Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Files1

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
  1. Page 15 of 42

    James R. Dauphinais Page 13 1 from the EDR after three months. Second, Condition 7 does not account for normal 2 variations in industrial operations, such as maintenance outages, production 3 schedules, and seasonal or market-driven changes in output, that can temporarily 4 reduce usage over a three-month period. 5 Furthermore, CL&P has not explained why Condition 7 is needed to protect 6 CL&P’s other customers. 7 Q WHAT DO YOU RECOMMEND? 8 A I recommend that PURA require that Condition 7 be entirely removed as CL&P has not 9 supported the need for it. However, to the extent PURA in this proceeding finds a 10 performance requirement is necessary, it should be measured against the incremental 11 load specified in the customer’s Service Agreement as that load ramps up pursuant to 12 the Customer’s Service Agreement (rather than a fixed percentage of the customer’s 13 total usage), be measured over a period of no less than a year, and exclude 14 documented maintenance outages and other temporary reductions. For example, the 15 UI EDR approved by PURA measures performance against a percentage of the 16 customer’s own forecasted load increase over the term.30 17 F. Discount Structure and Term 18 Q WHAT DISCOUNT STRUCTURE HAS CL&P PROPOSED? 19 A CL&P proposes “a declining, time-limited discount applied to incremental load over a 20 five-year term, consistent with the declining structure proposed in the Company’s prior 30 Docket No. 22-08-08, August 25, 2023 Decision at 252. BRUBAKER & ASSOCIATES, INC.
  2. Page 16 of 42

    James R. Dauphinais Page 14 1 economic development rate.”31 As noted earlier, CL&P has not proposed specific 2 discount percentages. 3 Q 4 5 IS A DECLINING DISCOUNT CONSISTENT WITH THE EDR PURA APPROVED FOR UI? A No. PURA approved a discount for UI that is fixed over the five-year term. In doing so, 6 PURA accepted “the assertion that a fixed rate discount over the Term of the EDR 7 Rider is the least-cost method of administering the EDR Rider” and concurred “that 8 providing customers with a single line-item discount is an easily understandable way 9 for Subscribers to both track and comprehend their discount.”32 CL&P states that its 10 proposal for a schedule of fixed percentage discounts “is consistent with prior 11 regulatory determinations favoring a fixed, uniform discount structure, rather than 12 discounts that vary based on other assumptions.”33 However, its proposal is not 13 consistent with the most recent regulatory determinations on this issue because the 14 discount PURA approved for UI is not only pre-determined rather than negotiated, but 15 is also uniform throughout the term. CL&P’s stated rationale for a discount that declines 16 each year is that the declining discount “[p]rovides a meaningful upfront incentive to 17 influence siting and expansion decisions,” “[t]ransitions customers to full rates over 18 time,” and “[e]nsures the EDR functions as a temporary incentive rather than a 19 permanent subsidy.”34 None of these reasons justifies departing from the fixed discount 20 structure PURA approved for UI. 21 First, a customer’s siting or expansion decision depends on the value of the 22 incentive over the full term, not just in the first year. A declining discount concentrates 31 Davis and Parsons Direct at 28. Docket No. 22-08-08, August 25, 2023 Decision at 250. 33 Davis and Parsons Direct at 28. 34 Davis and Parsons Direct at 29. 32 BRUBAKER & ASSOCIATES, INC.
  3. Page 17 of 42

    James R. Dauphinais Page 15 1 the incentive in the early years of the term, when the incremental load of a new or 2 expanded facility is often still ramping up, and reduces it in the later years, when that 3 load is more likely to be fully in place. As a result, a declining discount can provide less 4 total incentive to a customer than a fixed discount with the same average percentage, 5 and therefore less influence on the customer’s decision. 6 Second, a declining discount is not needed to transition customers to full rates. 7 Under either a fixed or a declining structure, the discount ends at the conclusion of the 8 five-year term and the customer pays full rates thereafter. A fixed discount with a 9 defined term accomplishes that transition in a manner that PURA has found is the least- 10 cost to administer and the easiest for customers to understand. 11 Third, the EDR would not be a permanent subsidy under either structure. 12 CL&P’s proposed EDR tariff provides that “[n]o discounts under this Rider shall 13 continue for more than five years at any service location,”35 and CL&P states that tying 14 the discount to its marginal cost ensures “the discount never results in a subsidy of 15 participating customers by other customers.”36 Given these protections, a declining 16 schedule does not provide any additional protection for other customers. It simply 17 reduces the value of the incentive to the customers the EDR is intended to attract. 18 Q WHAT DO YOU RECOMMEND WITH RESPECT TO THE DISCOUNT? 19 A I recommend that PURA establish the EDR discount percentages in this proceeding 20 rather than leave them unspecified, so that customers considering new or expanded 21 load can know the discount that would be available to them. The discount should be 22 fixed over the term at levels no lower than the 15% base discount and the 20% discount 23 for Distressed Municipalities and Environmental Justice Communities that PURA 35 36 Exhibit CLP-RATES-3 at 439. Davis and Parsons Direct at 28. BRUBAKER & ASSOCIATES, INC.
  4. Page 18 of 42

