    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-05 Date Issued September 08, 2026 ALLCO-054 Page 21 of 27 In this case, Table 2 (above) and the working model included as part of this response, each show that it would be necessary for the Company to realize cost savings of approximately $29 million annually, by the end of the PBR term, in order to be able to offset the downward pressures on the (currently) authorized return on equity (“ROE”) of 9.25%, all else equal. (See, EOE-156, Attachment 1, worksheet “Financial Summary”, Line 24). “Downward pressures” mean increased costs, whether operating expense or the cost of carrying unrecovered capital investment. For context, the Company’s O&M reflected in this docket (per Exhibit CLP-REVREQ-2, Schedule C-3.0), excluding vegetation management, storm restoration and uncollectible expense, is $352 million, annually. Cost efficiency gains of $29 million therefore equate to a reduction on total O&M of approximately 8 percent, which is a significant reduction in the normal course of business. At the same time, Table 2 further highlights that this $29 million annual gap is almost doubled to a gap of $49.3 million with only a five percent increase in capital investment as compared to the capped F-Factor. This computation highlights the extreme sensitivity that exists within the cost-of-service ratemaking model when operating expenses and investment costs are increasing and the point at which base rates will be reset and realigned with actual costs is extended to a future point in time. For example, recall that this analysis is founded on a “going in revenue requirement” that is equal to the Company’s filed, proposed revenue requirement – and assumes only one change in the modelling over the entire PBR term, which is the 5% increase in capital investment. However, in reality, there is a virtual certainty of operating cost increases and investment additions that well exceed the 5% shown here, which would only further suppress the rate of return. Accordingly, this analysis highlights the inherent power of the stay-out term associated with a multi-year rate plan that provides revenue support, but without any guarantee of aligning with the actual cost of service along the way. The growing gap is the pressure that is created for efficiency gains that will then be passed on to customers at the next rate-setting interval. D. Model Overview Please refer to EOE-156, Attachment 1, for the Company’s illustrative PBR model. The model incorporates the Company’s proposal with respect to inflation measurement, revenue increases related to operating expenses, FFactor, and combined effect on the financial results of the Company. Key assumptions include: i. The base rate increase, PBMRP, and catastrophic storm cost recovery authorized in this docket are all assumed at the level filed by the Company in this proceeding, with the only exception being the Company used the return on equity and equity capitalization as currently allowed, which is 9.25% and 53.0%, respectively. ii. The sum of plant additions and cost of removal each year are equal to the capital investment forecast provided in this proceeding, as shown in Exhibit CLP-ELP-1, Figure 7. iii. Capital and O&M costs related to AMI are excluded from the projected cost of service and illustrative F-Factor revenue requirement calculations. Should the F Factor be approved as the mechanism enabling revenue support for AMI, the cap on capital investment would need to be increased to accommodate the costs for that program. Allco Exhibit CL-1 — Page 22 of 29
  2. Page 38 of 78Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-05 Date Issued September 08, 2026 ALLCO-054 Page 22 of 27 iv. Catastrophic storm costs, both the recovery of existing deferred costs as well as the costs related to future events, have no bearing on the model. Importantly, this implies the catastrophic storm and pre-staging costs in base rates perfectly match future costs (i.e. future revenue equals future cost for each and every year). v. O&M cost pressure is assumed to be 1% greater than inflation, annually. The model is organized into three primary sections: 1) Financial Summary, which presents illustrative results of the combined effect of the Company’s proposed rate increase, PBR framework, and cost projections 2) PBR Model, which covers “I – X – CD” and F-Factor a. Worksheet “PBR-1 Total PBRA” b. Worksheet “PBR-2 Inflation” c. Worksheet “PBR-3 F-Factor Summary” d. Worksheet “PBR-4 F-Factor” e. Worksheet “PBR-5 F-Factor Property Tax” f. Worksheet “PBR-6 Capital Forecast” g. Worksheet “PBR-7 Going-In Capital RR” h. Worksheet “PBR-8 GDP” i. Worksheet “PBR-9 ECI” 3) Cost of service, which consists of three worksheets, provides a forecast of the actual cost of providing electric service 1) Financial Summary The “Financial Summary” provides the combined results of going-in revenues along