  1. Page 15 of 43

    1 Eversource makes no mention of how large customers can contribute to beneficial electrification, 2 focusing its rate design updates solely on residential heat pumps. This disconnect is at odds with 3 Connecticut’s goal to advance economywide decarbonization in the coming years. 4 Q. How do you recommend that PURA address these issues? 5 A. I have two recommendations that would help improve Eversource’s rate design for large 6 customers and would support the three major ratemaking objectives articulated by Ms. Nieto. 7 My first recommendation is that PURA requires Eversource to introduce a CPT rate option 8 for the Company’s large customers in Connecticut. This transmission rate design solution has been 9 offered to Eversource’s large customers in Western Massachusetts since 2014, has been offered to 10 Eversource’s large customers in Eastern Massachusetts since 2023, and is expected to be 11 introduced in Eversource’s New Hampshire service territory in 2027. The next two sections of my 12 testimony detail the merits of the CPT rate option, the proposed terms for implementing the CPT 13 rate option in Eversource’s Connecticut service territory, and the precedent for offering this rate 14 option to large customers elsewhere in New England. 15 My second recommendation is that PURA directs Eversource to examine time-of-day 16 differentiation and seasonal differentiation in the Company’s distribution rate design for its large 17 customers and to propose necessary changes across its non-residential customer classes. One 18 option is for PURA to initiate a follow-up investigation following this proceeding that examines 19 whether each electric utility’s rate design supports and advances Connecticut’s policies related to 20 beneficial electrification and decarbonization. In Maine, this type of effort was recently conducted 21 by the Maine Public Utilities Commission as part of Docket No. 2021-00325, Commission 22 Initiated Investigation into Transmission and Distribution Utility Rate Design to Promote State 23 Policies. The final section of our testimony details our concerns with Eversource only focusing on 15
  2. Page 16 of 43

    1 distribution rate design modernization for its residential class, and how this ignores the potential 2 to support beneficial electrification measures that may be considered by larger customers. 3 Q. 4 A. 5 a CPT rate design, I expect that Eversource will likely oppose my recommendations. In DPU 6 Docket No. 22-22, Eversource opposed the expansion of the CPT rate option to its large customers 7 in Eastern Massachusetts. In NHPUC Docket No. DE 24-070, Eversource opposed the 8 implementation of the CPT rate option to its large customers in New Hampshire. 9 Q. Do you anticipate that Eversource will oppose your recommendations? Yes. Based on the Company’s response to UCONN-014 that Eversource does not support Is a distribution rate case like this proceeding the appropriate venue for transmission rate design to be considered and debated? 10 11 A. Absolutely. The rate design analysis and testimony provided by Ms. Nieto is 12 comprehensive. Unlike the Company’s annual rate reconciliation filing, in which PURA reviews 13 the prudency of incurred and forecasted costs for inclusion in formula rates, the rate design 14 testimony included in Eversource’s initial filing includes a detailed examination of ratemaking 15 principles, an updated marginal cost of service study, and significant new rate offerings. 16 Furthermore, in presenting its case on the affordability challenge and options to tackle the 17 issue, Eversource’s leadership panel makes it clear that the full customer bill must be considered. 18 If Eversource is allowed to use a distribution rate case as a venue to advocate for expanded utility- 19 ownership of generation assets, as the Company has done in its initial filing, 14 transmission rate 20 design should certainly not be off the table for consideration. This proceeding is the appropriate 21 time and place to consider modernizing Eversource’s transmission rate design. 14 Exhibit CLP-ELP-1, page 21, lines 14-20. 16
  3. Page 17 of 43

