMENTS_Eversource_Additional_Information_Motions_084_099 TMM.pdf
Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
Page 11 of 24
answers an interrogatory “without waiving” one objection does not thereby reserve every other objection it might later think of. The Authority should hold the Company to the objections it made. If it reaches the new ones, they fail for the reasons below. B. “Requires creation of analysis” is not a ground for refusing to answer, and the Company has not shown burden. The Uniform Administrative Procedure Act does not recognize an objection that an interrogatory requires the respondent to compile information from its own records. The provisions the Company cites — General Statutes § 4-177c(a), which guarantees a party the opportunity to inspect and copy relevant materials and to present evidence and argument, and § 4-178(1), which directs the exclusion of “irrelevant, immaterial or unduly repetitious evidence” at hearing — say nothing about compilation, and the Authority has already held that the second is an evidentiary rule that does not limit discovery to what is admissible. Ruling at 5 & n.6 (quoting Office of Consumer Counsel v. Dept. of Public Utility Control, 44 Conn. Supp. 21, 26– 27 (1994)). Every interrogatory a regulator serves on a utility asks it to compile something; the Company’s responses to the Authority’s own RRU interrogatories — the overhead-rate components in RRU-055 and RRU-079, the cash-flow narrative and attachment in RRU-137, the seven monthly trial-balance attachments to RRU-140 — are compilations the Company does not “maintain in the ordinary course of business.” So are the ones it has chosen to make for Allco: the forty-seven-project DG capital schedule it produced as ALLCO-178, Attachment 1, and the general-ledger extract it produced as ALLCO-059-SP01, Attachment 1. So are the PowerClerk exports it produced to the Interconnection Customer Coalition within days of being asked (ICC014, -015, -017). The Company compiles when it wants to. The question is whether the records exist, and on that the Company’s own responses are unequivocal: interconnection applications and milestones are tracked in PowerClerk (ALLCO-154(a), (d)); charges are accumulated at the work-order level by cost element (ALLCO-102, Attachment 1); final accountings are performed in “multiple systems” (ALLCO-103); outside-counsel matters each carry a Legal Tracker number (ALLCO-155); customer advances sit in Accounts 252500 and 252010 (ALLCO-001; RRU-140). Running a report from a system the Company already uses is not the creation of analysis. Nor has the Company shown burden. Not one of the 38 “overly burdensome” rows states the number of records, the hours, or the cost involved; each recites the same sentence that the 11Page 12 of 24
Company “is not able [to] create the requested analysis without manually” reviewing something. When Allco asked the Company to state the hours and cost of producing one such compilation (ALLCO-154(c)), it refused. A burden objection unsupported by any estimate of the burden is an assertion, not a showing, and the Authority told the parties on November 2 that assertions would not do. Where the Company genuinely cannot compile — and ALLCO-060(e) asked it to say so and to identify the system that holds the data, which it also refused — the remedy is to produce the native records and let Allco do the arithmetic, not to produce nothing. C. The rows marked “Fully” are not fully answered. Twenty-seven rows are marked “Fully.” In most of them the Company’s own “Additional Information” column shows the opposite. Five patterns account for nearly all of them. “Does not track.” The Company marks as fully answered interrogatories to which its answer was that it does not keep the information: the interval between a generator’s execution of an interconnection agreement and the Company’s countersignature (ALLCO-017), the overheadattributable share of the CIAC tax gross-up (ALLCO-064), and interconnection complaints and disputes (ALLCO-113(a)–(d), by reference to ALLCO-182: “[o]utside of Eversource Legal, the Company does not track the requested information”). “We do not track it” is a complete answer only if the information cannot be derived from records the Company does keep. ALLCO-017 asked for the 2026 PowerClerk execution-date data the Company admits it “now” records; none has been produced. ALLCO-064 can be answered from the same ledger and work-order records that produced ALLCO-064, Attachment 1, whose “Gross-Up Refund” column is zero in every month from 2017 to 2025. ALLCO-113 asked for the disputes, not for a tracking system; the Company’s Legal department, by its own account, handles them, and ALLCO-182 identified eight of them. “Cannot be produced.” ALLCO-132(a) asked for the monthly PowerClerk report that management reviews. The Company’s answer — “[t]his is not a formal report, but an internal tool. The requested information cannot be produced” — is marked “Fully.” A report that exists and is circulated monthly (ICC-010) can be produced; whether the Company calls it a report or a tool does not bear on whether it is a document. “Refer to another response that does not answer.” ALLCO-102(b) asked for each overhead policy from 2017 to the present; the Company produced its current policy and marks 12Page 13 of 24
