Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Files4

Search terms highlighted
Eversource rate increase is on 3 pages of the text below, highlighted. Go to the first matchClear highlighting
3 pages match
  1. Page 38 of 82

    1 B. The Beta Coefficient 2 Q. How is the beta coefficient used in this model? 3 A. As discussed above, beta represents the sensitivity of a given security to movements in the 4 overall market. The CAPM states that in efficient capital markets, the expected risk 5 premium on each investment is proportional to its beta. Recall that a security with a beta 6 greater than 1.0 is riskier than the market portfolio. Conversely, a security with a beta less 7 than one is less risky than the market portfolio. An index such as the S&P 500 Index is 8 used as a proxy for the market portfolio. The historical betas for publicly traded firms are 9 published by various institutional analysts. Beta may also be calculated through a linear 10 regression analysis, which provides additional statistical information about the relationship 11 between a single stock and the market portfolio. The market portfolio of all stocks has a 12 beta equal to one. Stocks with betas greater than one are relatively more sensitive to market 13 risk than the average stock. In contrast, stocks with betas of less than one are less sensitive 14 to market risk. 15 Q. Describe the source for the betas you used in your CAPM analysis. 16 A. I used betas recently published by Value Line Investment Survey. The beta for each proxy 17 company is less than 1.0, and the average beta for the total proxy group is only 0.74. Thus, 18 we have an objective measure confirming the well-known concept that utility stocks are 19 less risky than the average stock in the market. While there is evidence suggesting that 20 betas published by sources such as Value Line may actually overestimate the risk of 35
  2. Page 39 of 82

    1 utilities, and thus overestimate the CAPM, I used the Value Line betas in the interest of 2 reasonableness.4647 3 C. The Equity Risk Premium 4 Q. Describe the equity risk premium. 5 A. The final term of the CAPM is the equity risk premium (“ERP”), which is the required 6 return on the market portfolio less the risk-free rate (RM – RF). In other words, the ERP is 7 the level of return investors expect above the risk-free rate in exchange for investing in 8 risky securities. Many experts agree that “the single most important variable for making 9 investment decisions is the equity risk premium.”48 Likewise, the ERP is arguably the 10 single most important factor in estimating the cost of capital in this matter. There are three 11 basic methods that can be used to estimate the ERP: (1) calculating a historical average; 12 (2) taking a survey of experts; and (3) calculating the implied ERP. I will discuss each 13 method in turn, noting advantages and disadvantages of these methods. 14 1. Historical Average 15 Q. Describe the historical equity risk premium. 16 A. The historical ERP may be calculated by simply taking the difference between returns on 17 stocks and returns on government bonds over a certain period of time. Many practitioners 46 Exhibit DJG-8. 47 See Appendix B for a more detailed discussion of raw beta calculations and adjustments. 48 Elroy Dimson, Paul Marsh & Mike Staunton, Triumph of the Optimists: 101 Years of Global Investment Returns, p. 4 (Princeton University Press 2002). 36
  3. Page 40 of 82

    1 rely on the historical ERP as an estimate for the forward-looking ERP because it is easy to 2 obtain. However, there are disadvantages to relying on the historical ERP. 3 4 Q. What are the limitations of relying solely on a historical average to estimate the current or forward-looking ERP? 5 A. As I mentioned, many investors use the historic ERP because it is convenient and easy to 6 calculate. But what matters in the CAPM model is the current and forward-looking risk 7 premium.49 Some investors may think that a historic ERP provides some indication of 8 what the prospective risk premium is; however, there is empirical evidence to suggest the 9 prospective, forward-looking ERP is actually lower than the historical ERP. In a landmark 10 publication on risk premiums around the world, Triumph of the Optimists, the authors 11 suggest through extensive empirical research that the prospective ERP is lower than the 12 historical ERP.50 This is due in large part to what is known as “survivorship bias” or 13 “success bias” — a tendency for failed companies to be excluded from historical indices.51 14 From their extensive analysis, the authors make the following conclusion regarding the 15 prospective ERP: 49 John R. Graham, Scott B. Smart & William L. Megginson, Corporate Finance: Linking Theory to What Companies Do, p. 330 (3rd ed., South-Western Cengage Learning 2010). 50 Elroy Dimson, Paul Marsh & Mike Staunton, Triumph of the Optimists: 101 Years of Global Investment Returns, p. 34 (Princeton University Press 2002). 51 Id. at 194. 37
  4. Page 41 of 82

