Prefiled testimony
Witness: Eben Perkins
Files4
CES Direct Testimony 10.21.2026.pdf
PDF · 512 KB · 43 pagesText searchable
Download CES Direct Testimony 10.21.2026.pdfRead the text of CES Direct Testimony 10.21.2026.pdf
Exhibit UCONN-1 Perkins Resume.pdf
PDF · 116 KB · 2 pagesText searchable
Download Exhibit UCONN-1 Perkins Resume.pdfRead the text of Exhibit UCONN-1 Perkins Resume.pdf
Exhibit UCONN-2 Existing CPT Rate Options.pdf
PDF · 724 KB · 33 pagesText searchable
Download Exhibit UCONN-2 Existing CPT Rate Options.pdfRead the text of Exhibit UCONN-2 Existing CPT Rate Options.pdf
Exhibit UCONN-3 Eversource NH Rate LG CPT.pdf
PDF · 172 KB · 6 pagesText searchable
Download Exhibit UCONN-3 Eversource NH Rate LG CPT.pdfRead the text of Exhibit UCONN-3 Eversource NH Rate LG CPT.pdf
Page 22 of 43
1 Q. What are the consequences of these shortcomings? 2 A. 3 Eversource’s transmission rate design does not foster economically efficient energy usage 4 decisions by large customers, does not ensure equitable rates and mitigation of intra-class cross- 5 subsidies within the large customer classes, and does not help preserve customer affordability in 6 the transition to a decarbonized sector. Eversource’s customers receive a suboptimal price signal 7 that does not properly incentivize reductions in customer grid demand during the Company’s 12 8 CP hours. Without such an incentive, Eversource’s service pricing does not reflect its actual costs 9 and the Company’s transmission system could need to be expanded earlier and less efficiently as 10 electric loads and peak demand grow over time due to beneficial electrification measures driven 11 by Connecticut’s push towards economywide decarbonization. 12 Q. The three major ratemaking objectives articulated by Ms. Nieto are not achieved. Please expand on how transmission rate design can support the preservation of customer affordability in the transition to a decarbonized Connecticut. 13 14 A. 15 can reduce regional transmission expansion needs by billions of dollars: 16 17 18 19 20 21 22 23 ISO-NE’s 2050 Transmission Study concludes that reducing peak load in the coming years Increases in load become significantly more expensive (with regard to transmission costs) as peak load levels increase. This is especially true at levels above ~51 GW of load. Increases in load at peak load levels below 51 GW do increase costs (roughly $0.75 billion per GW of load added from 28 GW to 51 GW), but these increases are small when compared to the increase in costs above 51 GW of load (roughly $1.5 billion per GW of load added from 51 GW to 57 GW). 18 Figure 1 below presents the projected cost required for regional transmission expansion to reliably serve load in each year studied by ISO-NE: 24 ISO New England, “2050 Transmission Study” (February 12, 2024) at 16 https://www.iso-ne.com/systemplanning/transmission-planning/longer-term-transmission-studies. 18 22Page 23 of 43
1 Figure 1. ISO-NE 2050 Transmission Study: Forecasted Benefit of Reducing Future Peak Load 2 3 In the 2050 Transmission Study, ISO-NE directly calls out demand response and peak 4 shaving programs as primary solutions that can help reduce future transmission costs for ratepayers 5 across New England. ISO-NE concludes that demand response and peak shaving can shift 6 customer load to times of lower demand, which can help maintain a lower peak load level on the 7 regional transmission system and reduce future build out of the system: 8 9 10 11 12 13 14 15 16 Alternately, more aggressive demand response (when customers reduce their electrical consumption for compensation) and peak shaving programs (e.g., smart thermostats that reduce the set temperature during a winter peak time) that could shift load to times of lower demand may also help maintain a 51 GW peak load level, thereby reducing transmission costs. Public education and involvement may be an important factor in modifying consumer behavior to reduce electricity demand at key times. Consumer awareness of the nature and timing of peak load may help consumers participate in the reduction of peak loads to more manageable levels, which could save billions of dollars in transmission system upgrade costs. 19 ISO New England, “2050 Transmission Study” (February 12, 2024) at 17 https://www.iso-ne.com/systemplanning/transmission-planning/longer-term-transmission-studies. 19 23Page 24 of 43