the request full. ALLCO-108(b) asked where unpaid refund liabilities are reflected in the test year, rate year and balance sheet and whether they offset rate base; the Company refers to ALLCO-157(d), which says only that customer advances are not in the lead-lag study. ALLCO110(a) asked for the written policy under which the Company refunds the percentage “CIAC fee” to Form 556 customers — a refund its own Final Accounting Reports describe — and the Company refers to ALLCO-064, which concerns the deductibility of refunds for tax purposes. ALLCO-122(b) and -132(b) asked for the authority for, and the adoption date of, the practice of withholding an executable interconnection agreement pending ISO-New England review; the Company refers to ALLCO-184, which says only that projects over 1 MW “may be subject to” ISO-NE planning procedures, and to “the relevant language in the PURA-approved Guidelines” without citing a section. ALLCO-122(d) asked whether the Guidelines authorize that practice; the Company refers to ALLCO-132, which refers to the Guidelines. ALLCO-149(d) asked what portion of the Keegan Werlin and Steptoe test-year billings related to this Application; the Company says it “reviewed the transactions” and that “no further adjustments were necessary,” which is a conclusion, not the portion. ALLCO-152(b) asked for the method and loss study by which retail sales are converted to wholesale load; the answer that the Company “does not apply a static value” describes what the method is not. ALLCO-152(c) asked for two annual totals and the difference; the Company says the numbers are “in the record” and “cannot equal one another,” and supplies neither total. “We will supplement to clarify.” ALLCO-133(b) and (c) are marked “Fully” in the same row in which the Company “proposes to provide a supplement . . . to clarify this response.” A response that needs clarifying is not a full response, and the Company should be directed to serve the supplement by a date certain rather than “[s]ubject to PURA’s ruling.” “All identifiable time” and “no such costs were included.” ALLCO-150(d) asked for inhouse Legal time charged to the federal case; the Company says it has provided “all identifiable time,” having told Allco in the same response that its attorneys charge Allco work to the general CL&P regulatory time code and “do not typically distinguish” it. The identifiable time is therefore none, and the WorkForce records that would identify it (ALLCO-153) are withheld as “confidential.” ALLCO-153(c), (d) and (f) are marked “Fully” on the strength of the Company’s assurance that no non-regulated legal cost is in the rate year; the interrogatories asked for the 13Page 14 of 24
time records that would test the assurance, and a protective order is in place for exactly that purpose. Finally, ALLCO-142(e) and -143(e) asked the Company’s cost-of-capital witness to perform the same return and credit-metric computation he performs in his testimony at four alternative returns on equity; the Company’s refusal to do so on the ground that the results would be “unreliable and misleading” is marked “Fully.” A refusal is not an answer, and the Authority, not the witness, decides what is misleading. The Company’s own Attachment 3 to ALLCO-143 computes pre-tax return at each requested ROE; what is missing is the same computation with the cost of debt it concedes would change (ALLCO-143(c)). D. The rows marked “Partially” with a supplement “subject to PURA’s ruling.” In eight rows the Company states that, “[s]ubject to PURA’s ruling on Motion Nos. 084 & 099,” it “proposes to provide a supplement”: ALLCO-018 (no variable compensation in overheads), ALLCO-104(c) (refund-authorization levels), ALLCO-108(c) (interest on Account 252500), ALLCO-121(a) (the PowerClerk status fields), ALLCO-128(e) (how estimates are derived), ALLCO-133(b)–(c), ALLCO-145(a)(v) (no board cost-of-capital presentation since 2022) and ALLCO-151(d) (corrected billing-determinant attachment). No ruling is needed for a party to supplement a response it concedes is incomplete, and nothing prevented the Company from serving these supplements on November 12 with Table 1. Allco asks that