Prefiled testimony
Witness: Eben Perkins
Files4
CES Direct Testimony 10.21.2026.pdf
PDF · 512 KB · 43 pagesText searchable
Download CES Direct Testimony 10.21.2026.pdfRead the text of CES Direct Testimony 10.21.2026.pdf
Exhibit UCONN-1 Perkins Resume.pdf
PDF · 116 KB · 2 pagesText searchable
Download Exhibit UCONN-1 Perkins Resume.pdfRead the text of Exhibit UCONN-1 Perkins Resume.pdf
Exhibit UCONN-2 Existing CPT Rate Options.pdf
PDF · 724 KB · 33 pagesText searchable
Download Exhibit UCONN-2 Existing CPT Rate Options.pdfRead the text of Exhibit UCONN-2 Existing CPT Rate Options.pdf
Exhibit UCONN-3 Eversource NH Rate LG CPT.pdf
PDF · 172 KB · 6 pagesText searchable
Download Exhibit UCONN-3 Eversource NH Rate LG CPT.pdfRead the text of Exhibit UCONN-3 Eversource NH Rate LG CPT.pdf
Page 11 of 33
NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 21I Cancels M.D.P.U. No. 21H Page 4 of 4 EASTERN MASSACHUSETTS CAMBRIDGE SERVICE AREA LARGE GENERAL SERVICE RATE G-3 TERMS OF PAYMENT Charges are net and are payable upon presentation of the Company's bill. TERM Service under this rate shall be for a minimum term of 12 consecutive months and shall continue thereafter until terminated on six months’ written notice by the Customer. Except for Customers engaging in net metering, Customers served under this rate must provide the Company with six months’ prior written notice before installing or allowing to be installed for its use a non-emergency generator with a nameplate capacity greater than that in place on the Customer’s location as of March 1, 1995. Issued by: Douglas W. Foley President Filed: Effective: October 31, 2024 January 1, 2025Page 12 of 33
NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 31I Cancels M.D.P.U. No. 31H Page 1 of 4 EASTERN MASSACHUSETTS SOUTH SHORE, CAPE COD & MARTHA’s VINEYARD SERVICE AREA LARGE GENERAL SERVICE RATE G-3 AVAILABILITY This rate is available for all uses of electricity to Customers in the South Shore, Cape Cod & Martha’s Vineyard service area who establish demands in excess of an average of 500 kilowatts for 12 consecutive months. Service under this rate is subject to both the Company's printed requirements and the Company's Terms and Conditions - Distribution Service, each as in effect from time to time. CHARACTER OF SERVICE The Company delivers 60 hertz, alternating current service at secondary voltage under this rate schedule. As available and at the Company's option, such service shall be either single-phase at approximately 120/240 or 120/208 volts or 4-wire, three-phase at approximately 120/208 or 277/480 volts. RATE PER MONTH Delivery Services: Customer Charge: Distribution: Transition: Transmission: As per M.D.P.U. No. 1 as in effect from time to time. As per M.D.P.U. No. 1 as in effect from time to time. As per M.D.P.U. No. 1 as in effect from time to time. As per M.D.P.U. No. 1 as in effect from time to time. Supplier Services: (Optional) Basic Service: As in effect per Tariff Minimum Charge: The minimum charge per month shall be the Customer Charge. Issued by: Douglas W. Foley President Filed: Effective: October 31, 2024 January 1, 2025Page 13 of 33
NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 31I Cancels M.D.P.U. No. 31H Page 2 of 4 EASTERN MASSACHUSETTS SOUTH SHORE, CAPE COD & MARTHA’s VINEYARD SERVICE AREA LARGE GENERAL SERVICE RATE G-3 RATE ADJUSTMENTS The charges for delivery service shall be subject to the following provisions: Revenue Decoupling Adjustment Mechanism Residential Assistance Adjustment Clause Attorney General Consultant Expense Storm Reserve Adjustment Mechanism Basic Service Cost Adjustment Transmission Service Cost Adjustment Renewable Energy Charge Performance Based Revenue Adjustment Vegetation Management Solar Massachusetts Renewable Target Grid Modernization Factor Provisional System Planning Factor Pension Adjustment Mechanism Net Metering Recovery Surcharge Long Term Renewable Contract Adjustment Storm Cost Recovery Adjustment Solar Program Cost Adjustment Transition Cost Adjustment Energy Efficiency Charge Solar Expansion Cost Recovery Mechanism Miscellaneous Charges 2017 Tax Act Credit Advanced Metering Infrastructure Electric Vehicle Program Factor PRIMARY METERING CREDIT When the Company meters electricity at primary voltage to a Customer taking primary voltage service, a discount of 2% will apply to the volumetric (per kWh) charges determined under all of the foregoing provisions of this rate schedule. TRANSFORMER OWNERSHIP ALLOWANCE If a Customer furnishes, installs, owns and maintains at his