Prefiled testimony
Witness: Eben Perkins
Files4
CES Direct Testimony 10.21.2026.pdf
PDF · 512 KB · 43 pagesText searchable
Download CES Direct Testimony 10.21.2026.pdfRead the text of CES Direct Testimony 10.21.2026.pdf
Exhibit UCONN-1 Perkins Resume.pdf
PDF · 116 KB · 2 pagesText searchable
Download Exhibit UCONN-1 Perkins Resume.pdfRead the text of Exhibit UCONN-1 Perkins Resume.pdf
Exhibit UCONN-2 Existing CPT Rate Options.pdf
PDF · 724 KB · 33 pagesText searchable
Download Exhibit UCONN-2 Existing CPT Rate Options.pdfRead the text of Exhibit UCONN-2 Existing CPT Rate Options.pdf
Exhibit UCONN-3 Eversource NH Rate LG CPT.pdf
PDF · 172 KB · 6 pagesText searchable
Download Exhibit UCONN-3 Eversource NH Rate LG CPT.pdfRead the text of Exhibit UCONN-3 Eversource NH Rate LG CPT.pdf
Page 30 of 43
1 billing practices, not the incremental cost of administering the CPT rate option. In response to 2 UCONN-016, Eversource states that it takes approximately three full-time employees to 3 manually enter billing data each month for 348 manually billed accounts on Rates 55–58. 4 Eversource states that the labor cost to manually perform this work is approximately $195,600 5 per year. That equals about $47 in average manual-billing labor per bill across those accounts, 6 not the incremental cost of a CPT calculation. It is not clear that adding a CPT charge to a 7 customer bill would necessitate additional manual billing labor. That being said, CPT customers 8 should be responsible for true incremental effort and manual billing practices required by 9 Eversource’s billing team. 10 Q. 11 A. 12 fixed charge for CPT billing. In Maine, CMP similarly does not charge an incremental billing fee 13 for its customers that enroll in the CPT rate option. In New Hampshire, the proposed Rate LG 14 CPT pilot rate option in Eversource’s service territory does not include an incremental billing fee 15 for participating customers. 16 How does this proposed fee compare to other utilities’ comparable billing fees? In Western Massachusetts, Eversource does not charge its T-5 customers an incremental In Massachusetts, Eversource assesses a $500 bill preparation fee for its large customers 17 in Eastern Massachusetts that enroll in CPT rate option. The $500, which is added to 18 Eversource’s fixed monthly service charge, will remain in place until Eversource has transitioned 19 to its new billing system that allows automated CPT billing. National Grid assesses a monthly 20 $155 bill preparation fee for its large customers in Massachusetts that enroll in the CPT rate 21 option. In New Hampshire, Liberty assesses a $250 monthly billing fee for Rate G-1 customers 22 that enroll in the CPT rate option. 23 30Page 31 of 43
1 2 IV. PRECEDENT FOR THE COINCIDENT PEAK TRANSMISSION RATE OPTION Q. Is there precedent for the CPT rate option being adopted by electric utilities in New England, including Eversource in its other service territories outside Connecticut? 3 4 A. Yes. The CPT rate option has been approved and implemented for large customers in 5 Massachusetts, Maine, and New Hampshire across several different utility service territories. 6 There is an established track record of large customers taking service under this rate design for 7 nearly 15 years, with high levels of satisfaction, and of large customers advocating for the 8 expansion of the CPT rate option across Massachusetts’ New England footprint. 9 In Western Massachusetts, Eversource has used a CPT rate design to assess transmission 10 charges to its large customers since 2014. The CPT rate design is automatically applied to all 11 customers in Eversource’s T-5 rate class, which includes customers with maximum demand 12 greater than 2,500 kW. Each T-5 customer is assessed a transmission demand charge each month 13 based on the customer’s average 60-minute grid demand (measured in kW) during Eversource’s 14 peak load hour in the prior month as measured across the Company’s legacy Northeast Utilities 15 service territory. 23 This rate design was approved by the Massachusetts DPU for all T-5 customers 16 in DPU 10-70-B. A copy of Eversource’s Rate T-5 service tariff is provided for reference in 17 Exhibit UCONN-2. 18 In November 2022, the DPU approved an expansion of the CPT rate design to Eversource’s 19 service territory in Eastern Massachusetts. This expansion was driven by a variety of large 20 customers throughout Eastern Massachusetts, including the University of Massachusetts System 23 The Rate T-5 tariff defines the legacy Northeast Utilities service territory as including Eversource’s service territories in Western Massachusetts (Western Massachusetts Electric Company), New Hampshire (Eversource), and Connecticut (Connecticut Light & Power). 31Page 32 of 43
