Response to Motion No. 113
Response type: Comment
Files2
Docket No. 26-05-10 - Eversource Response to Motion No. 113 - 11.20.26.pdf
PDF · 124 KB · 1 pageText searchable
Download Docket No. 26-05-10 - Eversource Response to Motion No. 113 - 11.20.26.pdfRead the text of Docket No. 26-05-10 - Eversource Response to Motion No. 113 - 11.20.26.pdf
Docket No. 26-05-10 - Table 1.pdf
PDF · 423 KB · 42 pagesText searchable
Download Docket No. 26-05-10 - Table 1.pdfRead the text of Docket No. 26-05-10 - Table 1.pdf
Page 13 of 42
Interrogatory No. ALLCO-204 ALLCO-204 ALLCO-204 ALLCO-204 ALLCO-205 Subpart Information Sought (b) the name, ISO-NE designation, scheduled and actual start date, scheduled and actual completion date, and number and aggregate megawatts of projects in each ISO-NE cluster, ASO, or group transmission study in No which any Company distribution interconnection application has been included since 2022, and the study in which the Spencer Hill Applications are now included, with its current expected completion date; (c) (d) (e) (a) Answered the date on which the Company knew that models had to be approved by October 2024 for inclusion in the 2025 study cycle, why that cut-off was No not stated in the September 2024 agreement or notice, and the date on which it was first communicated to the applicant; the number of applications that missed inclusion in an ISO-NE study cycle since 2022 because a Company No requirement or cut-off was communicated after the cycle closed, and the resulting delay for each; whether the “ASO Study timelines” that govern the duration of the study under Exhibit C are published, and if so produce the schedule in effect on September 18, 2024 and today Objection Type Legal Authority Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Eversource objects to the requested analysis because analysis of interconnection applications since 2022 that are subject to specific ISO-NE requirements (which is outside of the Company's control) is not material to the Company's distribution rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. Eversource further objects to this request because it would require the Company to create analysis that it does not maintain in the ordinary course of business. Eversource is not able create the requested analysis without manually reviewing records from since 2022 for ISO-NE-related requirements and then analyzing the Company's records to locate the C.G.S. §§ 4-177c(a) requested information and then compiling that information to create a document with the requested analysis, which would also be an undue burden to create. & 4-178(1) Materiality; Relevance; Eversource objects to the requested analysis because analysis of amounts determined for ISO-NE-related requirements (over which the Company has no control) pertaining to specific Allco projects is not material C.G.S. §§ 4-177c(a) to the Company's distribution rate case application, nor is it relevant to determine whether a material fact in & 4-178(1) the Company's rate case application is more or less probable. Materiality; Relevance; Eversource objects to the requested analysis because the exclusion of applications in ISO-NE study cycles (over which the Company has no control) since 2022, if any, and the reasons for any such exclusions are not C.G.S. §§ 4-177c(a) material to the Company's distribution rate case application, nor are they relevant to determine whether a material fact in the Company's rate case application is more or less probable. & 4-178(1) Materiality; Relevance; Eversource objects to the request because the requested information about ASO studies, which are an ISOrelated requirement (over which the Company has no control), is not material to the Company's distribution C.G.S. §§ 4-177c(a) rate case application, nor is it relevant to determine whether a material fact in the Company's rate case & 4-178(1) application is more or less probable. Materiality; Relevance; Eversource objects to the request because the requested information about PSCAD models, which are an ISO-related requirement (over which the Company has no control), for Allco-related applications is not C.G.S. §§ 4-177c(a) material to the Company's rate case application, nor is it relevant to determine whether a material fact in the & 4-178(1) Company's rate case application is more or less probable. No Allco Applications: the date on which the Company’s records show each delivery of the models was received, No by whom, and the date on which each was reviewed; # Eversource - Internal Use Additional Information/AnalysisPage 14 of 42
