Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Files5

Search terms highlighted
Eversource rate increase is on 13 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
12 pages match
  1. Page 95 of 107

    Every new customer that installs a heat pump should be auto-enrolled in Rate HP at 1 2 the time of installation. To achieve this, every customer receiving a heat pump incentive through 3 Energize CT or the New England Heat Pump Accelerator should be placed on Rate HP 4 automatically. For installations that happen outside of Energize CT — for example, self-funded 5 purchases — the Company should provide an attestation and certification pathway: a simple 6 form the installer or customer submits to confirm a qualifying heat pump was installed. For existing heat pump customers, the Company should auto-enroll all known electric 7 8 customers who have previously installed heat pumps. These customers are being overcharged 9 right now. Since the day they installed their heat pump, they have been paying far more than the 10 T&D costs caused by their new load. And a portion of these customers are readily identifiable by 11 the Company, those that previously received a heat pump incentive through EnergizeCT or any 12 other relevant state or utility program. There is no reason to delay correcting this. 13 After a customer is auto-enrolled, Rate HP would be opt-out: the customer could return to Rate 1 14 (or any other optional rate) if they choose. 15 Q. Why do you recommend automatic enrollment rather than an opt-in rate? 16 A. Because opt-in rates fail. They require customers to know the rate exists, understand that it 17 would save them money, and take affirmative action to enroll. Most customers never do. 18 This is not a theoretical concern. Maine’s Central Maine Power offered a seasonal heat pump 19 rate on an opt-in basis. Enrollment never exceeded 2% of eligible customers. 82 20 York’s experience is even more striking. Con Edison has facilitated more than 43,000 21 heat pump installations through its Clean Heat program, yet as of December 2025, only about Shah, Wagner & Teener, “Designing Better Rates for Heat Pump Customers,” RMI (June 17, 2026) (Shah, Wagner, and Teener 2026). CMP’s seasonal heat pump rate launched January 2023 with a 5,000 customer enrollment cap. Maine had approximately 143,000 heat pumps installed statewide by the end of 2024. Even with active marketing, only about 2,100 enrolled. 82 93
  2. Page 96 of 107

    1 500 households — barely 1% — had enrolled in the utility’s opt-in Steady Use Rate, which is 2 designed to save a typical heat pump customer roughly $500 per year. 83 That is $131 million in 3 cumulative bill savings left on the table over the rate period, simply because customers did not 4 know the rate existed or found the enrollment process confusing. 5 The goal of offering heat pump rates by creating Rate HP is to eliminate the existing 6 cross-subsidy between heat pump customers and fossil-heating customers, and to prevent 7 customers newly installing heat pumps from overpaying in the first place. But creating a new 8 rate schedule does not automatically solve the problem — the rate needs to be adopted at 9 scale. And if a heat pump rate isn’t paired with auto-enrollment, it won’t be. 10 Massachusetts avoided the opt-in trap entirely by building auto-enrollment into its heat 11 pump rate from the start. In DPU 25-08, the Massachusetts Department of Public Utilities 12 approved a lower heat pump rate for the state’s three investor-owned electric utilities — 13 Eversource, Unitil, and National Grid. 84 Customers who install heat pumps through Mass Save 14 — the state’s ratepayer-funded efficiency program — are automatically enrolled at the time of 15 installation. For customers who installed heat pumps before the program existed, Massachusetts 16 uses an attestation process. 17 We know that opt-in rates get low enrollment; the Company can and must design a better 18 enrollment mechanism: automatic enrollment through Energize CT and the New England Heat 19 Pump Accelerator. Every heat pump customer who is not enrolled continues to be overcharged 20 by the full amount every year. 83 Environmental Defense Fund, Rewiring America & Alliance for a Green Economy, “Con Edison Heat Pump Customers Missing Out on $131 Million in Bill Savings” (July 9, 2025) (Environmental Defense Fund, Rewiring America, and Alliance for a Green Economy 2025). Enrollment figure of ~500 as of December 2025 reported in Mona Zhang, “How NY heat pump users got stuck with higher bills,” E&E News (March 3, 2026) (Zhang 2026). 84 The Massachusetts DPU maintains an overview of the seasonal heat pump rates and enrollment procedures for all three IOUs at DPU (2025). 94
  3. Page 97 of 107

