    1 New Hampshire (“UNH”) also completed and commissioned a TES system with 1.4 million 2 gallons of chilled water storage capacity at its flagship campus in Durham, NH. 20 3 Each institution installed a TES to satisfy increasing cooling needs in lieu of constructing 4 new chiller capacity on campus. Similar to the non-wires alternatives that enable electric utilities 5 to maximize the use of existing grid capacity rather than pursue capacity expansion, TES 6 technology allows campuses with district cooling to more efficiently use existing campus energy 7 infrastructure while reducing grid demand on Eversource’s transmission system on hot summer 8 afternoons that drive capacity expansion needs. 9 A TES is designed to operate as a “water battery”; instead of installing a new chiller plant 10 to produce additional energy for space cooling, the TES tank will store chilled water produced by 11 the existing chiller plants during off-peak nighttime hours, when it is more efficient to cool water. 12 The chilled water can then be released for use in campus air conditioning during the following 13 day, reducing campus grid demand when Eversource’s transmission system is most constrained 14 on peak summer days. The TES technology is flexible; it can be adapted to also provide hot water 15 storage in the future during the winter months as large campuses transition their district heating 16 systems from steam to lower-temperature hot water to be compatible with air-source and/or 17 ground-source heat pumps. 18 Q. How does Eversource’s existing transmission rate design affect the viability of using behind-the-meter energy storage to implement load shifting to off-peak periods? 19 20 A. If a large customer wants to use an energy storage system to try to reduce its transmission 21 charges, the necessary storage duration depends on the customer’s load shape across Eversource’s For additional information on UNH’s TES project, see https://www.unh.edu/news/what-mysterious-cylindercampus-get-know-unhs-thermal-energy-storage-tank. 20 25
  2. Page 26 of 43

    1 on-peak period. The system needs to have sufficient storage capacity to enable discharging across 2 the full eight-hour window on weekdays where a transmission demand charge can be assessed. 3 Eversource’s eight-hour on-peak period each weekday (12 P.M. to 8 P.M. during Eastern Standard 4 Time and 1 P.M. to 9 P.M. during Eastern Daylight Time) means that failing to reduce the interval 5 that sets the customer’s monthly billing maximum can substantially limit retail transmission 6 savings. More importantly, a customer does not realize direct retail savings when its behind-the- 7 meter energy storage system is discharged during Eversource’s monthly peak load hour, unless 8 that reduction also coincidentally lowers the account’s on-peak billing maximum. 9 Sizing an energy storage system to be able to discharge over eight hours significantly 10 increases implementation cost for end users. The installed cost of an energy storage system is 11 driven by the system’s nameplate energy storage capacity (i.e., discharge duration) rather than 12 nameplate power capacity (i.e., instantaneous discharging or charging capability). 13 In response to UCONN-005, Eversource provided the timestamp of its 12CP hours in 2023, 14 2024, and 2025. Figure 2 below presents this data and shows that Eversource’s monthly peak load 15 hour was highly concentrated between 5 P.M. and 7 P.M., occurring during this window in 31 of 16 the 36 months. Figure 2 shows that an eight-hour energy storage system would be significantly 17 oversized for an end user that aims to load shift its grid demand outside the period where 18 Eversource’s monthly peak load hour will likely occur. The 36 monthly peak load hours shown in 19 Figure 2 include three weekend hours. These observations support measuring the customer during 20 Eversource’s 12CP hours, rather than treating a general retail window change as equivalent. 21 21 21 Eversource’s response to UCONN-005 Attachment 1. 26
  3. Page 27 of 43

    Figure 2: Timestamp of Eversource’s Monthly Peak Load Hour: January 2023 – December 2025 Hour Ending 1 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 2 3 Q. What do you propose as a solution for Eversource to modernize its transmission rate design and to address your concerns? 4 5 A. PURA should require Eversource to introduce a CPT rate option for Rate 55, Rate 56, Rate 6 57, and Rate 58 customers in Connecticut through a compliance tariff established in this 7 proceeding, with billing implementation tied to verified meter data and incremental billing costs. 8 The rate option should be structured to be voluntary, allowing large customers to opt into the CPT 9 rate design for transmission charges only. Existing kVA distribution and ESI demand charges, 10 public benefit charges, and supply charges would retain their existing billing determinants for 11 participating accounts. 27
  4. Page 28 of 43