Interrogatory No. ALLCO-205 ALLCO-205 ALLCO-205 ALLCO-205 ALLCO-206 Subpart Information Sought (b) Allco Applications:whether PowerClerk is configured to send an email to the applicant when a deficiency notice or other status change is posted, whether that configuration was in effect on No December 18, 2025, and whether the Company has audited whether such notices were delivered to applicants between October 2025 and May 2026, with the results; (c) (d) Answered Allco Applications:the number of applications for which a Company request for additional information or a deficiency notice remained No unanswered for more than 90 days between January 1, 2024 and the present, and whether the Company followed up in each case; Allco Applications:the number of engineers and project managers (employees and contractors, including Burns & McDonnell personnel) assigned to transmission-level review of distributed generation applications No in each year 2023 through 2026, the turnover in that group, and the cost of the group charged to the Company in the Test Year and Rate Year, with schedule references (e) Allco Applications: whether the Company contends that any portion of the delay in Allco's Applications since No September 25, 2024 is attributable to the applicant, and if so the specific period and reason. (a) Allco Applications: whether the Company has countersigned that Interconnection Agreement (INT60394), and if so the date and the date it was transmitted to the applicant; if not, why not, and what the No PowerClerk status “Awaiting Fulfillment of Milestone Requirements and Municipal Approval” contends remains outstanding; Objection Type Legal Authority Materiality; Relevance; Please see Eversource's supplement to Motion Nos. 084 & 099, Table 1 at ALLCO-121(a). Subject to PURA's ruling on Motion Nos. 084, 099, and 113, the Company proposes to submit the printout of 140 different statuses in PowerClerk and clarify whether PowerClerk includes such statuses and the implementation date, if it can be determined. Eversource objects to the remainder of the request because whether or not the Company audited ISO-NE-related notices for Allco-related applications is not material to C.G.S. §§ 4-177c(a) the Company's distribution rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. & 4-178(1) Materiality; Relevance; Eversource objects to the request because information related to Company deficiency notices/requests for additional information, issued between 2024 and the present, pertaining to ISO-NE requirements (over which the Company has no control) is not material to the Company's distribution rate case application, nor is C.G.S. §§ 4-177c(a) it relevant to determine whether a material fact in the Company's rate case application is more or less probable. & 4-178(1) Materiality; Relevance; Unduly Repetitious Eversource objects to the request because information related to engineers and project managers assigned to an ISO-NE requirement (over which the Company has no conrol) between 2023 and 2026 is not material to the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. Please also refer to the Company's responses ALLCO-109, C.G.S. §§ 4-177c(a) which cites to ALLCO-010 and ALLCO-055, Based on the information in these responses, Eversource further objects to this request as unduly repetitious. & 4-178(1) Materiality; Relevance; Eversource objects to the request because information related to any delays by Allco with respect to an ISONE requirement (over which the Company has no control) for specific Allco applications is not material to C.G.S. §§ 4-177c(a) the Company's distribution rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. & 4-178(1) Materiality; Relevance; Eversource objects to the requested analysis because information related to the countersignature of a single C.G.S. §§ 4-177c(a) Allco Interconnection Agreement is not material to the Company's rate case application, nor is it relevant to & 4-178(1) determine whether a material fact in the Company's rate case application is more or less probable. # Eversource - Internal Use Additional Information/AnalysisPage 15 of 42
Interrogatory No. ALLCO-206 ALLCO-206 ALLCO-206 Subpart Information Sought (b) Allco Applications: the Company’s practice and average elapsed time, for all applications since January 1, 2020, between receipt of a generatorexecuted Interconnection Agreement No and the Company’s countersignature, and the number of agreements that have remained uncountersigned for more than 90 days, 180 days, and one year; (c) Allco Applications: what the “CIAC 16%” line represents, how the 16 percent rate was derived, whether it is the same percentage overhead that the Company’s December 2024 Final Accounting Reports for other Allco No clusters described as having been “allocated at time of deposit” and “refunded in full,” and the percentage applied to every Interconnection Agreement issued in each year 2020 through 2026 (d) Answered Allco Applications: the identity (anonymized) and status of the “project ahead in the queue,” the estimated cost of the upgrades it No is responsible for, the deadline by which it must proceed, and the written procedure by which those costs would be reassigned to INT-60394 or any other later applicant if it does not. Objection Type Legal Authority Additional Information/Analysis Please see the Company's response to ALLCO-017 and Eversource's supplement to Motion Nos. 084 & 099, Table 1 at ALLCO-017. The