Prefiled testimony
Witness: Eben Perkins
Files4
CES Direct Testimony 10.21.2026.pdf
PDF · 512 KB · 43 pagesText searchable
Download CES Direct Testimony 10.21.2026.pdfRead the text of CES Direct Testimony 10.21.2026.pdf
Exhibit UCONN-1 Perkins Resume.pdf
PDF · 116 KB · 2 pagesText searchable
Download Exhibit UCONN-1 Perkins Resume.pdfRead the text of Exhibit UCONN-1 Perkins Resume.pdf
Exhibit UCONN-2 Existing CPT Rate Options.pdf
PDF · 724 KB · 33 pagesText searchable
Download Exhibit UCONN-2 Existing CPT Rate Options.pdfRead the text of Exhibit UCONN-2 Existing CPT Rate Options.pdf
Exhibit UCONN-3 Eversource NH Rate LG CPT.pdf
PDF · 172 KB · 6 pagesText searchable
Download Exhibit UCONN-3 Eversource NH Rate LG CPT.pdfRead the text of Exhibit UCONN-3 Eversource NH Rate LG CPT.pdf
Page 11 of 43
1 generally help track ongoing changes in the incremental cost to serve, particularly when 2 differentiating by season. 3 On the third objective, Ms. Nieto argues that when utility charges are 3 set well above marginal unit costs, customers that add usage will tend to experience 4 disproportionally higher bills that exceed the cost of incremental service. 4 5 Q. Do you agree with Ms. Nieto? 6 A. Yes and no. I agree that these three major ratemaking objectives are critical and should 7 guide Eversource’s rate design for all customer classes. The problem is that these objectives are 8 not sufficiently reflected in the Company’s existing rate design for large customers in Connecticut. 9 In her testimony, Ms. Nieto concludes “I have reviewed the Company’s rate proposals and in my 10 opinion the direction of changes proposed aligns with what the MCOS suggests.” 5 “The proposals 11 recognize that rates should gradually be rebalanced to seek improved economic efficiency and 12 equity.” 6 Here, Ms. Nieto misses the mark. For large customers, there is no gradual rebalancing of 13 rate design. There is simply status quo, which, as we detail in the coming sections, includes blatant 14 examples of contradiction to the three major ratemaking objectives described by Ms. Nieto. 15 Q. How does Eversource’s existing transmission rate design for its large customers not support the three major ratemaking objectives articulated by Ms. Nieto? 16 17 A. Eversource assesses a monthly transmission demand charge to each large customer in a 18 manner that is disconnected from the cost that the Company incurs to provide transmission service 19 to its large customers. ISO New England (“ISO-NE”) allocates regional transmission costs and Exhibit CLP-MCOS-1, page 3, lines 17-20. Exhibit CLP-MCOS-1, page 4, lines 1-4. 5 Exhibit CLP-MCOS-1, page 17, lines 3-4. 6 Exhibit CLP-MCOS-1, page 17, lines 5-7. 3 4 11Page 12 of 43
1 associated reliability costs to Eversource and the other transmission owners throughout the region 2 based on each transmission owner’s monthly coincident peak load. 3 Eversource then recovers and reconciles this wholesale transmission cost through its retail 4 rates. 7 The Company uses a 12 coincident peak (“12CP”) allocation factor to assign transmission 5 revenue requirements to each rate class. According to Eversource, this methodology is designed 6 to reflect the methodology used in the development of the ISO-NE Open Access Transmission 7 Tariff (“OATT”) revenue requirement and the resulting charges billed to the Company for 8 transmission service under the OATT. 8 9 Rather than charging large customers for what they contribute to grid demand during 10 Eversource’s 12CP hours in a year, which determines the transmission cost that ISO-NE allocates 11 to Eversource for these customers, the Company bills each large customer based on its maximum 12 30-minute grid demand measured across nearly 25% of hours in a monthly billing cycle. Contrary 13 to Ms. Nieto’s first major ratemaking objective, the existing rate design does not foster 14 economically efficient energy usage decisions by customers. Rather than incentivizing targeted 15 demand management efforts by customers during periods that could set Eversource’s CP load hour 16 in a month, Eversource’s transmission rate design requires a large customer to manage its grid 17 demand across a broad window on every weekday. 18 In addition to diluting the price signal for large customers to reduce grid demand during 19 Eversource’s 12CP hours, the Company’s existing transmission rate design results in cost shifting 20 within each large customer class. Large customers that have lower grid demand during 21 Eversource’s 12CP hours, compared to their billed kilovolt-ampere (“kVA”) demand that 7 8 Eversource’s most recent RAM filing was made in PURA Docket No. 26-01-03. See Eversource response to UCONN-024. 12Page 13 of 43