    1 Q. Could automatic enrollment cause some heat pump customers to see higher bills? 2 A. No, because Rate HP is specifically designed so that every heat pump customer pays less than 3 they would under Rate 1. By lowering Rate 1’s existing winter rates, no heat pump customer 4 would be made worse off by being placed on Rate HP. 5 This is the key link between rate design and enrollment. A rate that only lowers charges 6 can be safely applied to all heat pump customers without risk of adverse bill impacts. If the rate 7 raised some charges and lowered others — for example, a higher fixed charge paired with a 8 lower volumetric rate — some customers could see higher bills in certain months. The seasonal 9 winter reduction avoids this entirely: summer rates are unchanged, and winter rates are only 10 lower. There are no structural losers. 11 A rate design that only lowers charges unlocks auto-enrollment, but it necessarily 12 constrains eligibility: it must be a tech-specific rate, rather than one available to all residential 13 customers. A lower rate is justified for heat pump customers. As covered in section III, they are 14 structural “high-usage” customers who would otherwise overpay. A lower rate available to all 15 customers would simply lower the bills of anyone who enrolled, which would create a revenue 16 shortfall under heavy enrollment. 17 I believe this is the right trade-off. A rate that can be safely auto-enrolled to every eligible 18 customer, even if restricted to a defined population, will reach far more people and thus have a 19 fundamentally bigger impact than an optional rate with a revenue-neutral design (like a high 20 fixed charge) that is available to all customers but which will achieve negligible enrollment, 21 because it requires customers to discover it, evaluate it, and opt in. 22 Q. Why is it important to auto-enroll existing heat pump customers, not just new ones? 95
  4. Page 98 of 107

    1 A. Because enrolling only new customers stops the cross-subsidy from getting bigger, but it does 2 not fix it for the customers who are already bearing it. 3 If the Authority only enrolls new heat pump customers going forward, every customer 4 who has already installed a heat pump continues to be overcharged by the full amount, 5 indefinitely — unless they opt in on their own, which as I have discussed, many of them will not. 6 The per-household stakes are substantial: $1,040 per year in combined T&D overcharges. These 7 are real dollars being transferred from heat pump customers to fossil-heating customers every 8 year, and they have been accumulating since the day each customer installed their heat pump. 9 The Company and Energize CT have records of past heat pump incentive recipients. For 10 customers who installed heat pumps outside of incentive programs, an attestation process — as 11 Massachusetts uses — can identify them. Auto-enrollment of existing heat pump customers is 12 what makes this proposal a genuine fix rather than a half-measure. 13 XIII. DISCUSSION OF ALTERNATIVE RATE DESIGNS 14 Q. The heat pump rate you propose in Rate HP is a seasonal design, lowering winter 15 transmission and distribution rates. Are there other rate designs that can eliminate the 16 cross-subsidy? 17 A. Yes, and I considered several before arriving at this recommendation. But any viable solution 18 must solve two problems simultaneously: the overpayment problem — by stopping the 19 overcollection of transmission and distribution revenue from heat pump customers — and the 20 enrollment problem — ensure that the customers who are actually being overcharged are 21 actually on the rate that fixes it. These two constraints significantly narrow the design space. 22 There are two broad categories of solutions: default rate redesign, which changes Rate 1 23 for all residential customers, and tech-specific rates, which create a new schedule for heat pump 96
  5. Page 99 of 107Match

    1 customers only. Each approach has different strengths and weaknesses on the overpayment and 2 enrollment dimensions. I will discuss each in turn. 3 Q. Could the cross-subsidy be eliminated by redesigning Rate 1? 4 A. The main virtue of the default rate redesign approach is that it solves the enrollment problem 5 directly: if you managed to eliminate the overpayment by redesigning Rate 1, the vast majority 6 of residential customers are already on this rate, so you would fix the problem at scale without 7 requiring anyone to change anything. 8 The difficulty is that the main lever for reducing the overpayment within Rate 1 is raising 9 the fixed charge. Raising the customer charge shifts revenue recovery away from volumetric 10 rates, which reduces the per-kWh overcollection on high-usage customers. 11 The problem is magnitude. To eliminate the heat pump overpayment by redesigning Rate 12 1, the monthly fixed charge would then have to rise from $12.36 to $121.49 — an increase of 13 $109.13 per month. 85 14 This is a massive change that would affect every residential customer, not just heat pump 15 customers, and would be regressive to low-income households unless paired with an income- 16 graduated structure. 17 To put that in perspective, the Company’s own MCOS supports a marginal customer cost 18 of $28.98 per month for Rate 1. 86 Yet for Rate 1, the Company proposes moving the customer 19 charge from $9.62 to just $12.36 — a $2.74 step toward a $16.62 gap. 87 At that pace, the fixed The derivation of this figure — the revenue-neutral, cost-reflective redesign of Rate 1 — is described in Exhibit JPV-2, Section 6. 85 86 Exhibit CLP-MCOS-1 (Eversource 2026c), Table 1: Rate 1 marginal customer cost = $28.98/month. Joint Direct Testimony of Edward Davis and Kimberly R. Parsons, Exhibit CLP-RATES-1 (Eversource 2026e), Section IV.B. Current Rate 1 customer charge of $9.62 proposed to increase to $12.36 per the MRCC calculation in Exhibit CLP-RATES-2.13. 87 97
  6. Page 100 of 107

