Prefiled testimony
Witness: Christopher Little
Files1
Allco_Prefiled_Direct_Testimony_Christopher_Little_ROE_PURA_26-05-10_10-21_final.pdf
PDF · 4.0 MB · 78 pagesText searchable
Download Allco_Prefiled_Direct_Testimony_Christopher_Little_ROE_PURA_26-05-10_10-21_final.pdfRead the text of Allco_Prefiled_Direct_Testimony_Christopher_Little_ROE_PURA_26-05-10_10-21_final.pdf
Search terms highlighted
Eversource rate increase is on 16 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 42 of 78
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-05 Date Issued September 08, 2026 ALLCO-054 Page 26 of 27 h. • Lines 47-81 provide rates for uncollectible expense, gross earnings tax, and the costs of capital as well as necessary calculation of gross-ups to those rates for use in the model’s calculations. • Additional details are shown in column (F) of this worksheet. Worksheet “PBR-8 GDP” This worksheet presents raw Gross Domestic Product-Price Index (GDP-PI) data obtained from the Bureau of Economic Analysis. For illustrative purposes only, this model also includes a projection of GDP-PI obtained from Moody’s September 14, 2026. As noted above, actual calculations of PBR increases, if approved as filed, rely only on historical data available at the time of a given year’s annual PBR filing. i. Worksheet “PBR-9 ECI” This worksheet contains raw Employment Cost Index (ECI) data obtained from the Bureau of Labor Statistics. Note that projections of inflation are used for analytical purposes and to assist with discussion pertaining to future rate increase implications. Calculations of PBR increases, if approved as filed, rely only on historical data available at the time of a given year’s annual PBR filing. 3) Cost of Service The cost of service included for analytical purposes in the Company’s working model consists of three worksheets: “COS-1 Total,” “COS-2 Capital,” and “COS-3 Property Tax.” a. Worksheet “COS-1 Total” This worksheet provides projections of the Company’s actual costs through the end of the PBMRP term as a means of assessing the impact the capital investment forecast and O&M cost pressures have on the overall cost of service as well as the degree to which revenues align with the Company’s cost of service (as reflected on the “Financial Summary” worksheet). Lines 15-37 summarize the results of the cost drivers, including especially O&M (Lines 16-19), depreciation (Line 21), property taxes (Line 22), and costs of capital, including corresponding income taxes (Lines 2427). Gross earnings taxes and uncollectible expense are calculated on Lines 33 and 34 as if the full cost of service (Line 28) is in rates. Non-storm O&M is shown on Lines 38-44, while storm O&M is shown on Lines 45-50, where noncatastrophic costs are identified separately from catastrophic storm / pre-staging funding. Non-storm rate base is shown on Lines 52-59, which reflect the capital investment forecast (exclusive of AMI) filed in this docket. Lastly, capital-driven costs of service are shown on Lines 61-67. Depreciation, property tax, uncollectible, gross earnings taxes, and costs of capital are based on the Company’s filed cost of service in this docket, Allco Exhibit CL-1 — Page 27 of 29Page 43 of 78
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-05 Date Issued September 08, 2026 ALLCO-054 Page 27 of 27 specifically Exhibit CLP REVREQ-2-A, B, C, D Schedules, except that the return on equity (9.25%) and equity capitalization (53%) are shown at currently authorized amounts. b. Worksheet “COS-2 Capital” This worksheet functions nearly identically to “PBR-4 F-Factor” except that it relies on actual capital investment projected over the term of the PBMRP. This is essential to understanding actual costs of service, whether or not those costs are supported by revenues. It forms the basis for evaluating the degree to which the F-Factor is sufficient. For additional details pertaining to the mechanics, please see the line references found at the end of this worksheet (or model PDF page 19). c. Worksheet “COS-3 Property Tax” Similarly, this worksheet is included to assist with the calculation of actual costs of service. It operates mechanically identically to “PBR-5 F-Factor Property Tax” except that it relies on actual capital investment projections (Line 12). Allco Exhibit CL-1 — Page 28 of 29Page 44 of 78
