    James R. Dauphinais Page 8 1 C. Discretionary Qualification Criteria and Conditions 2 Q PLEASE DESCRIBE THE QUALIFICATION REQUIREMENTS OF CL&P’S 3 4 PROPOSED EDR. A Under Qualification 1, a customer must be: (A) an existing or proposed new tax-exempt 5 manufacturing plant; (B) an existing or proposed new customer located in an Enterprise 6 Zone; or (C) a non-tax-exempt facility that has an Incremental Load of 500 kW or more 7 and “provides added value to the Company’s service territory, as determined by the 8 Company.” In addition, the customer must either: (2) obtain economic development 9 funds or loan guarantees from specified state agencies; or (3) “[d]emonstrate to the 10 satisfaction of the Company that concessions provided by this Rider, either alone or in 11 conjunction with concessions from others provide a significant incentive to cause the 12 Customer to add the Incremental Load in the Company’s service area.”18 13 Q WHAT ARE YOUR CONCERNS WITH THESE REQUIREMENTS? 14 A Qualification 1(C) and Qualification 3 leave a customer’s eligibility to CL&P’s discretion 15 without any stated criteria. The proposed tariff does not define “added value” or explain 16 how CL&P will determine whether a project provides it. 17 information a customer would need to provide to demonstrate a “significant incentive” 18 to CL&P’s satisfaction. A customer evaluating whether to expand or locate in CL&P’s 19 service territory would therefore have no reasonable way to know in advance whether 20 it would qualify for the EDR. This uncertainty undermines the ability of the EDR to 21 influence siting and expansion decisions. It also creates the potential for similarly 22 situated customers to be treated differently. 18 Exhibit CLP-RATES-3 at 436. BRUBAKER & ASSOCIATES, INC. Nor does it identify the
  2. Page 11 of 42

    James R. Dauphinais Page 9 1 Q 2 3 DO OTHER PROVISIONS OF CL&P’S PROPOSED EDR DEPEND ON CL&P’S DISCRETION? A Yes. Conditions 2, 3 and 4 of the proposed EDR tariff also depend on CL&P’s 4 discretion: 5 6 7 Condition 2 requires the customer to begin and/or continue implementation of cost-effective energy efficiency and load management measures and programs “as determined appropriate by the Company.” 8 9 10 Condition 3 requires the customer to seek participation in available local, state and federal economic development programs “as determined appropriate by the Company.” 11 12 13 14 15 16 Condition 4 provides that, if the customer has not obtained economic development funds or loan guarantees from the specified state agencies, “the Company must be able to demonstrate, to its satisfaction,” that serving the customer’s Incremental Load at the discount will increase the revenue requirements recovered from CL&P’s remaining customers by less than if the Incremental Load were not served by CL&P.19 17 I do not object to requiring EDR participants to invest in energy efficiency or 18 load management, or to encouraging them to seek other economic development 19 assistance. 20 subsidizing the incremental load. My concern is that, as written, neither customers nor 21 PURA can determine what these conditions actually require, and it is unclear what 22 information a customer would need to provide for CL&P to make the Condition 4 23 demonstration to its own satisfaction. I also agree that the discount should not result in other customers 24 Q WHAT DO YOU RECOMMEND WITH RESPECT TO THESE PROVISIONS? 25 A Eligibility for the EDR should be determined by clear, objective criteria stated in the 26 tariff rather than by CL&P’s discretion. Specifically, I recommend that PURA require 27 CL&P to: 19 Exhibit CLP-RATES-3 at 437. BRUBAKER & ASSOCIATES, INC.
  3. Page 12 of 42

