Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Prefiled testimony

Witness: Gennelle Wilson and Oliver Tully

Files1

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting
2 pages match
  1. Page 72 of 91

    The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 70 of 89 1 per Customer, and Capital Expense per Line Mile. The Company acknowledges that only 2 the two capital-expense measures are the same as measures identified in the RE02 PFD, 3 while the two Core Operating Expense measures are modified versions of RE02’s 4 Controllable Opex measures. 98 The RE02 PFD, by contrast, includes a broader Cost 5 Efficiency Scorecard with six sub-metrics covering operating expenditures, controllable 6 Opex, authorized controllable Opex, capital expenditures, capital cost, and total cost, which 7 PURA found would allow stakeholders to evaluate both overall utility costs and individual 8 cost drivers. 99 Similarly, the Company proposes to report Non-Hardship Receivables 9 Greater than 60 Days as a standalone metric, while the RE02 PFD includes accounts 10 receivable over 60 days as one of five sub-metrics within a broader Accounts Receivable 11 and Uncollectibles Scorecard. The Company explains that it selected the 60-day measure 12 because it provides a more timely indicator of delinquency and excludes hardship accounts 13 because collection outcomes for those customers are heavily influenced by legislative and 14 regulatory protections.100 The RE02 PFD instead uses the broader Scorecard to provide 15 visibility into arrears, accounts receivable, write-offs, and uncollectibles, and specifically 16 found that the 60-day measure provides useful insight when considered within that broader 17 framework.101 98 The Connecticut Light and Power Company d/b/a Eversource Energy, Docket No. 26-05-10, Response to OCC Interrogatory OCC-440, Sept. 11, 2026, pages 3–4. 99 RE02 PFD, pages 16–17. 100 The Connecticut Light and Power Company d/b/a Eversource Energy, Docket No. 26-05-10, Response to OCC Interrogatory OCC-533, Sept. 15, 2026, page 1. 101 RE02 PFD, pages 99–100.
  2. Page 73 of 91

    The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 71 of 89 1 We recommend that the full suite of Metrics and Scorecards identified in the RE02 PFD 2 serve as the baseline reporting framework in this proceeding. Where the Company proposes 3 to omit or materially modify a measure, that departure should be clearly explained and 4 justified based on the purpose and informational value of the measure before PURA adopts 5 any modification. 6 7 Q. What is your recommendation regarding the Cost Efficiency Scorecard developed in the RE02 PFD? 8 A. We recommend that the Authority require Eversource to implement the Cost Efficiency 9 Scorecard outlined in the RE02 PFD. The Company proposes four individual cost- 10 efficiency reporting measures: Core Operating Expense per Customer, Core Operating 11 Expense per Line Mile, Capital Expense per Customer, and Capital Expense per Line Mile. 12 The Company acknowledges that only the two capital-expense measures are the same as 13 measures identified in the RE02 PFD, while its Core Operating Expense measures modify 14 the RE02 approach.102 15 The RE02 PFD instead developed a broader Cost Efficiency Scorecard comprising six sub- 16 metrics covering operating expenditures, controllable operating expenditures, authorized 17 controllable operating expenditures, capital expenditures, capital cost, and total cost. 102 The Connecticut Light and Power Company d/b/a Eversource Energy, Docket No. 26-05-10, Response to OCC Interrogatory OCC-440, Sept. 11, 2026, pages 3–4.
  3. Page 74 of 91

    The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 72 of 89 1 PURA found that considering these measures together would allow stakeholders to assess 2 both overall utility costs and individual cost drivers over time.103 3 That broader view is particularly important given the cost-containment concerns discussed 4 elsewhere in this testimony and the testimony of OCC’s capital witness, Nikhil Balakumar. 5 Looking only at selected operating and capital spending measures may not provide 6 sufficient visibility into whether the Company is improving overall cost efficiency or 7 shifting costs among categories. 8 We recommend that the Authority include the Cost Efficiency Scorecard as part of 9 Eversource’s Performance Evaluation System, rather than replacing it with the Company’s 10 narrower set of individual reporting measures. 11 12 Q. How could the Performance Evaluation System support greater accountability for management efficiency? 13 A. The limitations of the management audit discussed above reinforce the value of developing 14 transparent measures of management efficiency over time. Other jurisdictions provide 15 examples of regulators using performance information not only to assess utility costs and 16 operations, but also to inform financial incentives and consequences. 17 In Iowa, the Utilities Commission evaluates management efficiency using factors including 18 operating and maintenance costs, service quality, officer compensation, bad debt, and 19 management practices that improve service or control costs. If the Commission finds that 103 RE02 PFD, pages 16–17.
  4. Page 75 of 91