    James R. Dauphinais Page 16 1 approved for UI, subject to the same type of hurdle rate analysis and discount cap 2 PURA approved for UI. 3 Q 4 5 SHOULD AN EDR PARTICIPANT HAVE AN OPPORTUNITY TO EXTEND ITS DISCOUNT BEYOND FIVE YEARS? A Yes. CL&P’s proposed EDR tariff provides that “[n]o discounts under this Rider shall 6 continue for more than five years at any service location.”37 I recommend that a 7 participating customer have one opportunity to extend its discount for an additional 8 five-year term, provided that an updated hurdle rate analysis shows that the revenue 9 from the incremental load at the discounted rate will continue to exceed the incremental 10 cost to serve that load. The capital investments associated with industrial expansions 11 typically have service lives well beyond five years. Where the discounted revenue 12 continues to exceed the incremental cost to serve, an extension continues to provide a 13 contribution to CL&P’s fixed costs that benefits CL&P’s other customers. 14 I recognize that PURA declined to extend the term of the UI EDR from five to 15 seven years, finding the necessity of that increase was not clear based on the record 16 in that proceeding.38 The extension I recommend differs from that proposal because it 17 would not be automatic. It would only be available upon a showing that the extension 18 continues to benefit CL&P’s other customers. In addition, the phrase “at any service 19 location” should be clarified so that it does not prevent a separate, later expansion at 20 the same service location from qualifying for its own EDR discount. 37 38 Exhibit CLP-RATES-3 at 439. Docket No. 22-08-08, August 25, 2023 Decision at 251. BRUBAKER & ASSOCIATES, INC.
  5. Page 19 of 42

    James R. Dauphinais Page 17 1 G. Load Retention 2 Q CL&P’S PROPOSED EDR WOULD NOT BE AVAILABLE FOR LOAD RETENTION. 3 4 DO YOU TAKE ISSUE WITH THAT? A Not within the EDR itself, provided CL&P also has a separate load retention special 5 contract policy. In Docket No. 22-08-08, PURA limited the UI EDR to incremental load, 6 finding “that it is more appropriate to utilize the special contracting process” for load 7 retention purposes.39 PURA also directed UI to file its special contracting policy in its 8 next rate case.40 Because CL&P’s proposed EDR is similarly limited to incremental 9 load, it would provide no benefit to an existing customer whose load is at risk of being 10 reduced or relocated outside of CL&P’s service territory. As I discuss in Section III of 11 my testimony, CL&P should be required to adopt a load retention special contract policy 12 similar to UI’s so that it has an appropriate tool to address such situations. 13 H. EDR Recommendations 14 Q PLEASE SUMMARIZE YOUR RECOMMENDATIONS WITH RESPECT TO CL&P’S 15 16 PROPOSED EDR. A I recommend that PURA approve an EDR for CL&P with the following modifications: 17 18 Make the EDR available to the incremental load of existing Rate 39 customers on the same terms as Rate 57 and Rate 58 customers; 19 20 Specify in the EDR tariff a single minimum incremental load threshold applicable to all participants; 21 22 23 24 Replace the discretionary provisions of Qualification 1(C), Qualification 3 and Conditions 2, 3 and 4 with the clear, objective criteria described in Section II.C of my testimony, including an objective hurdle rate analysis with a methodology described in a compliance filing; 39 40 Docket No. 22-08-08, August 25, 2023 Decision at 251. Id. at 254. BRUBAKER & ASSOCIATES, INC.
  6. Page 20 of 42

