Prefiled testimony
Witness: Lindsay J. Griffin
Files1
Direct Testimony of Lindsay J. Griffin - Docket No. 26-05-10 with App. A, B. C.pdf
PDF · 979 KB · 121 pagesText searchable
Download Direct Testimony of Lindsay J. Griffin - Docket No. 26-05-10 with App. A, B. C.pdfRead the text of Direct Testimony of Lindsay J. Griffin - Docket No. 26-05-10 with App. A, B. C.pdf
Search terms highlighted
Eversource rate increase is on 7 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 63 of 121
Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 60 of 90 1 financial efficiency. 130 Its reliability PIMs follow the general structure of the RE02 2 designs: a downside-only System Reliability PIM based on Blue Sky SAIDI and 3 SAIFI, with penalties beginning at one standard deviation above a fixed five-year 4 average, and an upside-only Customer Reliability PIM based on repeat CEMI-5 5 and CELID-6 customers. 131 The Company assigns each PIM its own maximum 6 penalty or incentive: $3.5 million each for the SAIDI and SAIFI penalties, a $3.0 7 million Customer Reliability incentive, and a “Customer Suite” with a $3.0 million 8 maximum penalty and a $2.0 million maximum incentive. 132 In total, penalties are 9 capped at about $10 million per year and incentives at about $5 million, amounts 10 the Company derives from 0.5 percent of distribution revenues. 133 11 The Company’s design departs from RE02 in ways that weaken the PIMs’ ability 12 to provide the data and performance measures PURA needs to assess the 13 Company’s performance and hold it accountable. First, it uses a 2022–2026 14 baseline, which includes a year that has not yet concluded. 134 That would let the 15 Company’s own current-year performance help set the benchmark it will be 16 measured against. The Company also testifies that its SAIDI has been increasing in 17 recent years, indicating longer outages. 135 A baseline built on those recent years 18 would treat worsening reliability as the norm, making a penalty less likely. 130 131 132 133 134 135 Exhibit CLP-PBR-1, at pages 66-67. Exhibit CLP-ELP-3, at pages 1-2. Id., at page 2. Id.; Exhibit CLP-PBR-1, at page 66. Exhibit CLP-ELP-3, at pages 1-2. Exhibit CLP-ELP-1, at page 48. 60Page 64 of 121
Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 61 of 90 1 Second, the Company's penalties rise on a sliding scale that begins at one standard 2 deviation and reaches its maximum only at two standard deviations. 136 Under that 3 structure, reliability could deteriorate well past normal year-to-year variation while 4 the Company faces only a fraction of the maximum penalty. 5 Third, it measures Customer Reliability with a single count of repeat customers, 6 rather than the four sub-metrics RE02 specifies. Those sub-metrics include the 7 percentage of repeat customers, which accounts for changes in the total number of 8 affected customers. 137 9 Fourth, it folds the Level 1 DER Interconnection PIM into a composite “Customer 10 Suite” with four unrelated customer-service measures, such as digital engagement 11 and call handling time, and sets a Company-selected target of 35 business days. 138 12 RE02 proposes a standalone PIM benchmarked to a three-year historical average. 139 13 In a composite, slow interconnection processing could be offset by strong 14 performance on unrelated measures, so the Company would face no consequence 15 for the delays that matter most to customers seeking to interconnect. 16 Fifth, it omits the NWS Shared Savings Mechanism entirely. 140 That mechanism is 17 the one PIM designed to reward the Company for choosing lower-cost non-wires 18 solutions over capital investment. Omitting it removes the only counterweight to 19 the capital bias the rest of the proposal reinforces. 136 137 138 139 140 Exhibit CLP-ELP-3, at pages 1-2. RE02 PFD No. 2, at page 46. Exhibit CLP-ELP-3, at pages 1-2. RE02 PFD No. 2, at pages 76-79. See id., at page 23. 61Page 65 of 121
Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 62 of 90 1 Q. WHAT ARE THE SPECIFIC DESIGN ELEMENTS OF THE SYSTEM 2 RELIABILITY PIM AND THE CUSTOMER RELIABILITY PIM 3 PROPOSED BY PURA? 4 A. The proposed System Reliability PIM is downside-only. 141 It measures Blue-Sky 5 SAIDI and Blue-Sky SAIFI as two separate sub-metrics to be evaluated annually 6 against a fixed five-year historical average calculated under IEEE (Institute of 7 Electrical and Electronics Engineers) methodology and excluding major event 8 days, using transmission and distribution reliability performance filing data. The 9 penalty applies only when annual performance exceeds one standard deviation 10 above (i.e. directionally worse) that fixed five-year average, with the dollar penalty 11 amount to be set in each utility’s rate case. 142 12 The Customer Reliability PIM is upside-only. 143 It tracks four sub-metrics averaged 13 into a single composite score: CEMI-5, percent of repeat CEMI-5 customers, 14 CELID-6, and percent of repeat CELID-6 customers. 144 The financial incentive 15 becomes available only if that composite score falls below (i.e. directionally better) 16 a threshold equal to the fixed 2020–2024 historical average composite value plus 141 142 143 144 A downside-only PIM carries a financial penalty if the Company’s performance falls below the target, but no financial reward if performance exceeds it. RE02 2025 PFD, at pages 32-35. An upside-only PIM provides a financial reward if the Company’s performance exceeds the target, but no penalty if performance falls short. “CEMI-5” (Customers Experiencing Multiple Interruptions) counts customers who experienced five or more sustained interruptions in a year. “CELID-6” (Customers Experiencing Long Interruption Durations) counts customers who experienced an interruption lasting six hours or more. The “percent of repeat” sub-metrics measure the share of customers on each year's CEMI-5 or CELID-6 list who also appeared on the prior year’s list, to identify customers with chronic reliability problems. (RE02 PFD (July 14, 2025), at pages 35-39; see also Exhibit CLP-ELP-3, at page 1). 62Page 66 of 121
Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 63 of 90 1 one standard deviation. The reward is a capped, fixed dollar amount, with the 2 maximum amount set in each utility’s rate case. 145 3 I recommend that the Authority (1) adopt these two PIMs, and (2) not attach a 4 financial reward to the Customer Reliability metric. Reliable service is a core 5 obligation of the Company. The Company should face penalties for 6 underperforming on reliability, but it should not be rewarded for improving it. If 7 the Authority nonetheless makes a reward available, it should not use the threshold 8 the Company proposed. Read literally, that threshold would pay a reward for 9 performance up to one standard deviation worse than the 5-year historical average, 10 which does not advance the Reliable and Resilient Electric Service or Affordable 11 Service priority outcomes. The reward threshold should instead be set at the 12 historical average minus one standard deviation, so that the Company is rewarded 13 only for improvement beyond normal year-to-year variation. 14 Q. ACCOUNTABLE FOR PERFORMANCE? 15 16 ARE THE COMPANY’S PROPOSED PIMS SUFFICIENT TO HOLD IT A. No, for two reasons. First, the amounts at stake are very small relative to the rest 17 of the plan. The Company’s maximum annual penalty across all PIMs is about 18 $10 million, or about $40 million over a four-year plan term. 146 By comparison, 19 the Company estimates that the return it seeks to collect through the F-Factor 20 would add $124.1 million over the same term, roughly three times its maximum 145 146 RE02 2025 PFD, at pages 35-39. Exhibit CLP-ELP-3, at page 2. 63Page 67 of 121
Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 64 of 90 1 penalty exposure. 147 Second, the Company would make its PIMs available only if 2 the Authority approves its plan. 148 The RE01 Proposed Final Decision takes the 3 opposite approach, which I support as a more reasonable option: performance 4 mechanisms and the IDSP apply whether or not a utility accepts a multi-year rate 5 plan, and declining an MRP “does not exempt the EDC from the requirements of 6 Performance Mechanisms and the IDSP.” 149 Accountability for performance 7 should not be something the Company offers in exchange for approval of its 8 preferred revenue mechanisms. 9 Q. COMPANY’S AUTHORIZED RETURN ON EQUITY? 10 11 SHOULD PIM REWARDS BE AVAILABLE IN ADDITION TO THE A. The RE01 Proposed Final Decision treats PIM incentives and penalties separately 12 from the authorized ROE, while directing the Authority to “consider the presence 13 of PBR mechanisms when evaluating the utility-specific risk factors.” 150 I 14 recommend that the Authority take this approach. PIM rewards give the utility an 15 additional opportunity to earn money, and that opportunity is part of the utility’s 16 overall balance of risk and return. The Company requests an ROE of 10.25 percent 17 and proposes up to about $5 million per year in PIM incentives. 151 In setting the 18 Company’s ROE, the Authority should consider the holistic PIM portfolio it 19 ultimately adopts, including both penalty exposure and any reward opportunity. 147 148 149 150 151 OCC-423, at page 7. Exhibit CLP-ELP-1, at page 50. RE01 PFD, at page 10. Id. at page 42. Application, at page 3; CLP-ELP-3, at page 2. 64Page 68 of 121
Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 65 of 90 1 Where PIMs offer rewards, the total return available to the Company, including 2 those rewards, should be no greater than the Authority would otherwise find just 3 and reasonable. 4 Q. IMPROVED? 5 6 HOW DO YOU RECOMMEND THE COMPANY’S PROPOSED PIMS BE A. The Authority should decline to adopt Eversource’s Company-designed PIMs 7 portfolio. PURA should instead adopt the PIM designs set out in the RE02 PFD 8 No. 2, including the downside only System Reliability PIM, the Level 1 DER 9 Interconnection PIM, the NWS Shared Savings Mechanism, and the other PIMs 10 identified in that decision, together with their incentive structures and per-PIM 11 exposure caps, and make them effective whether or not the Authority approves a 12 multi-year rate plan. For the reasons I note above, the Customer Reliability metric 13 should be adopted as a Scorecard, without a financial reward. 14 Adopting PIMs in this proceeding, using the RE02 designs, allows the Authority to 15 begin measuring Eversource’s performance when new rates take effect, whatever 16 it decides about the Company’s proposed revenue mechanisms. The RE02 record 17 supports adopting the PIMs developed in that proceeding here. The System 18 Reliability PIM and Customer Reliability PIM methodologies have been proposed 19 twice, a year apart, without substantive changes, and the Authority stated that “[n]o 20 further modifications are warranted” to the System Reliability PIM’s design. 152 152 RE02 PFD No. 2, at page 41. 65Page 69 of 121
Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 66 of 90 1 Because RE02 leaves the dollar amount of each PIM to the rate case, I recommend 2 that the Authority set System Reliability PIM penalty amounts in this proceeding 3 at levels no lower than the maximum SAID and SAIFI penalties the Company itself 4 proposes in Exhibit CLP-ELP-3, applied to the RE02 proposed design. These 5 penalty amounts should not, however, be considered as ceilings, as a PIM should 6 be designed with some amount of stretch to provide actual incentive to improve. 7 Rather, they should be considered a floor because the Company itself, in proposing 8 them, establishes these amounts as workable and reasonable. No reward should 9 attach to reliability performance. Providing safe and reliable service is a core 10 obligation the Company already undertakes in exchange for its authorized return, 11 and customers should not pay extra for it. Reliability should instead be enforced 12 through penalties for underperformance. 13 VII. SHIFT RISK TO CUSTOMERS AND WOULD NOT CONTAIN COSTS. 14 15 Q. WHAT IS THE CUMULATIVE EFFECT OF THE PBR MECHANISMS THE COMPANY PROPOSES? 16 17 TAKEN TOGETHER, EVERSOURCE’S PBR PROPOSAL WOULD A. Each of the Company’s departures from the RE01, RE02 and RE03 design shifts 18 risk from the Company to its customers, and the departures reinforce one another. 19 The capital funding mechanism funds capital at the Company’s own forecast as 20 plant enters service, so customers bear the risks that the forecast is too high or that 21 the Company’s investment choices are imprudent until a later reconciliation. The 22 revenue cap has two weaknesses. First, it applies only to OM&A, so it places no 66Page 70 of 121
Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 67 of 90 1 discipline on capital, the category of costs on which the Company earns a return. 2 Any dollar the Company shifts from an operating solution to a capital solution 3 leaves the formula entirely. Capital spending is limited instead by the Company’s 4 own forecast, which the Company has a financial incentive to set high. Second, 5 even for OM&A, the formula provides little discipline. The Company’s proposed 6 X-Factor is negative (−0.03 percent), so on its own it would let OM&A revenues 7 grow slightly faster than inflation. Only the Company’s proposed 0.30 percent 8 Consumer Dividend produces any net offset to inflation, and that offset is about 9 0.27 percent per year. 153 10 The Company’s proposed PIMs would put only about $10 million per year at risk, 11 and the Company offers them only if the Authority approves its PBMRP. And the 12 capital forecast that drives the rest of the plan rests on the Company’s Targeted 13 System Performance Plan. That plan does not map onto the thoroughly scrutinized 14 IDSP framework and was developed without any stakeholder review, so it gives 15 the Authority no independently vetted basis for testing the forecast. 