Response to Motion No. 113
Response type: Comment
Files2
Docket No. 26-05-10 - Eversource Response to Motion No. 113 - 11.20.26.pdf
PDF · 124 KB · 1 pageText searchable
Download Docket No. 26-05-10 - Eversource Response to Motion No. 113 - 11.20.26.pdfRead the text of Docket No. 26-05-10 - Eversource Response to Motion No. 113 - 11.20.26.pdf
Docket No. 26-05-10 - Table 1.pdf
PDF · 423 KB · 42 pagesText searchable
Download Docket No. 26-05-10 - Table 1.pdfRead the text of Docket No. 26-05-10 - Table 1.pdf
Page 23 of 42
Interrogatory No. ALLCO-212 ALLCO-213 ALLCO-213 ALLCO-213 Subpart Information Sought (e) The Burns & McDonnell charges applied to each work order associated with the Fisk, Plainfield, Voluntown No 1240, and Bilton clusters and to INT60394, INT-90809 and INT-90811, by year. Answered Objection Type Legal Authority Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Unduly Repetitious C.G.S. §§ 4-177c(a) & 4-178(1) (a) Overheads: For each calendar year 2017 through 2026, for all customers, state the percentage overhead or CIAC rate stated in the No Interconnection Agreements and cost estimates issued that year (if more than one, each rate and the number of agreements at each); Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Unduly Repetitious; (b) Overheads: For each calendar year 2017 through 2026, for all customers, state each instance in which a rate other than the standard rate, a waiver, No or a cap was applied, the applicant (anonymized), the rate applied, the reason, and the approver by title Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Unduly Repetitious; Overheads: The basis on which the Company’s December 2024 Final Accounting Reports for the Fisk, Plainfield, Voluntown 1240, and Bilton clusters reported CIAC of 12.00, 9.97, 10.19 and 11.00 percent No and the Interconnection Agreement for INT-60394 states “CIAC - 16%,” and whether those rates are the rates in (a) for the years in which those agreements and estimates issued Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Unduly Repetitious; (c) Additional Information/Analysis See response to ALLCO-212, subpart (a) Eversource objects to this request because it would require the Company to create analysis that it does not maintain in the ordinary course of business. Eversource is not able create the requested analysis without manually reviewing all Interconnection Agreements and project cost documentation from 2017 to 2026 in order to locate the requested information and then using that information to create the requested analysis, which would thus be an undue burden to create. Eversource further objects to this request as unduly C.G.S. §§ 4-177c(a) repetitious. In response to ALLCO-115(c), ALLCO-102, and ALLCO-003, the Company explained that it & 4-178(1) develops overhead rates annually from historical or budgeted costs and those rates are maintained by the ESC Investment Planning, Corporate Accounting, Plant Accounting and Accounts Payable departments. The Company further explained that those charges are applied to a project’s direct charges, such as labor, materials and contractors, so that only projects with direct spending are eligible to receive overheads. Additionally, the Company explained it uses a “gross up” method when calculating the CIAC “tax adder” percentage. Allco’s repeated requests for the same, or substantially the same information, despite having received responses, serve no legitimate purpose. C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-213, subpart (a) C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-213, subpart (a) # Eversource - Internal UsePage 24 of 42
Interrogatory No. ALLCO-217 ALLCO-217 ALLCO-217 ALLCO-217 ALLCO-217 Subpart Information Sought (a) RNS/LNS Billing: For each month of calendar years 2020 through 2026 todate, state in native format: the date and hour of the monthly peak of the local network (or other load aggregation) on which the Company’s No Regional Network Service charge under the ISO-New England Transmission, Markets and Services Tariff is determined, and the tariff provision that defines that peak; (b) (c) (d) (e) Answered See subpart (a): the Company’s network load (MW) at that hour as billed for Regional Network Service, No and the corresponding value billed for Local Network Service and for any transmission adjustment charge See subpart (a): the Regional Network Service rate ($/kW-month or $/kW-year) applied in that month and the resulting monthly charge in dollars, separately for Regional No Network Service, Local Network Service, and each other ISO-New England or Eversource transmission charge billed on a peak-load determinant; Objection Type Legal Authority Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Eversource objects to the requested analysis because it seeks ISO-NE wholesale market-related information that is not material to the Company's distribution rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. Eversource further objects to this request because it would require the Company to create analysis that it does not maintain in the ordinary course of business. Eversource is not able create the requested analysis without compiling the C.G.S. §§ 4-177c(a) information for each month from 2020 through 2026, if possible, and then compiling that information to create a document with the requested analysis, which would also be an undue burden to create. & 4-178(1) Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-217, subpart (a). Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-217, subpart (a). Materiality; Relevance; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-217, subpart (a). Materiality; Relevance; Unduly Repetitious See response to ALLCO-217, subpart (a). Please also refer to the Company's response to ALLCO-063, C.G.S. §§ 4-177c(a) wherein the Company states that it does not serve load and therefore does not receive settlement statements & 4-178(1) for any load assets. Eversource further objects to this request as unduly reptitious. See subpart (a): the identity of the entity that computes the monthly network load (the Company, No Eversource Energy Service Company, ISO-New England, or another) and the data from which it is computed; See subpart (a): produce the monthly Regional Network Service and Local Network Service invoices or settlement statements for the Test Year and the workpapers that derive the billing determinant. Additional Information/Analysis Fully # Eversource - Internal UsePage 25 of 42
Interrogatory No. ALLCO-218 ALLCO-218 ALLCO-218 Subpart Information Sought (a) For each calendar year 2020 through 2025, state in native format: the date and hour of the ISO New England system-wide annual peak load used to No determine capacity requirements for the following Capacity Commitment Period, and the system-wide peak load (MW) at that hour; (b) For each calendar year 2020 through 2025, state in native format: the total load of the Company’s Metering Domain at that hour as reported by the Company to ISO-New England, and the load at that hour of each Load No Asset in the Metering Domain, identified by load-serving entity category (Standard Service, Last Resort Service, each competitive supplier, which may be anonymized other than by category); (c) Answered For each calendar year 2020 through 2025, state in native format: the Capacity Load Obligation (MW) of the Standard Service and Last Resort Service Load Assets for each Capacity Commitment Period from 2021–2022 No through 2026–2027, the Forward Capacity Market clearing price applicable to the Connecticut load zone or Rest-of-Pool for each period, and the capacity cost ($) embedded in the Standard Service and Last Resort Service rates for each period; Objection Type Legal Authority Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Eversource objects to the requested analysis because it seeks ISO-NE wholesale market-related information that is not material to the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. Eversource further objects to this request because it would require the Company to create analysis that it does not maintain in the ordinary course of business. Eversource is not able create the requested analysis without compiling the information C.G.S. §§ 4-177c(a) for each month from 2020 through 2026 and then compiling that information to create a document with the requested analysis, which would also be an undue burden to create. & 4-178(1) Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-218, subpart (a) Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-218, subpart (a) # Eversource - Internal Use Additional Information/AnalysisPage 26 of 42
Interrogatory No. ALLCO-218 ALLCO-218 ALLCO-219 ALLCO-219 Subpart Information Sought (d) For each calendar year 2020 through 2025, state in native format: whether the Company, as the entity that procures Standard Service and Last Resort Service supply, receives from No its wholesale suppliers any accounting of the capacity cost component of their bids, and if so produce it for the most recent solicitation; (e) (a) (b) For each calendar year 2020 through 2025, state in native format: if the Company contends that it does not possess the values in (a) through (c), identify the person at Eversource Energy Service Company or elsewhere who reports Metering Domain loads to ISO-New England and who receives the Capacity Load Obligation reports, and produce the reports for the Test Year. For each calendar year 2016 through 2025, state in native format: the date, hour, and megawatts of the Company’s annual system peak load (non-coincident), and of its monthly system peak load for each month, as measured at the Company’s delivery points or as otherwise determined by the Company; Answered Objection Type Legal Authority Additional Information/Analysis Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-218, subpart (a) Materiality; Relevance Eversource objects to this request because the identification of Eversource personnel involved in this ISOC.G.S. §§ 4-177c(a) NE process is not material to the Company's rate case application, nor is it relevant to determine whether a & 4-178(1) material fact in the Company's rate case application is more or less probable. Publicly Available; Materiality; Relevance; Eversource objects to the requested analysis because it seeks ISO-NE wholesale market-related information C.G.S. §§ 4-177c(a) that is publicly available, is not material to the Company's rate case application, nor is it relevant to & 4-178(1) determine whether a material fact in the Company's rate case application is more or less probable. Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Eversource objects to the requested analysis because it seeks ISO-NE wholesale market-related information is not material to the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. Eversource further objects to this request because it would require the Company to create analysis that it does not maintain in the ordinary course of business. Eversource is not able create the requested analysis without compiling the information for each C.G.S. §§ 4177c(a)(1), 4-177c(a) month from 2020 through 2026 and then compiling that information to create a document with the & 4-178(1) requested analysis, which would also be an undue burden to create. No No For each calendar year 2016 through 2025, state in native format: the three-year average peak-demand hour for each month that the No Company or its affiliates use for planning, rate design, or cost allocation, and the document in which it appears; # Eversource - Internal UsePage 27 of 42