with the rate increases determined through the Company’s PBR proposal, the operating costs of service projected over the same timeframe, and the investment base that enables the Company’s essential service to customers. Lines 15-27 show the calculation of the Company’s actual, earned return on equity over the four years of the Company’s PBMRP term. Specifically, Line 22 provides the annual earned return on equity; Line 23 provides the cumulative average annual ROE; and Line 24 provides the revenue requirement (excluding GET and uncollectible) or cost savings necessary to achieve the allowed ROE. Lines 28-44 provide a simplified Income Statement for the four years of the Company’s PBMRP, including revenue projections as well as the operating costs of service. These costs represent the projected costs of doing business whether or not those costs are supported with rates. Lines 46-61 provide a summary of the revenue increases calculated in the PBR model and the corresponding impacts on uncollectible expense and gross earnings tax. 2) PBR The PBR worksheets are the working calculations that drive the illustrative distribution rate increases discussed above. Each one of which is discussed separately below: Allco Exhibit CL-1 — Page 23 of 29
  3. Page 39 of 78Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-05 Date Issued September 08, 2026 ALLCO-054 Page 23 of 27 a. Worksheet “PBR-1 Total PBRA” This worksheet summarizes the results (i.e. rate increases) of the model’s other “PBR” worksheets and is organized into four sections: (1) Going-In Revenue Requirements; (2) PBR-O Adjustment; (3) FFactor Adjustment; and (4) Total Performance Base Revenue Adjustment. “Going-In Revenue Requirements” reflects the eventual revenues authorized as a result of this proceeding. For purposes of this response, this reflects revenues as proposed in this docket and adjusted, as discussed above. The purpose of this section is to orient the reader to the authorized levels of operating revenue (Line 17) and O&M (Line 21) established in this proceeding and, second, to perform calculations necessary to establish Rate Year 1 baselines for use with subsequent Rate Year revenue calculations. Line 19 is the resulting base distribution revenue requirement that represents the overall starting point for distribution revenues to which any and all PBMRP rate adjustments for Rate Year 2 would be added or subtracted as appropriate. Line 23 is the level of O&M to which the PBR-O percentage increase for Rate Year 2 would apply. The PBR-O adjustment section (Lines 25-30) provides the calculations for inflation-driven rate increases, which are initially applied to line 23 discussed above. Line 27 is the combined percentage increase resulting from the Company’s proposed composite inflation measure, -0.03% productivity (“x”) factor, and consumer dividend. For this analysis, the Company has assumed a 30-basis point consumer dividend for all years. Line 28 provides the resulting annual incremental revenues. The F-Factor adjustment section on this worksheet references the results determined on other worksheets of the model (discussed below). Here, Line 33 provides the resulting annual incremental revenues, while Line 34 provides the cumulative F-Factor revenue requirement. Line 37 provides the total annual revenue increase, which is the sum of Lines 28 and 33. Line 43 is the final resulting base distribution revenue requirement that begins with Rate Year 1 amounts and adjusts annually thereafter by the amounts described above. For purposes of this analysis, there are no exogenous cost recovery assumptions reflected in the accompanying working model. If PURA were to authorize the Company’s proposal, including mechanics related to exogenous cost provisions and the consumer dividend, the PBR model would need to be adapted from the attached to include additional worksheets as appropriate. b. Worksheet “PBR-2 Inflation” This worksheet first aggregates the relevant indices’ data points from worksheets 10 and 11 (discussed below), which are shown on Lines 13-16 for GDP-PI and Lines 21-24 for ECI. Each index is then averaged for a given calendar year (Lines 17 and 25), which then form the basis for the annual growth calculations on Lines 18 and 26. As discussed in the Company’s pre-filed testimony, the Company is proposing to weight the indices 66.9% for GDP-PI and 33.1% for ECI. The composite resulting inflation is shown on Line 32. Line 33 provides the -0.03% productivity factor, while Line 34 shows the consumer dividend, which assumes 30 basis points for simplicity of this analysis. The combined result of inflation, productivity factor and consumer dividend is shown on Line 35, which is before the imposition of a 5% cap. To the Allco Exhibit CL-1 — Page 24 of 29
