  1. Page 31 of 42

    Interrogatory No. ALLCO-223 ALLCO-223 ALLCO-223 ALLCO-223 ALLCO-223 Subpart Information Sought (a) Queue Position: For distribution circuits/substations serving specific Allco projects: state, in native format, for every interconnection application of 50 kW or more received by the Company for a facility on the same circuit(s) or substation from January 1, 2015 to the present: the PowerClerk or legacy application identifier, No applicant (which may be anonymized other than for the Connecticut Green Bank, its affiliates, and projects financed or owned through Green Bank programs, and other than Allco and its affiliates), nameplate capacity, and date stamp assigned under Guidelines § 2.6; (b) (c) (d) (e) See subpart (a): the dates of each study, Contingent Approval, interconnection-agreement issuance, execution by the Company, construction start, and Permission to Operate; Answered No See subpart (a): the hosting capacity of the circuit and substation as of each No such date, and the upgrade cost assigned to each application; See subpart (a): each instance in which an application with a later datestamp than an Allco-affiliate application received a study result, an No interconnection agreement, or Permission to Operate before the Allco-affiliate application, and the reason; See subpart (a): whether any Green Bank-affiliated or Green Bankfinanced project on those circuits was No processed under a program, agreement, or priority not available to other applicants, identifying it; Objection Type Legal Authority Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Materiality; Relevance; Eversource objects to this request because it would require the Company to create analysis that it does not maintain in the ordinary course of business. Eversource is not able create the requested analysis without reviewing all interconnection applications since 2015 for the circuit(s) and substation serving specific Allco projects to gather the requested information and then use that information to create the requested analysis, which would also be an undue burden to create. Eversource further objects to the requested analysis because it seeks interconnection queue-related information that is not material to the Company's rate case C.G.S. §§ 4-177c(a) application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. & 4-178(1) Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Materiality; Relevance; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-223, subpart (a) Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Materiality; Relevance; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-223, subpart (a) Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Materiality; Relevance; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-223, subpart (a) Requires Creation of New Analysis Not Readily Available; Overly Burdensome; Materiality; Relevance; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-223, subpart (a) # Eversource - Internal Use Additional Information/Analysis
  2. Page 32 of 42

    Interrogatory No. Subpart Information Sought Answered ALLCO-223 (f) See subpart (a): the person(s) who made each sequencing decision. No ALLCO-224 ALLCO-224 ALLCO-224 ALLCO-224 ALLCO-224 (a) (b) (c) (d) (e) Objection Type Legal Authority Materiality; Relevance Eversource objects to this subpart because the names of specific Eversource personnel and contractors responsive to this request are not material to the review of the Company's rate case application, nor is it C.G.S. §§ 4-177c(a) relevant to determine whether a material fact in the Company's rate case application is more or less & 4-178(1) probable. Materiality; Relevance; Eversource objects to this subpart because the Company's filing in Allco's federal court lawsuit with respect to a Company shareholder in the state of Florida is not material to the review of the Company's rate case C.G.S. §§ 4-177c(a) application, nor is it relevant to determine whether a material fact in the Company's rate case application is & 4-178(1) more or less probable. Materiality; Relevance; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-224, subpart (a). Materiality; Relevance; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-224, subpart (a). Materiality; Relevance; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-224, subpart (a). Materiality; Relevance; C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-224, subpart (a). The Company has represented to the United States District Court (No. 3:26cv-01277, ECF 46-3) that the State Board of Administration of Florida Retirement System holds 312,059 Eversource Energy shares, drawn from that fund’s Form 13F-HR. State for each of the fifty largest holders of Eversource Energy No common shares as of the most recent date for which the Company or Eversource Energy has data, the holder, the number of shares, and whether