1 Q. Does Eversource acknowledge that demand management actions by customers to reduce Eversource’s peak load can benefit other ratepayers? 2 3 A. Yes. In response to UCONN-026, Eversource states “The longer-term benefit to other 4 customers is clearly associated with load reductions that coincide with transmission system’s 5 annual peak since this lower peak load may defer investment planned on the transmission to meet 6 annual peak load growth, i.e., long-term capacity expansion needs.” 7 Q. How can a large customer like UConn contribute to this effort to shift customer load to times of lower demand and defer expansion of Eversource’s transmission system? 8 9 A. In addition to behind-the-meter generation, there are a range of energy storage 10 technologies, including lithium-ion batteries and thermal storage systems, that large customers can 11 install and operate to shift their grid demand to off-peak periods and to reduce their contribution 12 to transmission loads when Eversource’s system experiences peak demand. The battery storage 13 market in New England has advanced rapidly over the last decade and large customers now have 14 access to a range of behind-the-meter battery storage technology offerings and operations services. 15 This market continues to mature. 16 Q. 17 A. 18 across the country. In 2025, the University of Massachusetts (“UMass”) Amherst completed and 19 commissioned a thermal energy storage (“TES”) system on its campus in Amherst, MA that can 20 store chilled water in a 2.2 million-gallon above ground tank. In the same year, the University of How could thermal storage be used in a district energy system to shift campus load? Chilled water storage is an option that is increasingly being adopted by large universities 24Page 25 of 43
1 New Hampshire (“UNH”) also completed and commissioned a TES system with 1.4 million 2 gallons of chilled water storage capacity at its flagship campus in Durham, NH. 20 3 Each institution installed a TES to satisfy increasing cooling needs in lieu of constructing 4 new chiller capacity on campus. Similar to the non-wires alternatives that enable electric utilities 5 to maximize the use of existing grid capacity rather than pursue capacity expansion, TES 6 technology allows campuses with district cooling to more efficiently use existing campus energy 7 infrastructure while reducing grid demand on Eversource’s transmission system on hot summer 8 afternoons that drive capacity expansion needs. 9 A TES is designed to operate as a “water battery”; instead of installing a new chiller plant 10 to produce additional energy for space cooling, the TES tank will store chilled water produced by 11 the existing chiller plants during off-peak nighttime hours, when it is more efficient to cool water. 12 The chilled water can then be released for use in campus air conditioning during the following 13 day, reducing campus grid demand when Eversource’s transmission system is most constrained 14 on peak summer days. The TES technology is flexible; it can be adapted to also provide hot water 15 storage in the future during the winter months as large campuses transition their district heating 16 systems from steam to lower-temperature hot water to be compatible with air-source and/or 17 ground-source heat pumps. 18 Q. How does Eversource’s existing transmission rate design affect the viability of using behind-the-meter energy storage to implement load shifting to off-peak periods? 19 20 A. If a large customer wants to use an energy storage system to try to reduce its transmission 21 charges, the necessary storage duration depends on the customer’s load shape across Eversource’s For additional information on UNH’s TES project, see https://www.unh.edu/news/what-mysterious-cylindercampus-get-know-unhs-thermal-energy-storage-tank. 20 25Page 26 of 43
1 on-peak period. The system needs to have sufficient storage capacity to enable discharging across 2 the full eight-hour window on weekdays where a transmission demand charge can be assessed. 3 Eversource’s eight-hour on-peak period each weekday (12 P.M. to 8 P.M. during Eastern Standard 4 Time and 1 P.M. to 9 P.M. during Eastern Daylight Time) means that failing to reduce the interval 5 that sets the customer’s monthly billing maximum can substantially limit retail transmission 6 savings. More importantly, a customer does not realize direct retail savings when its behind-the- 7 meter energy storage system is discharged during Eversource’s monthly peak load hour, unless 8 that reduction also coincidentally lowers the account’s on-peak billing maximum. 9 Sizing an energy storage system to be able to discharge over eight hours significantly 10 increases implementation cost for end users. The installed cost of an energy storage system is 11 driven by the system’s nameplate energy storage capacity (i.e., discharge duration) rather than 12 nameplate power capacity (i.e., instantaneous discharging or charging capability). 13 In response to UCONN-005, Eversource provided the timestamp of its 12CP hours in 2023, 14 2024, and 2025. Figure 2 below presents this data and shows that Eversource’s monthly peak load 15 hour was highly concentrated between 5 P.M. and 7 P.M., occurring during this window in 31 of 16 the 36 months. Figure 2 shows that an eight-hour energy storage system would be significantly 17 oversized for an end user that aims to load shift its grid demand outside the period where 18 Eversource’s monthly peak load hour will likely occur. The 36 monthly peak load hours shown in 19 Figure 2 include three weekend hours. These observations support measuring the customer during 20 Eversource’s 12CP hours, rather than treating a general retail window change as equivalent. 21 21 21 Eversource’s response to UCONN-005 Attachment 1. 26Page 27 of 43