    James R. Dauphinais Page 18 1 2 3 Require CL&P to provide a written explanation for any denial of an EDR application and to report annually to PURA the number of EDR inquiries, applications, approvals and denials; 4 5 Remove Condition 1 or, at a minimum, clarify that a customer’s choice of energy supplier does not affect its eligibility for the EDR or trigger any refund of discounts; 6 7 8 9 Remove Condition 7 or, if a performance requirement is retained, measure it against the incremental load in the customer’s Service Agreement over a period of no less than a year, excluding documented maintenance outages and other temporary reductions; 10 11 Establish in this proceeding a discount that is fixed over the five-year term at levels no lower than the 15% and 20% discounts PURA approved for UI; and 12 13 14 15 Provide participants one opportunity to extend the discount for an additional five-year term, subject to an updated hurdle rate analysis, and clarify that a separate, later expansion at the same service location may qualify for its own discount. 16 In addition, as I discuss in Section III of my testimony, CL&P should be required 17 to adopt a load retention special contract policy similar to UI’s. III. NEED FOR A LOAD RETENTION SPECIAL CONTRACT POLICY 18 19 A. Absence of a CL&P Load Retention Policy 20 Q DOES CL&P HAVE A TARIFF OR POLICY THAT ADDRESSES THE RETENTION 21 22 OF EXISTING LOAD THAT IS AT RISK OF BEING LOST? A No. As I discussed in Section II of my testimony, CL&P’s proposed EDR would not be 23 available “for load retention purposes.”41 CL&P’s Rates Panel direct testimony does 24 not propose any other rate, rider or policy to address the retention of existing load. The 25 only provision of CL&P’s tariff that addresses special contracts is Section 5F of its 26 Terms and Conditions for Delivery Service, which states: 27 28 29 30 In the event that the service desired by a customer is not available under any standard rate of the Company, such service (including auxiliary or parallel operation service, service for abnormally large or fluctuating loads, and other types of service under unusual circumstances) may be 41 Davis and Parsons Direct at 25. BRUBAKER & ASSOCIATES, INC.
  7. Page 21 of 42

    James R. Dauphinais Page 19 1 2 3 4 5 obtained, in the sole discretion of the Company, through special contract with the Company to the extent permitted under applicable Terms and Conditions and provided that no discrimination against other customers would result thereby. All such special contracts are subject to review and approval of PURA.42 6 Q IS SECTION 5F A LOAD RETENTION POLICY? 7 A No. Section 5F is a general provision for service that is not available under a standard 8 rate, such as service for abnormally large or fluctuating loads. It does not mention load 9 retention, establishes no eligibility criteria, identifies no information a customer would 10 need to provide, and provides no guidance on the form or level of any discount. 11 Whether to offer a special contract is left to CL&P’s sole discretion. As a result, an 12 existing customer that is considering curtailing or relocating its operations has no way 13 to know whether CL&P would consider a retention rate, or on what terms. 14 Q 15 16 DOES CL&P RECOGNIZE THE IMPORTANCE OF RETAINING EXISTING BUSINESSES IN CONNECTICUT? A Yes. CL&P’s Leadership Panel states that CL&P is proposing economic development 17 rates to stimulate “economic growth by attracting and retaining businesses in 18 Connecticut,” and describes CL&P’s proposed Economic Development Rate as 19 “designed to attract and retain new electric load that businesses might otherwise locate 20 outside Connecticut.”43 However, as I noted above, the EDR actually proposed by 21 CL&P would not be available “for load retention purposes,”44 and CL&P has not 22 proposed any other mechanism to retain existing load that is at risk of being lost due 23 to a competitive alternative or financial circumstances. A load retention special contract 42 Exhibit CLP-RATES-3 at 210-211. CL&P Witnesses Scacco, Chatterjee and Horton Direct (Exhibit CLP-ELP-1) at 10 and 119. 44 Davis and Parsons Direct at 25. 43 BRUBAKER & ASSOCIATES, INC.
  8. Page 22 of 42

