  1. Page 59 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 56 of 90 1 any public engagement. Although no stakeholder process was required for the TSP, 2 the absence of one matters. A plan that has not been tested by anyone outside the 3 Company rests entirely on the Company’s own assumptions about load growth, 4 grid needs, and solutions, and those are the assumptions that would set its capital 5 recovery. Other states have recognized this and require stakeholder engagement 6 before a utility files its grid plan. Illinois requires utilities to develop their multi- 7 year integrated grid plans through at least six stakeholder workshops over a 8 minimum of five months, run by an independent facilitator, before filing. 116 Maine 9 requires technical conferences or stakeholder workshops before filing to identify 10 the priorities, assumptions, goals, methods, and tools for the utility’s grid plan. 117 11 The TSP covers five years. 118 The Company already prepares ten-year substation 12 plans under N-1 contingency scenarios 119, so the shorter horizon reflects a choice 13 rather than a limitation. RE03 PFD No. 2 would require a ten-year Capital 14 Investment Plan and a Long-Term Strategic Plan looking 10 to 25 years ahead. 120 15 A longer horizon matters because the equipment the Company installs may remain 16 in service for 40 years or more. A five-year view cannot show whether an 116 117 118 119 120 220 Ill. Comp. Stat. 5/16-105.17(d)(6), (e) (requiring that integrated grid planning “ensure opportunities for robust public participation through open, transparent planning processes,” and establishing a stakeholder workshop process of at least six workshops over a minimum of five months, conducted by an independent facilitator selected by the Illinois Commerce Commission, before the utility files its plan). Me. Rev. Stat. tit. 35-A, § 3147(2) (“The commission shall hold technical conferences or stakeholder workshops before the filing to identify priorities, assumptions, goals, methods and tools that will assist the covered utility in developing a grid plan.”). Exhibit CLP-TSP-1, at page 13; Application, at pages 5-6. RE03 PFD No. 2, at p. 35. Id, at pages 9, 65-66. 56
  2. Page 60 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 57 of 90 1 investment made today will still fit the grid’s needs as load growth, DER adoption, 2 and electrification evolve. It also limits the Authority’s ability to see long-term 3 trends and to consider whether some investments could be deferred or right-sized. 4 RE03 PFD No. 2 also contemplates that a Comprehensive IDSP would be filed and 5 reviewed in its own docket three to six months before a rate case. 121 That separate 6 review would give stakeholders and the Authority time to examine the plan, ask 7 questions through discovery and technical meetings, and comment, and it would 8 give the Company an opportunity to revise the plan before it is used to support a 9 rate request. 122 The TSP was filed as a rate case exhibit, with no prior review. 10 The Company’s load forecasting falls short in several respects. RE03 PFD No. 2 11 directs the EDCs to develop at least three forecasts (low, middle, and high), with 12 the middle forecast serving as the baseline for identifying grid needs; to forecast at 13 the system, planning region, substation, and distribution feeder levels; and to use 14 leading indicators for DER and electrification adoption in the baseline and high 15 scenarios. 123 16 The Company forecasts load only at the substation level, and only for each 17 substation’s annual peak hour. It develops a 24-hour load profile only after that 18 peak-hour forecast identifies a capacity need. 124 That approach limits what the 19 forecast can reveal in three ways. First, it can miss grid needs that occur outside the 121 122 123 124 Id, at pages 73-74. Id., at page 73. RE03 PFD No. 2, at pages 30, 34. OCC-574. 57
