    James R. Dauphinais Page 29 1 Q 2 3 HOW DOES CL&P’S OWN ALLOCATED COST OF SERVICE STUDY ALLOCATE METER COSTS? A CL&P’s allocated cost of service study (“ACOS”) treats meter costs as 4 customer-related. CL&P Witness Nieto explains that “[c]ustomer-related costs vary 5 with the number and type of customers” and that: 6 7 8 9 Allocation factors for the meter plant were based on the relative ratios of the average installed meter cost within a class; with the relative weight of a residential customer set equal to one, each of the other classes is assigned weighting factors.69 10 CL&P’s ACOS uses this weighted meter cost allocator to allocate the meter 11 plant recorded in Account 370 to customer classes.70 In other words, CL&P’s own cost 12 study recognizes that meter costs are caused by the number and type of meters serving 13 each class. 14 Q 15 16 WHAT IS THE EFFECT OF ALLOCATING AMI COSTS ON THE BASIS OF CLASS DISTRIBUTION REVENUE RATHER THAN ON A COST BASIS? A It shifts AMI costs to classes whose share of distribution revenue is large relative to the 17 number and cost of their meters, which are primarily the larger commercial and 18 industrial classes. Table JRD-2 below compares, for selected rate classes, each 19 class’s share of test year distribution revenue with its share of meter plant under the 20 weighted meter cost allocator used in CL&P’s ACOS.71 69 CL&P Witness Nieto ACOS Direct (Exhibit CLP-ACOS-1) at 6. Exhibit CLP-ACOS-2 at 16-20. 71 Exhibit CLP-ACOS-2 at 16-20 (Account 370 meter plant allocation) and 137-142 (test year class distribution revenue). Test year distribution revenue is used here as a proxy for the class shares of Base Revenue Requirement that would be used under CL&P’s proposed PBMRP tariff. 70 BRUBAKER & ASSOCIATES, INC.
  2. Page 32 of 42

    James R. Dauphinais Page 30 TABLE JRD-2 Class Shares of Distribution Revenue and Meter Plant Share of Distribution Revenue Share of Meter Plant Ratio of Revenue Share to Meter Share Rate 1 (Residential) 54.724% 66.248% 0.8 Rate 5 (Residential Electric Heat) 8.879% 8.849% 1.0 Rate 30 (Small General) 16.970% 18.017% 0.9 Rate 37 (Intermediate Time-of-Day) 4.034% 1.663% 2.4 Rate 39 (Large Interruptible) 0.114% 0.018% 6.3 Rate 56 (Intermediate TOD Non-Manf.) 4.318% 1.005% 4.3 Rate 57 (Large TOD Manufacturers) 1.287% 0.309% 4.2 Rate 58 (Large TOD Non-Manufacturers) 2.692% 0.426% 6.3 Rate Class 1 As shown in Table JRD-2, under CL&P’s proposal, Rate 57 would be allocated 2 about 4.2 times, and Rate 39 about 6.3 times, the share of AMI costs they would be 3 allocated using the weighted meter cost allocator from CL&P’s own ACOS. 4 example, for every $1 million of AMI revenue requirement, Rate 57 would be allocated 5 approximately $12,900 under CL&P’s proposal, compared to approximately $3,100 6 using the weighted meter cost allocator.72 Conversely, the residential Rate 1 class 7 would be allocated a smaller share of AMI costs than its share of meter plant. 72 $12,900 ≈ $12,870 = $1,000,000 x 1.287%; $3,100 ≈ $3,090 = $1,000,000 x 0.309%. BRUBAKER & ASSOCIATES, INC. For
  3. Page 33 of 42