1 and The Energy Consortium, 24 strongly advocating for the adoption of a CPT rate option as part 2 of Eversource’s electric distribution rate case in DPU 22-22. 3 Since January 2023, all Eversource Rate G-3 customers across Massachusetts have had the 4 option to utilize the CPT rate option on a voluntary opt-in basis. In Western Massachusetts, 5 Eversource’s Rate G-3 class includes customers whose maximum demand equaled or exceeded 6 350 kW but less than 2,500 kW at any time in the most recent 12 months. In Eastern Massachusetts, 7 Eversource’s Rate G-3 class includes customers in the Company’s Cambridge service area whose 8 metered load exceeds or is estimated to exceed an average of 100 kilowatts for 12 consecutive 9 billing months and the service voltage is 13,800 volts or higher; customers in the Company’s 10 Greater Boston service area that take service that is supplied and metered at 14,000 volts nominal 11 or greater; 25 and customers in the Company’s South Shore, Cape Cod & Martha’s Vineyard service 12 area who establish demands in excess of an average of 500 kilowatts for 12 consecutive months. 13 Rate G-3 customers in Western Massachusetts that opt into Eversource’s CPT rate option 14 are assessed a transmission demand charge each month based on a customer’s average 60-minute 15 grid demand (measured in kW) during Eversource’s peak load hour in the prior month as measured 16 across the Company’s legacy Northeast Utilities system. A copy of Eversource’s Rate G-3 tariff 17 for Western Massachusetts, which details eligibility and billing methodology, is provided in 18 Exhibit UCONN-2. The Energy Consortium’s members include Harvard University, Mass General Brigham, Brandeis University, Massachusetts Water Resources Authority, Tufts University, Acushnet Company, Massachusetts Institute of Technology, UMass Chan Medical School, Procter & Gamble, and Beth Israel Lahey Health. Additional information on The Energy Consortium and its members can be found online at https://www.tec-ma.org/. 24 Rate G-3 customers in Greater Boston must also furnish, install, own and maintain all protective devices, transformers and other equipment required by the Company at the customer’s expense. 25 32Page 33 of 43
1 Rate G-3 customers in Eastern Massachusetts that opt into Eversource’s CPT rate option 2 are assessed a transmission demand charge each month based on a customer’s average 60-minute 3 grid demand (measured in kW) during Eversource’s peak load hour in the prior month as measured 4 across the Company’s legacy NSTAR Electric system. 26 A copy of Eversource’s Rate G-3 tariff 5 for the utility’s three service footprints in Eastern Massachusetts (Greater Boston, Cambridge, and 6 South Shore) is provided in Exhibit UCONN-2. 7 In September 2022, the Maine Public Utilities Commission approved a CPT rate option for 8 all non-residential rate classes served by CMP. While CMP’s sub-transmission and transmission 9 level customers that are network service customers pursuant to CMP’s Schedule 21 have had a 10 CPT rate design for decades, any distribution-level customer (i.e., below 34.5 kV) can now utilize 11 the CPT rate option. This decision was made in Docket No. 2021-00325, a rate design proceeding 12 called for by the Maine Legislature to examine whether transmission and distribution rate designs 13 in Maine fully support the state’s electrification goals. CMP voluntarily agreed to implement the 14 CPT rate option, unlike the other electric utilities in New England that have implemented CPT rate 15 options as a result of distribution rate cases. 16 Since July 2023, any non-residential CMP customer has been able to opt into the CPT rate 17 option known as Rate B-CPT. 27 Participating customers are assessed a monthly transmission 18 demand charge based on their average 60-minute grid demand (measured in kW) during CMP’s The legacy NSTAR Electric system includes Eversource’s service territories in Greater Boston, Cambridge, and the South Shore. 26 CMP’s non-residential distribution customers with maximum demand over 20 kW fall into one of three rate classes: Medium General Service (maximum on-peak demand between 20 kW and 400 kW), Intermediate General Service (maximum on-peak demand between 400 kW and 1,000 kW), or Large General Service (maximum on-peak demand over 1,000 kW). 27 33Page 34 of 43