    1 2 3 4 The result is a forward-looking, geometric mean risk premium for the United States . . . of around 2½ to 4 percent and an arithmetic mean risk premium . . . that falls within a range from a little below 4 to a little above 5 percent.52 5 Indeed, these results are lower than many reported historical risk premiums. Other noted 6 experts agree: 7 8 9 10 11 The historical risk premium obtained by looking at U.S. data is biased upwards because of survivor bias. . . . The true premium, it is argued, is much lower. This view is backed up by a study of large equity markets over the twentieth century (Triumph of the Optimists), which concluded that the historical risk premium is closer to 4%.53 12 Regardless of the variations in historic ERP estimates, many leading scholars and 13 practitioners agree that simply relying on a historic ERP to estimate the risk premium going 14 forward is not ideal. Fortunately, “a naïve reliance on long-run historical averages is not 15 the only approach for estimating the expected risk premium.”54 16 Q. Did you rely on the historical ERP as part of your CAPM analysis in this case? 17 A. No. Due to the limitations of this approach, I primarily relied on the ERP reported in expert 18 surveys and the implied ERP method discussed below. 19 2. Expert Surveys 20 Q. Describe the expert survey approach to estimating the ERP. 21 A. As its name implies, the expert survey approach to estimating the ERP involves conducting 22 a survey of experts including professors, analysts, chief financial officers, and other 52 Id. 53 Aswath Damodaran, Equity Risk Premiums: Determinants, Estimation and Implications – The 2015 Edition, p. 17 (New York University 2015). 54 John R. Graham, Scott B. Smart & William L. Megginson, Corporate Finance: Linking Theory to What Companies Do, p. 330 (3rd ed., South Western Cengage Learning 2010). 38
  5. Page 42 of 82

    1 executives around the country and asking them what they think the ERP is. The IESE 2 Business School conducts such a survey each year. Its 2026 expert survey reported an 3 average ERP of 5.3%.55 4 3. Implied Equity Risk Premium 5 Q. Describe the implied equity risk premium approach. 6 A. The third method of estimating the ERP is arguably the best. The implied ERP relies on 7 the stable growth model proposed by Gordon, often called the “Gordon Growth Model,” 8 which is a basic stock valuation model that has been widely used in finance for many years. 9 This model is a mathematical derivation of the DCF Model. In fact, the underlying concept 10 in both models is the same: the current value of an asset is equal to the present value of its 11 future cash flows. Instead of using this model to determine the discount rate of one 12 company, we can use it to determine the discount rate for the entire market by substituting 13 market-level inputs. Specifically, instead of using the current stock price (P0), we use the 14 current value of the S&P 500 (V500). Instead of using the dividends of a single firm, we 15 consider distributions by the entire market. Stock buybacks should be considered in 16 addition to paid dividends because buybacks represent another way for firms to return free 17 cash flow to shareholders. The market dividend yield plus the market buyback yield gives 18 us the gross cash yield to use as the cash-flow component of the model. These cash flows 55 Pablo Fernandez, Amir Habibian & Antonio Fdez. Acín, Survey: Market Risk Premium and Risk-Free Rate used for 97 countries in 2026 (IESE Business School, Apr. 13, 2026), available at https://ssrn.com/abstract=6570342. 39
  6. Page 43 of 82

    1 are grown into the future and discounted to determine their present value. After solving for 2 the required market return, I subtract the risk-free rate to arrive at the implied ERP.56 3 Q. Discuss the results of your implied ERP calculation. 4 A. I collected S&P 500 market-value, operating-earnings, dividend, and share-repurchase data 5 for the 2015–2025 period, using the latest trailing-four-quarter observation for 2025 6 because S&P had not published its normal completed calendar-year buyback dataset. From 7 those data I calculated the annual dividend yield, buyback yield, and gross cash yield, as 8 well as the compound annual growth rate in operating earnings from 2015 to 2025. I used 9 these inputs, together with the risk-free rate and current value of the index, to calculate an 10 implied ERP of approximately 5.4%, corresponding to a total required market return of 11 approximately 10.4%.57 12 Q. Did you also incorporate Dr. Damodaran’s estimate using his implied ERP method? 13 A. Yes. Dr. Damodaran, one of the world’s leading experts on the ERP, promotes the implied 14 ERP method discussed above. He calculates monthly and annual implied ERPs with this 15 method and publishes his results. To incorporate these results into my modeling, I selected 16 two of his calculations: the trailing-twelve-month cash-yield ERP and the ten-year-average 17 cash-flow-yield ERP. For the October 2026 publication, the midpoint of these modeling 18 results is 4.7%. Equal weighting of these modeling results balances current distributions 19 against historical normalization. Current payouts can be temporarily unusual, while a 20 historical average can respond slowly to changed conditions.58 56 Myron J. Gordon and Eli Shapiro, Capital Equipment Analysis: The Required Rate of Profit 102-10 (Management Science Vol. 3, No. 1 Oct. 1956). 57 58 See Exhibit DJG-9. See Monthly ERP Estimates, Damodaran Online (Oct. 1, 2026), available at https://pages.stern.nyu.edu/~adamodar/. 40
  7. Page 44 of 82