  4. Page 40 of 78Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-05 Date Issued September 08, 2026 ALLCO-054 Page 24 of 27 extent line 35 exceeds the proposed 5% cap, Line 36 would provide the adjustment such that Line 37, the final result, is the lesser of the 5% cap and Line 35. Note that projections of inflation are used for analytical purposes in this response and to assist with discussion pertaining to future rate increase implications. Actual calculations of PBR adjustments in future annual PBR filings would rely exclusively on published data available at the time of a given year’s annual PBR filing. c. Worksheet “PBR-3 F-Factor Summary” Like the CT-Bar, the Company’s proposed F-Factor is calculated on a monthly basis. The “F-Factor Summary” worksheet aggregates the results of those calculations on Lines 17-29 and presents in 6-month increments to enable both calendar-year and rate-year views of the same information. Property taxes (Line 19) are not calculated monthly, but rather on a fiscal year basis. Line 28 provides the resulting cumulative F-Factor revenue requirement, while Line 29 is the annual incremental amount shown on the worksheet “PBR-1 Total PBRA,” line 33. d. Worksheet “PBR-4 F-Factor” This worksheet provides the monthly calculation of the F-Factor revenue allowance summarized on the previous worksheet and is the “engine” of the overall F-Factor model. Broadly, it aggregates the necessary inputs, including rate base activity assumptions (Lines 18-25) and relevant rates resulting from this proceeding, including depreciation expense as a function of gross plant (Line 49) and pre-tax return on rate base (Line 51). Note also that this worksheet includes a “switch” (Line 16) that enables this model to adapt to the cutoff date of capital investment for inclusion in base rates. However, due to the large number of possibilities for a potential cut-off date and similarly large variation of resulting Going-In revenue requirements, the model is currently configured to use this line as an adjustment for Rate Year 1 only. That is, the model is not currently built such that the user can specify a cutoff date for capital investment inclusion in base rates and have that date adjust the going-in capital revenues, as well as the F-Factor. Conceptually, this switch is intended to affix the start of the F-Factor calculations to the last date capital investment is reflected in base rates. As presently configured, the F-Factor revenue requirement assumes the capital investment reflected in base rates is per the Company’s proposal, which is through June 30, 2028. However, the capital-driven Rate Year revenue requirement calculations reflected in the Company’s filed cost of service are based on Rate Year averages. For example, the rate base referenced in the return on rate base calculations found on Exhibit CLP-REVREQ-2, Schedule A-1.0, Line 16 is average rate base, while Rate Year 1 depreciation expense is based on rate-year average plant in-service, as denoted on WP C-3.34, line 13 of the same exhibit. Consequently, the F-Factor calculation is currently configured to rely on 50% of Rate Year 1 capital investment to effectively build the proper ending balances as of 6/30/2028 upon which subsequent Rate Year calculations can grow. Note that the interaction between the F-Factor and the cut-off date for capital investment inclusion in base rates is a critical component to the longevity of the Company’s proposal as it assures that the F-Factor starting point aligns with the endpoint for base rates, leaving no gap over the duration of the rate plan. For purposes of this written response, the Company does not detail the calculations of this worksheet here. Instead, the Company refers to the line references provided on the last page of this worksheet Allco Exhibit CL-1 — Page 25 of 29
  5. Page 41 of 78

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-05 Date Issued September 08, 2026 ALLCO-054 Page 25 of 27 (Model PDF, page 8) for both Attachments 1 and 2, which detail the calculations performed. For emphasis, note that Line 33 captures the accumulation of depreciation recovered in base rates. By design, the F-Factor intentionally reflects this to properly estimate a reasonably true capital driven revenue requirement. The resulting F-Factor revenue requirement, excluding property tax, which is referenced by the preceding worksheet, is shown on line 53. e. Worksheet “PBR-5 F-Factor Property Tax” This worksheet provides the fiscal year calculations for incremental property tax expense based on capital investments made since 2024 and forecast through 2031. Line 12 references capital investment assumptions discussed elsewhere, while Lines 13-24 perform the calculations of depreciation expense pursuant to Conn. Gen. Stat. §12-63(b)(6), net book value, assessed value pursuant to Conn. Gen. Stat. §12-63(a), and the eventual property tax expense by applying the composite mill rate calculated in Exhibit CLP-REVREQ-2, Schedule WP C-3.37 p17 to 21, Page 20, Line 73. The