Figure 2: Timestamp of Eversource’s Monthly Peak Load Hour: January 2023 – December 2025 Hour Ending 1 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 2 3 Q. What do you propose as a solution for Eversource to modernize its transmission rate design and to address your concerns? 4 5 A. PURA should require Eversource to introduce a CPT rate option for Rate 55, Rate 56, Rate 6 57, and Rate 58 customers in Connecticut through a compliance tariff established in this 7 proceeding, with billing implementation tied to verified meter data and incremental billing costs. 8 The rate option should be structured to be voluntary, allowing large customers to opt into the CPT 9 rate design for transmission charges only. Existing kVA distribution and ESI demand charges, 10 public benefit charges, and supply charges would retain their existing billing determinants for 11 participating accounts. 27Page 28 of 43
1 Following an account’s enrollment in the CPT rate option, a participating customer’s 2 monthly transmission demand charge would be based on the customer’s average 60-minute grid 3 demand measured in kW during Eversource’s monthly peak load hour in the prior month as 4 determined for the purposes of reporting RNS loads to ISO-NE. For example, the Eversource bill 5 that is issued to a participating customer in October 2027 would be based on the customer’s 6 average 60-minute grid demand measured in kW during Eversource’s monthly peak load hour in 7 September 2027. 8 To enroll in the CPT rate option, the customer would send a written e-mail notification to 9 its Eversource key account manager, or to a specific Eversource Billing team member designated 10 by the Company. The enrollment request should specify the account number(s) that the customer 11 wants to enroll in the CPT rate option, and Eversource would enroll the account(s) in the next 12 monthly billing cycle, assuming that notice is received at least 14 days prior to the start of the 13 billing cycle. Any additional billing fee should be limited to documented incremental CPT billing 14 costs. 15 Q. Why do you recommend that Eversource implement the CPT rate option for large customers on a voluntary, opt-in basis? 16 17 A. Implementing the CPT rate option on a voluntary, opt-in basis is a prudent, measured first 18 step in moving Eversource’s transmission rate design for large customers towards the Company’s 19 actual cost of providing transmission service. By allowing large customers to opt into the CPT rate 20 design, Eversource would be removing a key obstacle for customers interested in proceeding with 21 demand management measures immediately, while providing its other large customers with time 22 to review the CPT rate option in more detail. Furthermore, we expect voluntary enrollment will 28Page 29 of 43
1 initially limit Eversource’s need for manual billing and will provide time for the Company to assess 2 and implement an automated billing solution for CPT demand charges. 3 In addition, Eversource does not currently share its hourly RNS load data with its 4 customers. To help large customers evaluate the utility’s RNS load profile and consider the 5 effectiveness of various solutions to help reduce grid demand during the probable peak window, 6 Central Maine Power Company (“CMP”) voluntarily posts its hourly RNS load data publicly on 7 the company’s website. 22 CMP provides an RNS load measurement in near real time, which is 8 updated every five minutes, and also uploads an hourly RNS dataset to its website after each 9 operating day. While CMP’s large customers cannot exactly predict the utility’s monthly peak load 10 hour in advance, the availability of this data enables customers to study RNS load patterns and 11 make an educated guess of when CMP’s monthly peak load hour will likely occur. 12 Until Eversource provides its RNS data publicly like CMP does, which helps large 13 customers fully evaluate historical RNS load patterns and track RNS data in near real-time, it 14 makes sense for the CPT rate option to remain voluntary opt-in. 15 Q. 16 A. No. Eversource already manually bills some Rates 55–58 accounts. Eversource has been 17 billing the CPT rate option in Western Massachusetts for over a decade without major issues and 18 has been billing the CPT rate option in Eastern Massachusetts for several years. 19 Q. What are you proposing as the incremental billing fee for participating customers? 20 A. The present record does not establish the incremental cost of CPT billing or justify a 21 fixed fee amount. Eversource’s response to UCONN-016 describes the cost of existing manual 22 Is it unduly burdensome for Eversource to administer billing for a CPT rate option? See CMP’s website: https://www.cmpco.com/w/rns-downloads 29Page 30 of 43