Company stated that it does not track this information and that such functionality was added to PowerClerk in early 2026 so that execution dates are "now" recorded. This functionality was added on a going-forward basis; consequently, historical information is not available in PowerClerk and cannot be produced. Eversource also objects to this request because the requested information the elapsed time between generator execution and Company execution since 2020 is not material to the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. The Company stated that it does not track this information and that such functionality was added to PowerClerk in early 2026 so that execution dates are "now" recorded. This functionality was added on a going-forward basis; consequently, historical Materiality; Relevance; C.G.S. §§ 4-177c(a) information is not available in PowerClerk and cannot be produced. Based on the above citations, Eversource also objects to this request as unduly repetitious. Unduly Repetitious Evidence & 4-178(1) Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Eversource objects to the requested analysis because the derivation of specific CIAC information for one Allco project, comparing that information to certain other Allco project CIAC information, and then determining overhead percentages applied to every project from 2020 to present is not material to the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. Eversource further objects to the portion of the request that requested overhead percentages applied to every project from 2020 to present because it would require the Company to create analysis that it does not maintain in the ordinary course of business. Eversource is not able create the requested analysis without manually reviewing accounting records from since 2020, C.G.S. §§ 4-177c(a) determining the percentage applied, and then compiling that information to create a document with the requested analysis, which would also be an undue burden to create. & 4-178(1) Materiality; Relevance; Eversource objects to the requested analysis because detailed information about a non-Allco project ahead of an Allco project in the interconnection queue is not material to the Company's distribution rate case C.G.S. §§ 4-177c(a) application, nor is it relevant to determine whether a material fact in the Company's rate case application is & 4-178(1) more or less probable. # Eversource - Internal UsePage 16 of 42
Interrogatory No. ALLCO-207 ALLCO-207 ALLCO-207 ALLCO-207 Subpart Information Sought (a) NBFMCC Credits: For each calendar year 2021 through 2026 (year to date) and each program, state in native format for every amount treated as a sacrifice: the contract or tariff agreement identifier, the counterparty (which may be anonymized other than No Allco and its affiliates), the date the amount was received, the date and amount of the forfeiture, the contract or tariff provision invoked, and the Company officer who approved the forfeiture; (b) (c) (d) Answered See subpart (a), state in native format for every amount treated as a sacrifice: whether the counterparty had, before the forfeiture, declared force majeure, requested an extension, invoked a dispute-resolution No provision, or otherwise disputed the Company’s right to the funds, and whether any forfeited amount has since been returned, credited, or is the subject of a pending claim; Objection Type Legal Authority Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Eversource objects to the requested analysis because the requested information beyond what the Company provided in response to OCC-894, namely, from 2021 to present, for each program, contract and forfeiture related information, including the identification of Company personnel, that is not material to the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. Eversource further objects to this request because it would require the Company to create analysis that it does not maintain in the ordinary course of business. Eversource is not able create the requested analysis without manually reviewing contracts and business C.G.S. §§ 4-177c(a) records from since 2021 to locate the requested information and then compiling that information to create a document with the requested analysis, which would also be an undue burden to create. & 4-178(1) Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Eversource objects to the requested analysis because the requested information beyond what the Company provided in response to OCC-894, namely, from 2021 to present, for each program, whether generators invoked specific contractual rights under interconnection agreement and the status of such amounts, that is not material to the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. Eversource further objects to this request because it would require the Company to create analysis that it does not maintain in the ordinary course of business. Eversource is not able create the requested analysis without manually reviewing business records