result is shown on line 24. Lines 28-32 then summarize that result by calendar year, while Lines 38-40 summarize by Rate Year. After adjusting for the extent to which base rates recover the property tax related to these same investments on Line 41, as discussed in previous sections, the final property tax amount reflected in the F-Factor allowance is shown on Line 42. f. Worksheet “PBR-6 Capital Expense Forecast” This worksheet is provided to create the necessary link between the F-Factor revenue allowance calculations and the capital investment forecast discussed in this docket. The capital investment forecast included aligns with the Company’s filed capital investment forecast, as can be seen in Exhibit CLPELP-1, Figure 7. The F-Factor capital investment assumptions reflected in the revenue allowance calculations of “PBR-4 F-Factor” necessarily agree with this worksheet. g. Worksheet “PBR-7 Going-In Capital RR” This worksheet is a collection of select data points as approved in the Company’s “Going-In” rates (or, in this case, as proposed in the Company’s filed cost of service schedules, Exhibit CLP-REVREQ-2-A, B, C, D Schedules, adjusted to reflect the currently authorized return on equity (9.25%) and equity capitalization (53.0%), as stated previously: • Lines 12-16 provide the dollar amounts related to capital-driven costs of services, which are depreciation, property taxes and costs of capital. Amounts shown are currently as proposed in this illustrative model (except where noted), but ultimately will reflect the amounts as approved in this docket. • Lines 21-28 provide a summarized view of the Company’s filed rate base for the Test Year, Rate Year Beginning, Rate Year ending, and Rate Year average balances. These balances serve as the basis (denominators) for establishing the capital-driven costs above as a percentage of approved balances. Those percentages are used on the other “PBR” worksheets, as well as the cost of service worksheet to estimate future costs of service based on approved levels (Lines 30-32) Allco Exhibit CL-1 — Page 26 of 29
  6. Page 42 of 78Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-05 Date Issued September 08, 2026 ALLCO-054 Page 26 of 27 h. • Lines 47-81 provide rates for uncollectible expense, gross earnings tax, and the costs of capital as well as necessary calculation of gross-ups to those rates for use in the model’s calculations. • Additional details are shown in column (F) of this worksheet. Worksheet “PBR-8 GDP” This worksheet presents raw Gross Domestic Product-Price Index (GDP-PI) data obtained from the Bureau of Economic Analysis. For illustrative purposes only, this model also includes a projection of GDP-PI obtained from Moody’s September 14, 2026. As noted above, actual calculations of PBR increases, if approved as filed, rely only on historical data available at the time of a given year’s annual PBR filing. i. Worksheet “PBR-9 ECI” This worksheet contains raw Employment Cost Index (ECI) data obtained from the Bureau of Labor Statistics. Note that projections of inflation are used for analytical purposes and to assist with discussion pertaining to future rate increase implications. Calculations of PBR increases, if approved as filed, rely only on historical data available at the time of a given year’s annual PBR filing. 3) Cost of Service The cost of service included for analytical purposes in the Company’s working model consists of three worksheets: “COS-1 Total,” “COS-2 Capital,” and “COS-3 Property Tax.” a. Worksheet “COS-1 Total” This worksheet provides projections of the Company’s actual costs through the end of the PBMRP term as a means of assessing the impact the capital investment forecast and O&M cost pressures have on the overall cost of service as well as the degree to which revenues align with the Company’s cost of service (as reflected on the “Financial Summary” worksheet). Lines 15-37 summarize the results of the cost drivers, including especially O&M (Lines 16-19), depreciation (Line 21), property taxes (Line 22), and costs of capital, including corresponding income taxes (Lines 2427). Gross earnings taxes and uncollectible expense are calculated on Lines 33 and 34 as if the full cost of service (Line 28) is in rates. Non-storm O&M is shown on Lines 38-44, while storm O&M is shown on Lines 45-50, where noncatastrophic costs are identified separately from catastrophic storm / pre-staging funding. Non-storm rate base is shown on Lines 52-59, which reflect the capital investment forecast (exclusive of AMI) filed in this docket. Lastly, capital-driven costs of service are shown on Lines 61-67. Depreciation, property tax, uncollectible, gross earnings taxes, and costs of capital are based on the Company’s filed cost of service in this docket, Allco Exhibit CL-1 — Page 27 of 29
  7. Page 43 of 78