the holder is a public or private pension fund, an index fund, an actively managed fund, an insurance company, or other; See introduction to subpart (a). State the aggregate percentage of No Eversource Energy’s shares held by public pension funds, and the source; See introduction to subpart (a). State the actuarial assumed rate of return of each public pension fund among those holders of which the Company or its No ROE witness is aware, and the assumed long-term equity return used in Eversource Energy’s own pension plans; See introduction to subpart (a). State whether the Company or its ROE witness considered that the return investors require of Eversource No Energy is evidenced by the return assumptions of the pension funds that hold it, and if not, why not; See introduction to subpart (a). State each service (e.g., Broadridge, DTC, NOBO lists, 13F compilations) No through which Eversource Energy identifies its beneficial holders, and the date of the most recent such list. # Eversource - Internal Use Additional Information/Analysis
  3. Page 33 of 42

    Interrogatory No. ALLCO-225 ALLCO-225 ALLCO-225 ALLCO-226 Subpart Information Sought (a) Overheads Recovered in Base Rates: State the amount of administrative and general expense, engineering and supervision, construction overhead, and other indirect cost No included in the distribution revenue requirement approved in Docket No. 17-10-46, by FERC account, and the amount of each proposed in this docket (b) Answered Objection Type Legal Authority Additional Information/Analysis Unduly Repetitious Evidence C.G.S. § 4-178(1) Eversource objects to this request as seeking substantially the same information in a prior request. Please see the Company's response ALLCO-044 where the Company stated that capital expenditures (direct costs and overheads applied to those amounts) are entirely billed to the interconnection customer and reimbursed through the CIAC process; therefore, these asset additions are not included in rate base. Unduly Repetitious Evidence C.G.S. § 4-178(1) See response to ALLCO-224, subpart (a). Overheads Recovered in Base Rates: State the capitalized overhead and clearing-account rates (including the engineering, supervision, administrative, and constructionNo overhead loaders identified in ALLCO102, Attachment 1) in effect in each year 2018 through 2026, and the dollar amount of overhead capitalized to distribution plant in each year. (c) State for each year 2018 through 2025, the dollar amount of overhead charged to interconnection customers and other customer-funded work orders through those loaders, and No whether that amount was credited against the overhead pool recovered through base rates, capitalized plant, or both — identifying the account and the credit; (a) Exhibit CLP-Additions 4 Supplemental 2: For each project in that exhibit whose description or project type indicates a generator interconnection, state in native format: the gross direct cost, the No customer contribution credited, each overhead or indirect loader applied (by name, rate, and dollar amount), and the resulting total cost; See response to ALLCO-224, subpart (a). Eversource further objects to this request because it would require the Company to create analysis that it does not maintain in the ordinary course of business. Eversource is not able create the requested analysis without manually reviewing the documentation for each Unduly Repetitious Evidence; interconnection project completed between 2018 and 2025 to determine, for each project, the total dollar Requires Creation of Analysis Not Readily Available; Overly C.G.S. §§ 4-177c(a) amount of overheads charged and the total those amounts for each year, which would also be an undue Burdensome; & 4-178(1) burden to create. Eversource objects to this request because it would require the Company to create analysis that it does not maintain in the ordinary course of business. Eversource is not able to create the requested analysis without manually reviewing the approximately 1,500 lines of data in the exhibit and then determining whether certain projects are responsive to the question, and if so, reviewing final accounting and backup Requires Creation of Analysis Not Readily Available; Overly C.G.S. §§ 4-177c(a) documentation for each such project to gather the requested information and then compile that information Burdensome; & 4-178(1) for each project into the format requested, which would also be an undue burden to create. # Eversource - Internal Use
  4. Page 34 of 42

