The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 30 of 89 RE03 PFD IDSP Document Section Load Forecasting Grid Needs Assessment 33 Proposed IDSP Content Summarizes the utility forecasts for the distribution system. Proposed to include: Scenarios - three forecasts (low, middle/baseline, high) representing alternative technology adoption scenarios, each consisting of five prior years (including actual data and historical forecasts) and 10 forecast years. Forecasts will be reported at the system, planning region, substation, and feeder levels.33 Peak load charts: A line chart of peak load in MW for actual peak, 90/10 peak, and 50/50 peaks, for all three scenarios (low, middle/baseline, high). Historical EV and DER Adoption: Historical adoption of EVs, heat pumps, solar, and battery storage by feeder. Assessment of grid needs, including: Policy drivers Alignment with Non-Wires Solutions (NWS) process Steady-state analysis N-1 Contingency Analysis Reliability and Resiliency Analysis Hosting Capacity Analysis DER Interconnection Plan Content Provided in Company TSP Load forecast shared at the system level, inclusive of 10 prior years and 10 forecast years. However, there are no scenarios or other methodologies that account for forecast uncertainty. There are also no forecasts shared at the planning region, substation, or feeder level. Peak load charts are included for NWS (non-wires solutions) locations, but are not included for any other locations. Historical EV and DER adoption by feeder is also not included. Includes reliability and resiliency analysis, hosting capacity analysis, and alignment with NWS process. Does not include policy drivers, a comprehensive steady-state analysis, a comprehensive N-1 contingency analysis,34 or a comprehensive DER interconnection plan. Additionally, the RE03 PFD notes that DR, TOU, and social equity-focused incentive programs with quantifiable data that are already developed and in place or have already been designed but are not yet in place should be incorporated into the load forecasts. 34 Note that Eversource’s methodology indicates that they conducted a steady state analysis and an N-1 contingency analysis, but the results of the analysis were not shared as a part of the TSP.Page 33 of 91
The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 31 of 89 RE03 PFD IDSP Document Section Solutions Selection Process Capital Investment Plan Long-Term Strategic Plan Proposed IDSP Content Assessment of solutions to grid needs, including: Coordination with NWS Process Scenario-based least regrets analysis DER interconnection plan Standard project documentation (varied by cost tier) Cross-reference to capital investment plans Summary of capital investments, including: Summary table Explanatory narrative Individual project listing table appendix Supplemental filing with a financial analysis or standardized documentation Summary of the long-term strategic plan, including: Demand assessment (10-25 years) including a broad range of scenarios Explanatory narrative discussing assessment and potential solutions Summary of outcomes from longterm strategic plan working group Strategic narrative discussing company plan to achieve state’s clean energy objectives Content Provided in Company TSP Includes coordination with NWS process. Does not include scenario-based least regrets analysis of large investments, a comprehensive DER interconnection plan, or the standardized project documentation. Includes a summary table, explanatory narrative, and individual project listings. Does not include standardized project documentation that is coordinated with the solutions selection process. Not included in the TSP 1 2 Q. How do the differences you highlighted above limit the TSP’s efficacy in forecasting costs? 3 A. The proposed planning process in RE03 allows for iteration of utility forecasted costs 4 through stakeholder engagement and also provides stakeholders substantially more time to 5 review utility forecasts. It additionally proposes the creation of working groups to allowPage 34 of 91
The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 32 of 89 1 for data sharing, scenario input, and discussion of long-term strategy in utility planning. 2 Without a thorough stakeholder engagement process, it is difficult to determine whether 3 the utility is using best practices or is appropriately accounting for stakeholder needs in its 4 cost forecast. 5 The utility forecasts do not account for uncertainty nor do they provide granularity; without 6 this, it is difficult to evaluate the forecast’s sensitivity to certain inputs, assess the prudency 7 of the investments that have been included in the forecast, or determine whether there is 8 any flexibility on the timing of the investment if some spending needs to be prioritized. 