    1 Following an account’s enrollment in the CPT rate option, a participating customer’s 2 monthly transmission demand charge would be based on the customer’s average 60-minute grid 3 demand measured in kW during Eversource’s monthly peak load hour in the prior month as 4 determined for the purposes of reporting RNS loads to ISO-NE. For example, the Eversource bill 5 that is issued to a participating customer in October 2027 would be based on the customer’s 6 average 60-minute grid demand measured in kW during Eversource’s monthly peak load hour in 7 September 2027. 8 To enroll in the CPT rate option, the customer would send a written e-mail notification to 9 its Eversource key account manager, or to a specific Eversource Billing team member designated 10 by the Company. The enrollment request should specify the account number(s) that the customer 11 wants to enroll in the CPT rate option, and Eversource would enroll the account(s) in the next 12 monthly billing cycle, assuming that notice is received at least 14 days prior to the start of the 13 billing cycle. Any additional billing fee should be limited to documented incremental CPT billing 14 costs. 15 Q. Why do you recommend that Eversource implement the CPT rate option for large customers on a voluntary, opt-in basis? 16 17 A. Implementing the CPT rate option on a voluntary, opt-in basis is a prudent, measured first 18 step in moving Eversource’s transmission rate design for large customers towards the Company’s 19 actual cost of providing transmission service. By allowing large customers to opt into the CPT rate 20 design, Eversource would be removing a key obstacle for customers interested in proceeding with 21 demand management measures immediately, while providing its other large customers with time 22 to review the CPT rate option in more detail. Furthermore, we expect voluntary enrollment will 28
  5. Page 29 of 43

    1 initially limit Eversource’s need for manual billing and will provide time for the Company to assess 2 and implement an automated billing solution for CPT demand charges. 3 In addition, Eversource does not currently share its hourly RNS load data with its 4 customers. To help large customers evaluate the utility’s RNS load profile and consider the 5 effectiveness of various solutions to help reduce grid demand during the probable peak window, 6 Central Maine Power Company (“CMP”) voluntarily posts its hourly RNS load data publicly on 7 the company’s website. 22 CMP provides an RNS load measurement in near real time, which is 8 updated every five minutes, and also uploads an hourly RNS dataset to its website after each 9 operating day. While CMP’s large customers cannot exactly predict the utility’s monthly peak load 10 hour in advance, the availability of this data enables customers to study RNS load patterns and 11 make an educated guess of when CMP’s monthly peak load hour will likely occur. 12 Until Eversource provides its RNS data publicly like CMP does, which helps large 13 customers fully evaluate historical RNS load patterns and track RNS data in near real-time, it 14 makes sense for the CPT rate option to remain voluntary opt-in. 15 Q. 16 A. No. Eversource already manually bills some Rates 55–58 accounts. Eversource has been 17 billing the CPT rate option in Western Massachusetts for over a decade without major issues and 18 has been billing the CPT rate option in Eastern Massachusetts for several years. 19 Q. What are you proposing as the incremental billing fee for participating customers? 20 A. The present record does not establish the incremental cost of CPT billing or justify a 21 fixed fee amount. Eversource’s response to UCONN-016 describes the cost of existing manual 22 Is it unduly burdensome for Eversource to administer billing for a CPT rate option? See CMP’s website: https://www.cmpco.com/w/rns-downloads 29
  6. Page 30 of 43

    1 billing practices, not the incremental cost of administering the CPT rate option. In response to 2 UCONN-016, Eversource states that it takes approximately three full-time employees to 3 manually enter billing data each month for 348 manually billed accounts on Rates 55–58. 4 Eversource states that the labor cost to manually perform this work is approximately $195,600 5 per year. That equals about $47 in average manual-billing labor per bill across those accounts, 6 not the incremental cost of a CPT calculation. It is not clear that adding a CPT charge to a 7 customer bill would necessitate additional manual billing labor. That being said, CPT customers 8 should be responsible for true incremental effort and manual billing practices required by 9 Eversource’s billing team. 10 Q. 11 A. 12 fixed charge for CPT billing. In Maine, CMP similarly does not charge an incremental billing fee 13 for its customers that enroll in the CPT rate option. In New Hampshire, the proposed Rate LG 14 CPT pilot rate option in Eversource’s service territory does not include an incremental billing fee 15 for participating customers. 16 How does this proposed fee compare to other utilities’ comparable billing fees? In Western Massachusetts, Eversource does not charge its T-5 customers an incremental In Massachusetts, Eversource assesses a $500 bill preparation fee for its large customers 17 in Eastern Massachusetts that enroll in CPT rate option. The $500, which is added to 18 Eversource’s fixed monthly service charge, will remain in place until Eversource has transitioned 19 to its new billing system that allows automated CPT billing. National Grid assesses a monthly 20 $155 bill preparation fee for its large customers in Massachusetts that enroll in the CPT rate 21 option. In New Hampshire, Liberty assesses a $250 monthly billing fee for Rate G-1 customers 22 that enroll in the CPT rate option. 23 30
  7. Page 31 of 43