    Interrogatory No. ALLCO-226 ALLCO-226 ALLCO-226 ALLCO-227 ALLCO-227 ALLCO-227 Subpart Information Sought (b) Exhibit CLP-Additions 4 Supplemental 2: For each project in that exhibit whose description or project type indicates a generator No interconnection, state in native format: the amount placed in rate base and the amount of the customer contribution recorded as CIAC, by account; (c) (d) Answered Exhibit CLP-Additions 4 Supplemental 2: For each project in that exhibit whose description or project type indicates a generator interconnection, state in native format: No whether the overhead charged to the interconnection customer on the same work order was credited against the overhead capitalized, and if not, why not; Exhibit CLP-Additions 4 Supplemental 2: For each project in that exhibit whose description or project type indicates a generator No interconnection, state in native format: the final accounting status of the project under Guidelines § 1.2 and the amount of any refund due or paid. Objection Type Requires Creation of Analysis Not Readily Available; Overly Burdensome; Unduly C.G.S. §§ 4-177c(a) Repetitious & 4-178(1) See responses to ALLCO-225, subparts (a) and (b). Requires Creation of Analysis Not Readily Available; Overly Burdensome; Materiality; C.G.S. §§ 4-177c(a) Relevance & 4-178(1) (a) Materiality; Relevance (b) ISO-NE load settlement: the most recent distribution loss study the Company or Eversource Energy Service Company has prepared or No commissioned for the Connecticut system, by title, date, and author, and produce it; Materiality; Relevance (c) Additional Information/Analysis Requires Creation of Analysis Not Readily Available; Overly See response to ALLCO-225, subpart (a). Eversource further objects to this request as unduly repetitious. Burdensome; Unduly C.G.S. §§ 4-177c(a) As the Company stated in its response to ALLCO-044, interconnection asset additions are not included in Repetitious & 4-178(1) rate base. ISO-NE load settlement: State the method the Company does apply, step by step, including each loss factor, No. allocation, or estimation used, and its source; ISO-NE load settlement: the annual 2025 totals of the hourly wholesale loads in ALLCO-063, Attachment 1, for Standard Service, Last Resort Service, and competitive supply, and the annual 2025 retail kWh billed in CIEC-020, Attachment 2 — stated as numbers, not by crossreference — and the difference; Legal Authority See response to ALLCO-225, subpart (a). Eversource further objects to this subpart because the trueup/final reconciliation status of projects not included in rate base and any refunds due or paid are not material to the Company's rate case application, nor are they relevant to determine whether a material fact in the Company's rate case application is more or less probable. C.G.S. §§ 4-177c(a) Eversource objects to this subpart because the analysis requested on ISO-NE load settlement is not material & 4-178(1) to the review of the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. C.G.S. §§ 4-177c(a) & 4-178(1) Eversource objects to this subpart because the analysis requested on ISO-NE load settlement is not material to the review of the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. Please refer to the Company's response to ALLCO-152(c) and Eversource's supplement to Motion Nos. 084 & 099, Table 1 at ALLCO-152(c). Eversource fully responded to this subpart citing to where the information is in the record and that the two numbers cannot equal one another due to a variety of reasons, including but not limited to thermal losses. Eversource objects to further responding to this request because, for the foregoing reasons, the request is unduly repetitious. Eversource further objects to this subpart because the analysis requested on ISO-NE load settlement is not material to the review of the C.G.S. §§ 4-177c(a) Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. & 4-178(1) Fully Unduly Repetitious; Materiality; Relevance # Eversource - Internal Use
  5. Page 35 of 42

    Interrogatory No. ALLCO-227 ALLCO-228 ALLCO-228 Subpart Information Sought (d) ISO-NE settlement: the Company’s best estimate of the components of that difference (technical losses, Fully unaccounted-for energy, company use, unbilled usage, and other), with the basis for each. (a) (b) Answered Objection Type Legal Authority Unduly Repetitious; Materiality; Relevance C.G.S. §§ 4-177c(a) & 4-178(1) See response to ALLCO-227, subpart (c). Using Legal Tracker, state in native format for the Test Year and for 2023, 2024, and 2026 year to date:for each outside counsel matter with billings exceeding $10,000, the matter number, the vendor, the amount billed, the amount charged or allocated to the Company, the FERC No account, the category of matter (litigation, regulatory, transactional, employment, collections, other), and, for litigation, the forum and the adverse party’s relationship to the Company (customer, developer or interconnection customer, contractor, employee, regulator, other); Unduly Repetitious; Requires Creation of Analysis Not C.G.S. §§ 4-177c(a) Readily Available; Overly & 4-178(1) Burdensome; See subpart (a): the amounts in (a) billed by Day Pitney LLP, Cowdery Murphy & Healy LLC, Keegan Werlin LLP, and Steptoe & Johnson LLP for matters involving Allco or its affiliates, Windham Solar No LLC, any distributed generation interconnection dispute, FERC Docket No. EL25-117-000, Civil Action No. 3:26-cv 01277, PURA Docket No. 25-03-12, or the SCEF program, by matter; Unduly Repetitious; Requires Creation of Analysis Not C.G.S. §§ 4-177c(a) Readily Available; Overly & 4-178(1) Burdensome; Materiality; Relevance Additional Information/Analysis Please refer to the Company's responses to ALLCO-019, ALLCO-033, and OCC-309. Based on the foregoing Eversource objects to responding to this interrogatory as unduly repetitious. Eversource further objects to this request because it would require the Company to create analysis beyond what it has already provided that it does not maintain in the ordinary course of business. Eversource is not able to create the requested analysis without manually reviewing Legal Tracker to determine all matters over $10,000, compiling the requested information for such matters, and using that information to create the analysis requested, which would also be an undue burden to create. See response to ALLCO-228, subpart (a). Eversource further objects to this subpart because the information requested on Allco-specific matters and other program-specific and interconnection disputes is not material to the review of the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. # Eversource - Internal Use
  6. Page 36 of 42Match

    Interrogatory No. Subpart Information Sought (c) See subpart (a): whether any amount in (b) is included in the Test Year cost of service, the Rate Year revenue requirement (including through the No escalation applied in Schedule C3.20), or Exhibit CLP-REVREQ-9, and where; (d) See subpart (a): if the Company contends that the Legal Tracker system cannot produce the report No described in (a), the person who made that determination and the steps taken to test it. ALLCO-230 (a) For each of the following sums, state, by general-ledger account number and title, how the Company recorded the receipt, and each subsequent reclassification, of the funds; the date of each entry; whether the funds were at any time recorded as a liability to the developer, as forfeited security, as a credit to ratepayers or to the LREC/ZREC, SCEF, or interconnection cost-recovery No mechanisms, or as revenue; the FERC account and rate-case schedule, if any, in which the balance appears; and the person who authorized each entry: the $257,260.19 of interconnection-cost refunds computed in the Final Accounting Reports issued in December 2024 for the Allco-affiliate projects and confirmed in the Company’s January 16, 2025 correspondence; Materiality; Relevance; Unduly Repetitous ALLCO-230 (b) Refer to subpart (a), the $225,000 of SCEF Year 6 bid deposits posted by Allco affiliates in 2025; Materiality; Relevance; Unduly Repetitious C.G.S. §§ 4-177c(a) & 4-178(1) Materiality; Relevance; Unduly Repetitious C.G.S. §§ 4-177c(a) & 4-178(1) ALLCO-228 Answered Objection Type Legal Authority Additional Information/Analysis Unduly Repetitious; Requires Creation of Analysis Not C.G.S. §§ 4-177c(a) Readily Available; Overly & 4-178(1) Burdensome; Materiality; Relevance See responses to ALLCO-228, subparts (a) and (b). ALLCO-228 ALLCO-230 (c) No Refer to subpart (a), the $734,339.76 of Performance Assurance posted No under the LREC/ZREC contracts terminated in 2024 Unduly Repetitious; Requires Creation of Analysis Not C.G.S. §§ 4-177c(a) See response to ALLCO-228, subpart (a). Eversource further objects to this subpart because the Readily Available; Overly & 4-178(1) identification of specific Eversource personnel is not material to the review of the Company's rate case Burdensome; Materiality; application, nor is it relevant to determine whether a material fact in the Company's rate case application is Relevance more or less probable. Eversource objects to the requested analysis because it is not material to the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. The accounting treatment of interconnection cost refunds associated with specific C.G.S. §§ 4-177c(a) Allco-affiliate projects has no bearing on the determination of the Company’s revenue requirement or on & 4-178(1) whether its proposed rates are just and reasonable. The request is instead directed toward a collateral dispute between the Company and Allco, and this proceeding is not the appropriate forum for pursuing that dispute. Eversource further objects to this request as unduly repetitious. In response to ALLCO-059-SP01, the Company provided (a) funding projects and work order information, for (b) distributed generation, with (c) construction costs, (d) CIAC amounts, by (e) FERC account for the years 2018-2025. In addition, in response to ALLCO-001, the Company provided CIAC year-end balances for 2018 through 2025, as