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 8, 2026 ALLCO-054 Attachment 1 Page 1 of 1 ($ Millions) Line Description Test Year Adjusted * 6,198 304 342 $38.3 $14.5 Rate Year 1 ** 6,856 336 379 $42.4 $16.1 Rate Year 2 ** 7,205 353 398 $44.5 $16.9 Rate Year 3 ** 7,581 372 419 $46.9 $17.8 Rate Year 4 ** 7,977 Company Projections 391 Line 1 x 53% x 9.25% 440 Line 1 x 53.86% x 10.25% $49.3 Line 3 - Line 2 $18.7 (1/(1-.275175)-1) x Line 4 1 Rate Base 2 After-tax equity return, as authorized 3 After-tax equity return, as proposed 4 After-tax equity return, difference 5 Income Tax Impact 6 7 * Test Year rate base is adjusted to exclude defered storm and related ADIT, per Exhibit CLP-REVREQ-2, Schedule B-6.2, Lines 52 and 53 8 ** Rate base is provided on a 2-point annual average basis for rate years 1-4 Allco Exhibit CL-1 — Page 29 of 29Page 45 of 78
Docket No. 26-05-10 — Prefiled Direct Testimony of Christopher Little on behalf of Allco Finance Limited Exhibit CL-2 CL&P Response to ALLCO-048 and Attachment 1 Authorized returns and ratemaking mechanisms of the Company’s affiliates Allco Exhibit CL-2 — Page 1 of 4Page 46 of 78
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-048 Page 1 of 2 Date Filed: September 24, 2026 Witness: Douglas P. Horton, Brendan J. O' Brien and Garrett J. Murray Request from: ALLCO Question: For each electric distribution affiliate of Eversource Energy (including Public Service Company of New Hampshire and the Company’s Massachusetts electric distribution affiliate): (a) state the currently authorized distribution return on equity and common equity ratio, and identify the proceeding and date in which each was authorized; (b) identify each risk-reducing mechanism (decoupling, storm cost recovery or tracker, multi-year rate plan, capital tracker, earnings sharing) available to that affiliate; and (c) state whether the Company contends that CL&P faces greater business or regulatory risk than each such affiliate and, if so, produce every analysis supporting that contention. Response: Please refer to ALLCO-048, Attachment 1, for subparts (a) and (b). The Company has indicated in Attachment 1 whether each company’s respective, approved rate plan includes revenue decoupling, storm cost recovery or dedicated mechanism, multi-year rate plan, capital cost recovery, and/or earnings sharing provision. The Company does not agree with the characterization in the question of these mechanisms as “risk reducing mechanisms,” given the regulators would not implement these mechanisms unless there were a symmetrically, balancing impact for the utility and its customers and after consideration of the trade-offs inherent in the mechanism. Specifically: • Revenue decoupling is primarily implemented for policy reasons to eliminate any disincentive that the utility would have for promoting load-conservation initiatives that would reduce sales revenues between base-rate cases. In the course of achieving that policy goal, revenue decoupling operates as a symmetrical reconciliation in which revenues are adjusted up or down to the target level of revenues authorized by the regulator, so that both the utility and customers are held constant to the authorized level of revenue. As shown in Attachment 1, revenue decoupling has been implemented in Massachusetts for NSTAR Electric but has not been implemented for PSNH. • Storm cost recovery mechanisms operate to provide symmetrical benefits, shielding customers from rate shock associated with the accumulation of incremental storm expenses and limiting carrying costs associated with deferrals, while the utility is allowed timely and adequate recovery of costs it incurs to safely and efficiently restore service to its customers after a significant weather event. By definition, storm cost recovery mechanisms that Allco Exhibit CL-2 — Page 2 of 4Page 47 of 78