  3. Page 61 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 58 of 90 1 peak hour. As rooftop solar grows, some constraints arise during low-load, high- 2 generation periods, which is why RE03 PFD No. 2 would require forecasts for 3 winter peak, summer peak, and low-load/high-generation conditions. 125 Second, it 4 cannot identify constraints on individual feeders, where many DER interconnection 5 and hosting capacity limits occur. RE03 PFD No. 2 would require forecasts at the 6 feeder level as well as the substation level. 126 Third, a single peak-hour value does 7 not show how long a constraint lasts or how often it recurs. That information 8 determines whether a non-wires solution such as battery storage or demand 9 response could meet the need. Without it, non-wires options are harder to identify 10 and evaluate, and a traditional wires investment becomes the default. 11 The Company proposes two forecast scenarios, a 50/50 and a 90/10 peak forecast. 12 They differ only in their weather assumptions, and the Company uses only the 13 90/10 forecast for system planning. 127 While a 90/10 weather assumption is a 14 common utility practice for reliability planning, the concern is that weather is the 15 only variable the Company’s forecast considers. RE03 PFD No. 2 would require 16 low, middle, and high scenarios that reflect different assumptions about load 17 growth, DER adoption, and electrification. Though the middle scenario would 18 serve as the baseline for identifying grid needs, the others, critically, would inform 19 solution design. 128 125 126 127 128 RE03 PFD No. 2, at page 30. Id., at pages 30, 34. OCC-574. RE03 PFD No. 2, at page 30. 58
  4. Page 62 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 59 of 90 1 Scenario-based planning lets a utility and its regulator test whether an investment 2 still makes sense under a range of plausible futures. The Company’s capital forecast 3 instead rests on a single view of load growth. That matters here because, under the 4 F-Factor, the capital forecast becomes the cap on capital recovery. If the forecast is 5 too high, the Company would have an approved basis for spending up to it, and 6 customers would bear the cost. 7 Under the IDSP framework, the load forecast drives the grid needs assessment, 8 which drives solution selection and, ultimately, the capital investment plan. The 9 Company’s capital forecast rests on a load forecast built on a single view of load 10 growth, at only substation level, without any scenario analysis and stakeholder 11 review the IDSP would require. It is not a reliable foundation for a capital budget 12 that would set the Company’s capital recovery for four years. 13 VI. IMPROVE PERFORMANCE. 129 14 15 Q. WHAT PIM STRUCTURE IS EVERSOURCE PROPOSING IN ITS RATE CASE APPLICATION? 16 17 EVERSOURCE HAS NOT SHOWN THAT ITS PROPOSED PIMS WILL A. 18 Eversource proposes PIMs and reported metrics in three categories: service quality and reliability, customer satisfaction and engagement, and sustainability and 129 The RE02 PFD, issued July 14, 2025, proposed a “PBR Performance Mechanism Portfolio” of Reported Metrics, Scorecards, and Performance Incentive Mechanisms (“PIMs”), organized by the nine priority outcomes from the Phase I Decision. Among the proposed mechanisms were a System Reliability PIM, a Customer Reliability PIM, the NWS Shared Savings Mechanism, and a Level 1 DER Interconnection PIM (RE02 2025 PFD, Table 1, at pages 7-8). 59
  5. Page 63 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 60 of 90 1 financial efficiency. 130 Its reliability PIMs follow the general structure of the RE02 2 designs: a downside-only System Reliability PIM based on Blue Sky SAIDI and 3 SAIFI, with penalties beginning at one standard deviation above a fixed five-year 4 average, and an upside-only Customer Reliability PIM based on repeat CEMI-5 5 and CELID-6 customers. 131 The Company assigns each PIM its own maximum 6 penalty or incentive: $3.5 million each for the SAIDI and SAIFI penalties, a $3.0 7 million Customer Reliability incentive, and a “Customer Suite” with a $3.0 million 8 maximum penalty and a $2.0 million maximum incentive. 132 In total, penalties are 9 capped at about $10 million per year and incentives at about $5 million, amounts 10 the Company derives from 0.5 percent of distribution revenues. 133 11 The Company’s design departs from RE02 in ways that weaken the PIMs’ ability 12 to provide the data and performance measures PURA needs to assess the 13 Company’s performance and hold it accountable. First, it uses a 2022–2026 14 baseline, which includes a year that has not yet concluded. 134 That would let the 15 Company’s own current-year performance help set the benchmark it will be 16 measured against. The Company also testifies that its SAIDI has been increasing in 17 recent years, indicating longer outages. 135 A baseline built on those recent years 18 would treat worsening reliability as the norm, making a penalty less likely. 130 131 132 133 134 135 Exhibit CLP-PBR-1, at pages 66-67. Exhibit CLP-ELP-3, at pages 1-2. Id., at page 2. Id.; Exhibit CLP-PBR-1, at page 66. Exhibit CLP-ELP-3, at pages 1-2. Exhibit CLP-ELP-1, at page 48. 60