9 Additionally, the IDSP includes both a 10-year forecast and a long-term (10-25 year) 10 forecast to demonstrate how the utility plans to modernize the grid and achieve state policy 11 goals in the long run. The TSP does not provide a long-term forecast, making it difficult to 12 determine whether the proposed expenditures will help benefit or reduce costs for 13 customers in the long run. 14 Unlike the IDSP, the TSP does not include an assessment of why the forecasted 15 investments are least-regrets solutions. Without this analysis, it is difficult to determine 16 what other investments were considered by the utility. 17 18 Q. How do these concerns with the Company’s TSP heighten the concerns of costcontainment identified above? 19 A. The F-Factor, particularly without the analytical grounding of an IDSP, increases the risk 20 that the Company’s capital addition forecast is inflated. As noted above, a higher capital 21 forecast will make it easier for the Company to gold plate its capital projects duringPage 35 of 91
The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 33 of 89 1 construction, both to minimize reconciliation and increase the Company’s earnings through 2 higher capital returns. 3 The Company’s proposal of a fully forecasted capital plan based on a partial analysis as 4 represented in the TSP creates an incentive for the Company to spend up to its allowable 5 amount, retaining the problem of capex bias that was a motivation behind the initiation of 6 the RE01-03 proceedings and the consideration of a performance-based regulation 7 framework. 8 9 10 Q. What additional concerns do you have with respect to removing capital plant addition recovery from the externally indexed attrition relief mechanism and basing it on a multi-year forecast? 11 A. Most enterprises (utility or otherwise) are only marginally successful at achieving projected 12 timelines for construction projects. 35 The Company is no exception. A PURA- 13 commissioned management audit found that the Company’s actual capital spending 14 differed from plan by more than 10 percent in three of the five years from 2017 to 2021, 15 including a 25.8 percent variance in 2018.36 It would be challenging for any entity to make 16 a four-year capital budget that will be implemented as planned with respect to timing and 17 cost. To emphasize this point further, we note that the Company’s forecasted capital 35 Research finds that only 8.5 percent of more than 16,000 projects worldwide met their original cost and schedule estimates. (Bent Flyvbjerg and Dan Gardner, How Big Things Get Done, Penguin Random House, 2023, page 8). Another analysis finds that 75 percent of surveyed US and Canadian project owners reported late projects, which averaged 69 days behind original estimates. International Data Corporation, “Owners at the Leading Edge”, 2021, page 6. https://assets.ctfassets.net/8pep15rt0kef/6mowOFymkHpBeyXMXhX3m1/4deff7dc768666168864496602a8f212/20 21OwnersSurvey. 36 Exhibit CLP-ELP-4, FTI Consulting, Management Audit of Eversource Energy's Connecticut Companies (Feb. 11, 2025), page 205, Figure 2-24.Page 36 of 91
The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 34 of 89 1 expenditure in this proceeding represents a 49% increase over average historical capital 2 expenditure from 2017-2025 – which, presumably, will require a requisite increase in 3 utility capacity to manage and oversee.37 4 Moreover, given the rapid change in capabilities that are unlocked via technological 5 advancement and learnings from implementation, the plans made by a utility today cannot 6 reflect the potential changes to least-cost solutions, nor the changes in priorities for some 7 major components of the capital plan. Removing capital plant additions from the revenue 8 cap formula effectively solidifies a plan as appropriate, without a complementary incentive 9 to alter the plan as circumstances – costs and otherwise – evolve over time. 10 Finally, the differentiation between those capital costs that are included in going-in rates 11 as depreciation expenses, and those that are recovered via the F-Factor, is unclear. The bulk 12 of the itemized capital needs in the Company’s proposal are for assets and (largely) asset 13 replacement programs, such as building inventories of materials for preparedness.38 We are 14 concerned that the Company proposal does not recognize that some capital additions would 15 already be covered by what is provided in base rates. Such programs should be included in 16 existing going-in rates by way of being in accumulated rate base (and resulting depreciation 17 expense) for prior-year ongoing implementation. Our rationale for such treatment is that 18 these do not seem to be, for the most part, new programs, but are the types of infrastructure 19 replacement 37 38 to be OCC-424 Exhibit CLP-ELP-1, page 66–70 expected as constant addressing backlogs of deferredPage 37 of 91