expense all the protective devices, transformers, and other equipment required, as specified by the Company upon request, the electricity so supplied will be metered by the Company at line voltage and the monthly demand charges will be reduced by $1.09 per kilovolt-ampere of demand when the nominal voltage is 13,200 volts or higher. TRANSMISSION BILLING ADJUSTMENT Customers taking service under this schedule may elect to be billed on the customer’s demand at the time of the ISO New England regional network monthly transmission system peak (the Coincident Peak Demand) for the legacy NSTAR Electric system. Customers must remain on the elected option for a minimum of 12 consecutive months. Issued by: Douglas W. Foley President Filed: Effective: October 31, 2024 January 1, 2025Page 14 of 33
NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 31I Cancels M.D.P.U. No. 31H Page 3 of 4 EASTERN MASSACHUSETTS SOUTH SHORE, CAPE COD & MARTHA’s VINEYARD SERVICE AREA LARGE GENERAL SERVICE RATE G-3 ADJUSTMENT FOR SERVICE AT TRANSMISSION VOLTAGE If a Customer is provided service at 69 kV or higher, and furnishes, owns and maintains all service transformers and associated equipment except metering, which shall measure transmission voltage, the Customer will not be billed the distribution demand and energy charge effective under this tariff. DETERMINATION OF BILLING DEMAND The demand for billing purposes shall be the highest 15-minute demand in kilovolt-amperes established during the Peak Load Period of the billing month as measured on a suitable meter or as determined by any other accepted method, at the option of the Company, but shall not be less than 35% of the maximum 15minute demand in kilovolt-amperes established during any billing period of the billing month. The Coincident Peak Demand shall be determined by meter, each calendar month and shall be the customer’s coincident 60-minute kilowatt demand. BILLING PERIODS Peak Load Period: During that portion of the year when eastern daylight savings time is in effect, the period beginning at 9:00 a.m. and ending at 6:00 p.m. on all weekdays, Monday through Friday. During that portion of the year when eastern standard time is in effect, the period beginning at 4:00 p.m. and ending at 9:00 p.m. on all weekdays, Monday through Friday. Low Load Period: All hours not included in the Peak Load Period. The Low Load Period shall be further divided into 2 separate time periods as follows: Low Load Period A: All hours not included in the Peak Load Period or Low Load Period B. Low Load Period B: During both eastern daylight savings time and eastern standard time, the period beginning at 10:00 p.m. and ending at 7:00 a.m. on all weekdays, Monday through Friday, and all hours on Saturday and Issued by: Douglas W. Foley President Filed: Effective: October 31, 2024 January 1, 2025Page 15 of 33
NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 31I Cancels M.D.P.U. No. 31H Page 4 of 4 EASTERN MASSACHUSETTS SOUTH SHORE, CAPE COD & MARTHA’s VINEYARD SERVICE AREA LARGE GENERAL SERVICE RATE G-3 Sunday. SPECIAL PROVISIONS A. When requested by the Company, the Customer agrees to furnish free of charge adequate accommodations upon its property for the installation of transformers and other apparatus necessary for the Company to furnish service, and to permit the construction of necessary transmission lines upon its property either overhead or underground as mutually agreed upon. B. The Company will provide service at approximately 575 volts to service locations existing prior to January 31, 1989. The Company reserves the right to refuse additional or increased loads at 575 volts. FARM DISCOUNT RIDER A Customer taking service under this rate may be eligible for the Company’s Farm Discount Rider, as in effect from time to time. TERMS OF PAYMENT Charges are net and are payable upon presentation of the Company's bill. TERM Service under this rate shall be for a minimum term of 12 consecutive months and shall continue thereafter until terminated on six months’ written notice by the Customer. Except for customers engaging in net metering, Customers served under this rate must provide the Company with six months’ prior written notice before installing or allowing to be installed for its use a non-emergency generator with a nameplate capacity greater than that in place on the Customer’s location as of May 1, 1995. Issued by: Douglas W. Foley President Filed: Effective: October 31, 2024 January 1, 2025Page 16 of 33
NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 42I Cancels M.D.P.U. No. 42H Page 1 of 4 WESTERN MASSACHUSETTS LARGE GENERAL SERVICE RATE G-3 APPLICABILITY This rate is applicable only to the entire use of electricity at a single location in the Western Massachusetts territory. All electricity shall be measured through a single time-of-use meter installed by the Company, except that, where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed, then the measurement of electricity may be by two or more meters. All electricity supplied shall be for the exclusive use of the customer and shall not be resold. With the approval of the Company, the customer may furnish electricity to persons or concerns who occupy space in the building to which service is supplied hereunder, but on the express condition that the customer shall not resell, make a specific charge for, or re-meter (or sub-meter) or measure or control the use of, any of the electricity so furnished. Customers whose maximum demand equaled or exceeded 350 kW but less than 2,500 kW at any time in the most recent 12 months and new customers whose demand is reasonably anticipated to equal or exceed 350 kW but less than 2,500 kW within one year must take service under this rate. RATE PER MONTH ON-PEAK: Weekdays from 12 Noon to 8 p.m., EST OFF-PEAK: All other hours Delivery Services: Customer Charge: Distribution: Transition: Transmission: As per M.D.P.U. No. 1 as in effect from time to time. As per M.D.P.U. No. 1 as in effect from time to time. As per M.D.P.U. No. 1 as in effect from time to time. As per M.D.P.U. No. 1 as in effect from time to time. The Customer Service Charge shall be based on the customer's two highest maximum demand months within the most recent 12 months (On- or Off-Peak). If in the most recent 12 months, the customer has; a) Issued by: two billing months with maximum kW demands over a higher demand threshold or, Douglas W. Foley President Filed: Effective: October 31, 2024 January 1, 2025Page 17 of 33
NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 42I Cancels M.D.P.U. No. 42H Page 2 of 4 WESTERN MASSACHUSETTS LARGE GENERAL SERVICE RATE G-3 b) one billing month with a maximum kW demand over a higher demand threshold by 5 percent or more of the higher demand threshold then, the Customer Service Charge will be that of the higher demand threshold. Supplier Services: (Optional) Basic Service: As in effect per Tariff RATE ADJUSTMENTS The charges for delivery service shall be subject to the following provisions: Revenue Decoupling Adjustment Mechanism Residential Assistance Adjustment Clause Attorney General Consultant Expense Storm Reserve Adjustment Mechanism Basic Service Cost Adjustment Transmission Service Cost Adjustment Renewable Energy Charge Performance Based Revenue Adjustment Vegetation Management Solar Massachusetts Renewable Target Grid Modernization Factor Provisional System Planning Factor Pension Adjustment Mechanism Net Metering Recovery Surcharge Long Term Renewable Contract Adjustment Storm Cost Recovery Adjustment Solar Program Cost Adjustment Transition Cost Adjustment Energy Efficiency Charge Solar Expansion Cost Recovery Mechanism Miscellaneous Charges 2017 Tax Act Credit Advanced Metering Infrastructure Electric Vehicle Program Factor MISCELLANEOUS CREDITS Transformer Ownership Credit: If the service transformers and associated equipment, except metering, are furnished by the customer, a credit shall be applied to the bill equal to $1.09 per kW Metering Credit: The Company may meter the electricity delivered to the customer on the higher voltage side of the service transformers, in which case the number of kWh so registered shall be reduced by two (2) percent. TRANSMISSION BILLING ADJUSTMENT Customers taking service under this schedule may elect to be billed on the customer’s demand at the time of the ISO New England regional network monthly transmission system peak (the Coincident Peak Issued by: Douglas W. Foley President Filed: Effective: October 31, 2024 January 1, 2025Page 18 of 33
NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 42I Cancels M.D.P.U. No. 42H Page 3 of 4 WESTERN MASSACHUSETTS LARGE GENERAL SERVICE RATE G-3 Demand) for the legacy Northeast Utilities system. Customers must remain on the elected option for a minimum of 12 consecutive months. ADJUSTMENT FOR SERVICE AT TRANSMISSION VOLTAGE If a Customer is provided service at 69 kV or higher, and furnishes, owns and maintains all service transformers and associated equipment except metering, which shall measure transmission voltage, the Customer will not be billed the distribution demand and energy charge effective under this tariff. DETERMINATION OF BILLING DEMAND The Demand shall be determined by meter, monthly, and shall be the highest 30-minute kilowatt registration during the month in the On-Peak hours determined to the nearest one-half kW. Measurement of demand will be on the basis of the Company's available metering. The Coincident Peak Demand shall be determined by meter, each calendar month and shall be the customer’s coincident 60-minute kilowatt demand. POWER FACTOR CORRECTION If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. MINIMUM MONTHLY CHARGE The minimum charge is the customer charge. TERMS The Company's Terms and Conditions in effect from time to time, where not inconsistent with any specific provisions hereof, are a part of this rate schedule. Issued by: Douglas W. Foley President Filed: Effective: October 31, 2024 January 1, 2025Page 19 of 33
NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 42I Cancels M.D.P.U. No. 42H Page 4 of 4 WESTERN MASSACHUSETTS LARGE GENERAL SERVICE RATE G-3 TERM OF CONTRACT Customers served under this rate must provide the Company with six months prior written notice before installing, or allowing to be installed for its use, a non-emergency generator with a nameplate capacity greater than that in place on the Customer's location as of March 1, 1998. Also, customers receiving service under this or superseding rate schedule may not change to another rate schedule within the first 12 months of the service. Issued by: Douglas W. Foley President Filed: Effective: October 31, 2024 January 1, 2025Page 20 of 33
M.D.P.U. No. 1591 Page 1 of 4 Canceling M.D.P.U. No. 1548 MASSACHUSETTS ELECTRIC COMPANY GENERAL SERVICE TIME-OF-USE - G-3 RETAIL DELIVERY SERVICE AVAILABILITY Electric delivery service under this rate is available for all purposes, including separately metered electric vehicle (“EV”) charging as defined below, subject to the provisions of this section. A new Customer will begin delivery service on this rate if the Company estimates that its average use will exceed 200 kW of Demand. A Customer may be transferred from rate G-3 at its request if the customer’s 12-month average monthly demand is less than 180 kW of Demand for 3 consecutive months. A Customer may be transferred from rate G-3 at the option of the Company if the Customer’s 12-month average monthly demand is less than 180 kW of Demand for 3 consecutive months. The actual delivery of service and the rendering of bills under this rate are contingent upon the installation of the necessary time-of-use metering equipment by the Company; subject to both the availability of such meters from the Company’s supplier and the conversion or installation procedures established by the Company. All Customers served on this rate must elect to take their total electric delivery service under the time-of-use metering installation as approved by the Company. If delivery is through more than one meter, except at the Company’s option, the Monthly Charge for service through each meter shall be computed separately under this rate. Customers receiving delivery service under this rate shall be charged the applicable charges contained in the Summary of Electric Service Rates Tariff as in effect from time to time. MONTHLY CHARGE The Monthly Charge will be the sum of the applicable Customer, Demand and Energy Charges. PEAK AND OFF-PEAK PERIODS Peak hours will be from 8:00 a.m. to 9:00 p.m. daily on Monday through Friday, excluding holidays. Off-Peak hours will be from 9:00 p.m. to 8:00 a.m. daily Monday through Friday, and all day on Saturdays, Sundays, and holidays. The Company reserves the right to change these peak and off-peak hours, but in no case will the off-peak hours be less than eleven hours per day. The holidays will be: New Year’s Day, President’s Day, Memorial Day, Independence Day, Columbus Day, Labor Day, Veteran’s Day, Thanksgiving Day and Christmas Day. All holidays will be the nationally observed day. DETERMINATION OF DEMAND The Demand for each month under ordinary load conditions shall be the greater of the following: a) The greatest fifteen-minute peak occurring during the Peak hours period within such a month as measured in kilowatts, or b) 90% of the greatest fifteen-minute peak occurring during the Peak hours period, of such month as measured in kilovolt-amperes. Issued: January 31, 2025 Issued by: Lisa Wieland President Effective: March 31, 2025
As listed on the current system
Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Eben Perkins [26-05-10]