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-05 Date Issued September 08, 2026 ALLCO-054 Page 27 of 27 specifically Exhibit CLP REVREQ-2-A, B, C, D Schedules, except that the return on equity (9.25%) and equity capitalization (53%) are shown at currently authorized amounts. b. Worksheet “COS-2 Capital” This worksheet functions nearly identically to “PBR-4 F-Factor” except that it relies on actual capital investment projected over the term of the PBMRP. This is essential to understanding actual costs of service, whether or not those costs are supported by revenues. It forms the basis for evaluating the degree to which the F-Factor is sufficient. For additional details pertaining to the mechanics, please see the line references found at the end of this worksheet (or model PDF page 19). c. Worksheet “COS-3 Property Tax” Similarly, this worksheet is included to assist with the calculation of actual costs of service. It operates mechanically identically to “PBR-5 F-Factor Property Tax” except that it relies on actual capital investment projections (Line 12). Allco Exhibit CL-1 — Page 28 of 29
  8. Page 44 of 78

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 8, 2026 ALLCO-054 Attachment 1 Page 1 of 1 ($ Millions) Line Description Test Year Adjusted * 6,198 304 342 $38.3 $14.5 Rate Year 1 ** 6,856 336 379 $42.4 $16.1 Rate Year 2 ** 7,205 353 398 $44.5 $16.9 Rate Year 3 ** 7,581 372 419 $46.9 $17.8 Rate Year 4 ** 7,977 Company Projections 391 Line 1 x 53% x 9.25% 440 Line 1 x 53.86% x 10.25% $49.3 Line 3 - Line 2 $18.7 (1/(1-.275175)-1) x Line 4 1 Rate Base 2 After-tax equity return, as authorized 3 After-tax equity return, as proposed 4 After-tax equity return, difference 5 Income Tax Impact 6 7 * Test Year rate base is adjusted to exclude defered storm and related ADIT, per Exhibit CLP-REVREQ-2, Schedule B-6.2, Lines 52 and 53 8 ** Rate base is provided on a 2-point annual average basis for rate years 1-4 Allco Exhibit CL-1 — Page 29 of 29
  9. Page 45 of 78

    Docket No. 26-05-10 — Prefiled Direct Testimony of Christopher Little on behalf of Allco Finance Limited Exhibit CL-2 CL&P Response to ALLCO-048 and Attachment 1 Authorized returns and ratemaking mechanisms of the Company’s affiliates Allco Exhibit CL-2 — Page 1 of 4
  10. Page 46 of 78

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-048 Page 1 of 2 Date Filed: September 24, 2026 Witness: Douglas P. Horton, Brendan J. O' Brien and Garrett J. Murray Request from: ALLCO Question: For each electric distribution affiliate of Eversource Energy (including Public Service Company of New Hampshire and the Company’s Massachusetts electric distribution affiliate): (a) state the currently authorized distribution return on equity and common equity ratio, and identify the proceeding and date in which each was authorized; (b) identify each risk-reducing mechanism (decoupling, storm cost recovery or tracker, multi-year rate plan, capital tracker, earnings sharing) available to that affiliate; and (c) state whether the Company contends that CL&P faces greater business or regulatory risk than each such affiliate and, if so, produce every analysis supporting that contention. Response: Please refer to ALLCO-048, Attachment 1, for subparts (a) and (b). The Company has indicated in Attachment 1 whether each company’s respective, approved rate plan includes revenue decoupling, storm cost recovery or dedicated mechanism, multi-year rate plan, capital cost recovery, and/or earnings sharing provision. The Company does not agree with the characterization in the question of these mechanisms as “risk reducing mechanisms,” given the regulators would not implement these mechanisms unless there were a symmetrically, balancing impact for the utility and its customers and after consideration of the trade-offs inherent in the mechanism. Specifically: • Revenue decoupling is primarily implemented for policy reasons to eliminate any disincentive that the utility would have for promoting load-conservation initiatives that would reduce sales revenues between base-rate cases. In the course of achieving that policy goal, revenue decoupling operates as a symmetrical reconciliation in which revenues are adjusted up or down to the target level of revenues authorized by the regulator, so that both the utility and customers are held constant to the authorized level of revenue. As shown in Attachment 1, revenue decoupling has been implemented in Massachusetts for NSTAR Electric but has not been implemented for PSNH. • Storm cost recovery mechanisms operate to provide symmetrical benefits, shielding customers from rate shock associated with the accumulation of incremental storm expenses and limiting carrying costs associated with deferrals, while the utility is allowed timely and adequate recovery of costs it incurs to safely and efficiently restore service to its customers after a significant weather event. By definition, storm cost recovery mechanisms that Allco Exhibit CL-2 — Page 2 of 4