    III. EVERSOURCE TRANSMISSION RATE DESIGN 1 2 Q. Please explain which Eversource customer classes you believe should be considered “large customers” for the purpose of introducing the CPT rate option. 3 4 A. Eversource’s Rate 55, Rate 56, Rate 57, and Rate 58 customer classes include non- 5 residential ratepayers that should be considered large customers for the purpose of introducing the 6 CPT rate option detailed in this section. These four customer classes cover non-residential 7 customers of Eversource with grid demand of at least 350 kW and share a common distribution 8 and transmission rate design. Furthermore, these rate classes are active and open to new customers, 9 unlike Eversource’s Rate 39 for large interruptible service and Rate 41 for large church and school 10 electric service. CPT eligibility for these legacy rate classes should be considered separately. 11 Eversource’s Rate 55 provides for intermediate time-of-day electric service to manufacturers 12 that have grid demand equal to or greater than 350 kW, but less than 1,000 kW, and that meet 13 certain other service requirements. 15 Eversource’s Rate 56 provides for intermediate time-of-day 14 electric service to non-manufacturers that have grid demand equal to or greater than 350 kW but 15 less than 1,000 kW. For either rate, a customer whose maximum demand does not exceed 350 kW 16 for 12 consecutive months, or whose prospective maximum demand shall not exceed 350 kW due 17 to demonstrable conservation and load management measures may elect to take service under Rate 18 35 or Rate 37. Rate 55 is applicable to customers (1) who are manufacturers, as defined by Connecticut General Statute 12-412 (3) (A) (ii) and (iii), or who are engaged in manufacturing as defined in PA 92-193 amending Subsections 12-81(72) and 12-94c, or who are classified as supermarkets located in distressed municipalities, as defined by Connecticut General Statute Section 32-9p (b), and have an annual load factor of 65 percent or greater and agree to participate or have participated in the Company's conservation programs, and (2) are taking service on the effective date of this rate whose demand equaled or exceeded in the last twelve months, or shall equal or exceed in the next twelve months, 350 kW but less than 1,000 kW. 15 17
  4. Page 18 of 43

    1 Eversource’s Rate 57 provides for large time-of-day electric service to manufacturers whose 2 demand has previously equaled or exceeded 1,000 kW and who meet certain other service 3 requirements. 16 Eversource’s Rate 58 provides for large time-of-day electric service to non- 4 manufacturers whose demand has previously equaled or exceeded 1,000 kW. For either rate, if a 5 customer’s prospective maximum demand is below 1,000 kW due to demonstrable conservation 6 and load management measures, then the customer may take service immediately under the 7 appropriate general service rate. 8 Q. How does Eversource currently assess transmission charges to these large customers? 9 A. The monthly transmission demand charge for large customers, which Eversource refers to 10 as production/transmission demand in its service tariff and on customer bills, is based on a 11 customer’s highest average 30-minute kVA demand recorded during the billing month during the 12 Company’s “on-peak” hours. Eversource’s on-peak hours include the hours of 1 P.M. to 9 P.M. 13 on weekdays during Daylight Saving Time and the hours of 12 P.M. to 8 P.M. on weekdays during 14 Eastern Standard Time. For 2026, these on-peak hours cover approximately 24% of total hours in 15 each calendar month on average. 16 Rate 55 customers currently pay $12.00 per kVA of billed production/transmission demand. 17 Rate 56 customers currently pay $14.93 per kVA of billed production/transmission demand. Rate Rate 57 is applicable to customers (1) who are manufacturers, as defined by Connecticut General Statute 12-412 (3) (A) (ii) and (iii), or who are engaged in manufacturing as defined in PA 92-193 amending Subsections 12-81 (72) and 12-94c, or who are classified as supermarkets located in distressed municipalities, as defined by Connecticut General Statute Section 32-9p (b), and have an annual load factor of 65 percent or greater and agree to participate or have participated in the Company's conservation programs, and (2) are taking service on the effective date of this rate whose demand has previously equaled or exceeded 1,000 kW. Customers whose projected demand is expected to exceed 1,000 kW must demonstrate that this level of demand is not transitory. 16 18
  5. Page 19 of 43

    1 57 customers currently pay $13.13 per kVA of billed production/transmission demand. Rate 58 2 customers currently pay $17.04 per kVA of billed production/transmission demand. 3 Q. Please explain the components of Eversource’s transmission costs to serve customers. 4 A. Eversource’s transmission costs are regulated and authorized by the Federal Energy 5 Regulatory Commission (“FERC”). Charges that may enter the Company’s transmission-related 6 revenue requirement include several separately tariffed services under the ISO-NE OATT, 7 including Regional Network Service (“RNS”) costs, Scheduling and Dispatch (“S&D”) costs, 8 Reliability costs, and Local Network Service (“LNS”) costs. 9 RNS costs reflect the cost for the provision of regional transmission service across all ISO- 10 NE participating states and cover the cost of specific facilities referred to as Pool Transmission 11 Facilities (“PTFs”). RNS costs are billed to all entities in the region that have RNS load 12 responsibility, such as Eversource’s Connecticut operating company, The Connecticut Light and 13 Power Company (“CL&P”). The applicable RNS charge equals the annually set rate, expressed in 14 dollars per kW-month, multiplied by the relevant Monthly Regional Network Load. Eversource’s 15 response to UCONN-005 includes the monthly peak load and timestamp of Eversource’s 12CP 16 hours in 2023, 2024, and 2025 that the Company reported to ISO-NE for the purpose of RNS cost 17 allocation. 18 S&D costs are associated with services provided by ISO-NE related to scheduling, system 19 control, and dispatch services. LNS costs reflect the cost for provision of local transmission 20 service. Reliability costs include costs, such as black start and volt-ampere reactive (“VAR”) 21 support, that are related to electric system reliability. These reliability costs are billed to all entities 22 in the region that have RNS load responsibility based on their monthly peak load. 19
  6. Page 20 of 43

