Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Files1

Search terms highlighted
Eversource rate increase is on 7 pages of the text below, highlighted. Go to the first matchClear highlighting
7 pages match
  1. Page 57 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 54 of 90 1 Q. SUPPORT ITS CAPITAL FORECAST? 2 3 WHAT PLANNING DOCUMENT DID EVERSOURCE FILE TO A. The Company filed a “Five-Year Targeted System Performance Plan” (“TSP”). 112 4 That plan is the Company’s own capital planning document, created without any 5 stakeholder feedback or external evaluation of assumptions, inputs, or modeling 6 during development. 7 Q. FOR ITS CAPITAL FORECAST. 8 9 EXPLAIN WHY THE COMPANY’S TSP IS NOT AN ADEQUATE BASIS A. The Targeted System Performance Plan covers some of the same subject matter as 10 an IDSP, such as an overview of the state of the system and an investment plan. 11 However, it does not follow the structure, process, or planning horizon the 12 Authority has developed throughout the RE03 proceeding. These elements are not 13 superfluous; they are critical to the demonstration that a grid need is real and 14 requires a solution. The Company described its plan as aligning “generally” with 15 the IDSP content “while also reflecting practical differences.” 113 16 If the RE03 PFD No. 2 is finalized, each EDC’s IDSP would have to include, at a 17 minimum, ten defined sections, each with detailed content requirements the PFD 18 specifies. 114 The TSP does not map into that structure. Instead, it is organized by 112 113 114 Docket No. 26-05-10, July 14, 2026 Exhibits CLP-TSP-1 through CLP-TSP-5 OCC-566, at page 2. The ten sections are: (1) Executive Summary; (2) Planning Policy; (3) Current State of the System; (4) IDSP Methodology; (5) Stakeholder Engagement and Social Equity; (6) Load Forecasting; (7) Grid Needs Assessment; (8) Solution Selection Process; (9) Capital Investment Plan, covering a ten-year planning horizon; and (10) Long-Term Strategic Plan, covering the period beyond ten years (RE03 PFD No. 2, at page 9 & App. A). 54
  2. Page 58 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 55 of 90 1 investment category: substations, lines, new customer, asset health, capacity, grid 2 modernization, vegetation management, resiliency, and so on. When asked to 3 identify where the TSP addresses each IDSP section, the Company pointed to 4 scattered pages across several exhibits. 115 For several sections, those references fall 5 well short of what the IDSP would require: 6 • Stakeholder Engagement and Social Equity. An IDSP would have to 7 explain how stakeholders participate in the planning process and how equity 8 considerations are addressed. The Company points to no part of the TSP for 9 this section. It cites two pages of its leadership panel testimony that discuss 10 wholesale supply costs and public benefits charges, not stakeholder 11 participation in grid planning. 12 • Solution Selection Process. An IDSP would have to set out the criteria and 13 methods used to identify, compare, and select both traditional and non-wires 14 solutions. The Company points to three pages of the TSP. 15 • Planning Policy and Long-Term Strategic Plan. An IDSP would have to 16 address the state and local policies that inform grid planning, and separately 17 describe the Company's strategic plans beyond a ten-year horizon. The 18 Company cites the same two pages for both. 19 Notably, the TSP reflects no stakeholder review of any kind. It does not describe 20 any stakeholder process for evaluating load forecasting or long-term planning, or 115 OCC-566, at pages 2-3. 55
  3. Page 59 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 56 of 90 1 any public engagement. Although no stakeholder process was required for the TSP, 2 the absence of one matters. A plan that has not been tested by anyone outside the 3 Company rests entirely on the Company’s own assumptions about load growth, 4 grid needs, and solutions, and those are the assumptions that would set its capital 5 recovery. Other states have recognized this and require stakeholder engagement 6 before a utility files its grid plan. Illinois requires utilities to develop their multi- 7 year integrated grid plans through at least six stakeholder workshops over a 8 minimum of five months, run by an independent facilitator, before filing. 116 Maine 9 requires technical conferences or stakeholder workshops before filing to identify 10 the priorities, assumptions, goals, methods, and tools for the utility’s grid plan. 117 11 The TSP covers five years. 