  1. Page 24 of 33

    ELECTRIC DELIVERY RATE SCHEDULE CENTRAL MAINE POWER COMPANY Page 49.0 Original OPTIONAL TARGETED SERVICE RATE: B-CPT GENERAL SERVICE – COINCIDENT PEAK TRANSMISSION AVAILABILITY This Rate is available to all eligible customers meeting the availability and character of service criteria listed under one of the following general service rate schedules: MGS-P, MGS-S, MGS-P-TOU, MGS-S-TOU, IGS-PTOU, IGS-S-TOU, LGS-P-TOU, or LGS-S-TOU. Customers also must meet the eligibility criteria detailed below. ELIGIBILITY CRITERIA A. Except to the extent otherwise provided in the Company’s Electric Delivery Rate Schedule, any customer taking service under this Rate whose maximum monthly measured demand has not exceeded 20 kW in each of the preceding twelve months shall be transferred to the applicable Small General Service rate, effective with the next succeeding billing month. B. This Rate does not apply to customers taking short-term delivery service. DEMAND For customers with maximum measured non-coincident demands below 400 kW and taking service under a rate option that is not time-differentiated, the monthly non-coincident peak demand shall be the highest 15-minute integrated kW demand registered during the month as determined by the Company. _____________ Effective Date: July 1, 2023 Docket Nos. 2021-00325, 2022- (00039, 00152, 00160, 00341) and 2023- (00038, 00039) Peter Cohen Vice President– Regulatory
  2. Page 25 of 33

    ELECTRIC DELIVERY RATE SCHEDULE CENTRAL MAINE POWER COMPANY Page 49.1 Second Revision OPTIONAL TARGETED SERVICE RATE: B-CPT GENERAL SERVICE – COINCIDENT PEAK TRANSMISSION DEMAND (Continued) For customers taking service under time-differentiated rates, the monthly non-coincident peak demand for each period, on-peak year-round and off-peak during July and August, shall be the highest 15-minute integrated kW demand registered in each period during the month as determined by the Company. For all customers taking service under this Rate, the monthly coincident peak demand shall be the average kW demand registered during the hour of the Company’s monthly system peak during the calendar month. For customers with maximum measured non-coincident demands below 400 kW, the reactive demand will be determined for three phase service only and where the power factor of the customer’s load is determined by the Company to be less than 90% lagging. For customers with maximum measured non-coincident demands below 400 kW and taking service under a rate option that is not time-differentiated, the reactive demand shall be the highest 15-minute integrated kVar demand registered during the month. For customers with maximum measured demands below 400 kW and taking service under a time-differentiated rate option, the reactive demand shall be the highest 15-minute integrated kVar demand registered during any on-peak period during the month. For all other customers, the reactive demand shall be the highest 15-minute integrated kVar demand registered in any on-peak period during the month. ______________ Effective Date: July 1, 2025 Docket Nos. 2022-00152, 2025-00018, and 2025-00019 Peter Cohen Vice President– Regulatory
  3. Page 26 of 33

    ELECTRIC DELIVERY RATE SCHEDULE CENTRAL MAINE POWER COMPANY Page 49.2 Eighth Revision OPTIONAL TARGETED SERVICE RATE: B-CPT GENERAL SERVICE – COINCIDENT PEAK TRANSMISSION BASIC RATE PER MONTH Customer Eligible For Service Under MGS-P MGS-S Service Charge Single Phase Three Phase Demand Charges Non-Coincident Peak All Hours: July & August All Hours: Sept - June On-Peak: July & August Off-Peak: July & August On-Peak: Dec - Feb Off-Peak: Dec - Feb On-Peak: All Other Off-Peak: All Other Coincident Peak KWH Charges On-Peak: July & August On-Peak: Sept - June Off-Peak: July & August Off-Peak: Sept - June Reactive Demand Charge 320.61 428.24 189.87 209.29 4.93 /kW 4.67 /kW 6.39 /kW 6.05 /kW 24.50 /kW 0.011604 /kWh 1.06 /kVar 24.50 /kW 0.011604 /kWh 1.37 /kVar MGS-P-TOU MGS-S-TOU 405.74 477.25 328.20 292.91 12.43 /kW 0.66 /kW 1.76 /kW 0.00 /kW 1.54 /kW 0.00 /kW 24.50 /kW 13.28 /kW 0.73 /kW 2.33 /kW 0.00 /kW 1.83 /kW 0.00 /kW 24.50 /kW 0.011604 /kWh 0.011604 /kWh 0.011604 /kWh 0.011604 /kWh 3.77 /kVar 0.011604 /kWh 0.011604 /kWh 0.011604 /kWh 0.011604 /kWh 1.74 /kVar ______________ Effective Date: July 1, 2026 Docket Nos. 2026-00011 and 2025-00139 Peter Cohen Vice President– Regulatory
  4. Page 27 of 33