1 billing practices, not the incremental cost of administering the CPT rate option. In response to 2 UCONN-016, Eversource states that it takes approximately three full-time employees to 3 manually enter billing data each month for 348 manually billed accounts on Rates 55–58. 4 Eversource states that the labor cost to manually perform this work is approximately $195,600 5 per year. That equals about $47 in average manual-billing labor per bill across those accounts, 6 not the incremental cost of a CPT calculation. It is not clear that adding a CPT charge to a 7 customer bill would necessitate additional manual billing labor. That being said, CPT customers 8 should be responsible for true incremental effort and manual billing practices required by 9 Eversource’s billing team. 10 Q. 11 A. 12 fixed charge for CPT billing. In Maine, CMP similarly does not charge an incremental billing fee 13 for its customers that enroll in the CPT rate option. In New Hampshire, the proposed Rate LG 14 CPT pilot rate option in Eversource’s service territory does not include an incremental billing fee 15 for participating customers. 16 How does this proposed fee compare to other utilities’ comparable billing fees? In Western Massachusetts, Eversource does not charge its T-5 customers an incremental In Massachusetts, Eversource assesses a $500 bill preparation fee for its large customers 17 in Eastern Massachusetts that enroll in CPT rate option. The $500, which is added to 18 Eversource’s fixed monthly service charge, will remain in place until Eversource has transitioned 19 to its new billing system that allows automated CPT billing. National Grid assesses a monthly 20 $155 bill preparation fee for its large customers in Massachusetts that enroll in the CPT rate 21 option. In New Hampshire, Liberty assesses a $250 monthly billing fee for Rate G-1 customers 22 that enroll in the CPT rate option. 23 30Page 31 of 43
1 2 IV. PRECEDENT FOR THE COINCIDENT PEAK TRANSMISSION RATE OPTION Q. Is there precedent for the CPT rate option being adopted by electric utilities in New England, including Eversource in its other service territories outside Connecticut? 3 4 A. Yes. The CPT rate option has been approved and implemented for large customers in 5 Massachusetts, Maine, and New Hampshire across several different utility service territories. 6 There is an established track record of large customers taking service under this rate design for 7 nearly 15 years, with high levels of satisfaction, and of large customers advocating for the 8 expansion of the CPT rate option across Massachusetts’ New England footprint. 9 In Western Massachusetts, Eversource has used a CPT rate design to assess transmission 10 charges to its large customers since 2014. The CPT rate design is automatically applied to all 11 customers in Eversource’s T-5 rate class, which includes customers with maximum demand 12 greater than 2,500 kW. Each T-5 customer is assessed a transmission demand charge each month 13 based on the customer’s average 60-minute grid demand (measured in kW) during Eversource’s 14 peak load hour in the prior month as measured across the Company’s legacy Northeast Utilities 15 service territory. 23 This rate design was approved by the Massachusetts DPU for all T-5 customers 16 in DPU 10-70-B. A copy of Eversource’s Rate T-5 service tariff is provided for reference in 17 Exhibit UCONN-2. 18 In November 2022, the DPU approved an expansion of the CPT rate design to Eversource’s 19 service territory in Eastern Massachusetts. This expansion was driven by a variety of large 20 customers throughout Eastern Massachusetts, including the University of Massachusetts System 23 The Rate T-5 tariff defines the legacy Northeast Utilities service territory as including Eversource’s service territories in Western Massachusetts (Western Massachusetts Electric Company), New Hampshire (Eversource), and Connecticut (Connecticut Light & Power). 31
As listed on the current system
Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Eben Perkins [26-05-10]