1 peak load hour in the prior month as measured across the utility’s service territory across much of 2 Maine. A copy of CMP’s Rate B-CPT tariff is included in Exhibit UCONN-2. 3 In September 2024, the DPU approved a CPT rate option for National Grid’s large 4 customers in Massachusetts that take service under Rate G-3. The approval of the CPT rate option 5 was made in DPU Docket No. 23-150, National Grid’s most recent electric distribution rate case, 6 following strong advocacy from a consortium of National Grid’s large customers. National Grid’s 7 Rate G-3 generally applies when a new customer’s estimated average demand exceeds 200 kW; 8 an existing G-3 customer may transfer out if its 12-month average monthly demand falls below 9 180 kW for three consecutive months. Since April 2025, any Rate G-3 customer in National Grid’s 10 Massachusetts service territory has been able to opt into the CPT rate option. Participating G-3 11 customers are assessed a transmission demand charge each month based on a customer’s average 12 60-minute grid demand (measured in kW) during National Grid’s peak load hour in the prior month 13 as measured across the utility’s Massachusetts service territory. A copy of National Grid Rate G- 14 3 tariff, which details the terms of the CPT rate option, is included in Exhibit UCONN-2. 15 In New Hampshire, Liberty Utilities has offered a CPT rate option to its large customers 16 since July 2025. Liberty’s Rate G-1, which includes customers whose average grid demand is 17 greater than or equal to 200 kW, was modified to include a voluntary, opt-in CPT rate option as 18 part of a settlement agreement in Liberty’s most recent distribution rate case, NHPUC Docket No. 19 DE 23-039. Liberty’s Rate G-1 CPT is unique because it includes a distribution rate design 20 overhaul in addition to the CPT rate option for transmission. A copy of Liberty’s Rate G-1 tariff, 21 which details the terms of the CPT rate option, is included in Exhibit UCONN-2. 22 Q. 23 In approving the CPT rate option in Massachusetts, did the Massachusetts DPU detail its reasoning on adoption benefits? 34Page 35 of 43
1 A. 2 Massachusetts, the DPU recognized that the CPT rate design follows cost causation principles and 3 incentivizes efficient customer behavior that can benefit all ratepayers by reducing customer 4 contributions to coincident peak demand and flattening load profiles on the system: 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Yes. In its 2012 order approving the CPT rate design for all T-5 customers in Western As WMECO’s transmission rates are currently configured, cross-subsidization of transmission costs within rate classes can occur between those customers whose peak demand occurs coincident within the system peaks and those customers whose peak demand occurs in off-peak hours. WMIG’s rate design proposal eliminates this inequity by charging customers based on their individual consumption at the time of system peak. The incentives provided by cost-based transmission rates can also help reduce congestion on the Company’s system during peak hours, lower locational marginal prices, and lead to flatter load profiles. 28 As a principle, pricing transmission service based on a customer’s consumption at the time of system peak rather than based on the customer’s peak, which may not coincide with the system peak, provides a more equitable assignment of cost responsibility. However, converting the principle into a workable rate redesign requires that the transmission costs assigned to an individual customer are clearly identifiable. In this case, the interval billing meter required for service under Rate T-2 and Rate T-5 would identify these costs because the meter measures and records electrical use each half hour. 29 The Department finds that introduction of a new transmission rate redesign, mandatory for the 20 Rate T-5 customers only, would provide an opportunity for those customers to achieve lower transmission costs, would result in minimal, if any, shifting of transmission costs to other electric utilities, would not be unduly burdensome for the Company to administer, and would provide useful data for the Department to evaluate whether implementing a rate redesign for all intervalmetered customers statewide is in the public interest. Further, this transmission rate design would be consistent with the ratemaking principle of cost causation (i.e., rates for service reflect the costs that are actually “caused” or imposed by the customers who must pay the rates).30 30 In DPU Docket No. 22-22, the DPU required Eversource to expand the CPT rate option to 31 all Rate G-3 customers across Massachusetts, making a similar finding that a CPT rate design for Order on Western Massachusetts Electric Company’s Compliance Filing on Transmission Service Pricing; September 19, 2012; D.P.U. 10-70-B, page 5. 28 Order on Western Massachusetts Electric Company’s Compliance Filing on Transmission Service Pricing; September 19, 2012; D.P.U. 10-70-B, page 6. 29 Order on Western Massachusetts Electric Company’s Compliance Filing on Transmission Service Pricing; September 19, 2012; D.P.U. 10-70-B, page 7. 30 35Page 36 of 43
