James R. Dauphinais Page 21 1 PURA found that the policy, as modified, “provides sufficient flexibility while limiting the 2 risk of free ridership and meets the just and reasonable standard.”51 3 Q 4 5 PLEASE SUMMARIZE THE KEY ELEMENTS OF UI’S POLICY AS APPROVED BY PURA. A Based on PURA’s Decision in Docket No. 24-10-04, the key elements of UI’s policy 6 include: 7 8 9 10 Eligibility for existing non-residential customers not engaged in local commerce, for the purpose of retaining sales that would otherwise be lost due to customers curtailing all or a material portion of their electricity consumption due to the cost of electric distribution service or the availability of lower cost alternative fuels;52 11 12 A discount negotiated on a case-by-case basis that applies only to the delivery component of the customer’s bill;53 13 14 15 16 A price floor for the discounted distribution rate based on long-run marginal distribution cost, with UI permitted to propose larger discounts for PURA’s consideration in circumstances where the price floor is insufficient to retain at-risk load;54 17 18 19 Submission of a profit and loss statement where required by UI or PURA on a case-by-case basis, as one of the factors used to assess the risk of the customer terminating or reducing its operations in Connecticut;55 and 20 PURA approval of any discount provided under a special contract.56 51 Id. at 231. Id. at 230-231. 53 Id. at 230. 54 Id. 55 Id. at 230-231. Required submission of a profit and loss statement on no more than a case-by-case basis, when required by UI or PURA, is a critical finding by PURA as the risk of loss of a particular large customer load may not be related to profits and losses, but instead related to the availability of competitive alternatives to the customer or other unique circumstances not related to the profits and losses of the customer. As PURA noted in the aforementioned portion of its Docket No. 24-10-04 decision, there is no “one size fits all” approach for special contracts. 56 Id. at 230. 52 BRUBAKER & ASSOCIATES, INC.Page 24 of 42
James R. Dauphinais Page 22 1 C. Decline in CL&P’s Large Industrial Load 2 Q HAS THE LOAD OF CL&P’S LARGE INDUSTRIAL RATE CLASSES CHANGED 3 4 SINCE CL&P’S LAST RATE CASE? A Yes, it has declined. Table JRD-1 below compares the number of customers and 5 annual sales of Rate 39 and Rate 57 used in CL&P’s last base rate case, Docket 6 No. 17-10-46, with those used in CL&P’s allocated cost of service study in this 7 proceeding.57 TABLE JRD-1 Rate 39 and Rate 57 Customers and Sales Docket No. 17-10-46 Docket No. 26-05-10 Change Percent Change Customers 7 3 (4) (57.1%) Sales (MWh) 274,029 226,711 (47,318) (17.3%) Rate 39 (Large Int. Service) Rate 57 (Lrg. TOD Elec. Srv. Manf.) Customers 112 72 (40) (35.7%) Sales (MWh) 936,448 762,979 (173,469) (18.5%) Customers 119 75 (44) (37.0%) Sales (MWh) 1,210,477 989,690 (220,787) (18.2%) Rate 39 and Rate 57 Combined 57 Docket No. 17-10-46, Exhibit TRP-17, tab “Pg. 8 – Unit Rates,” a copy of which is provided as Exhibit JRD-2; and Exhibit CLP-ACOS-2 at 133-134. BRUBAKER & ASSOCIATES, INC.Page 25 of 42
James R. Dauphinais Page 23 1 As shown in Table JRD-1, the number of Rate 39 customers declined from 2 seven to three and the number of Rate 57 customers declined from 112 to 72. 3 Combined annual sales to the two classes declined by approximately 221,000 MWh, 4 or about 18%. 5 Q 6 7 WHAT ARE THE IMPLICATIONS OF THESE DECLINES FOR CL&P’S OTHER CUSTOMERS? A Much of the cost of CL&P’s distribution system is fixed and does not decline when a 8 customer’s load is lost. When load leaves CL&P’s system, the contribution that load 9 was making toward those fixed costs must instead be recovered from CL&P’s 10 remaining customers. 11 I am not suggesting that all of the decline shown in Table JRD-1 was caused 12 by the level of CL&P’s distribution rates, or that all of it could have been avoided with a 13 load retention policy. 14 However, the decline shows that the load of CL&P’s largest industrial customers cannot 15 be taken for granted. As PURA has recognized, commercial and industrial electric 16 rates in Connecticut are high relative to the national average.58 Yet CL&P currently has 17 no defined means to respond when an existing customer’s load is at risk due to the 18 availability of a competitive alternative or the cost of electric distribution service. Facility closures and curtailments occur for many reasons. 