they be ordered served within five business days. Allco notes what the offered supplements will not reach: ALLCO-018 asked for each loader component and rate and the amounts charged to interconnection customers, not only whether incentive compensation is among them; ALLCO121(a) asked whether each status field is time-stamped automatically or manually, which the “printout of the 140 different statuses” must answer field by field; and ALLCO-133(d) — the reconciliation of the $1.26 million of program-administration cost in the revenue requirement with the administration charges collected from interconnection customers — is left blank in Table 1’s “Additional Information” column, as is ALLCO-102(d). E. “Materiality” and the Allco-specific requests. The Company’s materiality objection is stated in identical words in 69 rows: the information “is not material to the Company’s rate case application, nor is it relevant to determine whether a material fact in the Company’s rate case application is more or less probable.” That is a formula, not a showing, and it is directed mostly at the interrogatories 14Page 15 of 24
concerning the four Allco clusters and the two completed Windham and Abington interconnections (ALLCO-101, -104, -105, -107, -126, -127, -128(a)–(c), -132(c)–(d), -147(c)). Allco’s Table 2 states, row by row, what each answer will show and the rate-case issue it bears on; Allco does not repeat that here. Three general points answer the objection. First, the Allco projects are the only interconnections in the record for which completed final accountings exist, and they are the Company’s own documents: a December 2024 Final Accounting Report that computed refunds the ledger shows unpaid through 2025; a November 2020 statement by the Company’s manager that actual overhead was “around $100,500 versus an original estimate of $253,876”; $115,428.30 of customer money credited to a maintenance-expense account. Those are not Allco’s grievances. They are the only test, on this record, of whether the practices the Company applies to every interconnection customer — percentage loaders, estimate-based grossups, reconciliation years after in-service — do what the Company says they do, and whether the $17.7 million of customer-funded capital additions it reports (ALLCO-178, Attachment 1) is correctly stated in the rate base it asks the Authority to approve. Second, the Company has put the subject at issue itself: it proposes an interconnection performance metric (Exhibit CLPCUSTOMER-1 at 34), seeks recovery of the interconnection customer-service function and of $47.6 million of SHARE investment, and reports customer advances as a source of working capital while showing no short-term debt (RRU-137). Third, where the Company’s objection is that an interrogatory asks about Allco alone, the Authority has Allco’s standing alternative request: order the answer as to all interconnection customers, which the Company has never accepted — the tell that “Allco-specific” was never the real objection. The “names of specific Eversource personnel” rows (ALLCO-102(a), (c); -104; -105(a), (c), (d); -107(b); -110(c); -111) stand on a different footing and fail for a different reason. The Authority has held that the Company’s stated reason for withholding names — that Allco might depose or sue the people identified — is not a cognizable basis. Ruling at 5. The names are the answer: who set each loader percentage, who approved the final accountings, and who decided not to pay the computed refunds are the witnesses to the prudence of the practices under review, and the Authority cannot evaluate a rate whose derivation the applicant will not attribute to anyone. The Company has not claimed privilege for any name. 15Page 16 of 24
F. “Publicly available” and “unduly repetitious.” The Company says the pending-application information sought in ALLCO-007 and ALLCO-120(b) is “publicly available” in its published queue and hosting-capacity map, and that ALLCO-120(b) is therefore also repetitious. The published queue lists active applications; it does not state how long each has been pending, the date of the Company’s last action, or the reason the application remains pending, and the Company keeps no historical snapshots from which pendency could be reconstructed (BETP-015). The Company’s own objection concedes the point: it says it cannot answer “without manually analyzing publicly available and PowerClerk information,” which is to say the answer is in PowerClerk, not on the website. The remaining “repetitious” rows (ALLCO-110(a), (c); -133(d); -134(c); -149(d)) each point to a prior response that did not answer the question, as Appendix A shows row by row; a crossreference to a non-answer is not a second answer. G. Privilege (ALLCO-147(a)–(b)). The only privilege asserted anywhere in Table 1 is for ALLCO-147(a) and (b), which ask the Company’s basis for treating distributed-generation interconnection payments as outside the safe harbor of IRS Notice 2016-36 and whether it has evaluated the safe harbor. Allco does not seek counsel’s memoranda. It seeks the position the Company has taken on its tax returns and in its books — it “generally deems distribution system interconnection payments to be taxable income” and charges a gross-up accordingly (ALLCO-064) — and the facts on which that treatment rests. A taxpayer’s reporting position and the business facts behind it are not privileged because a lawyer was consulted about them, and the Company’s fact witness can state what the Company did and why even if he cannot opine on the law. If the Company maintains the objection, it should be directed to produce a privilege log identifying the communications withheld, and to answer the factual portions of the interrogatory. H. Relief. Allco asks that the Authority (1) decline to entertain the objections raised for the first time in Table 1, or overrule them; (2) direct the Company to serve, within five business days, the eight supplements it has offered “subject to” the ruling; (3) order complete, data-inclusive answers, in native format where schedules are requested, to each row Appendix A marks “Compel,” with the alternative, as to any interrogatory the Authority regards as Allco-specific, of 16Page 17 of 24
an answer as to all interconnection customers; (4) direct the Company, as to any compilation it maintains it cannot make, to produce the underlying native records and identify the system that holds them; (5) require a privilege log for ALLCO-147(a)–(b); and (6) grant Allco leave to supplement its prefiled testimony within ten days of receiving the compelled responses. CONCLUSION The 2021 Settlement Agreement does not confine Allco to a petition for declaratory ruling; the Authority has already ruled that it lacks jurisdiction to resolve these contract disputes by declaratory ruling; private parties cannot confer that jurisdiction by agreement; and the Agreement itself recites that the courts, not the Authority, have jurisdiction over the parties’ contract claims. The Authority should hold that Section 3(d) of the Settlement Agreement is not a ground of objection in this docket, deny the Company’s request to substitute “anonymized, non-Allco” information for the information requested, and rule on Motion Nos. 084 and 099 on the remaining objections, granting the relief set out in Part IV.H and Appendix A. Respectfully submitted, ALLCO FINANCE LIMITED INC. /s/ Thomas Melone Thomas Melone Allco Finance Limited Inc. 777 West Putnam Avenue, Suite 300 Greenwich, CT 06830 [email removed] CERTIFICATE OF SERVICE I hereby certify that on November 16, 2026 a copy of the foregoing was filed with the Public Utilities Regulatory Authority and served electronically on all persons on the service list in this docket in accordance with R.C.S.A. § 16-1-15. /s/ Thomas Melone Thomas Melone 17Page 18 of 24
APPENDIX A ALLCO’S RESPONSE TO TABLE 1, ROW BY ROW “Co.” is the Company’s “Answered” entry. “Relief” is what Allco asks the Authority to order. Positions summarize Table 2 and Part IV; Table 2 states the offer of proof and relevance for each item. Interrogatory / subpart ALLCO-002 Co. Relief Allco’s position Partially Compel ALLCO-004 Partially Compel ALLCO-005 Partially Compel ALLCO-007 Partially Compel ALLCO-017 Fully Compel 2026 data ALLCO-018 Partially Compel; order offered supplement ALLCO-059 Fully Compel (d), (f) ALLCO-060 (a) No Compel (a)–(e); alternatively native records ALLCO-060 (b) No Compel (a)–(e); alternatively native records ALLCO-060 (c) No Compel (a)–(e); alternatively native records ALLCO-060 (d) No Compel (a)–(e); alternatively native records ALLCO-060 (e) No Compel (a)–(e); alternatively native records ALLCO-064 Fully Compel Annual collections 2018–2025 are sums of entries to Accounts 252500/252010, which the Company reports monthly (RRU-140). “Various payment methods” go to the same accounts. No burden stated. Company admits the liability is booked (ALLCO-004) and payable in 30 days (ALLCO-179(d)); year-end balances of a booked liability are a ledger query, not an analysis. The $257,260.19 computed Dec. 2024 for four Allco clusters was unpaid through 2025 (ALLCO-059-SP01, Att. 1). “Refunds are issued within 30 days unless the subject of a dispute” is a policy statement, not the aging schedule asked for. The Company’s own December 2024 refunds were not paid within 30 days and were not disputed by Allco. Published queue shows active applications only, without pendency, last action or reason; no historical snapshots