    James R. Dauphinais Page 31 1 C. AMI Cost Allocation Recommendations 2 Q WHAT DO YOU RECOMMEND WITH RESPECT TO THE ALLOCATION OF AMI 3 4 COSTS? A I take no position in my testimony on whether PURA should approve CL&P’s AMI 5 deployment or its proposed PBMRP. However, to the extent PURA allows CL&P to 6 recover AMI costs, whether through the PBMRP or another mechanism, I recommend 7 that PURA reject CL&P’s proposal to allocate those costs on the basis of class 8 distribution revenue. Instead, AMI costs should be separately identified and allocated 9 on a cost basis by using the weighted meter cost allocator used in CL&P’s ACOS to 10 allocate Account 370 meter plant. 11 I also recommend that PURA direct CL&P to use the same cost-based 12 allocation for the deferred AMI-related O&M expense and stranded AMR meter costs 13 when it seeks recovery of those costs, unless CL&P demonstrates that a different 14 cost-based method is more appropriate. 15 Q DOES THIS CONCLUDE YOUR DIRECT TESTIMONY? 16 A Yes, it does. BRUBAKER & ASSOCIATES, INC.
  4. Page 34 of 42

    Appendix A James R. Dauphinais Page 1 Qualifications of James R. Dauphinais 1 2 Q PLEASE STATE YOUR NAME AND BUSINESS ADDRESS. 3 A James R. Dauphinais. My business address is 16690 Swingley Ridge Road, Suite 140, 4 Chesterfield, MO 63017, USA. 5 Q PLEASE STATE YOUR OCCUPATION. 6 A I am a consultant in the field of public utility regulation and a Managing Principal with 7 the firm of Brubaker & Associates, Inc. (“BAI”), energy, economic and regulatory 8 consultants. 9 Q PLEASE SUMMARIZE YOUR EDUCATIONAL BACKGROUND AND EXPERIENCE. 10 A I graduated from Hartford State Technical College in 1983 with an Associate's Degree 11 in Electrical Engineering Technology. Subsequent to graduation, I was employed by 12 the Transmission Planning Department of the Northeast Utilities Service Company73 as 13 an Engineering Technician. 14 While employed as an Engineering Technician, I completed undergraduate 15 studies at the University of Hartford. I graduated in 1990 with a Bachelor's Degree in 16 Electrical Engineering. Subsequent to graduation, I was promoted to the position of 17 Associate Engineer. Between 1993 and 1994, I completed graduate level courses in 18 the study of power system analysis, power system transients and power system 19 protection through the Engineering Outreach Program of the University of Idaho. By 20 1996 I had been promoted to the position of Senior Engineer. 21 In the employment of the Northeast Utilities Service Company, I was 22 responsible for conducting thermal, voltage and stability analyses of the Northeast 73 In 2015, Northeast Utilities changed its name to Eversource Energy. BRUBAKER & ASSOCIATES, INC.
  5. Page 35 of 42

    Appendix A James R. Dauphinais Page 2 1 Utilities' transmission system to support planning and operating decisions. This 2 involved the use of load flow, power system stability and production cost computer 3 simulations. It also involved examination of potential solutions to operational and 4 planning problems including, but not limited to, transmission line solutions and the 5 routes that might be utilized by such transmission line solutions. Among the most 6 notable achievements I had in this area include the solution of a transient stability 7 problem near Millstone Nuclear Power Station, and the solution of a small signal (or 8 dynamic) stability problem near Seabrook Nuclear Power Station. In 1993 I was 9 awarded the Chairman's Award, Northeast Utilities’ highest employee award, for my 10 work involving stability analysis in the vicinity of Millstone Nuclear Power Station. 11 From 1990 to 1996, I represented Northeast Utilities on the New England Power 12 Pool Stability Task Force. I also represented Northeast Utilities on several other 13 technical working groups within the New England Power Pool (“NEPOOL”) and the 14 Northeast Power Coordinating Council (“NPCC”), including the 1992-1996 New York- 15 New England Transmission Working Group, the Southeastern Massachusetts/Rhode 16 Island Transmission Working Group, the NPCC CPSS-2 Working Group on Extreme 17 Disturbances and the NPCC SS-38 Working Group on Interarea Dynamic Analysis. 18 This latter working group also included participation from a number of ECAR, PJM and 19 VACAR utilities. 20 From 1990 to 1995, I also acted as an internal consultant to the 21 Nuclear Electrical Engineering Department of Northeast Utilities. This included 22 interactions with the electrical engineering personnel of the Connecticut Yankee, 23 Millstone and Seabrook nuclear generation stations and inspectors from the Nuclear 24 Regulatory Commission (“NRC”). 25 In addition to my technical responsibilities, from 1995 to 1997, I was also 26 responsible for oversight of the day-to-day administration of Northeast Utilities' Open BRUBAKER & ASSOCIATES, INC.
  6. Page 36 of 42