    James R. Dauphinais Page 10 1 2 3 4 5 Remove the requirement in Qualification 1(C) that a facility provide “added value to the Company’s service territory, as determined by the Company,” so that any C&I facility meeting the minimum incremental load threshold may qualify, subject to the same exception for customers directly participating in local commerce that PURA approved for UI; 6 7 8 9 10 Replace the “satisfaction of the Company” standard in Qualification 3 with a requirement that the customer provide a narrative description of why its load is increasing or, for a new customer, the role of the EDR in its decision to locate in CL&P’s service territory, similar to the application requirement PURA approved for UI;20 11 12 13 Replace Condition 2 with a requirement that the customer participate in at least one clean energy, grid modernization or energy efficiency program, as PURA required for UI;21 14 15 16 17 18 Remove Condition 3 as a condition of eligibility. CL&P may encourage EDR participants to seek other economic development assistance, but eligibility should not depend on whether the customer seeks such assistance, since some projects may have limited or no access to it. The UI EDR approved by PURA contains no such requirement; 19 20 21 22 23 24 25 26 27 Replace Condition 4 with an objective hurdle rate analysis, applied in the same manner to every application, under which CL&P compares the net present value of the revenue from the incremental load over the term, inclusive of the discount, to the incremental cost to serve that load, similar to the analysis PURA required of UI.22 CL&P should describe the methodology for this analysis in a compliance filing so that customers and PURA understand how it will be performed. This is consistent with CL&P’s own proposal to anchor the discount to a marginal cost floor and cap it based on the incremental distribution revenue from the incremental load;23 and 28 29 30 31 Provide a written explanation to any customer whose EDR application is denied, and report annually to PURA the number of EDR inquiries, applications, approvals and denials, similar to the information PURA required UI to include in its annual EDR report.24 20 Docket No. 22-08-08, August 25, 2023 Decision at 252. Id. 22 Docket No. 22-08-08, August 25, 2023 Decision at 250-251. 23 Davis and Parsons Direct at 28-29. 24 Docket No. 22-08-08, August 25, 2023 Decision at 253. 21 BRUBAKER & ASSOCIATES, INC.
  4. Page 13 of 42

    James R. Dauphinais Page 11 1 D. Partial Requirements Refund Provision 2 Q PLEASE DESCRIBE CONDITION 1 OF CL&P’S PROPOSED EDR TARIFF. 3 A Condition 1 provides that, if a full-service customer qualifies for the EDR and 4 subsequently becomes a partial requirements customer during the term of its Service 5 Agreement, or for three years thereafter, the customer must refund a percentage of the 6 discounts and concessions previously provided equal to the percentage of 7 energy (kWh) “displaced by sources other than the Company.” 8 discounts would be reduced by the same percentage.25 Any prospective 9 Q WHAT ARE YOUR CONCERNS WITH THIS PROVISION? 10 A First, the provision is ambiguous. The proposed EDR tariff does not define “full-service 11 customer” or “partial requirements customer,” and the phrase “sources other than the 12 Company” could be read to include energy purchased from a competitive retail supplier, 13 as well as energy from behind-the-meter (“BTM”) generation. The EDR discount 14 applies only to CL&P’s distribution charges.26 A customer’s choice of energy supplier 15 has no effect on the distribution service CL&P provides to the incremental load and 16 should have no bearing on the customer’s eligibility for, or continued participation in, 17 the EDR. 18 Second, to the extent the provision could be intended to address BTM 19 generation, it is inconsistent with PURA’s determination for the UI EDR that “BTM 20 generation itself shall not impact EDR Rider eligibility.”27 21 Third, the provision is unnecessary. The discount applies only to the customer’s 22 Incremental Load, which is the portion of the customer’s load that exceeds its base 25 Exhibit CLP-RATES-3 at 437. Davis and Parsons Direct at 30. 27 Docket No. 22-08-08, August 25, 2023 Decision at 252. 26 BRUBAKER & ASSOCIATES, INC.
  5. Page 14 of 42

    James R. Dauphinais Page 12 1 level of usage.28 To the extent on-site generation reduces the load CL&P delivers to 2 the customer, the Incremental Load eligible for the discount, and therefore the discount 3 itself, is already reduced. 4 Q WHAT DO YOU RECOMMEND? 5 A I recommend that PURA require Condition 1 be removed from the EDR tariff. At a 6 minimum, the tariff should be clarified to state that a customer’s choice of energy 7 supplier does not affect its eligibility for the EDR or trigger any refund of discounts. 8 E. Removal Provision 9 Q PLEASE DESCRIBE CONDITION 7 OF CL&P’S PROPOSED EDR TARIFF. 10 A Condition 7 provides that CL&P will remove an Existing Customer from the EDR 11 prospectively if, in each of three consecutive months, its kWh usage is less than 10% 12 greater than its kWh usage in the corresponding months of its Base Period.29 13 Q WHAT ARE YOUR CONCERNS WITH THIS PROVISION? 14 A Condition 7 effectively requires an existing customer’s total usage to remain at least 15 10% above its Base Period usage. This creates two problems. First, an expansion 16 that is significant in absolute terms may represent less than 10% of a large customer’s 17 existing usage. For example, a customer with 20 MW of existing load that adds 1.5 MW 18 of new load operating at a similar load factor would increase its usage by only about 19 7.5%. Even though this expansion would exceed the 500 kW minimum in the proposed 20 tariff and generate incremental distribution revenue, the customer would be removed 28 29 Exhibit CLP-RATES-3 at 437. Exhibit CLP-RATES-3 at 438. BRUBAKER & ASSOCIATES, INC.
  6. Page 15 of 42