    1 LNS costs cover the cost of non-PTF transmission facilities. Each Eversource operating 2 company’s LNS costs are billed to customers on a state-by-state basis. Eversource’s LNS costs for 3 CL&P are only billed to the Company’s customers in Connecticut. 4 Q. 5 A. No. Eversource’s costs of providing transmission service are not fixed due to the manner in 6 which ISO-NE charges Eversource for its share of regional RNS costs, S&D costs, and Reliability 7 costs each year. If an Eversource customer does not impose grid demand on Eversource’s system 8 during one or more of Eversource’s 12CP hours in a year, Eversource’s share of regional RNS 9 costs, S&D costs, and Reliability costs are directly impacted. Does Eversource have a fixed cost for providing transmission service to customers? 10 In other words, if a customer reduces or eliminates its grid demand during one or more of 11 Eversource’s 12 CP hours in a year through energy efficiency measures, manual load curtailment 12 actions, the installation and operation of onsite behind-the-meter generation, and/or the installation 13 and discharging of behind-the-meter energy storage (i.e., load shifting), Eversource’s Monthly 14 Regional Network Load used in ISO-NE’s 12CP allocation formula will be reduced, all else being 15 equal. 16 Q. If a large customer reduces or eliminates its grid demand during one or more of 17 Eversource’s 12CP hours, does the customer see a corresponding reduction in its 18 transmission demand charge(s) from Eversource? 19 A. No. Eversource’s current transmission rate design for large customers fails to create a 20 strong, direct connection to the Company’s underlying cost of providing transmission service. As 21 previously discussed, the monthly transmission demand charge that Eversource assesses to a large 22 customer is based on a single 30-minute demand reading that is measured across nearly 25% of 23 total hours in the month. This on-peak period is far broader than the single peak load hour each 20
  7. Page 21 of 43

    1 month that dictates ISO-NE’s allocation of regional transmission costs to Eversource. This billing 2 methodology has been in place since 2006, and, according to Ms. Nieto, is out of date. 17 3 Eversource charges large customers for transmission service based on kVA demand units 4 rather than kilowatt (“kW”) demand units, which is what is used to measure the hourly Regional 5 Network Load underlying the RNS charge. This billing methodology is disconnected from what 6 drives transmission costs for Eversource: a customer’s average 60-minute grid demand measured 7 in kW during the Company’s 12 CP hours. Examining Eversource’s tariffs for smaller non- 8 residential customers, it is notable that Eversource’s transmission demand charges for Rate 27 9 customers and Rate 37 customers are based on a customer’s maximum 30-minute on-peak kW 10 demand, not kVA readings. 11 Q. 12 A. 13 Time is particularly confusing for large customers. It is puzzling that Eversource maintains a 14 different on-peak period for residential time-of-use customers compared to the Company’s on- 15 peak period for nonresidential customers. The on-peak period for Rate 7 residential time-of-use 16 customers includes the weekday hours of 12 P.M. to 8 P.M. Eastern Prevailing Time, whereas the 17 on-peak period for non-residential time-of-use customers under Rates 27, 27A, 37, 39, 41, 55, 56, 18 57, 58, EV-M, EV-L, and EV-MHD includes the hours of 12 P.M. to 8 P.M. on weekdays during 19 Eastern Standard Time but changes to the hours of 1 P.M. to 9 P.M. on weekdays during Daylight 20 Saving Time. The basis for having different on-peak periods by customer type does not align with 21 the facts presented and contradicts sound ratemaking principles. 17 Is Eversource’s transmission rate design for large customers easy to understand? No. In CES’s experience, the one-hour shift in the on-peak period around Daylight Saving Exhibit CLP-MCOS-1, page 17, lines 10-17. 21
  8. Page 22 of 43Match