C.G.S. §§ 4-177c(a) from since 2021 to locate the requested information and then compiling that information to create a document with the requested analysis, which would also be an undue burden to create. & 4-178(1) Materiality; Relevance; Eversource objects to the requested analysis because the requested information beyond what the Company provided in response to OCC-894, namely, information from RAM dockets dating back to 2021 and then subsequently calculating the reduction in the revenue requirement in those dockets, that is not material to C.G.S. §§ 4-177c(a) the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's & 4-178(1) rate case application is more or less probable. Materiality; Relevance; Eversource objects to this request because FERC account information relative to "sacrifices" under state C.G.S. §§ 4-177c(a) renewable energy programs is not material to the Company's rate case application, nor is it relevant to & 4-178(1) determine whether a material fact in the Company's rate case application is more or less probable. See subpart (a): the RAM docket, exhibit, and line in which the sacrifice was submitted for recovery and the No amount by which it reduced the NBFMCC revenue requirement; See supbart (a): the FERC account in which the funds were held before forfeiture and the account to which No they were transferred, and whether interest was accrued or credited at any point; # Eversource - Internal Use Additional Information/AnalysisPage 17 of 42
Interrogatory No. ALLCO-207 ALLCO-207 Subpart Information Sought (e) See subpart (a):specifically, whether any amount received from Allcorelated companies, or any projectlevel affiliate — including the Performance Assurance of $367,169.88 posted under the October 21, 2020 REC contracts and the equal amount posted with the March 31, 2023 extension requests, the Development Period Security under the April 12, 2021 power purchase agreements, the Operating No Period Security under the three agreements terminated March 31, 2023, the Development Period Security under the four agreements the Sellers terminated effective July 23, 2024, and the $225,000 of SCEF Year 6 bid deposits wired March 5, 2025 — has been treated as a sacrifice, recorded as program revenue, or submitted for recovery in any docket, and if so the year, docket, exhibit, and amount; (f) Answered Objection Type Legal Authority Materiality; Relevance; Eversource objects to the requested analysis because the requested information beyond what the Company provided in response to OCC-894, namely, information on Allco-specific "sacrifices," that is not material to C.G.S. §§ 4-177c(a) the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's & 4-178(1) rate case application is more or less probable. Materiality; Relevance; Eversource objects to the requested analysis because the treatment of bid deposits for the SCEF program, amounts held at a specific time, and the rationale for retention of deposits (if any) are not material to the C.G.S. §§ 4-177c(a) Company's rate case application, nor are they relevant to determine whether a material fact in the Company's rate case application is more or less probable. & 4-178(1) See subpart (a): with respect to the statement that “[n]o amounts were returned to SCEF program customers” because Development Period Security “was applied toward and converted into the Operating Period Security,” state how bid deposits for bids that were not selected — which Section 3.5 of the SCEF Program Manual requires the No EDC to return — are recorded, how many such deposits were received and returned in each SCEF solicitation year, the aggregate amount of unselected bid deposits held at yearend 2025 and at the most recent date available, and the reason any such deposit has been held more than 60 days after selection results; # Eversource - Internal Use Additional Information/AnalysisPage 18 of 42
Interrogatory No. ALLCO-207 ALLCO-208 ALLCO-208 ALLCO-208 ALLCO-208 Subpart Information Sought (g) See subpart (a): whether the Company contends that a forfeiture it has credited to ratepayers through the NBFMCC must be reversed No through the same mechanism if the counterparty prevails in a dispute over it, and how that contingency is reflected in the Company’s accounts. (a) Answered Legal Authority Materiality; Relevance Eversource objects to the request because a hypothetical on reversing a "sacrifice" credited through the C.G.S. §§ 4-177c(a) NBFMCC is not material to the Company's rate case application, nor is it relevant to determine whether a & 4-178(1) material fact in the Company's rate case application is more or less probable. Materiality; Relevance; Eversource objects to the requested analysis because information on projects that are still in the process of being trued-up (i.e., the Company is still receiving invoices from contractors and their subcontractors) for final reconciliation purposes pursuant to the Guidelines and the Interconnection Agreement is not material C.G.S. §§ 4-177c(a) to the Company's