The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 19 of 89 Non-eligible costs Subjectivity to revenue cap formula CT-Bar Cost of removal is not included15 Not subject to the X-Factor or total factor productivity study, nor the S-Factor, or the I-Factor Eversource’s Proposed F-Factor Cost of removal is included Same as CT-Bar 1 The most notable and impactful differences between the F-Factor and what was envisioned 2 in the RE01 PFD are: 1) the removal of all capital recovery from the revenue cap formula, 3 such that all capital is forecasted and recovered through a separate F-Factor, and 2) the 4 annual recovery of all incremental annual capital plant addition costs, including return on 5 capital investment and cost of removal, which would be reviewed for prudence annually 6 during the MRP term. 7 Under the CT-Bar, a portion of capital expenditures represented in the test year would be 8 subject to the Revenue Cap Formula, which would escalate subject to actual changes in 9 inflation (I-Factor) minus productivity (X-Factor) and customer dividend (S-Factor). The 10 CT-Bar would allow supplemental revenues equal to a certain rate year capital expense 11 (i.e., depreciation and taxes) to support incremental capital plant additions made by the 12 utility during the MRP term. Under the CT-Bar, the amount of incremental plant additions 13 for which supplemental revenue would be provided would be reduced to recognize revenue 14 already recovered as depreciation expense. Return on capital investment and cost of 15 removal would not be allowed for recovery until the subsequent general rate case, after a 15 PURA’s logic for not allowing the cost of removal is that it would be inconsistent with the decision to exclude carrying charges, neither of which would be appropriate until a prudency determination made in a subsequent rate case proceeding. See Docket No. 21-05-15RE01, Proposed Final Decision, p. 35.Page 22 of 91
The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 20 of 89 1 complete prudence review of all capital projects placed into service during the previous 2 MRP. 3 In contrast, with the Company’s F-Factor approach, all capital expense is forecasted. 4 Revenues would be set at the outset of the PBMRP to recover all forecasted capital plant 5 additions, including capital costs and cost of removal, and would be reconciled annually 6 based on actual plant additions deemed prudent. 7 These differences are significant in that they (i) almost completely eliminate the incentive 8 for cost-efficiency during the multi-year term, and (ii) create additional administrative 9 burden that multi-year rate plans are intended to reduce by requiring an annual prudence 10 review process. 11 12 Q. How does the Company’s proposed F-Factor weaken the incentive for costefficiency relative to best practice MRP design? 13 A. Relative to best practice MRP design, the Company’s proposed F-Factor would weaken 14 the strength of the cost containment incentive that is desired in a well-designed MRP in 15 several ways, including: 16 a. an incentive to inflate the capital forecast to minimize risk of overspend; 17 b. the annual reconciliation process creates an incentive to spend up to the F-Factor 18 19 20 allowance; c. proposal to review actual capital spending in excess of the approved F-Factor forecast;Page 23 of 91
The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 21 of 89 1 d. no incentive to substitute capex investments for operational solutions; 2 e. an incentive to capitalize operational expenses; and 3 f. allowing return on capital investment to be recovered prior to prudence review. 4 First, all planned capital costs would be reconciled if unspent. Reconciliation creates a 5 strong incentive for the utility to inflate its forecast at the start of the MRP term, and then 6 during the MRP to pursue all planned capital investments up to the forecasted amount. An 7 inflated forecast creates a buffer for the utility to operate within in later years to reduce the 8 likelihood of insufficient revenues to support capital additions, recognizing that no method 9 of predicting the future is accurate. Even if later information, subsequent analyses, or 10 technological developments occur that indicate that there are cheaper alternatives relative 11 to what was forecasted, the Company would not benefit from spending less than the 12 forecasted amount. As a result, the Company would derive no benefit from capital cost 13 efficiencies. In other words, the F-Factor perpetuates the capex-bias and gold-plating 14 incentive associated with traditional cost of service regulation. 15 The only incentive the Company has to be cost-disciplined in its capital investments during 16 the PBMRP results from the treatment of costs that exceed the forecasted amount. Because 17 the utility would be eligible to recover the lesser amount between either forecasted or actual 18 capital additions, the utility would have an incentive not to exceed the annual forecasted 19 capital addition amount. However, even this incentive is eroded by the Company’s 20 proposal that all capital additions in excess of the annual forecasted amount could be 21 deferred and considered for recovery in the subsequent rate case.Page 24 of 91