118 The Company already prepares ten-year substation 12 plans under N-1 contingency scenarios 119, so the shorter horizon reflects a choice 13 rather than a limitation. RE03 PFD No. 2 would require a ten-year Capital 14 Investment Plan and a Long-Term Strategic Plan looking 10 to 25 years ahead. 120 15 A longer horizon matters because the equipment the Company installs may remain 16 in service for 40 years or more. A five-year view cannot show whether an 116 117 118 119 120 220 Ill. Comp. Stat. 5/16-105.17(d)(6), (e) (requiring that integrated grid planning “ensure opportunities for robust public participation through open, transparent planning processes,” and establishing a stakeholder workshop process of at least six workshops over a minimum of five months, conducted by an independent facilitator selected by the Illinois Commerce Commission, before the utility files its plan). Me. Rev. Stat. tit. 35-A, § 3147(2) (“The commission shall hold technical conferences or stakeholder workshops before the filing to identify priorities, assumptions, goals, methods and tools that will assist the covered utility in developing a grid plan.”). Exhibit CLP-TSP-1, at page 13; Application, at pages 5-6. RE03 PFD No. 2, at p. 35. Id, at pages 9, 65-66. 56
  4. Page 60 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 57 of 90 1 investment made today will still fit the grid’s needs as load growth, DER adoption, 2 and electrification evolve. It also limits the Authority’s ability to see long-term 3 trends and to consider whether some investments could be deferred or right-sized. 4 RE03 PFD No. 2 also contemplates that a Comprehensive IDSP would be filed and 5 reviewed in its own docket three to six months before a rate case. 121 That separate 6 review would give stakeholders and the Authority time to examine the plan, ask 7 questions through discovery and technical meetings, and comment, and it would 8 give the Company an opportunity to revise the plan before it is used to support a 9 rate request. 122 The TSP was filed as a rate case exhibit, with no prior review. 10 The Company’s load forecasting falls short in several respects. RE03 PFD No. 2 11 directs the EDCs to develop at least three forecasts (low, middle, and high), with 12 the middle forecast serving as the baseline for identifying grid needs; to forecast at 13 the system, planning region, substation, and distribution feeder levels; and to use 14 leading indicators for DER and electrification adoption in the baseline and high 15 scenarios. 123 16 The Company forecasts load only at the substation level, and only for each 17 substation’s annual peak hour. It develops a 24-hour load profile only after that 18 peak-hour forecast identifies a capacity need. 124 That approach limits what the 19 forecast can reveal in three ways. First, it can miss grid needs that occur outside the 121 122 123 124 Id, at pages 73-74. Id., at page 73. RE03 PFD No. 2, at pages 30, 34. OCC-574. 57
  5. Page 61 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 58 of 90 1 peak hour. As rooftop solar grows, some constraints arise during low-load, high- 2 generation periods, which is why RE03 PFD No. 2 would require forecasts for 3 winter peak, summer peak, and low-load/high-generation conditions. 125 Second, it 4 cannot identify constraints on individual feeders, where many DER interconnection 5 and hosting capacity limits occur. RE03 PFD No. 2 would require forecasts at the 6 feeder level as well as the substation level. 126 Third, a single peak-hour value does 7 not show how long a constraint lasts or how often it recurs. That information 8 determines whether a non-wires solution such as battery storage or demand 9 response could meet the need. Without it, non-wires options are harder to identify 10 and evaluate, and a traditional wires investment becomes the default. 11 The Company proposes two forecast scenarios, a 50/50 and a 90/10 peak forecast. 12 They differ only in their weather assumptions, and the Company uses only the 13 90/10 forecast for system planning. 127 While a 90/10 weather assumption is a 14 common utility practice for reliability planning, the concern is that weather is the 15 only variable the Company’s forecast considers. RE03 PFD No. 2 would require 16 low, middle, and high scenarios that reflect different assumptions about load 17 growth, DER adoption, and electrification. Though the middle scenario would 18 serve as the baseline for identifying grid needs, the others, critically, would inform 19 solution design. 128 125 126 127 128 RE03 PFD No. 2, at page 30. Id., at pages 30, 34. OCC-574. RE03 PFD No. 2, at page 30. 58