rate case application, nor is it relevant to determine whether a material fact in the & 4-178(1) Company's rate case application is more or less probable. Final Accountings: for each calendar year 2017 through 2025, the number of interconnection projects first connected to the electric power system in that year for which no final accounting report had been issued as No of September 30, 2026, and the aggregate amounts collected from the interconnecting customers for those projects, stated separately for construction deposits and for percentage overhead or CIAC components; (b) Final Accountings: the aggregate amount of those collections the Company still holds and the account(s) in which it is recorded; (c) Final Accountings: whether the Company contends that no refunds would be due on those projects if final No accountings were performed, and the basis (d) Objection Type No Final Accountings: each reason final accountings have not been performed, the person by title responsible for No deciding whether and when they are performed, and the Company’s plan and schedule for clearing the backlog. Additional Information/Analysis See response to subpart (a). In addition, the amounts paid by developers are used to fund construction of the upgrades; thus, any amounts still held cannot be determined until the true-up is performed. Eversource Materiality; Relevance; C.G.S. §§ 4-177c(a) further objects to the portion of the request that asks about the account(s) in which it is recorded as unduly Unduly Repetitious Evidence & 4-178(1) reptitious evidence. See Eversource response to ALLCO-001 Materiality; Relevance; C.G.S. §§ 4-177c(a) See response to subpart (a). In addition, the Company cannot make such a determination if the true-up has & 4-178(1) not been performed. Materiality; Relevance; See response to subpart (a). In addition, the identification of specific company personnel is not material to C.G.S. §§ 4-177c(a) the review of the Company's rate case application, nor is it relevant to determine whether a material fact in & 4-178(1) the Company's rate case application is more or less probable. # Eversource - Internal UsePage 19 of 42
Interrogatory No. ALLCO-209 ALLCO-209 ALLCO-209 ALLCO-209 ALLCO-210 Subpart Information Sought (a) in native format, from the Company’s own records rather than by reference to a map, each bulk and distribution substation at which DER online plus DER in queue equaled or exceeded 20 MW as of Fully December 31, 2025 and as of the most recent date available, with DER online (MW), DER in queue (MW), the number and aggregate MW of pending applications, and the number of pending applications over 1 MW; (b) (c) (d) (a) Answered for each such substation, each project in the Application, the Targeted System Performance plan, the SHARE proposal, or the 2026 capital plan (CLP ADDITIONS-4 Fully Supplemental) that would increase hosting capacity, relieve a thermal or voltage constraint, or replace a transformer at that substation, with its estimated cost and proposed rate Objection Type Legal Authority Additional Information/Analysis Publicly Available C.G.S. § 4177c(a)(1) The Company responded that it could not asnwer the question. See Eversource response to ALLCO-209(a). Eversource further objects because Allco is requesting that the Company perform analysis, as of the most recent data available, of specific information that is publicly available to Allco. N/A N/A The Company responded that it could not asnwer the question. See Eversource response to ALLCO-209(b). N/A N/A The Company responded that it could not asnwer the question. See Eversource response to ALLCO-209(c). Materiality; Relevance; Eversource objects to the requested analysis because this information pertaining to upgrades funded by interconnection customers that are still in the process of being trued-up (i.e., the Company is still receiving invoices from contractors and their subcontractors) for final reconciliation purposes pursuant to the Guidelines and the Interconnection Agreement is not material to the Company's rate case application, nor is C.G.S. §§ 4-177c(a) it relevant to determine whether a material fact in the Company's rate case application is more or less & 4-178(1) probable. Materiality; Relevance; The identification of specific company personnel and/or outside counsel is not material to the review of the C.G.S. §§ 4-177c(a) Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. & 4-178(1) yes or no, whether amounts collected from interconnection customers for upgrades at any such substation are credited against the gross cost of the related plant before it is included in Fully rate base, and if yes, identify the CIAC-funded plant placed in service in 2023, 2024, 2025 and 2026 at each such substation and the CIAC offset recorded for each; whether any plant whose cost was recovered in whole or part from an interconnection customer is included in the Test Year, Test Year Pro No Forma, or Rate Year rate base at gross cost pending “final project billing and reconciliation (ALLCO002), and the amount. Sec. 16-243p(b) advice: state the firm and title of the attorney who gave the advice, the date, and the Company No personnel to whom it was given; # Eversource - Internal UsePage 20 of 42