19 CL&P’s Leadership Panel also acknowledges that the volumetric recovery of 20 public benefits charges drives up electricity costs for commercial and industrial 21 customers, making them “less competitive relative to their peers in other states where 22 similar costs are not levied through electric rates.” 23 consequence for other customers: “By impairing the ability of businesses to increase 58 Docket No. 22-08-08, August 25, 2023 Decision at 250. BRUBAKER & ASSOCIATES, INC. It further recognizes thePage 26 of 42
James R. Dauphinais Page 24 1 load and stifling the creation of new commercial customers, more of the cost must be 2 shouldered by residential customers, contributing to affordability concerns for critical 3 energy service in a state with some of the highest electric rates in the country.”59 The 4 same is true when existing commercial and industrial load is lost. 5 D. Benefits of a Load Retention Policy 6 Q HOW WOULD A LOAD RETENTION SPECIAL CONTRACT POLICY BENEFIT 7 8 CL&P’S OTHER CUSTOMERS? A Where a customer’s load is genuinely at risk, a discounted rate that keeps that load on 9 CL&P’s system while still recovering more than the marginal cost of serving it leaves 10 CL&P’s other customers better off than if the load were lost. 11 continues to contribute toward CL&P’s fixed costs, even at a discounted rate, rather 12 than shifting that contribution to other customers. The price floor, case-by-case review 13 and PURA approval required under UI’s policy are intended to provide this protection 14 while limiting the risk of free ridership. 15 Q 16 17 The retained load HOW WOULD A LOAD RETENTION POLICY RELATE TO CL&P’S PROPOSED EDR? A The two would be complementary. The EDR is designed to attract new and expanded 18 load, while a load retention policy addresses existing load that is at risk of being lost 19 due to a competitive alternative or financial circumstances. An EDR alone provides no 20 benefit to an existing customer whose load is at risk but who is not expanding. Adopting 21 both would give CL&P the same two tools that PURA has approved for UI. 59 Scacco, Chatterjee and Horton Direct at 28. BRUBAKER & ASSOCIATES, INC.Page 27 of 42
James R. Dauphinais Page 25 1 Q 2 3 IS THE CONCEPT OF A LOAD RETENTION SPECIAL CONTRACT FAMILIAR TO EVERSOURCE? A Yes. Eversource’s New Hampshire electric utility affiliate, Public Service Company of 4 New Hampshire d/b/a Eversource Energy, is subject to a New Hampshire statute that 5 expressly provides for special contracts designed to retain load. Specifically, that 6 statute states: 7 8 9 10 11 12 II. After June 3, 1996 [the effective date of the statute], new special contracts designed to retain load shall be available to an electric utility customer only if the utility represents that the load would otherwise have left the utility, the contract is approved pursuant to RSA 378:18, and the commission determines that no tariffed rate is sufficient to retain the load.60 13 Like the UI policy approved by PURA, the New Hampshire statute makes load 14 retention special contracts available subject to a showing that the load is at risk and 15 approval by the state regulatory commission. 16 E. Load Retention Special Contract Policy Recommendations 17 Q WHAT DO YOU RECOMMEND WITH RESPECT TO A LOAD RETENTION POLICY 18 19 FOR CL&P? A I recommend that PURA direct CL&P to adopt a load retention special contract policy 20 substantially similar to the UI policy approved by PURA in Docket No. 24-10-04. 21 Specifically, CL&P’s policy should: 22 23 24 25 Be available to existing non-residential customers not engaged in local commerce whose sales would otherwise be lost due to the curtailment of all or a material portion of their electricity consumption, using the eligibility language PURA approved for UI; 26 27 Provide for a discount on the distribution component of the customer’s bill, negotiated on a case-by-case basis, with a price floor based on long-run marginal 60 N.H. Rev. Stat. Ann. § 378:18-a, II, https://gc.nh.gov/rsa/html/XXXIV/378/378-18-a.htm. A copy of this statute is provided as Exhibit JRD-3. BRUBAKER & ASSOCIATES, INC.Page 28 of 42