1 Eversource captures from a customer’s maximum 30-minute on-peak grid demand, subsidize other 2 large customers by enabling Eversource to lower the effective transmission rate for all customers 3 in the class. This disparity should be examined under Ms. Nieto’s second major ratemaking 4 objective: to ensure equitable rates and mitigate intra-class cross-subsidies over time. 5 If, despite Eversource’s current transmission rate design, a large customer reduces its grid 6 demand during Eversource’s peak load hour in a month through onsite generation, efficiency 7 measures, manual load curtailment, and/or behind-the-meter energy storage (i.e., load shifting), 8 the customer may realize little retail transmission savings unless the reduction coincidentally 9 lowers the customer’s maximum 30-minute grid demand measured across all on-peak hours in the 10 month. Separate distributed energy resource (“DER”) incentives may be used to support 11 investment in these demand management measures, but their costs are recovered through public- 12 benefit charges which impacts total electricity rates. Jumping to a DER incentive offering without 13 first optimizing price signals sent through existing rates is a recipe for inefficiency and higher- 14 than-necessesary public-benefit charges over time. 15 Eversource’s existing transmission rate design has been in place since 2006. 9 The rate 16 design is out of date, especially considering the widespread development of distributed solar 17 generation throughout Connecticut over the last 20 years. The rate design does not support 18 investment by large customers in modern forms of onsite generation and load shifting 19 technologies, nor does it incentivize operational changes that enable large customers to 20 strategically reduce their contribution to peak demand on Eversource’s transmission system. 21 Because Eversource’s transmission rate design does not create the appropriate incentive for large 9 See Eversource’s response to UCONN-001. 13Page 14 of 43
1 customers to help themselves reduce the Company’s coincident peak demand, over time 2 Eversource’s peak demand will be higher than it otherwise should be, driving the need for earlier 3 or more significant transmission system expansion and resulting in higher transmission costs for 4 all ratepayers. This outcome is contrary to Ms. Nieto’s third major ratemaking objective: to 5 preserve customer affordability in the transition to a decarbonized sector. 6 Q. How does Eversource’s distribution rate design for its large customers not support the three major ratemaking objectives articulated by Ms. Nieto? 7 8 A. Eversource assesses a monthly distribution demand charge to each large customer based 9 on a trailing 11-month ratchet formula that lacks time-of-use differentiation and seasonal 10 differentiation. Eversource is proposing to maintain this rate design without modification. 11 Ms. Nieto concludes that time-differentiated distribution rates must keep in mind the 12 system-wide distribution hourly marginal cost patterns. 10 Eversource contends that this finding is 13 irrelevant to distribution rate design for large customers. 11 The lack of time-of-use periods in 14 Eversource’s distribution demand charges to large customers severs the price signal in distribution 15 rates from the true underlying cost impact from incremental usage. 16 Ms. Nieto also concludes that seasonal differentiation is necessary to improve price signals 17 in rate design. 12 She argues that continuing with year-round distribution time-of-use periods would 18 not support efficient adoption of heat pump rates. 13 The lack of seasonality in the design and 19 assessment of distribution demand charges for large customers contradicts cost causation 20 principles and Eversource’s stated goal to support beneficial electrification through rate design. Exhibit CLP-MCOS-1, page 17, lines 10-11. See Eversource response to UCONN-002. 12 Exhibit CLP-MCOS-1, page 18, lines 4-6. 13 Exhibit CLP-MCOS-1, page 18, lines 13-14. 10 11 14Page 15 of 43