Interrogatory No. ALLCO-219 ALLCO-219 ALLCO-219 ALLCO-220 ALLCO-220 Subpart Information Sought (c) For each calendar year 2016 through 2025, state in native format: the peak-load values the Company reported in each annual Forecast of Loads and Resources filed with the No Connecticut Siting Council for those years, reconciled to the values in (a) and to the ISO-New England values in Q-ALLCO-218(b); (d) (e) (a) (b) Answered For each calendar year 2016 through 2025, state in native format: whether the Company’s reported peak loads are gross of, or net of, distributed generation that is not No separately metered (behind-the meter generation) and distributed generation that is separately metered but treated as a load reducer, and the method by which any adjustment is made; For each calendar year 2016 through 2025, state in native format: the hourly load of the Company’s Metering Domain (8,760 hours), and the hourly load of the No Standard Service and Last Resort Service Load Assets, for the Test Year, as reported to ISO-New England and after any resettlement. Follow-up to ALLCO-088, Attachment 1 and ALLCO-185: State in native format, for each month of 2020 through 2025: the same estimate at the hour of the Company’s No monthly network-load peak identified in Q-ALLCO-217(a) and at the hour of the Company’s own monthly system peak identified in Q-ALLCO219(a); See subpart (a): the estimated output at the ISO-New England annual peak No hour identified in Q-ALLCO-218(a); Objection Type Legal Authority Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-219, subpart (a) Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-219, subpart (a) Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-219, subpart (a) Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Eversource objects to the requested analysis because it seeks ISO-NE wholesale market-related information that is not material to the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. Eversource further objects to this request because it would require the Company to create analysis that it does not maintain in the ordinary course of business. Eversource is not able create the requested analysis without performing the analysis in C.G.S. §§ 4-177c(a) other Allco ISO-NE requests (to which the Company objects), all of which would also be an undue burden & 4-178(1) to create. Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-220, subpart (a) # Eversource - Internal Use Additional Information/AnalysisPage 28 of 42
Interrogatory No. ALLCO-220 ALLCO-220 ALLCO-220 Subpart Information Sought (c) See subpart (a): the installed capacity (MW AC) of distributed generation under five megawatts in the Company’s service territory assumed for each month, stated separately for No generation that is behind a customer meter and generation that is separately metered, and reconciled to the 75,727 facilities and 742.5 MW reported in ALLCO-095; (d) (e) Answered See subpart (a): the capacity factor or production profile applied to that installed capacity for each peak hour and its source (including any ISONew England behind the-meter photovoltaic forecast, PVWatts or PVsyst profile, or metered production No data from the Company’s own production meters), and why Attachment 1 reports zero output at the 18:00 and 19:00 peak hours of May through September in several years; Objection Type Legal Authority Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-220, subpart (a) Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-220, subpart (a) Materiality; Relevance; Eversource objects to the requested analysis because it seeks ISO-NE wholesale market-related information C.G.S. §§ 4-177c(a) since 2016 that is not material to the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. & 4-178(1) See subpart (a): whether the Company has, for any purpose, estimated the reduction in Regional Network Service or Local Network Service charges, or in Capacity Load Obligation, attributable to distributed generation in its service territory in any year since 2016, and if No so produce each such estimate (ALLCO-088(e) answered only that the Company has not “expressly” done so; state whether it has done so in any other manner, including in load forecasts that net out behind-the-meter generation) # Eversource - Internal Use Additional Information/AnalysisPage 29 of 42