James R. Dauphinais Page 26 1 2 distribution cost and the ability for CL&P to propose larger discounts for PURA’s consideration where the price floor is insufficient to retain the at-risk load; 3 4 5 Identify the information an applicant must provide to support its application, with a facility profit and loss statement required only on a case-by-case basis, consistent with PURA’s determination for UI; 6 7 Require PURA review and approval of each special contract entered into under the policy; and 8 9 10 Be referenced in CL&P’s EDR marketing materials and on CL&P’s website, consistent with PURA’s directive to UI that its special contracting process be noted wherever its EDR is marketed.61 11 Because PURA has already reviewed and approved a load retention policy for 12 UI, there is no need to wait until CL&P’s next rate case to put a similar policy in place 13 for CL&P. I recommend that PURA direct CL&P to discuss its proposed policy with 14 DECD and file the policy for approval in a compliance filing within 90 days of PURA’s 15 final decision in this proceeding, with an opportunity for parties to comment. I also 16 recommend that CL&P report annually to PURA the number of load retention inquiries, 17 applications and approved special contracts. Finally, I note that the UI EDR and special 18 contract policy are not included in its tariff or attached to it as a rider. UI only has an 19 EDR webpage with an online application.62 This omission reduces transparency and is 20 problematic insofar as the EDR is a tariff-based rate discount. PURA can avoid a 21 similar issue here by directing CL&P to include the approved EDR and special contract 22 policy in its tariff. 61 62 Docket No. 22-08-08, August 25, 2023 Decision at 254. See https://www.uinet.com/edr. BRUBAKER & ASSOCIATES, INC.Page 29 of 42
James R. Dauphinais Page 27 IV. CL&P’S PROPOSED ALLOCATION OF AMI COSTS 1 2 A. CL&P’s AMI Proposal and Cost Recovery 3 Q PLEASE BRIEFLY DESCRIBE CL&P’S AMI PROPOSAL. 4 A CL&P proposes to begin deploying AMI in 2027. The deployment would include a new 5 Customer Information System (“CIS”) and Meter Data Management System (“MDMS”), 6 an AMI communications network, and the replacement of approximately 1.35 million 7 meters between 2029 and 2032.63 CL&P estimates the total AMI build-out cost from 8 2027 through 2033 at $1.253 billion, consisting of $970.3 million in capital expenditures 9 and $282.8 million in O&M expense.64 10 Q HOW DOES CL&P PROPOSE TO RECOVER THESE COSTS? 11 A CL&P is not proposing to recover AMI costs in base distribution rates in this proceeding. 12 Instead, it proposes to recover AMI capital costs through the capital funding 13 mechanism (“F Factor”) of its proposed Performance-Based Multi-Year Rate 14 Plan (“PBMRP”), and to defer incremental AMI-related O&M expense and stranded 15 automated meter reading (“AMR”) meter costs for future securitization.65 16 Q 17 18 HOW DOES CL&P PROPOSE TO ALLOCATE AMI CAPITAL COSTS TO CUSTOMER CLASSES? A CL&P proposes to allocate AMI capital costs on the basis of class distribution revenue. 19 CL&P’s AMI Panel testimony does not address the allocation of AMI costs to customer 20 classes. However, in response to discovery, CL&P stated: 63 CL&P Witnesses Lawrence and Horton Direct (Exhibit CLP-AMI-1) at 4-5 and 15. Id. at 19. 65 Lawrence and Horton Direct at 5 and 27-28; and CL&P Response to Data Request OCC-739. A copy of all data request responses cited to in this testimony can be found in Exhibit JRD-1 in alphanumeric order. 64 BRUBAKER & ASSOCIATES, INC.Page 30 of 42