  6. Page 64 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 61 of 90 1 Second, the Company's penalties rise on a sliding scale that begins at one standard 2 deviation and reaches its maximum only at two standard deviations. 136 Under that 3 structure, reliability could deteriorate well past normal year-to-year variation while 4 the Company faces only a fraction of the maximum penalty. 5 Third, it measures Customer Reliability with a single count of repeat customers, 6 rather than the four sub-metrics RE02 specifies. Those sub-metrics include the 7 percentage of repeat customers, which accounts for changes in the total number of 8 affected customers. 137 9 Fourth, it folds the Level 1 DER Interconnection PIM into a composite “Customer 10 Suite” with four unrelated customer-service measures, such as digital engagement 11 and call handling time, and sets a Company-selected target of 35 business days. 138 12 RE02 proposes a standalone PIM benchmarked to a three-year historical average. 139 13 In a composite, slow interconnection processing could be offset by strong 14 performance on unrelated measures, so the Company would face no consequence 15 for the delays that matter most to customers seeking to interconnect. 16 Fifth, it omits the NWS Shared Savings Mechanism entirely. 140 That mechanism is 17 the one PIM designed to reward the Company for choosing lower-cost non-wires 18 solutions over capital investment. Omitting it removes the only counterweight to 19 the capital bias the rest of the proposal reinforces. 136 137 138 139 140 Exhibit CLP-ELP-3, at pages 1-2. RE02 PFD No. 2, at page 46. Exhibit CLP-ELP-3, at pages 1-2. RE02 PFD No. 2, at pages 76-79. See id., at page 23. 61
  7. Page 65 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 62 of 90 1 Q. WHAT ARE THE SPECIFIC DESIGN ELEMENTS OF THE SYSTEM 2 RELIABILITY PIM AND THE CUSTOMER RELIABILITY PIM 3 PROPOSED BY PURA? 4 A. The proposed System Reliability PIM is downside-only. 141 It measures Blue-Sky 5 SAIDI and Blue-Sky SAIFI as two separate sub-metrics to be evaluated annually 6 against a fixed five-year historical average calculated under IEEE (Institute of 7 Electrical and Electronics Engineers) methodology and excluding major event 8 days, using transmission and distribution reliability performance filing data. The 9 penalty applies only when annual performance exceeds one standard deviation 10 above (i.e. directionally worse) that fixed five-year average, with the dollar penalty 11 amount to be set in each utility’s rate case. 142 12 The Customer Reliability PIM is upside-only. 143 It tracks four sub-metrics averaged 13 into a single composite score: CEMI-5, percent of repeat CEMI-5 customers, 14 CELID-6, and percent of repeat CELID-6 customers. 144 The financial incentive 15 becomes available only if that composite score falls below (i.e. directionally better) 16 a threshold equal to the fixed 2020–2024 historical average composite value plus 141 142 143 144 A downside-only PIM carries a financial penalty if the Company’s performance falls below the target, but no financial reward if performance exceeds it. RE02 2025 PFD, at pages 32-35. An upside-only PIM provides a financial reward if the Company’s performance exceeds the target, but no penalty if performance falls short. “CEMI-5” (Customers Experiencing Multiple Interruptions) counts customers who experienced five or more sustained interruptions in a year. “CELID-6” (Customers Experiencing Long Interruption Durations) counts customers who experienced an interruption lasting six hours or more. The “percent of repeat” sub-metrics measure the share of customers on each year's CEMI-5 or CELID-6 list who also appeared on the prior year’s list, to identify customers with chronic reliability problems. (RE02 PFD (July 14, 2025), at pages 35-39; see also Exhibit CLP-ELP-3, at page 1). 62