The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 22 of 89 1 Additionally, because OM&A would be subject to the indexed revenue cap, the Company 2 would have a strong incentive to identify operational cost-efficiencies. Accordingly, the 3 utility would be highly reticent to substitute a planned capital project with an operational 4 expense (e.g., a non-wires alternative project) because doing so would increase its 5 operational expense and decrease its potential earnings margin from any OM&A 6 efficiencies it had achieved. Moreover, such a substitution would also likely contribute to 7 a reconciliation of the F-Factor that would reduce the Company’s earnings in the form of 8 return on capital investment. 9 The recovery of all incremental capital plant through the F-Factor, and the separate 10 treatment of O&M subject to the revenue cap, would create a strong incentive for the 11 Company to capitalize operational expense. At worst, the partially externally-indexed 12 revenue cap formula could create incentives to reduce or double-recover O&M expenses. 13 Broadly speaking, implementation of capital projects would result in incremental increases 14 in revenue, whereas marginal O&M expenses would not do so to the same degree. 15 Finally, because the return on capital investment is included in the forecasted F-Factor 16 costs, the regulatory lag on return on capital investment – which would create a cost 17 containment incentive and be consistent with PURA’s decision on storm cost carrying 18 charges in Docket 25-12-13 – would be eliminated.16 The F-Factor approach would allow 16 In OCC’s Letter in Lieu of Exceptions in RE01, the OCC expressed a similar concern with the CT-Bar as outlined in PURA’s Proposed Final Decision. The OCC stated, “We have repeatedly expressed our concerns with the CT-Bar (and the K-Bar before it) for its lack of clear cost containment incentives. We recognize that the proposed lag on the cost of capital proposed in the PFD serves as the only cost containment element of the mechanism. As we have noted throughout this proceeding, we view regulatory lag as an appropriate tool to balance ratepayer and investor interestsPage 25 of 91
The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 23 of 89 1 return on capital investment to be recovered from ratepayers prior to a prudence review, 2 which is highly unorthodox. As noted by the OCC in RE01, “EDCs have no legal 3 entitlement to recover the return on capital additions before they enter service.” 17 The 4 Company’s proposal has the potential to set an undesirable precedent for allowing 5 unchecked cost recovery. 6 In contrast, best practice multiyear rate plans break the linkage between actual costs and 7 revenues during the stay-out period. Multiyear rate plans that are associated with the 8 strongest incentive for cost-discipline apply an externally indexed revenue cap (also known 9 as an attrition relief mechanism) to all costs, including capital and O&M.18 Capital costs 10 are not forecasted, and opportunities for supplemental capital recovery are limited and 11 determined on a case-by-case basis.19 12 13 14 Q. Please elaborate on your concern with the Company’s proposal that actual capital spending in excess of the forecasted amount approved in this proceeding be reviewed in a later rate case and prudency review process? 15 A. The F-Factor, as discussed above, creates an incentive for the utility to inflate its capital 16 forecast. In a scenario in which the actual capital costs associated with a project are likely 17 to be greater than the forecasted amount, this would create a strong incentive for the utility and to incentivize cost containment and prudent investment, and we view the structure of the CT-Bar in the PFD as an attempt to subject portions of capital recovery to regulatory lag in order to maintain that balance. Without it, there is risk that the CT-Bar could effectively be an approved general capital budget that will be filled to and above the maximum level with no inherent incentive to control costs in real time.” (see pages 6-7). We note that the F-actor approach is similarly subject to the same critique. 17 Docket No. 21-05-15RE01 OCC Letter in Lieu of Exceptions, page 7. 18 Gennelle Wilson, Melissa Whited, Courtney Lane, Ben Havumaki, and Cara Goldenberg, Fixing Multiyear Rate Plans: Building a Firm Foundation for Cost Control, RMI and Synapse Energy Economics, 2025. 19 This is consistent with OCC’s arguments and recommendations made in RE01.Page 26 of 91