Interrogatory No. ALLCO-210 ALLCO-210 ALLCO-210 ALLCO-210 Subpart Information Sought (b) Sec. 16-243p(b) advice: whether the Company intends to rely on that advice, in whole or in part, to No support recovery of confidentialitydesignation and redaction costs, and if so whether it will produce it; (c) (d) (e) Answered Objection Type Legal Authority Additional Information/Analysis Privilege C.G.S. § 4-178(2) Eversource objects to the request because it seeks disclosure of information that is subject to the attorneyclient privilege (re: discussions relating to advice) and the work product privilege (production of advice). Please also see Eversource response to ALLCO-034. Privilege C.G.S. § 4-178(2) Eversource objects to the request because it seeks disclosure of information that is subject to the attorneyclient privilege and the work product privilege. Please also see Eversource response to ALLCO-034. Materiality; Relevance; Eversource objects to this request because redaction costs incurred in this proceeding, subsequent to the submittal of the Company's rate case application, is not material to the Company's rate case application, nor C.G.S. §§ 4-177c(a) is it relevant to determine whether a material fact in the Company's rate case application is more or less & 4-178(1) probable. Privilege C.G.S. § 4-178(2) Sec. 16-243p(b) advice: in the Company’s own words and without reference to counsel — the question ALLCO-123(d) asked and the response did not address — each reason the Company contends that redaction and confidentialitydesignation work performed for filings and discovery responses in this proceeding is not a “direct or indirect cost[] associated with its … No participation in” the proceeding under § 16-243p(b); whether fees paid or payable to Keegan Werlin LLP or TCDI for that work are “attorneys’ fees” or “fees to engage … consultants”; and whether the time of internal counsel and projectmanagement staff devoted to it is “the portion of employee salaries associated with such … participation”; Sec. 16-243p(b) advice: the amount of redaction and confidentiality designation cost included in the Test No Year, Test Year Pro Forma, or Rate Year cost of service or in any deferral, with the schedule and line; Sec. 16-243p(b) advice: each other category of cost of this proceeding the Company contends is recoverable No because it is “incurred to comply with legal obligations,” with the amount and schedule reference # Eversource - Internal Use Eversource objects to the request because it seeks disclosure of information that is subject to the attorneyclient privilege and the work product privilege.Page 21 of 42
Interrogatory No. ALLCO-211 ALLCO-211 ALLCO-211 ALLCO-211 ALLCO-211 Subpart Information Sought (a) Keegan Werlin redaction: State: (a) the date of that engagement, whether it is a separate engagement or an expansion of the rate case engagement, the hourly rates or other basis of compensation, any budget, No estimate, or not-to-exceed amount, and the Company personnel who approved it, and produce the engagement letter, statement of work, or e-mail by which it was made; (b) (c) (d) (e) Answered Keegan Werlin redaction: the hours recorded by Keegan Werlin on redaction and confidentialitydesignation work through No September 30, 2026 and through the most recent date available, whether or not invoiced; Keegan Werlin redaction: TCDI’s total billings through the most recent date available and the Company’s No current estimate of total TCDI cost for the proceeding; Keegan Werlin redaction: for each month since the Application was filed, by title, the hours and loaded cost of internal legal, project-management, and regulatory personnel devoted to No redaction and confidentialitydesignation work, using time records where they exist and a documented estimate stating its basis where they do not; Keegan Werlin redaction: the account(s) to which each amount has No been charged and whether any amount has been deferred. Objection Type Legal Authority Unduly Repetitious; Materiality; Relevance Eversource objects to this request as seeking substantially the same information in prior requests. Please see the Company's responses to ALLCO-034 and ALLCO-124, which are cited in the Company's response to ALLCO-211. As the Company stated in ALLCO-034(c), the Company is tracking costs associated with redaction and confidentiality-designation work and plans to seek recovery in this proceeding. Eversource further objects to the portion of the request that seeks the identification of Eversource personnel because C.G.S. §§ 4-177c(a) this information is not material to the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable, & 4-178(1) Unduly Repetitious; Unduly Repetitious; Unduly Repetitious; Unduly Repetitious; # Additional Information/Analysis