    James R. Dauphinais Page 13 1 from the EDR after three months. Second, Condition 7 does not account for normal 2 variations in industrial operations, such as maintenance outages, production 3 schedules, and seasonal or market-driven changes in output, that can temporarily 4 reduce usage over a three-month period. 5 Furthermore, CL&P has not explained why Condition 7 is needed to protect 6 CL&P’s other customers. 7 Q WHAT DO YOU RECOMMEND? 8 A I recommend that PURA require that Condition 7 be entirely removed as CL&P has not 9 supported the need for it. However, to the extent PURA in this proceeding finds a 10 performance requirement is necessary, it should be measured against the incremental 11 load specified in the customer’s Service Agreement as that load ramps up pursuant to 12 the Customer’s Service Agreement (rather than a fixed percentage of the customer’s 13 total usage), be measured over a period of no less than a year, and exclude 14 documented maintenance outages and other temporary reductions. For example, the 15 UI EDR approved by PURA measures performance against a percentage of the 16 customer’s own forecasted load increase over the term.30 17 F. Discount Structure and Term 18 Q WHAT DISCOUNT STRUCTURE HAS CL&P PROPOSED? 19 A CL&P proposes “a declining, time-limited discount applied to incremental load over a 20 five-year term, consistent with the declining structure proposed in the Company’s prior 30 Docket No. 22-08-08, August 25, 2023 Decision at 252. BRUBAKER & ASSOCIATES, INC.
  7. Page 16 of 42

    James R. Dauphinais Page 14 1 economic development rate.”31 As noted earlier, CL&P has not proposed specific 2 discount percentages. 3 Q 4 5 IS A DECLINING DISCOUNT CONSISTENT WITH THE EDR PURA APPROVED FOR UI? A No. PURA approved a discount for UI that is fixed over the five-year term. In doing so, 6 PURA accepted “the assertion that a fixed rate discount over the Term of the EDR 7 Rider is the least-cost method of administering the EDR Rider” and concurred “that 8 providing customers with a single line-item discount is an easily understandable way 9 for Subscribers to both track and comprehend their discount.”32 CL&P states that its 10 proposal for a schedule of fixed percentage discounts “is consistent with prior 11 regulatory determinations favoring a fixed, uniform discount structure, rather than 12 discounts that vary based on other assumptions.”33 However, its proposal is not 13 consistent with the most recent regulatory determinations on this issue because the 14 discount PURA approved for UI is not only pre-determined rather than negotiated, but 15 is also uniform throughout the term. CL&P’s stated rationale for a discount that declines 16 each year is that the declining discount “[p]rovides a meaningful upfront incentive to 17 influence siting and expansion decisions,” “[t]ransitions customers to full rates over 18 time,” and “[e]nsures the EDR functions as a temporary incentive rather than a 19 permanent subsidy.”34 None of these reasons justifies departing from the fixed discount 20 structure PURA approved for UI. 21 First, a customer’s siting or expansion decision depends on the value of the 22 incentive over the full term, not just in the first year. A declining discount concentrates 31 Davis and Parsons Direct at 28. Docket No. 22-08-08, August 25, 2023 Decision at 250. 33 Davis and Parsons Direct at 28. 34 Davis and Parsons Direct at 29. 32 BRUBAKER & ASSOCIATES, INC.
  8. Page 17 of 42