The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 24 of 89 1 to seek out cost-effective alternatives to the planned capital investment. The absence of a 2 guarantee that the next rate case will provide an opportunity to recover excess costs is 3 necessary to motivate the utility to operate and invest in a cost-disciplined manner during 4 the multiyear rate plan. 5 However, if the utility is allowed an opportunity to defer costs incurred in excess of the 6 forecasted amount, as is proposed by the Company, it provides a pathway to double down 7 on capital investment rather than to look for cost-effective alternatives. The assurance that 8 costs in excess of the planned capital forecast can be deferred and reviewed for potential 9 recovery in the next rate case alleviates the pressure to be cost-disciplined during the 10 multiyear rate plan. 11 Moreover, the erosion of the cost containment incentive risks reducing any cost-saving 12 benefits that may otherwise accrue to customers through the annual downside-only 13 reconciliation process, in a scenario in which the Company underspends on plant additions 14 in a rate year relative to the forecast. 15 16 Q. How does the Company’s proposed F-Factor create additional administrative burden that multiyear rate plans are intended to reduce? 17 A. The Company's proposal to apply the partially externally-indexed revenue cap only to 18 O&M expense but not to capital projects would create complexity and need for regulatory 19 oversight regarding allocation of Company expenses (e.g., Company labor and direct and 20 indirect overheads) to supplemental recovery for capital projects.Page 27 of 91
The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 25 of 89 1 The F-Factor approach proposed by the Company requires an annual prudence review to 2 reconcile actual capital plant projects placed into service during the rate year, relative to 3 the authorized F-Factor forecast. 4 Typically, MRPs do not require annual prudence reviews because the linkage between 5 revenues and actual costs during the stayout period is temporarily broken. Prudence review 6 of capital investments that are recovered through the MRP, therefore, typically does not 7 occur until a subsequent rate case. An annual prudence review in the manner proposed by 8 the Company would reduce the efficiencies that a multiyear rate plan is intended to 9 produce. 10 11 12 Q. Please elaborate on the challenges related to capitalization of overheads that will make implementation and oversight of the F-Factor and annual prudence reviews more administratively burdensome? 13 A. Under the Company’s proposal, the typical allocation of Company labor and/or Company 14 general overheads in the capitalized costs of capital projects would become a critical 15 accounting consideration. Because the amount of Company labor and Company overhead 16 expenses booked to capitalized projects affects the amount of revenue allowed as part of 17 the F-Factor during the MRP term, it is important to carefully examine and review the 18 accounting details regarding how these Company expenses are booked to capitalized 19 projects. 20 This would require identification and standardization of related accounting 20 OCC-860.Page 28 of 91
The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 26 of 89 1 protocols and would require probative examination, complicating the implementation of 2 the annual PBR reconciliation reviews. 3 The Hawaii Commission’s experience provides an illustrative example of the implications 4 that warrant consideration. For example, during the review of capital projects for which 5 supplemental revenue (above the PBR revenue formula) is allowed, the Hawaii 6 Commission examined the practices for assigning general company overheads for 7 supplemental recovery and issued protocols limiting what types of overheads could be 8 included in recovered amounts.21 For instance, Company labor dedicated to a project would 9 be allowed, as well as direct overheads associated with the Company labor, but general 10 overheads would not be allowed. The Commission determined that only expenses that were 11 incurred due to the existence of the project were allowed; overheads that were for costs 12 that would be incurred regardless of the existence of the project were not allowed. This 13 matter was not anticipated in the Hawaii Commission’s PBR Framework Order but arose 14 during the annual review process that required substantial examination. 15 16 17 Q. What other differences do you observe between the treatment of capital as envisioned in the RE01 PFD and what the Company has proposed, and what concerns do they present? 18 A. In the RE01 PFD, the Authority established that the cut-off for plant-in-service and 19 accumulated depreciation for inclusion in base rates was the close of the evidentiary 21 Hawaii Public Utilities Commission, In the Matter of the Application of In the Matter of the Application of Maui Electric Company, LTD. For Approval to Commit Funds in excess of $2,500,000 (excluding customer contributions) for the Switchyard/Synchronous Condenser Project and to Recover Costs through the Exceptional Project Recovery Mechanism, Docket No. 2020-0167, Order No. 38279 (March 17, 2022).Page 29 of 91