  6. Page 62 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 59 of 90 1 Scenario-based planning lets a utility and its regulator test whether an investment 2 still makes sense under a range of plausible futures. The Company’s capital forecast 3 instead rests on a single view of load growth. That matters here because, under the 4 F-Factor, the capital forecast becomes the cap on capital recovery. If the forecast is 5 too high, the Company would have an approved basis for spending up to it, and 6 customers would bear the cost. 7 Under the IDSP framework, the load forecast drives the grid needs assessment, 8 which drives solution selection and, ultimately, the capital investment plan. The 9 Company’s capital forecast rests on a load forecast built on a single view of load 10 growth, at only substation level, without any scenario analysis and stakeholder 11 review the IDSP would require. It is not a reliable foundation for a capital budget 12 that would set the Company’s capital recovery for four years. 13 VI. IMPROVE PERFORMANCE. 129 14 15 Q. WHAT PIM STRUCTURE IS EVERSOURCE PROPOSING IN ITS RATE CASE APPLICATION? 16 17 EVERSOURCE HAS NOT SHOWN THAT ITS PROPOSED PIMS WILL A. 18 Eversource proposes PIMs and reported metrics in three categories: service quality and reliability, customer satisfaction and engagement, and sustainability and 129 The RE02 PFD, issued July 14, 2025, proposed a “PBR Performance Mechanism Portfolio” of Reported Metrics, Scorecards, and Performance Incentive Mechanisms (“PIMs”), organized by the nine priority outcomes from the Phase I Decision. Among the proposed mechanisms were a System Reliability PIM, a Customer Reliability PIM, the NWS Shared Savings Mechanism, and a Level 1 DER Interconnection PIM (RE02 2025 PFD, Table 1, at pages 7-8). 59
  7. Page 63 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 60 of 90 1 financial efficiency. 130 Its reliability PIMs follow the general structure of the RE02 2 designs: a downside-only System Reliability PIM based on Blue Sky SAIDI and 3 SAIFI, with penalties beginning at one standard deviation above a fixed five-year 4 average, and an upside-only Customer Reliability PIM based on repeat CEMI-5 5 and CELID-6 customers. 131 The Company assigns each PIM its own maximum 6 penalty or incentive: $3.5 million each for the SAIDI and SAIFI penalties, a $3.0 7 million Customer Reliability incentive, and a “Customer Suite” with a $3.0 million 8 maximum penalty and a $2.0 million maximum incentive. 132 In total, penalties are 9 capped at about $10 million per year and incentives at about $5 million, amounts 10 the Company derives from 0.5 percent of distribution revenues. 133 11 The Company’s design departs from RE02 in ways that weaken the PIMs’ ability 12 to provide the data and performance measures PURA needs to assess the 13 Company’s performance and hold it accountable. First, it uses a 2022–2026 14 baseline, which includes a year that has not yet concluded. 134 That would let the 15 Company’s own current-year performance help set the benchmark it will be 16 measured against. The Company also testifies that its SAIDI has been increasing in 17 recent years, indicating longer outages. 135 A baseline built on those recent years 18 would treat worsening reliability as the norm, making a penalty less likely. 130 131 132 133 134 135 Exhibit CLP-PBR-1, at pages 66-67. Exhibit CLP-ELP-3, at pages 1-2. Id., at page 2. Id.; Exhibit CLP-PBR-1, at page 66. Exhibit CLP-ELP-3, at pages 1-2. Exhibit CLP-ELP-1, at page 48. 60
  8. Page 64 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 61 of 90 1 Second, the Company's penalties rise on a sliding scale that begins at one standard 2 deviation and reaches its maximum only at two standard deviations. 136 Under that 3 structure, reliability could deteriorate well past normal year-to-year variation while 4 the Company faces only a fraction of the maximum penalty. 5 Third, it measures Customer Reliability with a single count of repeat customers, 6 rather than the four sub-metrics RE02 specifies. Those sub-metrics include the 7 percentage of repeat customers, which accounts for changes in the total number of 8 affected customers. 137 9 Fourth, it folds the Level 1 DER Interconnection PIM into a composite “Customer 10 Suite” with four unrelated customer-service measures, such as digital engagement 11 and call handling time, and sets a Company-selected target of 35 business days. 138 12 RE02 proposes a standalone PIM benchmarked to a three-year historical average. 139 13 In a composite, slow interconnection processing could be offset by strong 14 performance on unrelated measures, so the Company would face no consequence 15 for the delays that matter most to customers seeking to interconnect. 16 Fifth, it omits the NWS Shared Savings Mechanism entirely. 140 That mechanism is 17 the one PIM designed to reward the Company for choosing lower-cost non-wires 18 solutions over capital investment. Omitting it removes the only counterweight to 19 the capital bias the rest of the proposal reinforces. 136 137 138 139 140 Exhibit CLP-ELP-3, at pages 1-2. RE02 PFD No. 2, at page 46. Exhibit CLP-ELP-3, at pages 1-2. RE02 PFD No. 2, at pages 76-79. See id., at page 23. 61