    James R. Dauphinais Page 20 1 policy would provide CL&P with the tool needed to address the retention objective its 2 own Leadership Panel identifies. 3 B. UI’s Load Retention Special Contract Policy 4 Q HOW HAS PURA ADDRESSED LOAD RETENTION FOR UI? 5 A In Docket No. 22-08-08, CIEC proposed that UI’s EDR include a load retention 6 provision.45 PURA declined to include load retention in the EDR, but recognized that: 7 8 9 10 11 12 While retaining load that asserts an intention to leave UI’s territory may be economically equivalent to attracting new or expanded load within the territory, it is significantly more difficult to assess whether and how an EDR Rider retained load in Connecticut than it is to assess whether it attracted a new business or load growth by existing Connecticut businesses.46 13 PURA concluded that “it is more appropriate to utilize the special contracting 14 process” for load retention.47 However, PURA also found that UI’s special contracting 15 process was, “at a minimum, not accessible enough to Connecticut businesses or 16 appropriately well known by those business or relevant government agencies, through 17 no fault of their own.”48 PURA therefore directed UI to file its special contracting policy 18 as part of its next rate case application, after discussing the policy with the Connecticut 19 Department of Economic and Community Development (“DECD”).49 20 Q DID UI FILE SUCH A POLICY? 21 A Yes. In Docket No. 24-10-04, UI filed a special contract policy for load retention 22 purposes, which PURA approved with modifications in its October 28, 2025 Decision.50 45 Docket No. 22-08-08, August 25, 2023 Decision at 247. Id. at 251. 47 Id. 48 Id. at 251-252. 49 Id. at 254. 50 Docket No. 24-10-04, October 28, 2025 Decision at 229-231. 46 BRUBAKER & ASSOCIATES, INC.
  9. Page 23 of 42

    James R. Dauphinais Page 21 1 PURA found that the policy, as modified, “provides sufficient flexibility while limiting the 2 risk of free ridership and meets the just and reasonable standard.”51 3 Q 4 5 PLEASE SUMMARIZE THE KEY ELEMENTS OF UI’S POLICY AS APPROVED BY PURA. A Based on PURA’s Decision in Docket No. 24-10-04, the key elements of UI’s policy 6 include: 7 8 9 10 Eligibility for existing non-residential customers not engaged in local commerce, for the purpose of retaining sales that would otherwise be lost due to customers curtailing all or a material portion of their electricity consumption due to the cost of electric distribution service or the availability of lower cost alternative fuels;52 11 12 A discount negotiated on a case-by-case basis that applies only to the delivery component of the customer’s bill;53 13 14 15 16 A price floor for the discounted distribution rate based on long-run marginal distribution cost, with UI permitted to propose larger discounts for PURA’s consideration in circumstances where the price floor is insufficient to retain at-risk load;54 17 18 19 Submission of a profit and loss statement where required by UI or PURA on a case-by-case basis, as one of the factors used to assess the risk of the customer terminating or reducing its operations in Connecticut;55 and 20 PURA approval of any discount provided under a special contract.56 51 Id. at 231. Id. at 230-231. 53 Id. at 230. 54 Id. 55 Id. at 230-231. Required submission of a profit and loss statement on no more than a case-by-case basis, when required by UI or PURA, is a critical finding by PURA as the risk of loss of a particular large customer load may not be related to profits and losses, but instead related to the availability of competitive alternatives to the customer or other unique circumstances not related to the profits and losses of the customer. As PURA noted in the aforementioned portion of its Docket No. 24-10-04 decision, there is no “one size fits all” approach for special contracts. 56 Id. at 230. 52 BRUBAKER & ASSOCIATES, INC.
  10. Page 24 of 42

    James R. Dauphinais Page 22 1 C. Decline in CL&P’s Large Industrial Load 2 Q HAS THE LOAD OF CL&P’S LARGE INDUSTRIAL RATE CLASSES CHANGED 3 4 SINCE CL&P’S LAST RATE CASE? A Yes, it has declined. Table JRD-1 below compares the number of customers and 5 annual sales of Rate 39 and Rate 57 used in CL&P’s last base rate case, Docket 6 No. 17-10-46, with those used in CL&P’s allocated cost of service study in this 7 proceeding.57 TABLE JRD-1 Rate 39 and Rate 57 Customers and Sales Docket No. 17-10-46 Docket No. 26-05-10 Change Percent Change Customers 7 3 (4) (57.1%) Sales (MWh) 274,029 226,711 (47,318) (17.3%) Rate 39 (Large Int. Service) Rate 57 (Lrg. TOD Elec. Srv. Manf.) Customers 112 72 (40) (35.7%) Sales (MWh) 936,448 762,979 (173,469) (18.5%) Customers 119 75 (44) (37.0%) Sales (MWh) 1,210,477 989,690 (220,787) (18.2%) Rate 39 and Rate 57 Combined 57 Docket No. 17-10-46, Exhibit TRP-17, tab “Pg. 8 – Unit Rates,” a copy of which is provided as Exhibit JRD-2; and Exhibit CLP-ACOS-2 at 133-134. BRUBAKER & ASSOCIATES, INC.

As listed on the current system

Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: James R. Dauphinais [26-05-10]

This filing on the current system (opens in a new tab)