well as the FERC account used to record the CIAC activity. The present request seeks the same, or substantially the same, information that the Company has already provided. Allco’s repeated submission of duplicative requests serves no legitimate discovery purpose, adds nothing to the record, and does not advance a more informed regulatory determination. Instead, it imposes an undue burden on the Company to re-address matters that have already been answered, consumes the parties’ time and resources, increases the cost of participation, delays the proceeding, and undermines the administrative efficiency that the discovery process is intended to protect. See response to ALLCO-230(a) See response to ALLCO-230(a) # Eversource - Internal Use
  7. Page 37 of 42

    Interrogatory No. ALLCO-230 ALLCO-231 ALLCO-232 Subpart Information Sought Objection Type Legal Authority (d) Refer to subpart (a), the $559,907.00 of Development Period Security posted under the power purchase agreements that No terminated on or about July 23, 2024. Produce the ledger detail and journal entries in native format. Materiality; Relevance; Unduly Repetitious C.G.S. §§ 4-177c(a) & 4-178(1) The Company conditioned the return of the SCEF Year 6 bid deposits described in Q-ALLCO-230(b) on receipt of a request on the bidder’s letterhead. Identify the provision of the SCEF Program Manual, Terms and Conditions, or any tariff, order, or Company policy that imposes that condition; the person who decided to impose it and the date; every other No bidder in SCEF Years 1 through 7 whose deposit refund was conditioned on a letterhead request, and the elapsed time between non-selection and refund for each; and whether any bidder other than an Allco affiliate waited more than ninety days after non-selection for the return of a deposit, identifying each. Materiality; Relevance With respect to the notices of force majeure delivered on behalf of Allco projects, identify every person who received or reviewed the notices; every written response, if any, and the date; every internal communication, memorandum, or legal-department entry concerning whether to accept, No dispute, or respond to the notices and whether the Performance Assurance and Development Period Security would be retained or returned; the date on which the Company first recorded or treated those sums as forfeited; and the person who made that decision. Materiality; Relevance; Privilege N/A N/A Answered Additional Information/Analysis See response to ALLCO-230(a) C.G.S. §§ 4-177c(a) & 4-178(1) Eversource objects to the requested analysis because it is not material to the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. The Company's administrative procedures for processing bid-deposit refunds related to SCEF procurements, including those applicable to other bidders, do not affect the Company’s revenue requirement or the justness and reasonableness of its proposed rates. Rather, the request appears aimed at investigating a collateral dispute between the Company and Allco. Moreover, Allco’s request for information about every other bidder in SCEF Years 1 through 7 is especially remote from the issues in this proceeding. If Allco seeks to investigate allegations of disparate treatment or improper conduct regarding the return of deposits, such claims pertain to a separate procurement or contractual dispute, not a matter relevant to the Commission’s determination of the Company’s rates in this proceeding. C.G.S. §§ 4-177c(a) & 4-178(1) Eversource objects to this request because it seeks information related to Allco's delivery of force majeure notices for 10 of its projects that is not material to the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. Eversource further objects to this request because it seeks information on Eversource Legal communications and work product that is protected by the attorney-client and work product privileges. # Eversource - Internal Use
  8. Page 38 of 42

    Interrogatory No. ALLCO-233 ALLCO-234 Subpart Information Sought N/A State the total amount of developer security, bid deposits, and interconnection-cost overpayments retained or treated as forfeited by the Company in each year 2019 through the Rate Year; the mechanism (LREC/ZREC reconciliation, SCEF reconciliation, FMCC, base rates, or other) through which each amount No was credited to or otherwise reflected in rates, with the docket and schedule; whether any such amount is reflected in the revenue requirement, rate base, or reconciliation balances proposed in this Docket; and whether the Company has ever returned security or deposits after first treating them as forfeited, identifying each instance. N/A Answered Verogy Holdings testified on October 21, 2026 that the Company “insisted that no single true-up would be processed until an agreement was reached regarding all other prior projects submitted by