The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 27 of 89 1 record.22 In contrast, the Company proposes to include forecasted capital additions through 2 the end of the Rate Year in going-in rates. The Company’s proposal to include forecasted 3 capital additions through the end of the Rate Year in going-in rates heightens the risk of 4 double recovery. As the Authority noted in the RE01 PFD, “Only plant that is both prudent 5 and used and useful as of the close of the evidentiary record is eligible for inclusion in the 6 EDC’s rate base,” while the incremental capital funding mechanism (i.e., CT-Bar) could 7 compensate the EDC for incremental plant entering service during the Rate Years of the 8 MRP.23 9 10 11 Q. Does the Company's proposal, including forecasted capital additions based on a Targeted System Performance plan etc., adequately address the goals that informed the development of an IDSP process in RE03? 12 A. No. We recommend the completion of a thorough and comprehensive IDSP process before 13 evaluating the PBMRP framework and the projected capital additions and forecasted capex 14 as proposed by the Company. The capital forecast is essential for understanding which 15 investments are actually necessary, which parties cannot adequately assess without a full 16 IDSP. To the extent there are investments that are appropriate to fund while an IDSP is in 17 development, we recommend that the Authority consider using a project-based capital 18 funding mechanism on a case-by-case basis. 22 Docket No. 21-05-15RE01, Proposed Final Decision, July 14, 2025 at p.15 Docket No. 21-05-15RE01, Proposed Final Decision, July 14, 2025 (Appendix A, page iii); see also, Docket No. 24-10-04, Decision dated March 3, 2026, p. 25-26 (“Specifically, a utility is permitted to include new plant additions, provided the company can demonstrate that (1) the plant is used and useful and (2) the costs were prudently incurred. Further, a utility is permitted to submit evidence to meet this evidentiary burden through the close of the record; however, projects first identified after the filing of the rate application may constitute an amendment to the application subject to Conn. Agencies Regs. § 16-1-58”). 23Page 30 of 91
The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 28 of 89 1 2 Q. How would you characterize the company’s TSP compared to the proposed IDSP document from the RE03 Proposed Final Decision issued in July 2026? 3 A. The IDSP planning process described in the RE03 PFD proposes a comprehensive planning 4 approach that accounts for emerging technology, policy goals, changing customer behavior 5 and load forecasts, and evolving system grid needs. 24 The Company’s submitted TSP 6 provides a narrower view of the grid and its solutions, does not account for uncertainty, 7 limits the information provided to stakeholders compared to an IDSP, and omits the longer- 8 term strategy often present in an IDSP. 25 Table D below summarizes how the content 9 submitted as a part of the TSP differs from the proposed content to be included in the IDSP. 10 Table D. Differences Between the TSP26 and an IDSP27 RE03 PFD IDSP Document Section Executive Summary Planning Policy 24 Proposed IDSP Content Identifies key points from each section of the document Discussion of relevant state and local goals and policies that inform grid planning, providing useful context for understanding subsequent IDSP sections. Content Provided in Company TSP Not applicable/included No state policies referenced in plan28 Docket No. 21-05-15RE03, Proposed Final Decision, July 17, 2026 (page 7). The Company notes in its response to OCC Interrogatory OCC-566 that the “TSP Plan aligns generally with the IDSP content, particularly in terms of the state of the system and investment plans to address current and projected needs, while also reflecting practical differences.” OCC characterizes the Company’s TSP based the assessment summarized in Table D. OCC-566 The Connecticut Light and Power Company d/b/a Eversource Energy, Docket No. 26-05-10, Response to OCC Interrogatory OCC-566, Sept. 22, 2026, p. 2. 26 Based on OCC-566 The Connecticut Light and Power Company d/b/a Eversource Energy, Docket No. 26-05-10, Response to OCC Interrogatory OCC-566, Sept. 22, 2026, pp. 2-3. 27 Docket No. 21-05-15RE03, Proposed Final Decision, July 17, 2026 at p.7 (Appendix A, page i) 28 In Exhibit CLP-TSP-2 (page 20-21), the Company references the evaluation of long-term policy objectives in its long-term demand assessment. However, no specific policy objectives are shared as a part of the TSP filings. 25
As listed on the current system
Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Gennelle Wilson and Oliver Tully [26-05-10]