exist (BETP-015). Company concedes the data is in PowerClerk. “Does not track” historically; but 2026 execution dates are “now” recorded in PowerClerk and have not been produced. Not “Fully.” Offered supplement confirms only that no incentive compensation is in overheads. The components and rates of each loader (ZPB, ZGS, AS&E etc.) and amounts charged 2020–2025 are in the work-order ledger (ALLCO-059-SP01) and the rate documentation (RRU-055/-079). “As much as could be provided” concedes incompleteness. Attachment 1 omits the loader components and percentages (d) and the true-up/refund status (f), and does not reconcile to ALLCO-002 or to the $35.961M deferred-tax-on-CIAC balance in rate base. Not “Fully.” Loaders are posted to customer-funded work orders by cost element (ALLCO-059-SP01); annual totals by loader are a ledger report. Subpart (e) asked the Company to identify the system if it could not compile — refused. Loaders are posted to customer-funded work orders by cost element (ALLCO-059-SP01); annual totals by loader are a ledger report. Subpart (e) asked the Company to identify the system if it could not compile — refused. Loaders are posted to customer-funded work orders by cost element (ALLCO-059-SP01); annual totals by loader are a ledger report. Subpart (e) asked the Company to identify the system if it could not compile — refused. Loaders are posted to customer-funded work orders by cost element (ALLCO-059-SP01); annual totals by loader are a ledger report. Subpart (e) asked the Company to identify the system if it could not compile — refused. Loaders are posted to customer-funded work orders by cost element (ALLCO-059-SP01); annual totals by loader are a ledger report. Subpart (e) asked the Company to identify the system if it could not compile — refused. “Does not track” the DG/QF and loader-attributable shares; both are derivable from the Attachment 1 population and the workorder loaders. The Attachment’s “Gross-Up Refund” column is 18Page 19 of 24
ALLCO-101 (a) No Compel ALLCO-101 (b) No Compel ALLCO-101 (c) No Compel ALLCO-101 (d) No Compel ALLCO-102 (a) Partially Compel ALLCO-102 (b) Fully ALLCO-102 (c) ALLCO-102 (d) No Partially Compel 2017–2023 policies Compel Compel ALLCO-104 (a) No ALLCO-104 (b) No ALLCO-104 (c) No ALLCO-104 (d) No ALLCO-105 (a) No Compel; order offered supplement to (c) Compel; order offered supplement to (c) Compel; order offered supplement to (c) Compel; order offered supplement to (c) Compel ALLCO-105 (b) No Compel ALLCO-105 (c) No Compel ALLCO-105 (d) No Compel zero every month 2017–2025. Not “Fully.” Work-order detail exists (ALLCO-059-SP01 proves it); the Company produced invoice-level storm-cost substantiation to OCC/EOE. Four completed final accountings are the only test in the record of whether interconnection charges are supported. See Table 2. Work-order detail exists (ALLCO-059-SP01 proves it); the Company produced invoice-level storm-cost substantiation to OCC/EOE. Four completed final accountings are the only test in the record of whether interconnection charges are supported. See Table 2. Work-order detail exists (ALLCO-059-SP01 proves it); the Company produced invoice-level storm-cost substantiation to OCC/EOE. Four completed final accountings are the only test in the record of whether interconnection charges are supported. See Table 2. Work-order detail exists (ALLCO-059-SP01 proves it); the Company produced invoice-level storm-cost substantiation to OCC/EOE. Four completed final accountings are the only test in the record of whether interconnection charges are supported. See Table 2. Departments are not persons. Who set the loader percentages is the witness to their reasonableness; the name objection is not a privilege (Ruling at 5). Only the current policy was produced; the request covers 2017 to present. Not “Fully.” Same as (a). Table 1 leaves the “Additional Information” column blank. Whether any review of the loaders for consistency was ever performed is a yes/no question. Who prepared and approved the December 2024 Final Accounting Reports and who decided not to pay the refunds they computed. Name objection not cognizable (Ruling at 5). Who prepared and approved the December 2024 Final Accounting Reports and who decided not to pay the refunds they computed. Name objection not cognizable (Ruling at 5). Who prepared and approved the December 2024 Final Accounting Reports and who decided not to pay the refunds they computed. Name objection not cognizable (Ruling at 5). Who prepared and approved the December 2024 Final Accounting Reports and who decided not to pay the refunds they computed. Name objection not cognizable (Ruling at 5). The Company’s manager wrote in November 2020 that actual overhead was about $100,500 against