1 Eversource makes no mention of how large customers can contribute to beneficial electrification, 2 focusing its rate design updates solely on residential heat pumps. This disconnect is at odds with 3 Connecticut’s goal to advance economywide decarbonization in the coming years. 4 Q. How do you recommend that PURA address these issues? 5 A. I have two recommendations that would help improve Eversource’s rate design for large 6 customers and would support the three major ratemaking objectives articulated by Ms. Nieto. 7 My first recommendation is that PURA requires Eversource to introduce a CPT rate option 8 for the Company’s large customers in Connecticut. This transmission rate design solution has been 9 offered to Eversource’s large customers in Western Massachusetts since 2014, has been offered to 10 Eversource’s large customers in Eastern Massachusetts since 2023, and is expected to be 11 introduced in Eversource’s New Hampshire service territory in 2027. The next two sections of my 12 testimony detail the merits of the CPT rate option, the proposed terms for implementing the CPT 13 rate option in Eversource’s Connecticut service territory, and the precedent for offering this rate 14 option to large customers elsewhere in New England. 15 My second recommendation is that PURA directs Eversource to examine time-of-day 16 differentiation and seasonal differentiation in the Company’s distribution rate design for its large 17 customers and to propose necessary changes across its non-residential customer classes. One 18 option is for PURA to initiate a follow-up investigation following this proceeding that examines 19 whether each electric utility’s rate design supports and advances Connecticut’s policies related to 20 beneficial electrification and decarbonization. In Maine, this type of effort was recently conducted 21 by the Maine Public Utilities Commission as part of Docket No. 2021-00325, Commission 22 Initiated Investigation into Transmission and Distribution Utility Rate Design to Promote State 23 Policies. The final section of our testimony details our concerns with Eversource only focusing on 15Page 16 of 43
1 distribution rate design modernization for its residential class, and how this ignores the potential 2 to support beneficial electrification measures that may be considered by larger customers. 3 Q. 4 A. 5 a CPT rate design, I expect that Eversource will likely oppose my recommendations. In DPU 6 Docket No. 22-22, Eversource opposed the expansion of the CPT rate option to its large customers 7 in Eastern Massachusetts. In NHPUC Docket No. DE 24-070, Eversource opposed the 8 implementation of the CPT rate option to its large customers in New Hampshire. 9 Q. Do you anticipate that Eversource will oppose your recommendations? Yes. Based on the Company’s response to UCONN-014 that Eversource does not support Is a distribution rate case like this proceeding the appropriate venue for transmission rate design to be considered and debated? 10 11 A. Absolutely. The rate design analysis and testimony provided by Ms. Nieto is 12 comprehensive. Unlike the Company’s annual rate reconciliation filing, in which PURA reviews 13 the prudency of incurred and forecasted costs for inclusion in formula rates, the rate design 14 testimony included in Eversource’s initial filing includes a detailed examination of ratemaking 15 principles, an updated marginal cost of service study, and significant new rate offerings. 16 Furthermore, in presenting its case on the affordability challenge and options to tackle the 17 issue, Eversource’s leadership panel makes it clear that the full customer bill must be considered. 18 If Eversource is allowed to use a distribution rate case as a venue to advocate for expanded utility- 19 ownership of generation assets, as the Company has done in its initial filing, 14 transmission rate 20 design should certainly not be off the table for consideration. This proceeding is the appropriate 21 time and place to consider modernizing Eversource’s transmission rate design. 14 Exhibit CLP-ELP-1, page 21, lines 14-20. 16Page 17 of 43