    1 charge would not approach the level needed to eliminate the heat pump cross-subsidy ($121.49) 2 for many decades to come. 3 Q. What about the tech-specific approach? What design levers does it offer, and why? 4 A. Within the default rate, where revenue sufficiency must be maintained, the only way to reduce 5 overcollection from heat pump customers is to raise the fixed charge on everyone, shifting 6 revenue recovery away from per-kWh rates. 7 And the Company could choose to create a tech-specific rate exclusively for heat pump 8 customers with a high fixed-charge design. Indeed, Rate 6 takes a step in this direction, by 9 raising the fixed charge from $12.36 to $30.95. 10 But a tech-specific rate opens an additional lever for reducing overcollection that the 11 default rate (or any rate that must be revenue neutral with respect to the residential class as a 12 whole) does not have: keep the fixed charge the same, and simply lower volumetric charges. 13 If the overcollection problem arises from the application of volumetric rates designed for the 14 average electric customer to a subclass of residential customers with structurally above-average 15 usage, then simply lowering the volumetric rates for that population reduces overcollection from 16 that population. Put another way, instead of fundamentally changing the rate design for Rate 1, 17 you can simply recalibrate it, by designing the volumetric rate component for the average heat 18 pump customer, rather than the average residential customer. 19 Q. How do each of these two kinds of tech-specific rates — raising the fixed charge vs. just 20 lowering the volumetric rates — affect the enrollment problem? 21 A. Unlike redesigning Rate 1, a tech-specific rate does not solve enrollment automatically — 22 customers must enroll onto it. And as I showed in Section XII, auto-enrollment is the only 23 realistic solution to reaching meaningful participation with an optional rate. 98
  7. Page 101 of 107

    1 2 I am working under the assumption that the Authority is more likely to approve autoenrollment if the rate design guarantees that no enrolled customer is made worse off. 3 A version of Rate HP with a very high fixed charge could cause a minority of heat pump 4 customers — particularly lower-usage ones — to see higher bills in certain months. Lower 5 volumetric rates guarantee the opposite: every enrolled customer either saves or pays the same in 6 a given month, depending on the design, but no customer pays more in any month. 7 In other words, tech-specific heat pump rates with lower volumetric charges would allow 8 the Authority to achieve the benefits of auto-enrollment without paying the cost of creating 9 structural losers. 10 Q. Are there different ways to structure the lower volumetric charges under a tech-specific 11 rate? 12 A. Yes. There are three main designs, each of which can eliminate the overpayment, if 13 volumetric rates are lowered to the right level: 14 1. Flat — lower all non-generation volumetric rates by whatever percentage is needed to 15 eliminate the annual overpayment. The rates would still be flat, so they would be the 16 same for every hour of the year. This is the simplest option. 17 2. Seasonal — leave the summer rate unchanged and lower only the winter rate. This is 18 what I propose. This is also how Massachusetts has designed their heat pump rates. 19 3. Time-of-use — create a heat-pump-specific version of a TOU rate that would have lower 20 on-peak and off-peak rates compared with a TOU rate designed to be revenue-neutral for 21 the residential class as a whole (such as Rate 7), layering TOU price signals onto the 22 tech-specific reduction. 99
  8. Page 102 of 107