Interrogatory No. ALLCO-221 ALLCO-221 ALLCO-221 ALLCO-221 Subpart Information Sought (a) State: the retail rate component(s) through which the Company recovers Regional Network Service, Local Network Service, and other ISO-New England transmission charges billed on peak-load determinants (identify No by tariff name and the schedule or exhibit in this docket, or in the most recent transmission rate adjustment proceeding, that sets the rate), and the total dollars so recovered in each calendar year 2020 through 2025; (b) (c) (d) State: the retail rate component(s) through which capacity costs for Standard Service and Last Resort Service are recovered, and the total dollars so recovered in each of those years; Answered Objection Type Legal Authority Additional Information/Analysis Materiality; Relevance; Eversource objects to the requested analysis because it seeks ISO-NE wholesale market-related information C.G.S. §§ 4-177c(a) that is not material to the Company's rate case application, nor is it relevant to determine whether a material & 4-178(1) fact in the Company's rate case application is more or less probable. Materiality; Relevance; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-221, subpart (a). Materiality; Relevance; Requires Creation of New Analysis Not Readily Available; Overly Burdensome; See response to ALLCO-221, subpart (a). Eversource further objects to this request because it would require the Company to create analysis that it does not maintain in the ordinary course of business. C.G.S. §§ 4-177c(a) Eversource is not able create the requested analysis without responding to subparts (a) and (b) (to which the Company objects), which would also be an undue burden to create. & 4-178(1) Materiality; Relevance; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-221, subpart (a). No State: for each of those years, the dollar amount by which the charges in (a) and (b) would have been reduced for each 100 MW of load reduction at No the applicable monthly network peaks and at the ISO-New England annual peak hour, respectively, showing the calculation; State: whether the Company agrees that, because ISO-New England procures capacity against a forecast peak and allocates capacity costs by actual coincident peak contribution, a No reduction in a load-serving entity’s coincident peak contribution reduces its Capacity Load Obligation by more than the reduction in load whenever cleared capacity exceeds the actual peak, and if it disagrees, explain; # Eversource - Internal UsePage 30 of 42
Interrogatory No. ALLCO-221 ALLCO-222 ALLCO-222 ALLCO-222 Subpart Information Sought (e) State: whether the Company has ever presented to the Authority, in this or any prior docket, a quantification of the transmission No and capacity cost reductions attributable to distributed generation in its service territory, and if so identify it by docket, date, and exhibit (a) (b) (c) Answered Objection Type Legal Authority Materiality; Relevance; Eversource objects to the requested analysis because it seeks ISO-NE wholesale market-related information C.G.S. §§ 4-177c(a) that is not material to the Company's distribution rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. & 4-178(1) Materiality; Relevance; Eversource objects to this request because the request analysis on benefits of load reducer treatment rather registering with ISO-NE is not material to the review of the Company's rate case application, nor is it C.G.S. §§ 4-177c(a) relevant to determine whether a material fact in the Company's rate case application is more or less probable. & 4-178(1) Materiality; Relevance; Unduly Repetitious C.G.S. §§ 4-177c(a) See response to ALLCO-222, subpart (a). Please also see the Company's responses to ALLCO-041 and & 4-178(1) ALLCO-088. Based on the foregoing, Eversource objects to this question as unduly repetitious. Materiality; Relevance; Eversource objects to this request because the requested legal position -- from a fact witness -- as to whether PURA may conduct a prudence review on proposed investments is not material to the review of the C.G.S. §§ 4-177c(a) Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. A fact witness cannot speak to a legal position. & 4-178(1) Load reducer treatment: State each benefit to distribution customers that the Company contends results from treating distributed generation under five megawatts as load reducers No rather than registering it as generation with ISO-New England, and the data, if any, on which the Company relies for each; Load reducer treatment: State whether any of the values requested in QALLCO-217 through Q-ALLCO-221 were considered by the Company in preparing the benefit-cost analyses, if No any, supporting the interconnection and hosting-capacity investments proposed in this docket, and if so identify where; Load reducer treatment: State whether the Company contends that the Authority may evaluate the prudence and reasonableness of those investments without data on the effect No of the resources they interconnect on the transmission and capacity charges its customers pay, and if so the basis for that contention. # Eversource - Internal Use Additional Information/AnalysisPage 31 of 42