    James R. Dauphinais Page 15 1 the incentive in the early years of the term, when the incremental load of a new or 2 expanded facility is often still ramping up, and reduces it in the later years, when that 3 load is more likely to be fully in place. As a result, a declining discount can provide less 4 total incentive to a customer than a fixed discount with the same average percentage, 5 and therefore less influence on the customer’s decision. 6 Second, a declining discount is not needed to transition customers to full rates. 7 Under either a fixed or a declining structure, the discount ends at the conclusion of the 8 five-year term and the customer pays full rates thereafter. A fixed discount with a 9 defined term accomplishes that transition in a manner that PURA has found is the least- 10 cost to administer and the easiest for customers to understand. 11 Third, the EDR would not be a permanent subsidy under either structure. 12 CL&P’s proposed EDR tariff provides that “[n]o discounts under this Rider shall 13 continue for more than five years at any service location,”35 and CL&P states that tying 14 the discount to its marginal cost ensures “the discount never results in a subsidy of 15 participating customers by other customers.”36 Given these protections, a declining 16 schedule does not provide any additional protection for other customers. It simply 17 reduces the value of the incentive to the customers the EDR is intended to attract. 18 Q WHAT DO YOU RECOMMEND WITH RESPECT TO THE DISCOUNT? 19 A I recommend that PURA establish the EDR discount percentages in this proceeding 20 rather than leave them unspecified, so that customers considering new or expanded 21 load can know the discount that would be available to them. The discount should be 22 fixed over the term at levels no lower than the 15% base discount and the 20% discount 23 for Distressed Municipalities and Environmental Justice Communities that PURA 35 36 Exhibit CLP-RATES-3 at 439. Davis and Parsons Direct at 28. BRUBAKER & ASSOCIATES, INC.
  9. Page 18 of 42

    James R. Dauphinais Page 16 1 approved for UI, subject to the same type of hurdle rate analysis and discount cap 2 PURA approved for UI. 3 Q 4 5 SHOULD AN EDR PARTICIPANT HAVE AN OPPORTUNITY TO EXTEND ITS DISCOUNT BEYOND FIVE YEARS? A Yes. CL&P’s proposed EDR tariff provides that “[n]o discounts under this Rider shall 6 continue for more than five years at any service location.”37 I recommend that a 7 participating customer have one opportunity to extend its discount for an additional 8 five-year term, provided that an updated hurdle rate analysis shows that the revenue 9 from the incremental load at the discounted rate will continue to exceed the incremental 10 cost to serve that load. The capital investments associated with industrial expansions 11 typically have service lives well beyond five years. Where the discounted revenue 12 continues to exceed the incremental cost to serve, an extension continues to provide a 13 contribution to CL&P’s fixed costs that benefits CL&P’s other customers. 14 I recognize that PURA declined to extend the term of the UI EDR from five to 15 seven years, finding the necessity of that increase was not clear based on the record 16 in that proceeding.38 The extension I recommend differs from that proposal because it 17 would not be automatic. It would only be available upon a showing that the extension 18 continues to benefit CL&P’s other customers. In addition, the phrase “at any service 19 location” should be clarified so that it does not prevent a separate, later expansion at 20 the same service location from qualifying for its own EDR discount. 37 38 Exhibit CLP-RATES-3 at 439. Docket No. 22-08-08, August 25, 2023 Decision at 251. BRUBAKER & ASSOCIATES, INC.
  10. Page 19 of 42

    James R. Dauphinais Page 17 1 G. Load Retention 2 Q CL&P’S PROPOSED EDR WOULD NOT BE AVAILABLE FOR LOAD RETENTION. 3 4 DO YOU TAKE ISSUE WITH THAT? A Not within the EDR itself, provided CL&P also has a separate load retention special 5 contract policy. In Docket No. 22-08-08, PURA limited the UI EDR to incremental load, 6 finding “that it is more appropriate to utilize the special contracting process” for load 7 retention purposes.39 PURA also directed UI to file its special contracting policy in its 8 next rate case.40 Because CL&P’s proposed EDR is similarly limited to incremental 9 load, it would provide no benefit to an existing customer whose load is at risk of being 10 reduced or relocated outside of CL&P’s service territory. As I discuss in Section III of 11 my testimony, CL&P should be required to adopt a load retention special contract policy 12 similar to UI’s so that it has an appropriate tool to address such situations. 13 H. EDR Recommendations 14 Q PLEASE SUMMARIZE YOUR RECOMMENDATIONS WITH RESPECT TO CL&P’S 15 16 PROPOSED EDR. A I recommend that PURA approve an EDR for CL&P with the following modifications: 17 18 Make the EDR available to the incremental load of existing Rate 39 customers on the same terms as Rate 57 and Rate 58 customers; 19 20 Specify in the EDR tariff a single minimum incremental load threshold applicable to all participants; 21 22 23 24 Replace the discretionary provisions of Qualification 1(C), Qualification 3 and Conditions 2, 3 and 4 with the clear, objective criteria described in Section II.C of my testimony, including an objective hurdle rate analysis with a methodology described in a compliance filing; 39 40 Docket No. 22-08-08, August 25, 2023 Decision at 251. Id. at 254. BRUBAKER & ASSOCIATES, INC.