    1 All three solve the overpayment problem as long as the resulting per-kWh rates are set 2 low enough to stop overcollecting from the average heat pump customer. 3 I’ll discuss the costs and benefits of each design in turn. 4 Q. Given these options, why do you not propose a flat tech-specific rate? 5 A. A tech-specific rate with a flat volumetric charge that is lower year-round, paired with auto- 6 enrollment, solves both the overpayment and enrollment problems, and it does so with the 7 simplest available design. It eliminates the overcharge, guarantees savings for every enrolled 8 customer, and is simple enough that customers, the Authority, and the Company can all verify 9 that it works. While this would remove the annual overpayment paid by heat pump customers on 10 average, it would do so by reducing the T&D bills of heat pump customers by a uniform 11 percentage in every month, including those in summer. I share the Company’s objective of 12 pricing incremental heat pump loads at (closer to) marginal cost, in order to satisfy cost- 13 causation principles. Doing this would “right-size” post-heat-pump T&D bills during the heating 14 season, since that is where 97% of incremental heat pump load occurs for the average customer 15 switching from fossil fuels (October through April). 16 Q. Why do you advocate for a seasonal tech-specific rate? 17 A. In addition to the benefits of a flat tech-specific rate — solving the overpayment and 18 enrollment problems — a seasonal rate has two main benefits: 19 1. Seasonal rates are targeted: as we saw in Section III, most of the overcollection occurs 20 during winter. Lowering rates in winter reduces overcollection from the season where 21 most of it occurs, rather than year-round. 22 2. Seasonal rates promote bill stability: winter is when new heat pump customers see their 23 electric bills rise most sharply — the heat pump replaces a gas furnace, so electricity 100
  9. Page 103 of 107

    1 consumption increases significantly during heating months. A seasonal rate concentrates 2 the bill relief in exactly those months, smoothing out the seasonal bill shock that might 3 otherwise discourage adoption or cause customers to question whether the heat pump was 4 a good investment (even if they are saving money by switching overall). 5 Q. How could the Company design a seasonal tech-specific heat pump rate correctly? 6 A. Designing a seasonal heat pump rate correctly requires satisfying three conditions: 7 1. The seasonal rate must lower what heat pump customers pay annually. Some seasonal 8 designs try to maintain revenue-neutrality for heat pump customers by lowering the 9 winter rate but raising the summer rate, which merely shifts the overpayment between 10 seasons, defeating the entire purpose of a heat pump rate. 11 2. The seasonal rate must lower what heat pump customers pay annually by a sufficient 12 amount to eliminate the overpayment. Reducing the winter rate by 1 c/kWh, for example, 13 would be a half-measure. 14 3. While rates in both seasons can be lowered — the reduced revenue collection doesn’t all 15 have to concentrate in winter — neither season’s rates should be set higher than those in 16 Rate 1, as that could produce structural losers, thus complicating auto-enrollment — even 17 if the rate satisfies the first two conditions. 18 Q. Why do you not recommend the other approaches you discussed? 19 A. Each of the alternatives I have discussed in this section could eliminate the overpayment 20 problem in theory. In practice, they either complicate auto-enrollment, or require significant 21 disruption to all residential customers in order to make a difference. In other words: given the 22 downsides of these alternatives, they would likely leave the cross-subsidy largely intact. 101
  10. Page 104 of 107

    1 A redesigned Rate 1 would require raising the fixed charge by an amount I do not 2 believe the Authority is prepared to approve in this case, particularly without introducing 3 income-graduation to avoid regressive impacts. If the Authority took this approach, the most 4 likely outcome would be a marginal increase in the fixed charge that would look like progress 5 but do essentially nothing to remove the overpayment and fix heat pump operating costs. 6 A tech-specific rate with a high fixed charge could strike customers as unfamiliar and 7 would create structural losers among lower-usage heat pump customers, complicating auto- 8 enrollment. And without auto-enrollment, creating an optional heat pump rate (that almost no 9 customers opt into) risks allowing stakeholders to claim victory without having any meaningful 10 impact on the problem. 11 A tech-specific TOU rate does not solve the overcollection problem on its own; it would 12 need significantly lower volumetric rates than a TOU rate design for the residential class as a 13 whole (such as Rate 7) to actually eliminate the overcharge. (The reason is simple: the 14 overpayment problem arises from an overreliance on volumetric rates applied to structurally 15 high-usage customers. Making a volumetric rate time-varying does not change this — it still has 16 to be significantly lowered.) While a properly designed TOU rate for heat pump customers 17 would create incentives for load shifting as well as removing the overpayment, it would also add 18 complexity and may create structural losers, unlike a seasonal tech-specific rate. Unless the 19 Authority is prepared to create a properly designed tech-specific TOU rate with rates low enough 20 to eliminate the overcharge, auto-enroll all heat pump customers onto it, and do so in a timely 21 fashion, this route risks allowing the perfect to become the enemy of the good. 22 XIV. CONCLUSION 23 Q. Does this conclude your direct testimony? 102

Text of JPV-1.pdf

Extracted from the file · 2 pages · 2,718 characters

1 page match
Words on different pages
Words on different pages

As listed on the current system

Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Juan-Pablo Velez [26-05-10]

This filing on the current system (opens in a new tab)