Interrogatory No. ALLCO-223 ALLCO-223 ALLCO-223 ALLCO-223 ALLCO-223 Subpart Information Sought (a) Queue Position: For distribution circuits/substations serving specific Allco projects: state, in native format, for every interconnection application of 50 kW or more received by the Company for a facility on the same circuit(s) or substation from January 1, 2015 to the present: the PowerClerk or legacy application identifier, No applicant (which may be anonymized other than for the Connecticut Green Bank, its affiliates, and projects financed or owned through Green Bank programs, and other than Allco and its affiliates), nameplate capacity, and date stamp assigned under Guidelines § 2.6; (b) (c) (d) (e) See subpart (a): the dates of each study, Contingent Approval, interconnection-agreement issuance, execution by the Company, construction start, and Permission to Operate; Answered No See subpart (a): the hosting capacity of the circuit and substation as of each No such date, and the upgrade cost assigned to each application; See subpart (a): each instance in which an application with a later datestamp than an Allco-affiliate application received a study result, an No interconnection agreement, or Permission to Operate before the Allco-affiliate application, and the reason; See subpart (a): whether any Green Bank-affiliated or Green Bankfinanced project on those circuits was No processed under a program, agreement, or priority not available to other applicants, identifying it; Objection Type Legal Authority Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Materiality; Relevance; Eversource objects to this request because it would require the Company to create analysis that it does not maintain in the ordinary course of business. Eversource is not able create the requested analysis without reviewing all interconnection applications since 2015 for the circuit(s) and substation serving specific Allco projects to gather the requested information and then use that information to create the requested analysis, which would also be an undue burden to create. Eversource further objects to the requested analysis because it seeks interconnection queue-related information that is not material to the Company's rate case C.G.S. §§ 4-177c(a) application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. & 4-178(1) Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Materiality; Relevance; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-223, subpart (a) Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Materiality; Relevance; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-223, subpart (a) Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Materiality; Relevance; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-223, subpart (a) Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Materiality; Relevance; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-223, subpart (a) # Eversource - Internal Use Additional Information/AnalysisPage 32 of 42
Interrogatory No. Subpart Information Sought Answered ALLCO-223 (f) See subpart (a): the person(s) who made each sequencing decision. No ALLCO-224 ALLCO-224 ALLCO-224 ALLCO-224 ALLCO-224 (a) (b) (c) (d) (e) Objection Type Legal Authority Materiality; Relevance Eversource objects to this subpart because the names of specific Eversource personnel and contractors responsive to this request are not material to the review of the Company's rate case application, nor is it C.G.S. §§ 4-177c(a) relevant to determine whether a material fact in the Company's rate case application is more or less & 4-178(1) probable. Materiality; Relevance; Eversource objects to this subpart because the Company's filing in Allco's federal court lawsuit with respect to a Company shareholder in the state of Florida is not material to the review of the Company's rate case C.G.S. §§ 4-177c(a) application, nor is it relevant to determine whether a material fact in the Company's rate case application is & 4-178(1) more or less probable. Materiality; Relevance; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-224, subpart (a). Materiality; Relevance; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-224, subpart (a). Materiality; Relevance; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-224, subpart (a). Materiality; Relevance; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-224, subpart (a). The Company has represented to the United States District Court (No. 3:26cv-01277, ECF 46-3) that the State Board of Administration of Florida Retirement System holds 312,059 Eversource Energy shares, drawn from that fund’s Form 13F-HR. State for each of the fifty largest holders of Eversource Energy No common shares as of the most recent date for which the Company or Eversource Energy has data, the holder, the number of shares, and whether the holder is a public or private pension fund, an index fund, an actively managed fund, an insurance company, or other; See introduction to subpart (a). State the aggregate percentage of No Eversource Energy’s shares held by public pension funds, and the source; See introduction to subpart (a). State the actuarial assumed rate of return of each public pension fund among those holders of which the Company or its No ROE witness is aware, and the assumed long-term equity return used in Eversource Energy’s own pension plans; See introduction to subpart (a). State whether the Company or its ROE witness considered that the return investors require of Eversource No Energy is evidenced by the return assumptions of the pension funds that hold it, and if not, why not; See introduction to subpart (a). State each service (e.g., Broadridge, DTC, NOBO lists, 13F compilations) No through which Eversource Energy identifies its beneficial holders, and the date of the most recent such list. # Eversource - Internal Use Additional Information/Analysis
As listed on the current system
Response to Motion No.: 113 - 11/20/2026 (Eversource) - Type Response = Comment [26-05-10]