  8. Page 66 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 63 of 90 1 one standard deviation. The reward is a capped, fixed dollar amount, with the 2 maximum amount set in each utility’s rate case. 145 3 I recommend that the Authority (1) adopt these two PIMs, and (2) not attach a 4 financial reward to the Customer Reliability metric. Reliable service is a core 5 obligation of the Company. The Company should face penalties for 6 underperforming on reliability, but it should not be rewarded for improving it. If 7 the Authority nonetheless makes a reward available, it should not use the threshold 8 the Company proposed. Read literally, that threshold would pay a reward for 9 performance up to one standard deviation worse than the 5-year historical average, 10 which does not advance the Reliable and Resilient Electric Service or Affordable 11 Service priority outcomes. The reward threshold should instead be set at the 12 historical average minus one standard deviation, so that the Company is rewarded 13 only for improvement beyond normal year-to-year variation. 14 Q. ACCOUNTABLE FOR PERFORMANCE? 15 16 ARE THE COMPANY’S PROPOSED PIMS SUFFICIENT TO HOLD IT A. No, for two reasons. First, the amounts at stake are very small relative to the rest 17 of the plan. The Company’s maximum annual penalty across all PIMs is about 18 $10 million, or about $40 million over a four-year plan term. 146 By comparison, 19 the Company estimates that the return it seeks to collect through the F-Factor 20 would add $124.1 million over the same term, roughly three times its maximum 145 146 RE02 2025 PFD, at pages 35-39. Exhibit CLP-ELP-3, at page 2. 63
  9. Page 67 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 64 of 90 1 penalty exposure. 147 Second, the Company would make its PIMs available only if 2 the Authority approves its plan. 148 The RE01 Proposed Final Decision takes the 3 opposite approach, which I support as a more reasonable option: performance 4 mechanisms and the IDSP apply whether or not a utility accepts a multi-year rate 5 plan, and declining an MRP “does not exempt the EDC from the requirements of 6 Performance Mechanisms and the IDSP.” 149 Accountability for performance 7 should not be something the Company offers in exchange for approval of its 8 preferred revenue mechanisms. 9 Q. COMPANY’S AUTHORIZED RETURN ON EQUITY? 10 11 SHOULD PIM REWARDS BE AVAILABLE IN ADDITION TO THE A. The RE01 Proposed Final Decision treats PIM incentives and penalties separately 12 from the authorized ROE, while directing the Authority to “consider the presence 13 of PBR mechanisms when evaluating the utility-specific risk factors.” 150 I 14 recommend that the Authority take this approach. PIM rewards give the utility an 15 additional opportunity to earn money, and that opportunity is part of the utility’s 16 overall balance of risk and return. The Company requests an ROE of 10.25 percent 17 and proposes up to about $5 million per year in PIM incentives. 151 In setting the 18 Company’s ROE, the Authority should consider the holistic PIM portfolio it 19 ultimately adopts, including both penalty exposure and any reward opportunity. 147 148 149 150 151 OCC-423, at page 7. Exhibit CLP-ELP-1, at page 50. RE01 PFD, at page 10. Id. at page 42. Application, at page 3; CLP-ELP-3, at page 2. 64
  10. Page 68 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 65 of 90 1 Where PIMs offer rewards, the total return available to the Company, including 2 those rewards, should be no greater than the Authority would otherwise find just 3 and reasonable. 4 Q. IMPROVED? 5 6 HOW DO YOU RECOMMEND THE COMPANY’S PROPOSED PIMS BE A. The Authority should decline to adopt Eversource’s Company-designed PIMs 7 portfolio. PURA should instead adopt the PIM designs set out in the RE02 PFD 8 No. 2, including the downside only System Reliability PIM, the Level 1 DER 9 Interconnection PIM, the NWS Shared Savings Mechanism, and the other PIMs 10 identified in that decision, together with their incentive structures and per-PIM 11 exposure caps, and make them effective whether or not the Authority approves a 12 multi-year rate plan. For the reasons I note above, the Customer Reliability metric 13 should be adopted as a Scorecard, without a financial reward. 14 Adopting PIMs in this proceeding, using the RE02 designs, allows the Authority to 15 begin measuring Eversource’s performance when new rates take effect, whatever 16 it decides about the Company’s proposed revenue mechanisms. The RE02 record 17 supports adopting the PIMs developed in that proceeding here. The System 18 Reliability PIM and Customer Reliability PIM methodologies have been proposed 19 twice, a year apart, without substantive changes, and the Authority stated that “[n]o 20 further modifications are warranted” to the System Reliability PIM’s design. 152 152 RE02 PFD No. 2, at page 41. 65