    ELECTRIC DELIVERY RATE SCHEDULE CENTRAL MAINE POWER COMPANY Page 49.3 Eighth Revision OPTIONAL TARGETED SERVICE RATE: B-CPT GENERAL SERVICE – COINCIDENT PEAK TRANSMISSION BASIC RATE PER MONTH (Continued) Customer Eligible For Service Under IGS-P-TOU IGS-S-TOU Service Charge Demand Charges Non-Coincident Peak All Hours: July & August All Hours: Sept - June On-Peak: July & August Off-Peak: July & August On-Peak: Dec - Feb Off-Peak: Dec - Feb On-Peak: All Other Off-Peak: All Other Coincident Peak KWH Charges On-Peak: July & August On-Peak: Sept - June Off-Peak: July & August Off-Peak: Sept - June Reactive Demand Charge LGS-P-TOU LGS-S-TOU 4,042.44 3,480.74 11,858.22 9,951.54 22.83 /kW 1.23 /kW 2.26 /kW 0.00 /kW 1.62 /kW 0.00 /kW 24.50 /kW 15.94 /kW 0.86 /kW 1.64 /kW 0.00 /kW 1.18 /kW 0.00 /kW 24.50 /kW 27.81 /kW 1.56 /kW 1.75 /kW 0.00 /kW 1.14 /kW 0.00 /kW 24.50 /kW 24.41 /kW 1.40 /kW 1.61 /kW 0.00 /kW 1.00 /kW 0.00 /kW 24.50 /kW 0.005270 /kWh 0.005270 /kWh 0.005270 /kWh 0.005270 /kWh 1.43 /kVar 0.005270 /kWh 0.005270 /kWh 0.005270 /kWh 0.005270 /kWh 1.58 /kVar 0.004367 /kWh 0.004367 /kWh 0.004367 /kWh 0.004367 /kWh 1.38 /kVar 0.004367 /kWh 0.004367 /kWh 0.004367 /kWh 0.004367 /kWh 2.07 /kVar The daily periods for weekdays (Monday through Friday, excluding holidays) shall be as follows: On-Peak: 5:00 p.m. to 9:00 p.m. Off-Peak: All Other Hours All Saturdays, Sundays, and holidays year-round shall be designated as off-peak. TRANSMISSION CHARGE The transmission charges in accordance with Subsection 44.1 of the Terms & Conditions are included in the above rates. _______________ Effective Date: July 1, 2026 Docket Nos. 2026-00011 and 2025-00139 Peter Cohen Vice President– Regulatory
  5. Page 28 of 33

    ELECTRIC DELIVERY RATE SCHEDULE CENTRAL MAINE POWER COMPANY Page 49.4 First Revision OPTIONAL TARGETED SERVICE RATE: B-CPT GENERAL SERVICE – COINCIDENT PEAK TRANSMISSION EFFICIENCY MAINE TRUST ASSESSMENT CHARGE The Efficiency Maine Trust assessment charges in accordance with Subsection 49.1 of the Terms & Conditions are included in the above rates. REACTIVE DEMAND CHARGE For customers with non-coincident demands less than or equal to 1,000 kW, the applicable reactive demand charge from the table above will be applied to reactive demand in excess of 50% of the monthly kW demand or, for time-differentiated options, the monthly on-peak kW demand. For customers with non-coincident demands greater than 1,000 kW, the applicable reactive demand charge from the table above will be applied to reactive demand in excess of 50% of the first 1,000 kW of monthly on-peak kW demand and 25% of all additional monthly on-peak kW demand. MINIMUM CHARGE The Service Charge, plus the Non-coincident Demand Charge, plus the Coincident Peak Demand Charge, plus the Reactive Demand Charge, per month. METERING If metering facilities are required for time-of-use service which are in addition to, or in substitution of, the standard facilities which the Company would normally install to provide regular service, they shall be provided by the Company and the customer will be subject to an additional monthly charge in accordance with Section 13 of the Terms & Conditions. CONTRACT 1. A contract shall be required for customers with loads of 2,000 kW or larger. 2. The contract shall specify the delivery point and voltage, phase characteristics, maximum available kVa capacity, billing criteria under the applicable rates(s), and any special conditions associated with the facilities providing the service. __________ Effective Date: July 1, 2025 Docket Nos. 2022-00152, 2025-00018, and 2025-00019 Peter Cohen Vice President– Regulatory
  6. Page 29 of 33