1 transmission charges creates a price signal that could help support rate affordability by leading to 2 more efficient expansion of the transmission system over time: 3 4 5 6 7 8 9 10 The Department has previously stated that pricing transmission service based on a customer’s use at the time of system peak rather than based on the customer’s peak, which may not coincide with the system peak, provides a more equitable assignment of cost responsibility. The 12 CP billing for Rate T-5 is one method of efficiently assigning accurate costs to those customers who utilize the transmission system during peak periods. While customer behavior benefits from 12 CP may not result in lower system costs immediately, lower system peak usage will eventually be reflected in transmission system peak forecasts, lowering costs for all customers. 31 11 The DPU also concluded that the CPT rate option creates a price signal that meets rate 12 design goals of efficiency, fairness, and simplicity: 13 14 15 16 17 18 19 20 21 In the Company’s last base distribution rate case, the Department directed the Company to evaluate the further expansion of coincident peak transmission billing to NSTAR Electric customers; however, the Company did not undertake any such evaluation that could assist the Department in weighing the merits of the proposed use of 12 CP transmission billing for all large customers. As the Company has made and continues to make efforts toward rate alignment, and as 12 CP billing supports numerous rate-making goals such as simplicity and efficiency, the Department finds that it is reasonable and appropriate for the Company to expand optional 12 CP transmission billing to all large general service customers. 32 22 In DPU Docket No. 23-150, the DPU required National Grid to make the CPT rate option 23 available to its large customers throughout Massachusetts due to the benefits of the rate design in 24 improving efficiency and fairness: 25 26 27 28 29 30 31 32 In NSTAR Electric’s most recent base distribution rate case, the Department approved the expansion of coincident peak transmission billing for large C&I customers. The Department determined that pricing transmission service based on a customer’s use at the time of system peak rather than based on the customer’s peak, which may not coincide with the system peak, provides a more equitable assignment of cost responsibility. In the instant case, the Department is persuaded that an opt-in coincident peak billing rate for transmission can help accelerate storage adoption and deliver load reductions during peak times. Therefore, such a rate design meets the goal of efficiency and helps supports the Commonwealth’s decarbonization policies. 31 Order on NSTAR Electric Company’s Petition for Approval of a General Increase in Base Distribution Rates for Electric Service and a Performance Based Ratemaking Plan; November 30, 2022, D.P.U. 22-22, page 460. Order on NSTAR Electric Company’s Petition for Approval of a General Increase in Base Distribution Rates for Electric Service and a Performance Based Ratemaking Plan; November 30, 2022, D.P.U. 22-22, pages 460-461. 32 36Page 37 of 43
1 2 3 4 Accordingly, the Department directs the Company to implement a coincident peak billing option for transmission service on an opt-in basis for large C&I customers. 33 Q. Has the CPT rate design been proposed for large customers in Eversource’s New Hampshire service territory? 5 6 A. Yes. In NHPUC Docket No. DE 24-070, Eversource’s most recent distribution rate case in 7 New Hampshire, a consortium of large customers, including the University System of New 8 Hampshire, Pike Industries, Inc., and Monadnock Paper Mills, Inc. (the “Large Customer 9 Consortium” or “LCC”), intervened and advocated for the adoption of a CPT rate option for 10 Eversource’s Large General Delivery Service Rate LG class. Rate LG includes eligible Eversource 11 customers in New Hampshire whose maximum demand exceeds 1,000 kW. 12 In response to the LCC’s proposal to introduce the CPT rate option in New Hampshire, 13 Eversource argued that a distribution rate case is not the appropriate venue for transmission rate 14 design to be considered. Following a motion by Eversource to have the LCC’s testimony struck 15 from the record of the proceeding and a rebuttal response from the LCC, NHPUC determined that 16 the LCC proposal for Eversource to implement a CPT rate option should first be considered in an 17 investigative docket. 