    1 2 IV. PRECEDENT FOR THE COINCIDENT PEAK TRANSMISSION RATE OPTION Q. Is there precedent for the CPT rate option being adopted by electric utilities in New England, including Eversource in its other service territories outside Connecticut? 3 4 A. Yes. The CPT rate option has been approved and implemented for large customers in 5 Massachusetts, Maine, and New Hampshire across several different utility service territories. 6 There is an established track record of large customers taking service under this rate design for 7 nearly 15 years, with high levels of satisfaction, and of large customers advocating for the 8 expansion of the CPT rate option across Massachusetts’ New England footprint. 9 In Western Massachusetts, Eversource has used a CPT rate design to assess transmission 10 charges to its large customers since 2014. The CPT rate design is automatically applied to all 11 customers in Eversource’s T-5 rate class, which includes customers with maximum demand 12 greater than 2,500 kW. Each T-5 customer is assessed a transmission demand charge each month 13 based on the customer’s average 60-minute grid demand (measured in kW) during Eversource’s 14 peak load hour in the prior month as measured across the Company’s legacy Northeast Utilities 15 service territory. 23 This rate design was approved by the Massachusetts DPU for all T-5 customers 16 in DPU 10-70-B. A copy of Eversource’s Rate T-5 service tariff is provided for reference in 17 Exhibit UCONN-2. 18 In November 2022, the DPU approved an expansion of the CPT rate design to Eversource’s 19 service territory in Eastern Massachusetts. This expansion was driven by a variety of large 20 customers throughout Eastern Massachusetts, including the University of Massachusetts System 23 The Rate T-5 tariff defines the legacy Northeast Utilities service territory as including Eversource’s service territories in Western Massachusetts (Western Massachusetts Electric Company), New Hampshire (Eversource), and Connecticut (Connecticut Light & Power). 31
  8. Page 32 of 43

    1 and The Energy Consortium, 24 strongly advocating for the adoption of a CPT rate option as part 2 of Eversource’s electric distribution rate case in DPU 22-22. 3 Since January 2023, all Eversource Rate G-3 customers across Massachusetts have had the 4 option to utilize the CPT rate option on a voluntary opt-in basis. In Western Massachusetts, 5 Eversource’s Rate G-3 class includes customers whose maximum demand equaled or exceeded 6 350 kW but less than 2,500 kW at any time in the most recent 12 months. In Eastern Massachusetts, 7 Eversource’s Rate G-3 class includes customers in the Company’s Cambridge service area whose 8 metered load exceeds or is estimated to exceed an average of 100 kilowatts for 12 consecutive 9 billing months and the service voltage is 13,800 volts or higher; customers in the Company’s 10 Greater Boston service area that take service that is supplied and metered at 14,000 volts nominal 11 or greater; 25 and customers in the Company’s South Shore, Cape Cod & Martha’s Vineyard service 12 area who establish demands in excess of an average of 500 kilowatts for 12 consecutive months. 13 Rate G-3 customers in Western Massachusetts that opt into Eversource’s CPT rate option 14 are assessed a transmission demand charge each month based on a customer’s average 60-minute 15 grid demand (measured in kW) during Eversource’s peak load hour in the prior month as measured 16 across the Company’s legacy Northeast Utilities system. A copy of Eversource’s Rate G-3 tariff 17 for Western Massachusetts, which details eligibility and billing methodology, is provided in 18 Exhibit UCONN-2. The Energy Consortium’s members include Harvard University, Mass General Brigham, Brandeis University, Massachusetts Water Resources Authority, Tufts University, Acushnet Company, Massachusetts Institute of Technology, UMass Chan Medical School, Procter & Gamble, and Beth Israel Lahey Health. Additional information on The Energy Consortium and its members can be found online at https://www.tec-ma.org/. 24 Rate G-3 customers in Greater Boston must also furnish, install, own and maintain all protective devices, transformers and other equipment required by the Company at the customer’s expense. 25 32
  9. Page 33 of 43