    The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 73 of 89 1 a utility is operating inefficiently, it may reduce the utility’s profit or adjust its revenue 2 requirement; extraordinarily efficient management that produces tangible ratepayer 3 benefits may support an upward adjustment.104 4 New York is taking a different but related approach. Beginning in 2027, utilities must 5 report an annual affordability index measuring residential energy burden. The New York 6 Public Service Commission is also required to develop performance-based targets tying 7 CEO and senior-management compensation and ratepayer-funded incentive compensation 8 to the affordability index, and to consider adjustments to utility return on equity based on 9 that metric, excluding factors outside the utility’s control.105 10 These examples illustrate how reporting and benchmarking can establish a performance 11 record that may later inform stronger financial incentives or consequences. We recommend 12 that the Authority begin by developing a Management Efficiency reporting Metric, 13 potentially in coordination with the RE02 PFD Cost Efficiency Scorecard. The Metric 14 could track implementation of management-audit recommendations, identified and 15 realized customer savings from those recommendations and other efficiency initiatives, 16 and peer-benchmarked measures of management efficiency. 17 We recommend that the Authority develop such a reporting Metric initially and use the 18 resulting performance data to evaluate over time whether particular measures warrant 104 105 Iowa Code § 476.52; Iowa Admin. Code r. 199-29.3, 29.4 N.Y. Pub. Serv. Law §§ 66(12)(n), 66-x.
  5. Page 76 of 91

    The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 74 of 89 1 elevation to a Scorecard or PIM, or could appropriately inform executive compensation, 2 utility earnings, or other financial incentives or consequences. 3 4 Q. What is your response to the Company’s position that performance measures should focus on outcomes within the Company’s control? 5 A. The Company states in this proceeding that its proposed Metrics seek to avoid “inclusion 6 of metrics for conduct or outcomes that are beyond the Company’s control” and argues that 7 PIMs should be limited to actions within its control.106 It relies on this rationale in opposing 8 or omitting several measures, including the Peak Demand Scorecard, Beneficial 9 Electrification Metric, Power Restoration After Major Storms Metric, and Environmental 10 Justice Reliability Metric. 11 That position does not account for the different purposes of PIMs, Scorecards, and Metrics. 12 The RE02 Design Principles impose a control requirement only on potential PIMs. Design 13 Principle #7 provides that a potential PIM should include performance under the EDC’s 14 “indirect or direct control.” That Design Principle does not apply to Metrics or 15 Scorecards.107 16 The RE02 PFD expressly applies this distinction. For the Environmental Justice Reliability 17 Metric, PURA recognized that storm patterns and other external factors may influence 18 reliability outcomes, but concluded that “direct or indirect utility control is not a 19 prerequisite for the mere reporting of information in the PBR Performance Evaluation 106 The Connecticut Light and Power Company d/b/a Eversource Energy, Docket No. 26-05-10, Response to OCC Interrogatory OCC-439, Sept. 11, 2026, pages 2–3. 107 RE02 PFD, pages 10–11.
  6. Page 77 of 91

    The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 75 of 89 1 System.” The Authority found that the data would still provide visibility into localized 2 outcomes and could inform future planning and engagement strategies.108 3 PURA reached the same conclusion for Scorecards. In discussing the Equitable AMI 4 Scorecard, the Authority acknowledged that customer participation in AMI-dependent 5 offerings may be influenced by factors outside an EDC’s control, but stated that “EDC 6 direct or indirect control is not among the design principles for a Scorecard.” The Authority 7 further noted that the EDCs can influence the ease and accessibility of customer 8 participation.109 9 Even for PIMs, RE02 does not require exclusive or direct control. Design Principle #7 10 expressly includes both direct and indirect control. The EDCs proposed instead that PIMs 11 be limited to activities over which they have “direct or substantial control.” PURA declined 12 to adopt that formulation, finding the proposed alternative overly subjective and potentially 13 likely to create future disputes over the definition of “substantial control.” The Authority 14 therefore retained the existing direct-or-indirect-control standard.110 15 Accordingly, we recommend that the Authority not permit the Company to exclude RE02 16 Metrics or Scorecards solely because the underlying outcome is not exclusively within the 17 Company’s control. Those measures should remain part of Eversource’s Performance 108 RE02 PFD, page 59. RE02 PFD, page 52. 110 RE02 PFD, page 10 n. 19. 109
  7. Page 78 of 91