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-048 Page 2 of 2 operate outside of base rates are intended to cover storms that cannot be reasonably covered through base rates as typical ‘ebb and flow’ of utility expenses, because to do so would leave customers or the utility paying too much or too little for the obligation. As shown in Attachment 1, although the mechanics differ by jurisdiction, both NSTAR Electric and PSNH have storm cost recovery mechanisms that operate outside of base rates. • Multi-year rate plans are aimed at stabilizing revenue levels to provide a symmetrical benefit for customers and the utility in terms of enabling necessary rate changes to cover the cost of service, while providing customers rate stability and predictability, along with strong incentives for cost control. Multi-year rate plans that are performance-based and involved in a relatively longer “stay-out” period drive efficiency for the benefit of the utility and customers, due to the fact that the utility needs to operate within the confines of the plan and control its costs in order to maintain financial integrity over the stay-out term. Conversely, customers are protected from utility over-earning during the rate plan through operation of the ESM which, in the Company’s experience is implemented in a one-sided manner – to the benefit of customers. The NHPUC approved a 4-year PBR plan as part of the Company’s last rate case issued in Docket No. 24-070. The MDPU approved a 5-year PBR plan as part of NSTAR Electric’s last rate case in DPU 22-22 (2022). • Capital cost recovery mechanism outside of a multi-year rate plan have also been implemented by the MDPU for certain targeted investments that are identified as benefitting customers, while providing timely and adequate recovery to the utility in relation to the investments that customers require. The design of the New Hampshire multi-year rate plan encompasses capital cost recovery and PSNH does not currently have a targeted capital cost recovery in place. • As noted in ALLCO-048, Attachment 1, both PSNH and NSTAR Electric have earnings sharing mechanisms that operate on an asymmetric basis so that the utility is allowed to share earnings above (not below) their authorized return on equity. The earnings sharing mechanisms do not provide additional revenues to the utilities in the event they earn below their authorized return on equity. As discussed on page of Exhibit CLP-ROE-1, Ms. Bulkley relied on a proxy group of comparable utilities to develop the costs of equity models. Therefore, when assessing business risk, the appropriate comparison is the business risk of the Company as compared to the proxy group to determine where within the range of results the Company’s ROE should fall. Accordingly, the requested analysis comparing CL&P to NSTAR Electric and PSNH were not conducted. Allco Exhibit CL-2 — Page 3 of 4Page 48 of 78
1 2 3 4 5 6 The Connecticut Light and Power Company Affiliates Regulatory Mechanisms 7 8 Docket No. Decision Date 9 10 11 12 13 14 15 16 17 18 19 DE 24-070 07/25/25 Public Service Company of New Hampshire Authorized Common Revenue Storm Cost Return on Equity Equity Ratio Decoupling Recovery (Yes or No) (Yes or No) 9.50% 50.00% No Yes 1,2 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 3, 2026 ALLCO-048 Attachment 1 Page 1 of 1 Earning Sharing Mechanism (Yes or No) Yes 3 Capital Trackers (List Each) N/A Notes: 1 - PSNH's annual storm fund contribution collected in base rates is $19 million approved in Docket No. DE 24-070. 2 - The PUC has authorize deferral of any storm costs in Docket No. DE 24-070. The Commission deferred any storm costs proposal to ongoing storm dockets. Order No. 28,170 did, however, direct the Company to recover storm costs through the RRA once approved through a storm cost review proceeding. 3 - Triggered when Company's computed ROE exceeds authorized ROE by 25 bps. Sharing is 75%/25%. 20 21 Docket No. Decision Date Authorized Return on Equity 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 D.P.U. 22-22 11/30/22 9.80% NSTAR Electric Company Common Revenue Equity Ratio Decoupling (Yes or No) 53.21% Yes Storm Cost Recovery (Yes or No) Earning Sharing Mechanism (Yes or No) Capital Trackers (List each) (List Each) Yes1,2 Yes3 Yes4 Notes: 1 - Storm Fund (Base Rates): The annual storm fund contribution collected through base distribution rates is $31 million. The storm-fund eligible event threshold is $1.3 million per storm event (meaning routine storms under $1.3M are not contributing to the storm fund deficit). 2 - DPU approved the recovery of exogenous storms outside of base rates as a provision of the PBR. NSTAR Electric is authorized to collect exogenous storm costs through the Storm Cost Recovery Adjustment Factor ("SCRAF") when the combination of any single storm exceeds $30 million and the balance in the storm fund exceeds $75 million and is not otherwise recoverable through the NSTAR Electric Storm Reserve Adjustment Mechanism. 