    1 Q. Did you also consider the ERP estimate published by Kroll? 2 A. Yes. Kroll (formerly Duff & Phelps) is a multinational financial and risk advisory company. Kroll recently published an ERP estimate of 5.0%.59 3 4 Q. What are the results of your final ERP estimate? 5 A. For the final ERP estimate I used in my CAPM analysis, I considered the results of the 6 ERP surveys, the estimated ERP reported by Kroll, the estimated ERP calculated by Dr. 7 Damodaran, and the implied ERP based on my calculations.60 The results are presented in 8 the following figure: 9 10 Figure 9: Equity Risk Premium Results IESE Business School Survey 5.3% Kroll Report 5.0% Damodaran (midpoint) 4.7% Garrett 5.4% Average 11 5.1% I used the average ERP of 5.1% from these sources in my CAPM. 59 Kroll Assesses Impact of U.S. Monetary and Fiscal Policy on Treasury Yields, Kroll (Sept. 2, 2026) (available at https://www.kroll.com/en/publications/valuation/kroll-assesses-effect-us-monetary-fiscal-policies) (reaffirming a 5.0% recommended U.S. equity risk premium). 60 See also Exhibit DJG-10. 41
  8. Page 45 of 82

    1 Q. Please explain the final results of your CAPM analysis. 2 A. Using the inputs for the risk-free rate, beta, and equity risk premium discussed above, I 3 estimate that the Company’s CAPM cost of equity is 8.7%.61 The CAPM can be displayed 4 graphically through what is known as the Security Market Line (“SML”). The figure below 5 shows the expected return (cost of equity) on the y-axis, and the average beta for the proxy 6 group on the x-axis. The SML intercepts the y-axis at the level of the risk-free rate. The 7 slope of the SML is the equity risk premium. 8 9 Figure 10: CAPM Graph 61 Exhibit DJG-11. 42
  9. Page 46 of 82

    1 The SML provides the rate of return that will compensate investors for the beta risk of that 2 investment. Thus, at an average beta of 0.74 for the proxy group, the estimated CAPM 3 cost of equity for the Company is 8.7%. 4 D. Response to Ms. Bulkley’s CAPM Analysis and Other Issues 5 Q. Please summarize the results of Ms. Bulkley’s CAPM analysis. 6 A. Ms. Bulkley’s traditional CAPM analysis produced results ranging from 11.14% - 7 11.45%.62 8 “empirical CAPM” (“ECAPM”), which produced results ranging from 11.70% - 11.94%.63 9 Additionally, Ms. Bulkley conducted another type of risk premium analysis, the “Bond 10 Yield Risk Premium” analysis, which produced results as high as 10.78%.64 Ms. Bulkley also conducted another variation of the CAPM called the 11 12 Q. Do the results of Ms. Bulkley’s CAPM and other risk premium analyses indicate a reasonable cost of equity estimate for Eversource? 13 A. No. The primary factor causing Ms. Bulkley’s traditional CAPM results to be unreasonably 14 high is her use of an unreasonably high ERP estimate. I also do not place weight on her 15 ECAPM results. Ms. Bulkley applies the ECAPM to Value Line adjusted betas, which have 16 already been adjusted toward the market beta of 1.0. The ECAPM then applies an 17 additional adjustment that raises the indicated return for betas below 1.0. For a low-beta 18 utility proxy group, in my opinion, using both adjustments compounds the upward bias in 19 the indicated cost of equity. Finally, the separate Bond Yield Plus Risk Premium analysis 62 Exhibit CLP-ROE-2. Id. 64 Id. 63 43
  10. Page 47 of 82

    1 does not independently estimate a market-based cost of equity and should be given little 2 weight. 3 1. Equity Risk Premium 4 Q. Did Ms. Bulkley rely on a reasonable measure for the ERP? 5 A. No. The primary factor that causes Ms. Bulkley’s CAPM results to be unreasonably high 6 is her use of an unreasonably high market risk premium. Ms. Bulkley’s S&P 500 market- 7 return analysis produces an implied market risk premium as high as 8.68%, compared with 8 the 5.1% ERP I use in my CAPM application. Her high market risk premium is driven by 9 an expected S&P 500 market return of 13.38%, which in turn relies on a weighted long- 10 term growth assumption of 12.02%. In a constant-growth market DCF analysis, that growth 11 assumption is effectively treated as perpetual. A perpetual 12.02% growth rate for the broad 12 U.S. equity market is not sustainable relative to long-term nominal U.S. GDP growth of 13 approximately 3.8%. This assumption materially inflates Ms. Bulkley’s market return, 14 market risk premium, and ultimately her CAPM results. See Exhibit CLP-ROE-7. 15 16 Q. Please discuss and illustrate how Ms. Bulkley’s ERP compares with other estimates for the ERP. 17 A. Ms. Bulkley’s implied market risk premium estimate is substantially higher than the other 18 ERP indications I considered. The 2026 IESE Business School survey reports an average 19 U.S. market risk premium of 5.3%. Kroll currently recommends a 5.0% U.S. ERP. The 20 midpoint of the two Damodaran implied-ERP specifications I rely on is 4.7%, and my own 21 implied-ERP calculation is approximately 5.4%. The chart in the following figure 22 illustrates the magnitude of this difference. 44
Words on different pages
Words on different pages
Words on different pages

As listed on the current system

Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: David J. Garrett [26-05-10]

This filing on the current system (opens in a new tab)