Verogy” (Verogy Testimony at 7). State whether the Company has a policy or practice of withholding, delaying, or conditioning the final accounting or true-up of one interconnection project on the resolution of accountings for other projects of the same developer or its No affiliates; identify the provision of the Guidelines, the Standard IA, or any Authority decision that authorizes that practice; identify each developer (by anonymized identifier if the Company contends confidentiality), the projects, and the periods during which the practice was applied since January 1, 2019; state whether the practice was applied to any project of Allco or its affiliates; and identify the person who approved the practice. Objection Type Legal Authority Additional Information/Analysis Eversource objects to the requested analysis because it is not material to the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. This repetitive request for a historical accounting exercise is disproportionate to any potential relevance to the issues in this proceeding. Moreover, the historical treatment of forfeited developer security, bid deposits, and interconnection overpayments payments addressed in other Materiality; Relevance; Requires Creation of Analysis C.G.S. §§ 4-177c(a) proceedings does not bear on the reasonableness of the Company’s rates or revenue requirement at issue in this proceeding. Eversource further objects to this request because it would require the Company to create Not Readily Available; Overly & 4-178(1) analysis that it does not maintain in the ordinary course of business. Eversource is not able create the Burdensome; requested analysis without reviewing filings in previous RAM dockets to gather the requested information and then use that information to create the requested analysis, which would also be an undue burden to create. In response to OCC-894, the Company provided the performance assurance amounts that were returned, by year. The Company also explained that performance assurance amounts which are forfeited under the terms of customer contracts or tariff agreements are listed as “sacrifices” within itemized clean energy program costs submitted for recovery through the Non-Bypassable Federally Mandated Congestion Charge and provided amounts credited as a reduction to program costs, by year. ALLCO’s request for the same, or substantially the same information, serves no legitimate purpose. C.G.S. §§ 4-177c(a) & 4-178(1) Materiality; Relevance Eversource objects to the request because it is not material to the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. Allco’s requests pertain to a developer-specific commercial dispute that is neither relevant nor material to the Company’s application in this proceeding. The fact that an intervenor raises a personal grievance in its testimony does not, by itself, render information related to that grievance discoverable. Allco cannot transform its rights to inspect relevant and material records into an unrestricted right to compel the Company to respond to every allegation, grievance, or theoretical dispute Allco can conjure, regardless of whether the subject has any bearing on the proceeding. The Company’s discovery obligations do not extend to undertaking an investigation of collateral matters simply because Alloc wishes to pursue them. # Eversource - Internal Use
  9. Page 39 of 42

    Interrogatory No. ALLCO-235 Subpart Information Sought N/A Verogy Holdings testified that Interconnection Agreements issued through 2023 stated in Appendix G that “Price is based on Impact study with an accuracy of +/- 25%,” and that “more recent interconnection agreements remove this requirement” (Verogy Testimony at 11–12). State the date on which, and the Standard IA revision in which, the accuracy language was removed; identify the person who approved the removal and the reasons; state whether the removal No was filed with or approved by the Authority, identifying the docket; produce each version of the Standard IA and its Appendix G in use since January 1, 2019; and state, for each year 2019 through 2026, the number of executed Interconnection Agreements whose final cost exceeded the Appendix G estimate by more than 25 percent and the aggregate amount of the excess billed to interconnection customers Answered Objection Type Legal Authority Materiality; Relevance C.G.S. §§ 4-177c(a) & 4-178(1) Additional Information/Analysis Eversource objects to the request because it is not material to the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less probable. The requested information concerning language in an Appendix to standard Interconnection Agreement is not probative of any material or disputed issue relevant to the Company’s application in this proceeding, which PURA is conducting as a general distribution rate proceeding pursuant to Conn. Gen. Stat. § 16-19 to amend the