James R. Dauphinais Page 28 1 2 3 Under the Company’s proposed PBMRP tariff, costs would be allocated to rate classes on the basis of class distribution revenue (class allocation factors) described in the tariff.66 4 The proposed PBMRP tariff defines Class Allocation Factors as “proportional 5 shares of Base Revenue Requirement for each Customer Class in the Prior Year,” and 6 provides that the incremental revenue adjustment under the PBMRP “will be allocated 7 among Customer Classes using the Class Allocation Factors.”67 With respect to the 8 deferred O&M expense and stranded AMR meter costs, CL&P states that it intends to 9 submit a proposal on the allocation of those costs at the time it seeks to securitize 10 them.68 11 B. Distribution Revenue Is Not a Cost-Based Allocator for AMI Costs 12 Q IS ALLOCATING AMI COSTS ON THE BASIS OF CLASS DISTRIBUTION 13 14 REVENUE COST-BASED? A No. A class’s share of distribution revenue reflects all of the costs recovered through 15 distribution rates, including the demand-related costs of the poles, conductors, 16 transformers and other facilities that are driven by class peak demands. It bears no 17 particular relationship to the number or type of meters serving the class, or to the cost 18 of the communications network and systems needed to read, communicate with and 19 manage data from those meters. AMI costs are driven by the number and type of 20 meters deployed and the number of customers served, not by a class’s share of 21 distribution revenue. 66 CL&P Response to Data Request OCC-740. Exhibit CLP-RATES-3 at 431 and 433. 68 CL&P Response to Data Request OCC-740. 67 BRUBAKER & ASSOCIATES, INC.Page 31 of 42
James R. Dauphinais Page 29 1 Q 2 3 HOW DOES CL&P’S OWN ALLOCATED COST OF SERVICE STUDY ALLOCATE METER COSTS? A CL&P’s allocated cost of service study (“ACOS”) treats meter costs as 4 customer-related. CL&P Witness Nieto explains that “[c]ustomer-related costs vary 5 with the number and type of customers” and that: 6 7 8 9 Allocation factors for the meter plant were based on the relative ratios of the average installed meter cost within a class; with the relative weight of a residential customer set equal to one, each of the other classes is assigned weighting factors.69 10 CL&P’s ACOS uses this weighted meter cost allocator to allocate the meter 11 plant recorded in Account 370 to customer classes.70 In other words, CL&P’s own cost 12 study recognizes that meter costs are caused by the number and type of meters serving 13 each class. 14 Q 15 16 WHAT IS THE EFFECT OF ALLOCATING AMI COSTS ON THE BASIS OF CLASS DISTRIBUTION REVENUE RATHER THAN ON A COST BASIS? A It shifts AMI costs to classes whose share of distribution revenue is large relative to the 17 number and cost of their meters, which are primarily the larger commercial and 18 industrial classes. Table JRD-2 below compares, for selected rate classes, each 19 class’s share of test year distribution revenue with its share of meter plant under the 20 weighted meter cost allocator used in CL&P’s ACOS.71 69 CL&P Witness Nieto ACOS Direct (Exhibit CLP-ACOS-1) at 6. Exhibit CLP-ACOS-2 at 16-20. 71 Exhibit CLP-ACOS-2 at 16-20 (Account 370 meter plant allocation) and 137-142 (test year class distribution revenue). Test year distribution revenue is used here as a proxy for the class shares of Base Revenue Requirement that would be used under CL&P’s proposed PBMRP tariff. 70 BRUBAKER & ASSOCIATES, INC.Page 32 of 42
James R. Dauphinais Page 30 TABLE JRD-2 Class Shares of Distribution Revenue and Meter Plant Share of Distribution Revenue Share of Meter Plant Ratio of Revenue Share to Meter Share Rate 1 (Residential) 54.724% 66.248% 0.8 Rate 5 (Residential Electric Heat) 8.879% 8.849% 1.0 Rate 30 (Small General) 16.970% 18.017% 0.9 Rate 37 (Intermediate Time-of-Day) 4.034% 1.663% 2.4 Rate 39 (Large Interruptible) 0.114% 0.018% 6.3 Rate 56 (Intermediate TOD Non-Manf.) 4.318% 1.005% 4.3 Rate 57 (Large TOD Manufacturers) 1.287% 0.309% 4.2 Rate 58 (Large TOD Non-Manufacturers) 2.692% 0.426% 6.3 Rate Class 1 As shown in Table JRD-2, under CL&P’s proposal, Rate 57 would be allocated 2 about 4.2 times, and Rate 39 about 6.3 times, the share of AMI costs they would be 3 allocated using the weighted meter cost allocator from CL&P’s own ACOS. 4 example, for every $1 million of AMI revenue requirement, Rate 57 would be allocated 5 approximately $12,900 under CL&P’s proposal, compared to approximately $3,100 6 using the weighted meter cost allocator.72 Conversely, the residential Rate 1 class 7 would be allocated a smaller share of AMI costs than its share of meter plant. 72 $12,900 ≈ $12,870 = $1,000,000 x 1.287%; $3,100 ≈ $3,090 = $1,000,000 x 0.309%. BRUBAKER & ASSOCIATES, INC. For