    NHPUC NO. 23 - ELECTRICITY DELIVERY LIBERTY UTILITIES Original Page 90 Rate G-1 Rate G-1 General Service Time-of-Use Rate Availability Retail Delivery Service under this rate is available for all purposes except resale, subject to the provisions of this section. The sale of electric vehicle charging services to a third party from an electric vehicle charging station shall not be considered resale of electricity. A Customer will take delivery service on this rate if the Company estimates that its average use will be greater than or equal to 200 kW of Demand. A Customer may be transferred from Rate G-1 at its request or at the option of the Company if the Customer’s 12 month average monthly demand is less than 180 kW of Demand for 3 consecutive months. If electricity is delivered through more than one meter, except at the Company’s option, the charge for electricity delivered through each meter shall be computed separately under this rate. If any electricity is delivered hereunder at a given location, then all electricity delivered by the Company at such location shall be furnished hereunder, except such electricity as may be delivered under the provisions of the Limited Commercial Space Heating Rate V. The actual delivery of service and the rendering of bills under this rate is contingent upon the installation of the necessary time-of-use metering equipment by the Company; subject to both the availability of such meters from the Company’s supplier and the conversion or installation procedures established by the Company. All Customers served on this rate must elect to take their total electric service under the time-ofuse metering installation as approved by the Company. If delivery is through more than one meter, except at the Company’s option, the Monthly Charge for service through each meter shall be computed separately under this rate. Character of Service Service supplied under this rate will be 60 cycle, three-phase alternating current normally at a nominal voltage of 120/208, 277/480, 2400, 4160, 4800, 7200, 13,200 and 13,800 volts. All voltages are not available in every area. Summary of Rates All rates associated with this rate schedule may be found in the Summary of Rates. Issued: May 8, 2025 Issued by: Effective: May 1, 2025 Title: /s/ Jeffrey Faber Jeffrey Faber Interim President Authorized by NHPUC Order No. 28,135 in Docket No. DE 23-039, dated April 24, 2025.
  7. Page 30 of 33

    NHPUC NO. 23 - ELECTRICITY DELIVERY LIBERTY UTILITIES Original Page 91 Rate G-1 – CPT Pilot CPT Pilot On the first of the month following sixty days after the effective date of this tariff, the Company shall test an alternative critical peak period rate design, on a pilot basis, with up to fifteen (15) Customers taking Delivery Service under Rate G-1 that elect Delivery Service under the Rate G1 CPT Pilot. This rate shall be optional to Customers and available through the conclusions of the Company’s next distribution rate proceeding. In the Company’s next distribution rate filing, the Company shall report on its findings, including Rate G-1 customer feedback and whether the rate design encouraged load reduction during the Critical Peak hours, and may propose modifications to the rates, as needed. CPT Distribution Demand Charges Peak Periods Critical Peak hours will be from 3:00 pm to 8:00 pm daily Monday through Friday, excluding holidays. Peak hours will be from 8:00 a.m. to 9:00 p.m. daily Monday through Friday excluding holidays. CPT Demand For the Critical Peak hours, the Demand for each month under ordinary load conditions shall be the greatest of the following: The greatest fifteen-minute peak during the Critical Peak hours which occurs during such month as measured in kilowatts, or 90% of the greatest fifteen-minute peak during the peak hours occurring during such month as measured in kilovolt-amperes where the Customer’s kilowatt Demand exceeds 75 kilowatts, or For the Peak hours, the Demand for each month under ordinary load conditions shall be the greatest of the following: The greatest fifteen-minute peak during the peak hours which occurs during such month as measured in kilowatts, 90% of the greatest fifteen-minute peak during the peak hours occurring during such month as measured in kilovolt-amperes where the Customer’s kilowatt Demand exceeds 75 kilowatts, or 80% of the greatest Demand as so determined above during the preceding eleven months. CPT Transmission Demand Charges A CPT Pilot Customer's monthly transmission demand charge shall be based on the Customer's average 60-minute demand registered during the monthly coincident peak load hour as initially reported and billed for Regional Network Service loads by ISO New England, Inc. at the end of each month. Issued: May 8, 2025 Issued by: Effective: May 1, 2025 Title: /s/ Jeffrey Faber Jeffrey Faber Interim President Authorized by NHPUC Order No. 28,135 in Docket No. DE 23-039, dated April 24, 2025.
  8. Page 31 of 33