III. EVERSOURCE TRANSMISSION RATE DESIGN 1 2 Q. Please explain which Eversource customer classes you believe should be considered “large customers” for the purpose of introducing the CPT rate option. 3 4 A. Eversource’s Rate 55, Rate 56, Rate 57, and Rate 58 customer classes include non- 5 residential ratepayers that should be considered large customers for the purpose of introducing the 6 CPT rate option detailed in this section. These four customer classes cover non-residential 7 customers of Eversource with grid demand of at least 350 kW and share a common distribution 8 and transmission rate design. Furthermore, these rate classes are active and open to new customers, 9 unlike Eversource’s Rate 39 for large interruptible service and Rate 41 for large church and school 10 electric service. CPT eligibility for these legacy rate classes should be considered separately. 11 Eversource’s Rate 55 provides for intermediate time-of-day electric service to manufacturers 12 that have grid demand equal to or greater than 350 kW, but less than 1,000 kW, and that meet 13 certain other service requirements. 15 Eversource’s Rate 56 provides for intermediate time-of-day 14 electric service to non-manufacturers that have grid demand equal to or greater than 350 kW but 15 less than 1,000 kW. For either rate, a customer whose maximum demand does not exceed 350 kW 16 for 12 consecutive months, or whose prospective maximum demand shall not exceed 350 kW due 17 to demonstrable conservation and load management measures may elect to take service under Rate 18 35 or Rate 37. Rate 55 is applicable to customers (1) who are manufacturers, as defined by Connecticut General Statute 12-412 (3) (A) (ii) and (iii), or who are engaged in manufacturing as defined in PA 92-193 amending Subsections 12-81(72) and 12-94c, or who are classified as supermarkets located in distressed municipalities, as defined by Connecticut General Statute Section 32-9p (b), and have an annual load factor of 65 percent or greater and agree to participate or have participated in the Company's conservation programs, and (2) are taking service on the effective date of this rate whose demand equaled or exceeded in the last twelve months, or shall equal or exceed in the next twelve months, 350 kW but less than 1,000 kW. 15 17Page 18 of 43
1 Eversource’s Rate 57 provides for large time-of-day electric service to manufacturers whose 2 demand has previously equaled or exceeded 1,000 kW and who meet certain other service 3 requirements. 16 Eversource’s Rate 58 provides for large time-of-day electric service to non- 4 manufacturers whose demand has previously equaled or exceeded 1,000 kW. For either rate, if a 5 customer’s prospective maximum demand is below 1,000 kW due to demonstrable conservation 6 and load management measures, then the customer may take service immediately under the 7 appropriate general service rate. 8 Q. How does Eversource currently assess transmission charges to these large customers? 9 A. The monthly transmission demand charge for large customers, which Eversource refers to 10 as production/transmission demand in its service tariff and on customer bills, is based on a 11 customer’s highest average 30-minute kVA demand recorded during the billing month during the 12 Company’s “on-peak” hours. Eversource’s on-peak hours include the hours of 1 P.M. to 9 P.M. 13 on weekdays during Daylight Saving Time and the hours of 12 P.M. to 8 P.M. on weekdays during 14 Eastern Standard Time. For 2026, these on-peak hours cover approximately 24% of total hours in 15 each calendar month on average. 16 Rate 55 customers currently pay $12.00 per kVA of billed production/transmission demand. 17 Rate 56 customers currently pay $14.93 per kVA of billed production/transmission demand. Rate Rate 57 is applicable to customers (1) who are manufacturers, as defined by Connecticut General Statute 12-412 (3) (A) (ii) and (iii), or who are engaged in manufacturing as defined in PA 92-193 amending Subsections 12-81 (72) and 12-94c, or who are classified as supermarkets located in distressed municipalities, as defined by Connecticut General Statute Section 32-9p (b), and have an annual load factor of 65 percent or greater and agree to participate or have participated in the Company's conservation programs, and (2) are taking service on the effective date of this rate whose demand has previously equaled or exceeded 1,000 kW. Customers whose projected demand is expected to exceed 1,000 kW must demonstrate that this level of demand is not transitory. 16 18Page 19 of 43