    1 Q. What are the consequences of these shortcomings? 2 A. 3 Eversource’s transmission rate design does not foster economically efficient energy usage 4 decisions by large customers, does not ensure equitable rates and mitigation of intra-class cross- 5 subsidies within the large customer classes, and does not help preserve customer affordability in 6 the transition to a decarbonized sector. Eversource’s customers receive a suboptimal price signal 7 that does not properly incentivize reductions in customer grid demand during the Company’s 12 8 CP hours. Without such an incentive, Eversource’s service pricing does not reflect its actual costs 9 and the Company’s transmission system could need to be expanded earlier and less efficiently as 10 electric loads and peak demand grow over time due to beneficial electrification measures driven 11 by Connecticut’s push towards economywide decarbonization. 12 Q. The three major ratemaking objectives articulated by Ms. Nieto are not achieved. Please expand on how transmission rate design can support the preservation of customer affordability in the transition to a decarbonized Connecticut. 13 14 A. 15 can reduce regional transmission expansion needs by billions of dollars: 16 17 18 19 20 21 22 23 ISO-NE’s 2050 Transmission Study concludes that reducing peak load in the coming years Increases in load become significantly more expensive (with regard to transmission costs) as peak load levels increase. This is especially true at levels above ~51 GW of load. Increases in load at peak load levels below 51 GW do increase costs (roughly $0.75 billion per GW of load added from 28 GW to 51 GW), but these increases are small when compared to the increase in costs above 51 GW of load (roughly $1.5 billion per GW of load added from 51 GW to 57 GW). 18 Figure 1 below presents the projected cost required for regional transmission expansion to reliably serve load in each year studied by ISO-NE: 24 ISO New England, “2050 Transmission Study” (February 12, 2024) at 16 https://www.iso-ne.com/systemplanning/transmission-planning/longer-term-transmission-studies. 18 22
  9. Page 23 of 43

    1 Figure 1. ISO-NE 2050 Transmission Study: Forecasted Benefit of Reducing Future Peak Load 2 3 In the 2050 Transmission Study, ISO-NE directly calls out demand response and peak 4 shaving programs as primary solutions that can help reduce future transmission costs for ratepayers 5 across New England. ISO-NE concludes that demand response and peak shaving can shift 6 customer load to times of lower demand, which can help maintain a lower peak load level on the 7 regional transmission system and reduce future build out of the system: 8 9 10 11 12 13 14 15 16 Alternately, more aggressive demand response (when customers reduce their electrical consumption for compensation) and peak shaving programs (e.g., smart thermostats that reduce the set temperature during a winter peak time) that could shift load to times of lower demand may also help maintain a 51 GW peak load level, thereby reducing transmission costs. Public education and involvement may be an important factor in modifying consumer behavior to reduce electricity demand at key times. Consumer awareness of the nature and timing of peak load may help consumers participate in the reduction of peak loads to more manageable levels, which could save billions of dollars in transmission system upgrade costs. 19 ISO New England, “2050 Transmission Study” (February 12, 2024) at 17 https://www.iso-ne.com/systemplanning/transmission-planning/longer-term-transmission-studies. 19 23
  10. Page 24 of 43

    1 Q. Does Eversource acknowledge that demand management actions by customers to reduce Eversource’s peak load can benefit other ratepayers? 2 3 A. Yes. In response to UCONN-026, Eversource states “The longer-term benefit to other 4 customers is clearly associated with load reductions that coincide with transmission system’s 5 annual peak since this lower peak load may defer investment planned on the transmission to meet 6 annual peak load growth, i.e., long-term capacity expansion needs.” 7 Q. How can a large customer like UConn contribute to this effort to shift customer load to times of lower demand and defer expansion of Eversource’s transmission system? 8 9 A. In addition to behind-the-meter generation, there are a range of energy storage 10 technologies, including lithium-ion batteries and thermal storage systems, that large customers can 11 install and operate to shift their grid demand to off-peak periods and to reduce their contribution 12 to transmission loads when Eversource’s system experiences peak demand. The battery storage 13 market in New England has advanced rapidly over the last decade and large customers now have 14 access to a range of behind-the-meter battery storage technology offerings and operations services. 15 This market continues to mature. 16 Q. 17 A. 18 across the country. In 2025, the University of Massachusetts (“UMass”) Amherst completed and 19 commissioned a thermal energy storage (“TES”) system on its campus in Amherst, MA that can 20 store chilled water in a 2.2 million-gallon above ground tank. In the same year, the University of How could thermal storage be used in a district energy system to shift campus load? Chilled water storage is an option that is increasingly being adopted by large universities 24
No matches
1 page match
2 pages match

As listed on the current system

Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Eben Perkins [26-05-10]

This filing on the current system (opens in a new tab)