    The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 76 of 89 1 Evaluation System where they continue to provide value for transparency, benchmarking, 2 and evaluation. 3 4 Q. What recommendations do you have regarding public accessibility of the Performance Evaluation System? 5 A. An important objective of the Performance Evaluation System is to improve transparency 6 into utility performance and provide information that can inform future regulatory 7 decisions. As discussed above, Metrics and Scorecards serve an important role in tracking 8 performance, identifying trends, and evaluating outcomes, even where they are not tied to 9 financial incentives. However, realizing those benefits also requires that the reported 10 information be readily accessible and understandable to stakeholders and the public. 11 The RE02 PFD recognizes this need and envisions a publicly accessible PBR Dashboard 12 that presents Metrics, Scorecards, and PIMs in a clear, visually accessible format, with 13 explanatory information to support interpretation. OCC has supported this approach 14 throughout RE02, emphasizing the importance of a user-friendly dashboard that allows 15 stakeholders to meaningfully engage with utility performance data. OCC also identified 16 Hawaiian Electric's PBR dashboard as a potential model.111 17 A centralized dashboard would allow customers, advocates, and other stakeholders to more 18 easily evaluate utility performance over time and against relevant benchmarks, without 19 having to compile information from multiple regulatory filings. It could also help identify 111 RE02 PFD, pages 104–105.
  8. Page 79 of 91

    The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 77 of 89 1 areas where performance is improving or deteriorating and support more informed 2 participation in future regulatory proceedings. 3 The RE02 PFD further proposes that PURA develop and maintain the dashboard, while 4 EDCs remain responsible for submitting complete and timely performance data and 5 accompanying explanatory narratives. 112 We support this division of responsibilities, 6 which would provide for a centralized presentation of utility performance while 7 maintaining the Company's reporting obligations. 8 We recommend that the Authority carry forward the publicly accessible PBR Dashboard 9 envisioned in the RE02 PFD as part of implementing the Performance Evaluation System. 10 The dashboard should present all adopted Metrics, Scorecards, and PIMs, including 11 relevant historical trends and benchmarks, in a format that is accessible and understandable 12 to the public. We further recommend that the Authority solicit stakeholder input on the 13 dashboard's design and use cases, consistent with the approach outlined in the RE02 PFD. 112 RE02 PFD, page 105.
  9. Page 80 of 91

    The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 78 of 89 1 V. STORM COST RECOVERY 2 Q. What is the purpose of this section? 3 A. The purpose of this section is to identify the potential risks to ratepayers associated with 4 the Company’s proposed changes to the storm cost recovery framework due to lack of cost 5 containment incentives, respond in a preliminary manner to the Authority’s alternative 6 framework and menu of alternative ideas as described in Attachment 1 to the Notice for 7 Technical Meeting on November 2nd, and to outline additional ideas and considerations for 8 the Authority and other parties’ consideration in the workshop and throughout the 9 proceeding. Final positions of this panel may also shift as a result of the input in the 10 Technical Meeting. 11 12 Q. Summarize the changes that the Company proposes to the cost recovery framework for storm costs relative to the pre-existing framework? 13 A. The Company proposes several changes to the recovery of storm costs in base rates, as well 14 as the recovery of storm costs that exceed the reserves funded through base rate 15 contributions. For ease of reference, we summarize here the primary differences between 16 the business-as-usual approach (i.e. the existing framework) that are most relevant for the 17 concerns we highlight in later questions: 18 a. Eligibility criteria for what constitutes a catastrophic storm: The Company 19 proposes to increase the catastrophic storm cost threshold from $4 million per event 20 to $5.4 million per event. 113 113 Exhibit CLP-ELP-1, p. 121.
  10. Page 81 of 91

    The Office of Consumer Counsel Docket No. 26-05-10 Direct Testimony of Gennelle Wilson and Oliver Tully October 21, 2026 Page 79 of 89 1 b. Funding mechanism – base rate reserves: First, the Company proposes to 2 “establish the customer contribution to the catastrophic storm reserve in base rates 3 at $60 million per year.”114 Second, the Company proposes to ”establish a level of 4 pre-staging reserve funding in base rates at $4 million per year.”115 5 c. Funding mechanism for and prudence review of storm costs in excess of base 6 rate reserves (referred to as “excess storm costs”): The Company proposes to 7 increase the frequency of prudence reviews for excess storm costs from rate cases 8 or other irregular intervals to occur in an annual Storm Cost Recovery Adjustment 9 Factor (“SCRAF”) proceeding.116 10 d. Carrying Charges on excess storm costs: The Company proposes to alter the 11 current framework and apply carrying charges from the date of cost occurrence on 12 the net balance of catastrophic storm and prestaging storm funds for storms after 13 March 2025 (i.e., carrying charges would be incurred prior to prudence 14 determination), whereas previously, carrying charges were allowed only on a 15 prospective basis (i.e., after a prudence determination). 16 17 Q. What are your concerns with the Company’s proposed changes to the cost recovery framework for storm costs? 18 A. When looked at as a whole, the Company’s proposal works in favor of the Company and 19 against ratepayers by creating a weak and limited incentive for the Company to be cost 114 Id. Id. 116 Id. 115

As listed on the current system

Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Gennelle Wilson and Oliver Tully [26-05-10]

This filing on the current system (opens in a new tab)