    Appendix A James R. Dauphinais Page 3 1 Access Transmission Tariff. This included the creation of Northeast Utilities' pre-FERC 2 Order No. 889 transmission electronic bulletin board and the coordination of Northeast 3 Utilities' transmission tariff filings prior to and after the issuance of Federal Energy 4 Regulatory Commission (“FERC” or “Commission”) FERC Order No. 888. I was also 5 responsible for spearheading the implementation of Northeast Utilities' Open Access 6 Same-Time Information System and Northeast Utilities’ Standard of Conduct under 7 FERC Order No. 889. During this time, I represented Northeast Utilities on the Federal 8 Energy Regulatory Commission's "What" Working Group on Real-Time Information 9 Networks. Later I served as Vice Chairman of the NEPOOL OASIS Working Group 10 and Co-Chair of the Joint Transmission Services Information Network Functional 11 Process Committee. I also served for a brief time on the Electric Power Research 12 Institute facilitated "How" Working Group on OASIS and the North American Electric 13 Reliability Council facilitated Commercial Practices Working Group. 14 In 1997 I joined the firm of Brubaker & Associates, Inc. The firm includes 15 consultants with backgrounds in accounting, engineering, economics, mathematics, 16 computer science and business. Since my employment with the firm, I have filed or 17 presented testimony before the Federal Energy Regulatory Commission in Consumers 18 Energy Company, Docket No. OA96-77-000; Midwest Independent Transmission 19 System Operator, Inc., Docket No. ER98-1438-000; Montana Power Company, Docket 20 No. ER98-2382-000; Inquiry Concerning the Commission’s Policy on Independent 21 System Operators, Docket No. PL98-5-003; SkyGen Energy LLC v. Southern 22 Company Services, Inc., Docket No. EL00-77-000; Alliance Companies, et al., Docket 23 No. EL02-65-000, et al.; Entergy Services, Inc., Docket No. ER01-2201-000; 24 Remedying Undue Discrimination through Open Access Transmission Service, 25 Standard Electricity Market Design, Docket No. RM01-12-000; Midwest Independent 26 Transmission System Operator, Inc., Docket No. ER10-1791-000; NorthWestern BRUBAKER & ASSOCIATES, INC.
  7. Page 37 of 42

    Appendix A James R. Dauphinais Page 4 1 Corporation, Docket No. ER10-1138-001, et al.; Illinois Industrial Energy Consumers 2 v. Midcontinent Independent System Operator, Inc., Docket No. EL15-82-000; 3 Midcontinent Independent System Operator, Inc., Docket No. ER16-833-000; 4 Midcontinent Independent System Operator, Inc., Docket No. ER17-284-000; 5 Midcontinent Independent System Operator, Inc. and Ameren Services Company 6 Docket No. ER18-463-000; and PJM Interconnection, L.L.C., Docket No. ER26-1479- 7 000. I have also filed or presented testimony before the Alberta Utilities Commission, 8 the California Public Utilities Commission, the Colorado Public Utilities Commission, 9 the Connecticut Department of Public Utility Control, the Florida Public Service 10 Commission, the Idaho Public Service Commission, the Illinois Commerce 11 Commission, the Indiana Utility Regulatory Commission, the Iowa Utilities Board, the 12 Kentucky Public Service Commission, the Louisiana Public Service Commission, the 13 Michigan Public Service Commission, the Missouri Public Service Commission, the 14 Montana Public Service Commission, the Nevada Public Utilities Commission, the New 15 Mexico Public Regulation Commission, the Council of the City of New Orleans, the New 16 York Public Service Commission, the Oklahoma Corporation Commission, the Public 17 Utility Commission of Texas, the Public Service Commission of Utah, the Virginia State 18 Corporation Commission, the Wisconsin Public Service Commission, the Wyoming 19 Public Service Commission, Federal District Court and various committees of the 20 Illinois, Missouri and South Carolina state legislatures. This testimony has been given 21 regarding a wide variety of issues including, but not limited to, ancillary service rates, 22 avoided cost calculations, certification of public convenience and necessity, class cost 23 of service, cost allocation, fuel adjustment clauses, fuel costs, generation 24 interconnection, interruptible rates, large load additions, market power, market 25 structure, off-system sales, prudency, purchased power costs, resource adequacy, BRUBAKER & ASSOCIATES, INC.
  8. Page 38 of 42