16 The Company acknowledges that it introduced new elements to its PBR proposal 17 “to remediate the flaws that would ultimately hinder PURA’s (draft) PBR model 18 from supporting the necessary stay-out terms”. It calls the CT-Bar’s exclusion of 19 the cost of capital “a non-starter”. 154 The Company’s proposal reflects what the 20 Company wants from a multi-year rate plan, not the cost containment and 153 154 Exhibit CLP-PBR-1, at pages 42, 64. OCC-423, at pages 2-3). 67Page 71 of 121
Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 68 of 90 1 accountability that customers are supposed to receive in exchange for accepting 2 one. Those protections are identified in the Phase 1 Decision as core objectives of 3 PBR in Connecticut. They include the priority outcomes of Business Operations 4 and Investment Efficiency and Affordable Service, and the foundational 5 consideration of Risk Distribution. They are also consistent with the Take Back 6 Our Grid Act’s direction that the PBR framework measure utility performance on 7 objectives such as cost efficiency and affordability. 155 8 Q. THE PROPOSAL ASKS THEM TO BEAR? 9 10 WHAT DO CUSTOMERS RECEIVE IN EXCHANGE FOR THE RISK A. Customers do not receive sufficient benefit to categorize the Company’s proposal 11 as reasonable. In a well-designed multi-year rate plan, customers accept several 12 years of formula-based rate increases in exchange for stronger incentives for cost 13 control, protection from imprudent spending, and meaningful accountability for 14 performance. The Company’s proposal asks customers to accept annual rate 15 increases without providing corresponding guardrails. The Company requests a 16 10.25 percent return on equity, would authorize capital recovery up to roughly 40 17 percent above its recent historical average, and could earn PIM rewards on top of 18 its authorized return. It has not shown that customers would be better off under its 19 plan than under either the framework the Authority developed in the reopeners or 20 conventional cost-of-service ratemaking. In my opinion, customers would likely be 155 Phase 1 Decision, at pages 14-16; Conn. Gen. Stat. § 16-244aa(b)(1). 68Page 72 of 121
Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 69 of 90 1 worse off. By the Company’s own estimate, collecting a return on new capital 2 before prudence is established would cost customers $124.1 million more over the 3 plan term than the CT-Bar. That figure does not include the effects of funding 4 capital up to a forecast that has not been independently reviewed, or of a revenue 5 cap formula that applies little productivity discipline. Without that showing, the 6 Company has not carried its burden, and the plan should not be approved. 7 The Company’s proposed Consumer Dividend does not change this conclusion. Its 8 consultant’s benchmarking shows the Company’s OM&A costs averaging 11.9 9 percent above the model-predicted benchmark from 2015 through 2024, and 31.5 10 percent above it in 2024. 156 From 2021 through 2024, the Company’s OM&A costs 11 were 16.4 percent above the benchmark, and over the full 2015-2024 period it 12 ranked 54th of 88 utilities in the study. 157 Given the magnitude of risk the Company 13 is attempting to shift onto ratepayers, its proposed consumer dividend is far too 14 small to meaningfully address that shifted risk. 15 The Company agrees that a utility whose OM&A costs are materially above 16 benchmark “would generally warrant a higher Consumer Dividend.” 158 Yet it 17 proposes a Consumer Dividend of 0.30 percent, in the lower half of the 0.15 to 0.60 18 percent range its consultant identifies. 159 The Company acknowledges that it did 19 not derive its proposed 0.30 percent Consumer Dividend from its own consultant’s 156 157 158 159 Exhibit CLP-PBR-1, at page 56. OCC-559, at pages 3-4. OCC-539(a), at page 1. Exhibit CLP-PBR-1, at page 58-59; Exhibit CLP-PBR-3, Figure 16. 69
As listed on the current system
Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Lindsay J. Griffin [26-05-10]