The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 35 of 89 1 maintenance. However, from the Company’s application, it is not clear that the revenues 2 already included in going-in rates for such programs would be properly recognized. 3 For the sake of consideration, even the CT-Bar – which OCC did not and does not support 4 because of its failure to create adequate cost containment incentives – would more 5 appropriately recognize the recovery of such infrastructure replacement programs.39 The 6 CT-Bar was designed to deduct depreciation expense already included in going-in rates 7 from plant additions eligible for supplemental recovery. 8 9 10 11 Q. The X-Factor in the partially externally-indexed revenue cap is based on a TFP study conducted by Eversource’s consultant, London Economics International . To what extent did the Company and its consultant follow the guidance established in RE01 regarding the process for conducting a TFP study? 12 A. The Authority has established detailed guidance in RE01 intended to make a TFP study 13 transparent, reproducible, and subject to meaningful review by the Authority and 14 intervenors.40 However, the Company and its consultant, London Economics International 15 (“LEI”), did not follow key parts of this guidance. Instead of providing an open, 16 reproducible, and iterative productivity analysis, the Company and LEI relied in part on 17 confidential data and on code that parties could not run as provided; 41 declined to run 18 several alternative scenarios that OCC requested in discovery;42 based the proposed X- 39 Docket No. 21-05-15RE01, OCC Letter in Lieu of Written Exceptions (August 15, 2025), page 2; see also Docket No. 21-05-15RE01, OCC Written Comments in Response to the Revised Straw Proposal (March 26, 2025), page 12– 14. 40 Docket No. 21-05-15RE01, Proposed Final Decision, July 14, 2025 (page 24). 41 Docket No. 26-05-10, Ruling on Motion No. 10, August 3, 2026, p. 3; Docket No. 26-05-10, Exhibit CLP-PBR-3B, July 14, 2026, p. 5. 42 Docket No. 26-05-10, Company Response to OCC-538, September 15, 2026.Page 38 of 91
The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 36 of 89 1 Factor on a single output measure, customer count; 43 and offered parties no working 2 sessions to review the study with LEI. In detail, the Company’s filing falls short of these 3 directives across several44 critical dimensions. 4 First, the Company and LEI met RE01’s data-sharing guidance only in part. The Authority 5 guidance in RE01 PFD requires that all TFP study data be provided and run on an open- 6 source platform, with the code made available.45 They serve a practical purpose. The X- 7 Factor affects how much OM&A revenues can grow in each year of the PBMRP, yet the 8 Company and its consultants control the underlying data, model, and analytical choices. 9 Transparent data and models that parties can run help level the playing field and allow the 10 Authority and parties to test other reasonable assumptions. This lets the Authority see how 11 much the result depends on those choices, instead of relying on a single estimate prepared 12 by the Company. However, LEI and the Company employed a proprietary TFP and 13 benchmarking model, some of the data for which was obtained from a confidential third- 14 party database.46 The underlying data was granted protected treatment by the Authority.47 15 As a result, testing model assumptions in the collaborative approach envisioned in RE01 16 was not possible. 43 Docket No. 26-05-10, Company Response to AMTRAK-010, September 22, 2026. To our knowledge, neither the Company nor LEI offered parties a technical session or working meeting on the study in this proceeding. Parties could review the study only through the filed exhibits, the protected workpapers, and written discovery. 45 Docket No. 21-05-15RE01, Proposed Final Decision, July 14, 2025, (page 22) 46 Docket No. 26-05-10, Motion No 10. for Protective Order and LEI Affidavit, Attachment C, July 15, 2026 (page 2) 47 Docket No. 26-05-10, Motion No 10. Ruling for Docket 26-05-10, August 3, 2026 (page 3) 44Page 39 of 91
The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 37 of 89 1 Second, the plain-language documentation and open-model requirements were also not met. 2 LEI’s pre-filings do describe the index method and several major assumptions. 48 That 3 description is useful, but it is not a substitute for a data dictionary, complete metadata, 4 source-to-model transformation records, executable formulas, and code. The code that LEI 5 did provide does not meet the open-model requirement either. LEI provided code for its 6 econometric benchmarking models written in a commercial software rather than an open- 7 source platform. Parties without this commercial software license cannot run the code. In 8 addition, the code relies on the commercial software's data file that was not provided in its 9 native format, so even parties with the commercial software cannot run the code as 10 provided and reproduce LEI's results.49Third, the alternative-scenario requirement was not 11 meaningfully met. The Authority specifically mandated that parties have the opportunity 12 to request alternative sensitivities. However, when OCC submitted a discovery request that 13 LEI provide the results of a sensitivity analysis isolating the highly anomalous 2019–2020 14 period, LEI declined. 