C.G.S. § 4-178(1) Eversource objects to this request as seeking substantially the same information in prior requests. Please see the Company's responses to ALLCO-034 and ALLCO-124, which are cited in the Company's response to ALLCO-211. As the Company stated in ALLCO-034(b), the Company will supplement its response when the information becomes available. C.G.S. § 4-178(1) Eversource objects to this request as seeking substantially the same information in prior requests. Please see the Company's responses to ALLCO-034 and ALLCO-124, which are cited in the Company's response to ALLCO-211. As the Company stated in ALLCO-034(b), the Company will supplement its response when the information becomes available. C.G.S. § 4-178(1) Please see the Company's responses to ALLCO-034 and ALLCO-124, which are cited in the Company's response to ALLCO-211. As the Company stated in ALLCO-034(b), the Company will supplement its response when the information becomes available. C.G.S. § 4-178(1) Please see the Company's responses to ALLCO-034 and ALLCO-124, which are cited in the Company's response to ALLCO-211. As the Company stated in ALLCO-034(b), the Company will supplement its response when the information becomes available. Eversource - Internal UsePage 22 of 42
Interrogatory No. ALLCO-212 ALLCO-212 Subpart Information Sought (a) Burns & McDonnell charges: for all customers, state for each calendar year 2020 through 2025, the total Burns & McDonnell charges applied to distributedgeneration interconnection work orders, the number of work orders so charged, the hourly rates charged by labor category, and any markup, fee, or multiplier applied; No Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Unduly Repetitious (b) Burns & McDonnell charges: for all customers, state whether any portion of Burns & McDonnell’s cost is also included in the pools from which the ZGS, ZAS/AS&E, ZNP, or any other No loader described in ALLCO-102, Attachment 1 is derived, and if so how double recovery from a customerfunded work order is prevented; Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Unduly Repetitious (c) Burns & McDonnell charges: for all customers, state whether the customer is informed, in the estimate, the Interconnection Agreement, or the final accounting report, that contractor No project management time will be charged to the work order in addition to the percentage overhead, and where; Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Unduly Repetitious (d) Burns & McDonnell charges: for all customers, the agreement(s) under which Burns & McDonnell performs the functions described, including No statements of work and rate schedules, which ALLCO-109 asked the Company to produce and which it did not; Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Unduly Repetitious Answered Objection Type Legal Authority Additional Information/Analysis Eversource objects to this request because it seeks detailed analysis related to costs that are entirely billed to interconnection customers that is not material to the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. Eversource further objects to this request because it would require the Company to create analysis that it does not maintain in the ordinary course of business. Eversource is not able create the requested analysis without manually reviewing project level documentation since 2022 to locate the request information and C.G.S. §§ 4-177c(a) then use that information to create the requested analysis, which would also be an undue burden to create. & 4-178(1) Eversource further objects to the request as unduly reptitious. In response to ALLCO-109, the Company confirmed that Burns & McDonnell employees charge their time to individual work orders, that those charges are applied against the customer payments, and that the compensation does not vary with the amounts estimated, billed, or collected from interconnecting customers. In addition, as stated in the Company’s response to ALLCO-055, the Burns & McDonnell costs are not recovered through the approximately $1.257 million in annual interconnection program administration costs identified in ALLCO010. ALLCO’s repeated requests for the same, or substantially the same information, despite having received responses, serve no legitimate purpose. Allco’s Offer of Proof fails to establish that the requested aggregated annual data, work-order counts, labor-category rates, and markups for a six-year period bear on the reasonableness of the costs or rates at issue in this proceeding. The information sought by Allco bears no material relevance to the evaluation of the Company's application. C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-212, subpart (a) ALLCO-212 ALLCO-212 C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-212, subpart (a) C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-212, subpart (a) # Eversource - Internal Use
As listed on the current system
Response to Motion No.: 113 - 11/20/2026 (Eversource) - Type Response = Comment [26-05-10]