Company’s base-rate schedules. Allco’s request pertains to a developer-specific grievance that is neither relevant nor material to the Company’s application in this proceeding. The fact that an intervenor raises a personal grievance in its testimony does not, by itself, render information related to that grievance discoverable. Allco cannot transform its rights to inspect relevant and material records into an unrestricted right to compel the Company to respond to every allegation, grievance, or theoretical dispute Allco asserts, regardless of whether the subject has any bearing on the proceeding. The Company’s discovery obligations do not extend to undertaking an investigation of collateral matters simply because Allco wishes to pursue them. # Eversource - Internal Use
  10. Page 40 of 42

    Interrogatory No. Subpart ALLCO-236 N/A ALLCO-237 ALLCO-237 (a) (b) Information Sought Answered Verogy Holdings and Earthlight Technologies testified that the Company requires a Real-Time Automation Controller (“RTAC”) on projects of 500 kW and larger and bills it at approximately $75,000 to $90,000 per unit, with additional customer equipment of approximately $27,500 and studies of $22,500 or more, against a procurement cost of approximately $15,000 (Verogy Testimony at 13–14; Earthlight Testimony at 14–15). State the date on which, and the document by which, the RTAC requirement and the 500 No kW threshold were adopted, and whether either was filed with or approved by the Authority; produce the Company’s build-up of the perunit charge (equipment, labor, engineering, overhead loaders, and any other component, by amount); state the number of RTAC units billed to interconnection customers in each year 2022 through 2026 and the total billed; state whether the RTAC is Company-owned plant recorded in rate base and, if so, the account and amount; and state whether the Company permits an Objection Type Legal Authority C.G.S. §§ 4-177c(a) Eversource objects to the request because it is not material to the Company's rate case application, nor is it relevant to determine whether a material fact in the Company's rate case application is more or less & 4-178(1) probable. The information sought is not relevant or material to any issue in the Company’s application in this proceeding, which PURA is conducting as a general distribution rate proceeding pursuant to Conn. Gen. Stat. § 16-19 to amend the Company’s rate schedules. Allco’s requests relate to a developer-specific grievance based on an unsupported equipment cost, which the developer merely “believes” equipment should cost, and a 500 kW threshold supported in another proceeding that the developer simply disagrees with. See Decision, November 29, 2023, Docket No. 23-08-05, Annual Energy Storage Solutions Program Review – Year 3, at 23. The fact that an intervenor raises a personal grievance in its testimony does not, by itself, render information related to that grievance discoverable. Allco’s offer of proof fails to establish that these issues are relevant or material to the Company’s application in this proceeding and the Company objection must be sustained. Allcos right to inspect relevant and material records does not grant it carte blanche to compel the Company to respond to every allegation, grievance, or hypothetical dispute it raises, regardless of relevance to the proceeding. The Company’s discovery obligations do not encompass investigating collateral issues merely because Allco wishes to pursue them, nor do they require addressing every conceivable grievance Allco may assert. Materiality; Relevance For each proposed SHARE investment state, in native format: the Fully estimated direct cost of labor, materials, contractors and equipment; For each proposed SHARE investment state, in native format: each overhead, loader, adder or clearing-account allocation included in the estimate (including the ZNP, ZPB, ZGS, ZST, ZLO, ZMI, ZAS, ZEL/ZEB and ZVE loaders described in ALLCO-102, Attachment 1, and any A&G, engineering, supervision, AFUDC or contingency component), with the rate and dollar amount of each Fully Additional Information/Analysis Unduly Repetitious C.G.S. § 4-178(1) The Company has fully answered this question through its responses to ALLCO-056 and ALLCO-131. As stated in ALLCO-131(b), Eversource has not completed detailed engineering, design, or cost estimating for potential system modifications associated with the identified substations. Accordingly, the Company cannot provide additional project-specific cost information beyond what was previously provided. Eversource objects to further responding to this question as unduly repetitious. Unduly Repetitious; C.G.S. § 4-178(1) See response to ALLCO-237, subpart (a) # Eversource - Internal Use

As listed on the current system

Response to Motion No.: 113 - 11/20/2026 (Eversource) - Type Response = Comment [26-05-10]