50 LEI argued that removing individual years would introduce 15 "selection bias."51 We are not recommending permanently excluding these observations 16 from the regulatory record, but are instead recognizing that testing the model's sensitivity 17 to an unusually volatile macroeconomic period provides important information regarding 18 the stability of the proposed productivity factor. LEI’s decision not to conduct the standard 48 Docket No. 26-05-10, Exhibit CLP-PBR-1, July 14, 2026 Docket No. 26-05-10, Exhibit CLP-PBR-3B (page 5), July 14, 2026 50 Docket No. 26-05-10, OCC Interrogatories Set 9, August 20, 2026 51 Docket No. 26-05-10, OCC-445, September 03, 2026 49Page 40 of 91
The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 38 of 89 1 econometric stress testing has prevented parties from better understanding the stability of 2 the results. 3 Fourth, LEI uses incomplete output metrics. In the RE01 PFD, the Authority required TFP 4 study outputs to be measured in customer count, delivered energy, and peak demand.52 5 However, LEI’s study evaluated output solely on customer count, omitting delivered 6 energy and peak demand; we were unable to find the evaluation of these other measures 7 within the filed working papers.53 LEI acknowledged that sales was the only alternative 8 output measure it evaluated, and that it "did not separately evaluate peak demand" because 9 it is “impossible to get high quality data.” 54 This omission inherently skews the 10 productivity evaluation by ignoring the efficiency gains required to serve higher peak loads 11 or throughput without necessarily adding new customers. 12 Finally, the RE01 PFD states that any TFP study “should employ reasonably accessible 13 techniques and methodologies.” 55 In our view, a study meets the standard when the 14 Authority and parties can follow how the inputs lead to the result and can test how much 15 the result depends on key choices. (A breakdown of the PFD’s expectations compared to 16 the Company’s submission appears in Table B). LEI selected the index method in part 17 because it considered the approach relatively straightforward and easy to explain to a 52 Docket No. 21-05-15RE01, Proposed Final Decision, July 14, 2025 (page 22). Docket No. 26-05-10, Exhibit CLP-PBR-2A, Exhibit CLP-PBR-3A, and Exhibit CLP-PBR-3B, July 14, 2026 54 Docket No. 26-05-10, AMTRAK-010_Final, September 22, 2026 55 Docket No. 21-05-15RE01, Proposed Final Decision, July 14, 2025 (page vii). 53Page 41 of 91
The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 39 of 89 1 diverse audience.56 However, the relative simplicity of the methodology does not, by itself, 2 make LEI’s application of that methodology reasonably accessible for independent review 3 as contemplated by RE01. The test is whether the Authority and intervenors can recreate 4 the result, alter assumptions, inspect intermediate calculations, and evaluate the 5 consequences. The record available to parties did not permit that level of review. 6 Table E below summarizes these issues, contrasting the Authority's original guidance in 7 RE01 with LEI's actual execution: 8 Table E. Comparison of Eversource's TFP Study Process to PURA Guidance from RE01 Guidance included in RE01 PFD57 Did the Company or its consultants comply with this guidance? All TFP Study data should be provided to PURA and other parties and intervenors (under a non-disclosure agreement, if appropriate). Partially. The Company provided Excel workpapers under protected treatment, but we note some inconsistencies between the Excel workpapers, which do not fully match the PDF workpapers, and some data in the PDF workpapers is incomplete. All TFP data, meta-data, and assumptions should be described in plain language. No. LEI did not provide a complete plain-language description. Without this, parties could not understand how data was structured, assess modeling assumptions, or determine how those choices affected LEI’s results. All models should be run on an open-source platform with the code provided to PURA and other parties and intervenors (i.e., if using Excel or R, all formulas or code must be distributed to all stakeholders). No. LEI provided code for its econometric benchmarking models, but that code was written in a commercial software rather than an open-source platform. The code also relies on a data file that was not provided in its native format, so it cannot be run as provided. 56 57 Docket No. 26-05-10, Exhibit CLP-PBR-1, July 14, 2026 (page 25). Docket No. 21-05-15RE01, Proposed Final Decision, July 14, 2025