3 - The Earning Sharing Mechanism has a deadband of 100 basis points above the Company’s ROE. If the Company’s earnings exceed 100 basis points earnings above the deadband will be shared 75 % with customers and 25% with the Company 4 - NSTAR Electric effective capital trackers: K-Bar (provision of PBR) - M.D.P.U. No. 59H Grid Modernization - M.D.P.U. No. 73L Electric Vehicles - M.D.P.U. No. 78G Electric Sector Modernization - M.D.P.U. No. 84 Provisional System Planning Program - M.D.P.U. No. 81D Advanced Metering - M.D.P.U. No. 80E Solar Massachusetts Renewable Target - M.D.P.U. No. 74M Solar Expansion - M.D.P.U. No. 67I Allco Exhibit CL-2 — Page 4 of 4Page 49 of 78
Docket No. 26-05-10 — Prefiled Direct Testimony of Christopher Little on behalf of Allco Finance Limited Exhibit CL-3 CL&P Response to ALLCO-138 Market-to-book cost-of-equity calculation declined (“not available”) Allco Exhibit CL-3 — Page 1 of 3Page 50 of 78
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-138 Page 1 of 2 Date Filed: October 09, 2026 Witness: Rima Hyder and Ann Bulkley Request from: ALLCO Question: (Implied cost of equity from market value and growth.) (a) State the long-term earnings-per-share growth rate, dividend growth rate, and rate-base growth rate most recently communicated by Eversource Energy to investors (including in its most recent earnings guidance, investor presentation, and annual report), the date of each communication, and the period to which each applies. (b) State the long-term growth rate(s) used by the ROE Witness in each discounted cash flow model, the source of each (identifying each analyst, service, or calculation relied on), and, for each Proxy Group company, the growth rate assigned. (c) State the long-term nominal growth rate of United States gross domestic product assumed or implied in the ROE Witness’s analysis, or, if none, the source the Company regards as authoritative for that figure, and state whether any growth rate used in (b) exceeds it and by how much. (d) Using the relationship M/B = (ROE − g) ÷ (COE − g), where M/B is the market-to-book ratio, ROE is the return on book equity, g is long-term growth, and COE is the cost of equity, compute the cost of equity implied for Eversource Energy at each year-end 2020 through 2025 using (i) Eversource Energy’s reported earned return on average common equity and (ii) its communicated long-term growth rate, and produce the calculation; if the Company contends the relationship is inapplicable, state each reason. Response: a. Please refer to ALLCO-138, Attachment 1, (pages 4, 19, and 23) for the most recent long-term earnings-per-share growth rate of between 5% and 7% by the end of fiscal year 2030 communicated in the Q2 2026 earnings call presentation dated July 31, 2026. Please refer to ALLCO-138, Attachment 2, (pages 1, 39, and 48) for the most recent dividend growth rate of 5.2% for fiscal year 2025 as compared to 2024 as communicated in the 2026 proxy statement made available on March 27, 2026. Please refer to ALLCO-138, Attachment 3, (page 12) for the most recent rate base growth rate estimate of 8.3% Compound Annual Growth Rate by 2030 as compared to the 2024 rate base as communicated in the Year-End 2025 earnings call presentation dated February 13, 2026. b. Please refer to Exhibit CLP-ROE-4. c. Ms. Bulkley did not rely on a forward-looking estimate of GDP growth in her analysis. While the Company has relied on historical measures of GDP growth from the Bureau of Economic Analysis, however since the cost of equity is a forward-looking analysis, the historical GDP growth rates may not be appropriate for the long-term GDP growth rate. Allco Exhibit CL-3 — Page 2 of 3Page 51 of 78
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-138 Page 2 of 2 d. The requested analysis was not developed in the preparation of the Company’s rate case filing and therefore is not available. Ms. Bulkley did not rely on Eversource Energy in the proxy group used for the estimation of the cost of equity in this proceeding due to the circularity that could occur from relying on the parent company market data to set the ROE for the subject company. This reason was sufficient to eliminate Eversource Energy from the proxy group. Allco Exhibit CL-3 — Page 3 of 3
As listed on the current system
Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Christopher Little [26-05-10]