1 57 customers currently pay $13.13 per kVA of billed production/transmission demand. Rate 58 2 customers currently pay $17.04 per kVA of billed production/transmission demand. 3 Q. Please explain the components of Eversource’s transmission costs to serve customers. 4 A. Eversource’s transmission costs are regulated and authorized by the Federal Energy 5 Regulatory Commission (“FERC”). Charges that may enter the Company’s transmission-related 6 revenue requirement include several separately tariffed services under the ISO-NE OATT, 7 including Regional Network Service (“RNS”) costs, Scheduling and Dispatch (“S&D”) costs, 8 Reliability costs, and Local Network Service (“LNS”) costs. 9 RNS costs reflect the cost for the provision of regional transmission service across all ISO- 10 NE participating states and cover the cost of specific facilities referred to as Pool Transmission 11 Facilities (“PTFs”). RNS costs are billed to all entities in the region that have RNS load 12 responsibility, such as Eversource’s Connecticut operating company, The Connecticut Light and 13 Power Company (“CL&P”). The applicable RNS charge equals the annually set rate, expressed in 14 dollars per kW-month, multiplied by the relevant Monthly Regional Network Load. Eversource’s 15 response to UCONN-005 includes the monthly peak load and timestamp of Eversource’s 12CP 16 hours in 2023, 2024, and 2025 that the Company reported to ISO-NE for the purpose of RNS cost 17 allocation. 18 S&D costs are associated with services provided by ISO-NE related to scheduling, system 19 control, and dispatch services. LNS costs reflect the cost for provision of local transmission 20 service. Reliability costs include costs, such as black start and volt-ampere reactive (“VAR”) 21 support, that are related to electric system reliability. These reliability costs are billed to all entities 22 in the region that have RNS load responsibility based on their monthly peak load. 19Page 20 of 43
1 LNS costs cover the cost of non-PTF transmission facilities. Each Eversource operating 2 company’s LNS costs are billed to customers on a state-by-state basis. Eversource’s LNS costs for 3 CL&P are only billed to the Company’s customers in Connecticut. 4 Q. 5 A. No. Eversource’s costs of providing transmission service are not fixed due to the manner in 6 which ISO-NE charges Eversource for its share of regional RNS costs, S&D costs, and Reliability 7 costs each year. If an Eversource customer does not impose grid demand on Eversource’s system 8 during one or more of Eversource’s 12CP hours in a year, Eversource’s share of regional RNS 9 costs, S&D costs, and Reliability costs are directly impacted. Does Eversource have a fixed cost for providing transmission service to customers? 10 In other words, if a customer reduces or eliminates its grid demand during one or more of 11 Eversource’s 12 CP hours in a year through energy efficiency measures, manual load curtailment 12 actions, the installation and operation of onsite behind-the-meter generation, and/or the installation 13 and discharging of behind-the-meter energy storage (i.e., load shifting), Eversource’s Monthly 14 Regional Network Load used in ISO-NE’s 12CP allocation formula will be reduced, all else being 15 equal. 16 Q. If a large customer reduces or eliminates its grid demand during one or more of 17 Eversource’s 12CP hours, does the customer see a corresponding reduction in its 18 transmission demand charge(s) from Eversource? 19 A. No. Eversource’s current transmission rate design for large customers fails to create a 20 strong, direct connection to the Company’s underlying cost of providing transmission service. As 21 previously discussed, the monthly transmission demand charge that Eversource assesses to a large 22 customer is based on a single 30-minute demand reading that is measured across nearly 25% of 23 total hours in the month. This on-peak period is far broader than the single peak load hour each 20
As listed on the current system
Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Eben Perkins [26-05-10]