an estimate of $253,876 and a refund of about $125,000 was due; the 2024 Report shows $69,762.23. What happened in between is a question about the Company’s estimating and true-up practice, applied to every customer. The Company’s manager wrote in November 2020 that actual overhead was about $100,500 against an estimate of $253,876 and a refund of about $125,000 was due; the 2024 Report shows $69,762.23. What happened in between is a question about the Company’s estimating and true-up practice, applied to every customer. The Company’s manager wrote in November 2020 that actual overhead was about $100,500 against an estimate of $253,876 and a refund of about $125,000 was due; the 2024 Report shows $69,762.23. What happened in between is a question about the Company’s estimating and true-up practice, applied to every customer. The Company’s manager wrote in November 2020 that actual 19Page 20 of 24
ALLCO-106 No Compel ALLCO-107 (a) No Compel ALLCO-107 (b) No Compel ALLCO-107 (c) No Compel ALLCO-107 (d) No Compel ALLCO-107 (e) No Compel ALLCO-108 (a) Partially Compel ALLCO-108 (b) Fully Compel ALLCO-108 (c) No ALLCO-108 (d) No ALLCO-110 (a) Fully Order offered supplement Compel; alternatively native records Compel ALLCO-110 (b) No Compel; alternatively native records ALLCO-110 (c) Partially Compel ALLCO-111 No Compel overhead was about $100,500 against an estimate of $253,876 and a refund of about $125,000 was due; the 2024 Report shows $69,762.23. What happened in between is a question about the Company’s estimating and true-up practice, applied to every customer. Asks whether the Company has ever compared actual to estimated overhead and to produce any such comparison. Loader rates are “calculated annually” from historical or budgeted data (ALLCO102); the annual calculation is itself the comparison. The Fisk Report bills “Overhead Linework $232,474.22”; the ledger for the same project shows no such cost element. The Company’s new suggestion that the item is overhead (aerial) line construction, not an overhead loader, is itself the answer to (a) and should be given under oath with the work-order records (d); (e) is a cost-element total by year. The Fisk Report bills “Overhead Linework $232,474.22”; the ledger for the same project shows no such cost element. The Company’s new suggestion that the item is overhead (aerial) line construction, not an overhead loader, is itself the answer to (a) and should be given under oath with the work-order records (d); (e) is a cost-element total by year. The Fisk Report bills “Overhead Linework $232,474.22”; the ledger for the same project shows no such cost element. The Company’s new suggestion that the item is overhead (aerial) line construction, not an overhead loader, is itself the answer to (a) and should be given under oath with the work-order records (d); (e) is a cost-element total by year. The Fisk Report bills “Overhead Linework $232,474.22”; the ledger for the same project shows no such cost element. The Company’s new suggestion that the item is overhead (aerial) line construction, not an overhead loader, is itself the answer to (a) and should be given under oath with the work-order records (d); (e) is a cost-element total by year. The Fisk Report bills “Overhead Linework $232,474.22”; the ledger for the same project shows no such cost element. The Company’s new suggestion that the item is overhead (aerial) line construction, not an overhead loader, is itself the answer to (a) and should be given under oath with the work-order records (d); (e) is a cost-element total by year. Date recorded and balance of each computed-but-unpaid refund is a liability-account query. Cross-references to ALLCO-004/-179 give neither. ALLCO-157(d) says advances are not in the lead-lag study; it does not say where the liabilities appear in the test year, rate year and balance sheet or whether they offset rate base. Not “Fully.” Company proposes to supplement; no ruling needed. Five business days. Schedule of refunds computed 2017–present from the finalaccounting system(s) the Company identifies in ALLCO-103. ALLCO-064 addresses tax deductibility of refunds, not the policy under which the percentage “CIAC fee” is refunded to Form 556 customers — a refund the Company’s own Reports describe. Not “Fully”; not repetitious. Form 556 status is a field the Company must record to apply its own refund practice; the population of QF customers charged a CIAC fee is a records query. The decision to collect a tax-related fee from tax-exempt QFs and who made it. Not repetitious of ALLCO-064; name objection not cognizable. Whether the Company furnishes work-order substantiation to customers who ask (18 C.F.R. Pt. 101, Electric Plant Instruction 20
As listed on the current system