  9. Page 65 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 62 of 90 1 Q. WHAT ARE THE SPECIFIC DESIGN ELEMENTS OF THE SYSTEM 2 RELIABILITY PIM AND THE CUSTOMER RELIABILITY PIM 3 PROPOSED BY PURA? 4 A. The proposed System Reliability PIM is downside-only. 141 It measures Blue-Sky 5 SAIDI and Blue-Sky SAIFI as two separate sub-metrics to be evaluated annually 6 against a fixed five-year historical average calculated under IEEE (Institute of 7 Electrical and Electronics Engineers) methodology and excluding major event 8 days, using transmission and distribution reliability performance filing data. The 9 penalty applies only when annual performance exceeds one standard deviation 10 above (i.e. directionally worse) that fixed five-year average, with the dollar penalty 11 amount to be set in each utility’s rate case. 142 12 The Customer Reliability PIM is upside-only. 143 It tracks four sub-metrics averaged 13 into a single composite score: CEMI-5, percent of repeat CEMI-5 customers, 14 CELID-6, and percent of repeat CELID-6 customers. 144 The financial incentive 15 becomes available only if that composite score falls below (i.e. directionally better) 16 a threshold equal to the fixed 2020–2024 historical average composite value plus 141 142 143 144 A downside-only PIM carries a financial penalty if the Company’s performance falls below the target, but no financial reward if performance exceeds it. RE02 2025 PFD, at pages 32-35. An upside-only PIM provides a financial reward if the Company’s performance exceeds the target, but no penalty if performance falls short. “CEMI-5” (Customers Experiencing Multiple Interruptions) counts customers who experienced five or more sustained interruptions in a year. “CELID-6” (Customers Experiencing Long Interruption Durations) counts customers who experienced an interruption lasting six hours or more. The “percent of repeat” sub-metrics measure the share of customers on each year's CEMI-5 or CELID-6 list who also appeared on the prior year’s list, to identify customers with chronic reliability problems. (RE02 PFD (July 14, 2025), at pages 35-39; see also Exhibit CLP-ELP-3, at page 1). 62
  10. Page 66 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 63 of 90 1 one standard deviation. The reward is a capped, fixed dollar amount, with the 2 maximum amount set in each utility’s rate case. 145 3 I recommend that the Authority (1) adopt these two PIMs, and (2) not attach a 4 financial reward to the Customer Reliability metric. Reliable service is a core 5 obligation of the Company. The Company should face penalties for 6 underperforming on reliability, but it should not be rewarded for improving it. If 7 the Authority nonetheless makes a reward available, it should not use the threshold 8 the Company proposed. Read literally, that threshold would pay a reward for 9 performance up to one standard deviation worse than the 5-year historical average, 10 which does not advance the Reliable and Resilient Electric Service or Affordable 11 Service priority outcomes. The reward threshold should instead be set at the 12 historical average minus one standard deviation, so that the Company is rewarded 13 only for improvement beyond normal year-to-year variation. 14 Q. ACCOUNTABLE FOR PERFORMANCE? 15 16 ARE THE COMPANY’S PROPOSED PIMS SUFFICIENT TO HOLD IT A. No, for two reasons. First, the amounts at stake are very small relative to the rest 17 of the plan. The Company’s maximum annual penalty across all PIMs is about 18 $10 million, or about $40 million over a four-year plan term. 146 By comparison, 19 the Company estimates that the return it seeks to collect through the F-Factor 20 would add $124.1 million over the same term, roughly three times its maximum 145 146 RE02 2025 PFD, at pages 35-39. Exhibit CLP-ELP-3, at page 2. 63

As listed on the current system

Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Lindsay J. Griffin [26-05-10]

This filing on the current system (opens in a new tab)