18 In May 2025, NHPUC opened Docket No. IR 25-035, Investigation Into Eversource Rate 19 LG\Rate B Transmission Rate Design, for consideration and discussion of the CPT rate design for 20 Rate LG customers. After filing written comments, technical sessions, and holding a series of 21 discussions, the participants in the investigation were able to find sufficient common ground to Order on Massachusetts Electric Company’s and Nantucket Electric Company’s Petition for Approval of a General Increase in Base Distribution Rates for Electric Service, a Performance-Based Ratemaking Plan, and a Capital Recovery Mechanism; September 30, 2024, D.P.U. 23-150, page 517. 33 37Page 38 of 43
1 satisfactorily resolve all issues to the point where the investigation could be closed and an 2 adjudication could be opened for the consideration and approval of a Rate LG CPT pilot proposal. 3 The participants drafted a joint stipulation reflecting the resolution of the open issues in the 4 investigation and filed it with NHPUC in June 2026. 5 On June 30, 2026, the LCC submitted a petition to NHPUC along with a detailed pilot 6 proposal for Rate LG CPT and requested that the Commission open a new adjudicative docket to 7 review and consider the pilot proposal. The proposal, which has been filed under Docket No. DE 8 26-042, includes a CPT rate design for a maximum of five Rate LG customers, which would be 9 available on a first-come, first-served opt-in basis. The pilot would be offered by Eversource until 10 September 30 of the year Eversource files its next base distribution rate case. NHPUC has 11 scheduled a final hearing for the proceeding in December 2026. A copy of Eversource’s proposed 12 tariff terms for Rate LG CPT is provided in Exhibit UCONN-3. 13 On October 16, 2026, a Comprehensive Settlement Agreement Regarding the Large 14 Customer Consortium’s Rate LG CPT Pilot Proposal was filed in NHPUC Docket No. 26-042, 15 which recommends that the Rate LG CPT pilot be approved. The parties to the Settlement 16 Agreement include Public Service Company of New Hampshire d/b/a Eversource Energy, the 17 Large Customer Consortium, the New Hampshire Department of Energy, the New Hampshire 18 Office of the Consumer Advocate, and the Community Power Coalition of New Hampshire. 19 NHPUC has scheduled a final hearing in the proceeding for December 1, 2026, and is expected to 20 issue a final order on the Settlement Agreement shortly thereafter. V. EVERSOURCE DISTRIBUTION RATE DESIGN 21 22 Q. How does Eversource assess distribution charges to its large customers? 38Page 39 of 43
1 A. Eversource charges distribution service rates to Rate 55, Rate 56, Rate 57, and Rate 58 2 customers using a fixed service charge and distribution demand charge. Rate 55 customers 3 currently pay a $350 per month service charge and a $6.65 per kilovolt-ampere (“kVA”) monthly 4 distribution demand charge. Rate 56 customers currently pay a $350 per month service charge and 5 a $7.91 per kVA monthly distribution demand charge. Rate 57 customers currently pay a service 6 charge ranging from $1,100 per month to $4,200 per month, depending on customer size, 34 and a 7 $5.45 per kVA monthly distribution demand charge. Rate 58 customers pay the same service 8 charge rates as Rate 57 customers and currently pay a $7.53 per kVA monthly distribution demand 9 charge. 35 10 A large customer’s distribution demand charge is based on a customer’s highest average 30- 11 minute kVA grid demand measured by Eversource in the current month or the preceding eleven 12 months. A customer may, upon not less than three months’ prior written notice to the Company, 13 decrease the distribution demand solely to reflect lower load levels from demonstrable 14 conservation and load management. 15 Eversource’s Distributed Generation Rider is applicable to customers with load associated 16 with new base load distributed generation projects (“DG Load”) who receive electric service under 17 a firm service rate that includes a distribution demand ratchet. The Rider waives the distribution 18 demand-ratchet provision of such rates for the customer’s DG Load served under those rates. For Rate 57 and Rate 58, Eversource currently charges $1,100 per month for less than 2,000 kW demand, $2,200 per month for between 2,000 kW and 4,999 kW demand, and $4,200 per month for 5,000 kW demand or more. 34 These figures describe the base distribution demand charge; separately billed ESI demand charges also appear in Eversource’s response to UCONN-009 Attachment 1 and must be included when comparing a customer’s total delivery bill. 35 39