    1 Rate G-3 customers in Eastern Massachusetts that opt into Eversource’s CPT rate option 2 are assessed a transmission demand charge each month based on a customer’s average 60-minute 3 grid demand (measured in kW) during Eversource’s peak load hour in the prior month as measured 4 across the Company’s legacy NSTAR Electric system. 26 A copy of Eversource’s Rate G-3 tariff 5 for the utility’s three service footprints in Eastern Massachusetts (Greater Boston, Cambridge, and 6 South Shore) is provided in Exhibit UCONN-2. 7 In September 2022, the Maine Public Utilities Commission approved a CPT rate option for 8 all non-residential rate classes served by CMP. While CMP’s sub-transmission and transmission 9 level customers that are network service customers pursuant to CMP’s Schedule 21 have had a 10 CPT rate design for decades, any distribution-level customer (i.e., below 34.5 kV) can now utilize 11 the CPT rate option. This decision was made in Docket No. 2021-00325, a rate design proceeding 12 called for by the Maine Legislature to examine whether transmission and distribution rate designs 13 in Maine fully support the state’s electrification goals. CMP voluntarily agreed to implement the 14 CPT rate option, unlike the other electric utilities in New England that have implemented CPT rate 15 options as a result of distribution rate cases. 16 Since July 2023, any non-residential CMP customer has been able to opt into the CPT rate 17 option known as Rate B-CPT. 27 Participating customers are assessed a monthly transmission 18 demand charge based on their average 60-minute grid demand (measured in kW) during CMP’s The legacy NSTAR Electric system includes Eversource’s service territories in Greater Boston, Cambridge, and the South Shore. 26 CMP’s non-residential distribution customers with maximum demand over 20 kW fall into one of three rate classes: Medium General Service (maximum on-peak demand between 20 kW and 400 kW), Intermediate General Service (maximum on-peak demand between 400 kW and 1,000 kW), or Large General Service (maximum on-peak demand over 1,000 kW). 27 33
  10. Page 34 of 43

    1 peak load hour in the prior month as measured across the utility’s service territory across much of 2 Maine. A copy of CMP’s Rate B-CPT tariff is included in Exhibit UCONN-2. 3 In September 2024, the DPU approved a CPT rate option for National Grid’s large 4 customers in Massachusetts that take service under Rate G-3. The approval of the CPT rate option 5 was made in DPU Docket No. 23-150, National Grid’s most recent electric distribution rate case, 6 following strong advocacy from a consortium of National Grid’s large customers. National Grid’s 7 Rate G-3 generally applies when a new customer’s estimated average demand exceeds 200 kW; 8 an existing G-3 customer may transfer out if its 12-month average monthly demand falls below 9 180 kW for three consecutive months. Since April 2025, any Rate G-3 customer in National Grid’s 10 Massachusetts service territory has been able to opt into the CPT rate option. Participating G-3 11 customers are assessed a transmission demand charge each month based on a customer’s average 12 60-minute grid demand (measured in kW) during National Grid’s peak load hour in the prior month 13 as measured across the utility’s Massachusetts service territory. A copy of National Grid Rate G- 14 3 tariff, which details the terms of the CPT rate option, is included in Exhibit UCONN-2. 15 In New Hampshire, Liberty Utilities has offered a CPT rate option to its large customers 16 since July 2025. Liberty’s Rate G-1, which includes customers whose average grid demand is 17 greater than or equal to 200 kW, was modified to include a voluntary, opt-in CPT rate option as 18 part of a settlement agreement in Liberty’s most recent distribution rate case, NHPUC Docket No. 19 DE 23-039. Liberty’s Rate G-1 CPT is unique because it includes a distribution rate design 20 overhaul in addition to the CPT rate option for transmission. A copy of Liberty’s Rate G-1 tariff, 21 which details the terms of the CPT rate option, is included in Exhibit UCONN-2. 22 Q. 23 In approving the CPT rate option in Massachusetts, did the Massachusetts DPU detail its reasoning on adoption benefits? 34
No matches
1 page match
2 pages match

As listed on the current system

Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Eben Perkins [26-05-10]

This filing on the current system (opens in a new tab)