    NHPUC NO. 23 - ELECTRICITY DELIVERY LIBERTY UTILITIES Original Page 92 Rate G-1 Distribution Energy Charges Peak Periods Peak hours will be from 8:00 a.m. to 9:00 p.m. daily on Monday through Friday excluding holidays. Off-Peak hours will be from 9:00 p.m. to 8:00 a.m. daily Monday through Friday, and all day on Saturdays, Sundays, and holidays. Demand The Demand for each month under ordinary load conditions shall be the greatest of the following: The greatest fifteen-minute peak during the peak hours which occurs during such month as measured in kilowatts, 90% of the greatest fifteen-minute peak during the peak hours occurring during such month as measured in kilovolt-amperes where the Customer’s kilowatt Demand exceeds 75 kilowatts, or 80% of the greatest Demand as so determined above during the preceding eleven months. Any Demands established during the eleven (11) months prior to the application of this rate shall be considered as having been established under this rate. Optional Determination of Demand However, a Customer who has been served hereunder for one year or more may upon written request have the Demand for each month, beginning with the next month after such request and running for a period of not less than two consecutive months, be based upon the greatest of items a) or b) above. In such case, the Demand Charge and the Energy Charge will be increased by 20% during such period. High Voltage Metering Adjustment The Company reserves the right to determine the metering installation. Where service is metered at the Company’s supply line voltage, in no case less than 2400 volts, thereby saving the Company transformer losses, a discount of 1% will be allowed from the amount determined under the preceding provisions. Credit for High Voltage Delivery If the Customer accepts delivery at the Company’s supply line voltage, not less than 2400 volts and the Company is saved the cost of installing any transformer and associated equipment, a credit of billing demand for such month shall be allowed against the amount determined under the preceding provisions. High Voltage Delivery Credit ($0.55) per kW Issued: May 8, 2025 Issued by: Effective: May 1, 2025 Title: /s/ Jeffrey Faber Jeffrey Faber Interim President Authorized by NHPUC Order No. 28,135 in Docket No. DE 23-039, dated April 24, 2025.
  9. Page 32 of 33

    NHPUC NO. 23 - ELECTRICITY DELIVERY LIBERTY UTILITIES Original Page 93 Rate G-2 Rate G-2 General Long Hour Service Availability Retail Delivery Service under this rate is available for all purposes except resale subject to the provisions of this section. The sale of electric vehicle charging services to a third party from an electric vehicle charging station shall not be considered resale of electricity. A Customer will take delivery service on this rate if the Company estimates that its average use will be greater than or equal to 20 kW of Demand but is less than 200 kW of Demand. If electricity is delivered through more than one meter, except at the Company’s option, the charge for electricity delivered through each meter shall be computed separately under this rate. A Customer may be transferred from Rate G-2 at its request or at the option of the Company if the Customer’s twelve (12) month average monthly demand is less than 18 kW of demand for three consecutive months. If any electricity is delivered hereunder at a given location, then all electricity delivered by the Company at such location shall be furnished hereunder, except such electricity as may be delivered under the provisions of the Limited Commercial Space Heating Rate V. Character of Service Service supplied under this rate will be 60 cycle, three-phase alternating current normally at a nominal voltage of 120/208, 277/480, 2400, 4160, 4800, 7200, 13,200 and 13,800 volts. All voltages are not available in every area. All rates associated with this rate schedule may be found in the Summary of Rates. Demand The Demand for each month under ordinary load conditions shall be the greatest of the following: The greatest fifteen-minute peak during the peak hours which occurs during such month as measured in kilowatts, 90% of the greatest fifteen-minute peak occurring during such month as measured in kilovolt-amperes where the Customer’s kilowatt Demand exceeds 75 kilowatts, or 80% of the greatest Demand as so determined above during the preceding eleven months. Any Demands established during the eleven months prior to the application of this rate shall be considered as having been established under this rate. Issued: May 8, 2025 Issued by: Effective: May 1, 2025 Title: /s/ Jeffrey Faber Jeffrey Faber Interim President Authorized by NHPUC Order No. 28,135 in Docket No. DE 23-039, dated April 24, 2025.
  10. Page 33 of 33

    NHPUC NO. 23 - ELECTRICITY DELIVERY LIBERTY UTILITIES Original Page 94 Rate G-2 Optional Determination of Demand However, a Customer who has been served hereunder for one year or more may upon written request have the Demand for each month, beginning with the next month after such request and running for a period of not less than two consecutive months, be based upon the greatest of items a) or b) above. In such case, the Demand Charge and the Energy Charge will be increased by 20% during such period. High Voltage Metering Adjustment The Company reserves the right to determine the metering installation. Where service is metered at the Company’s supply line voltage, in no case less than 2400 volts, thereby saving the Company transformer losses, a discount of 1% will be allowed from the amount determined under the preceding provisions. Credit for High Voltage Delivery If the Customer accepts delivery at the Company’s supply line voltage, not less than 2400 volts, and the Company is saved the cost of installing any transformer and associated equipment, a credit of the peak hours billing demand for such month shall be allowed against the amount determined under the preceding provisions. High Voltage Delivery Credit ($0.55) per kW Issued: May 8, 2025 Issued by: Effective: May 1, 2025 Title: /s/ Jeffrey Faber Jeffrey Faber Interim President Authorized by NHPUC Order No. 28,135 in Docket No. DE 23-039, dated April 24, 2025.
2 pages match

As listed on the current system

Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Eben Perkins [26-05-10]