    Appendix A James R. Dauphinais Page 5 1 resource planning, rate design, retail open access, standby rates, transmission losses, 2 transmission planning, transmission rates and transmission line routing. 3 I have also participated on behalf of clients in the Southwest Power Pool 4 Congestion Management System Working Group, the Alliance Market Development 5 Advisory Group and several committees and working groups of the Midcontinent 6 Independent System Operator, Inc. (“MISO”), including the Congestion Management 7 Working Group; Economic Planning Users Group; Large Load Working Group, Loss of 8 Load Expectation Working Group; Market Subcommittee; Michigan Transmission 9 Studies Task Force; Planning Subcommittee; Regional Expansion, Criteria and 10 Benefits Working Group; Resource Adequacy Subcommittee (formerly the Supply 11 Adequacy Working Group); and Reliability Subcommittee. I am currently a member of 12 the MISO Advisory Committee in the end-use customer sector on behalf of industrial 13 customer groups in Illinois, Louisiana, Michigan and Texas. 14 Chairman of the Issues/Solutions Subgroup of the MISO Revenue Sufficiency 15 Guarantee (“RSG”) Task Force. I am also the past 16 In 2009, I completed the University of Wisconsin-Madison High Voltage Direct 17 Current (“HVDC”) Transmission course for Planners that was sponsored by MISO. I 18 am a member of the Power and Energy Society (“PES”) of the Institute of Electrical and 19 Electronics Engineers (“IEEE”). 590554 BRUBAKER & ASSOCIATES, INC.
  9. Page 39 of 42

    Exhibit JRD-1 Page 1 of 2 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-739 Page 1 of 1 Date Filed: September 28, 2026 Witness: Douglas P. Horton, Brendan J. O' Brien, Garrett J. Murray, Edward A. Davis, Kimberly R. Parsons, and Jared A. Lawrence Request from: Office of Consumer Counsel Question: (ACOSS) Is the Company proposing any recovery of AMI costs in this case? If yes, please provide the amount and the types of costs (by FERC account.) Response: The Company is not proposing to recover AMI-related capital or expense in base distribution rates in this proceeding. However, the Company is requesting PURA’s approval for a ratemaking mechanism to recover AMI-related capital investments through the Performance-Based Mult-Year Rate Plan (“PBMRP”), included in the proposed capital funding mechanism. In addition, the Company is requesting PURA’s approval for the deferral treatment of incremental O&M expense and stranded meter costs associated with the implementation of AMI for future recovery or securitization. Therefore, the Company is not at a point to provide amounts or types of costs by FERC account in this proceeding.
  10. Page 40 of 42

    Exhibit JRD-1 Page 2 of 2 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-740 Page 1 of 1 Date Filed: September 28, 2026 Douglas P. Horton, Brendan J. O' Brien, Garrett J. Murray, Edward A. Witness: Davis, and Kimberly R. Parsons Request from: Office of Consumer Counsel Question: (ACOSS) How does the Company propose to classify and allocate AMI costs? Response: The Company is proposing to recover eligible AMI capital costs through the proposed Performance Based Multi-Year Rate Plant (“PBMRP”) capital funding mechanism. Under the Company’s proposed PBMRP tariff, costs would be allocated to rate classes on the basis of class distribution revenue (class allocation factors) described in the tariff. The Company proposes to defer AMI-related incremental O&M expenses and unrecovered AMR plant balances to be securitized in the future, at which time the Company intends to submit a proposal to PURA on the appropriate allocation of such costs.