    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 65 of 90 1 Where PIMs offer rewards, the total return available to the Company, including 2 those rewards, should be no greater than the Authority would otherwise find just 3 and reasonable. 4 Q. IMPROVED? 5 6 HOW DO YOU RECOMMEND THE COMPANY’S PROPOSED PIMS BE A. The Authority should decline to adopt Eversource’s Company-designed PIMs 7 portfolio. PURA should instead adopt the PIM designs set out in the RE02 PFD 8 No. 2, including the downside only System Reliability PIM, the Level 1 DER 9 Interconnection PIM, the NWS Shared Savings Mechanism, and the other PIMs 10 identified in that decision, together with their incentive structures and per-PIM 11 exposure caps, and make them effective whether or not the Authority approves a 12 multi-year rate plan. For the reasons I note above, the Customer Reliability metric 13 should be adopted as a Scorecard, without a financial reward. 14 Adopting PIMs in this proceeding, using the RE02 designs, allows the Authority to 15 begin measuring Eversource’s performance when new rates take effect, whatever 16 it decides about the Company’s proposed revenue mechanisms. The RE02 record 17 supports adopting the PIMs developed in that proceeding here. The System 18 Reliability PIM and Customer Reliability PIM methodologies have been proposed 19 twice, a year apart, without substantive changes, and the Authority stated that “[n]o 20 further modifications are warranted” to the System Reliability PIM’s design. 152 152 RE02 PFD No. 2, at page 41. 65
  2. Page 69 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 66 of 90 1 Because RE02 leaves the dollar amount of each PIM to the rate case, I recommend 2 that the Authority set System Reliability PIM penalty amounts in this proceeding 3 at levels no lower than the maximum SAID and SAIFI penalties the Company itself 4 proposes in Exhibit CLP-ELP-3, applied to the RE02 proposed design. These 5 penalty amounts should not, however, be considered as ceilings, as a PIM should 6 be designed with some amount of stretch to provide actual incentive to improve. 7 Rather, they should be considered a floor because the Company itself, in proposing 8 them, establishes these amounts as workable and reasonable. No reward should 9 attach to reliability performance. Providing safe and reliable service is a core 10 obligation the Company already undertakes in exchange for its authorized return, 11 and customers should not pay extra for it. Reliability should instead be enforced 12 through penalties for underperformance. 13 VII. SHIFT RISK TO CUSTOMERS AND WOULD NOT CONTAIN COSTS. 14 15 Q. WHAT IS THE CUMULATIVE EFFECT OF THE PBR MECHANISMS THE COMPANY PROPOSES? 16 17 TAKEN TOGETHER, EVERSOURCE’S PBR PROPOSAL WOULD A. Each of the Company’s departures from the RE01, RE02 and RE03 design shifts 18 risk from the Company to its customers, and the departures reinforce one another. 19 The capital funding mechanism funds capital at the Company’s own forecast as 20 plant enters service, so customers bear the risks that the forecast is too high or that 21 the Company’s investment choices are imprudent until a later reconciliation. The 22 revenue cap has two weaknesses. First, it applies only to OM&A, so it places no 66
  3. Page 70 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 67 of 90 1 discipline on capital, the category of costs on which the Company earns a return. 2 Any dollar the Company shifts from an operating solution to a capital solution 3 leaves the formula entirely. Capital spending is limited instead by the Company’s 4 own forecast, which the Company has a financial incentive to set high. Second, 5 even for OM&A, the formula provides little discipline. The Company’s proposed 6 X-Factor is negative (−0.03 percent), so on its own it would let OM&A revenues 7 grow slightly faster than inflation. Only the Company’s proposed 0.30 percent 8 Consumer Dividend produces any net offset to inflation, and that offset is about 9 0.27 percent per year. 153 10 The Company’s proposed PIMs would put only about $10 million per year at risk, 11 and the Company offers them only if the Authority approves its PBMRP. And the 12 capital forecast that drives the rest of the plan rests on the Company’s Targeted 13 System Performance Plan. That plan does not map onto the thoroughly scrutinized 14 IDSP framework and was developed without any stakeholder review, so it gives 15 the Authority no independently vetted basis for testing the forecast. 16 The Company acknowledges that it introduced new elements to its PBR proposal 17 “to remediate the flaws that would ultimately hinder PURA’s (draft) PBR model 18 from supporting the necessary stay-out terms”. It calls the CT-Bar’s exclusion of 19 the cost of capital “a non-starter”. 154 The Company’s proposal reflects what the 20 Company wants from a multi-year rate plan, not the cost containment and 153 154 Exhibit CLP-PBR-1, at pages 42, 64. OCC-423, at pages 2-3). 67
  4. Page 71 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 68 of 90 1 accountability that customers are supposed to receive in exchange for accepting 2 one. Those protections are identified in the Phase 1 Decision as core objectives of 3 PBR in Connecticut. They include the priority outcomes of Business Operations 4 and Investment Efficiency and Affordable Service, and the foundational 5 consideration of Risk Distribution. They are also consistent with the Take Back 6 Our Grid Act’s direction that the PBR framework measure utility performance on 7 objectives such as cost efficiency and affordability. 155 8 Q. THE PROPOSAL ASKS THEM TO BEAR? 9 10 WHAT DO CUSTOMERS RECEIVE IN EXCHANGE FOR THE RISK A. Customers do not receive sufficient benefit to categorize the Company’s proposal 11 as reasonable. In a well-designed multi-year rate plan, customers accept several 12 years of formula-based rate increases in exchange for stronger incentives for cost 13 control, protection from imprudent spending, and meaningful accountability for 14 performance. The Company’s proposal asks customers to accept annual rate 15 increases without providing corresponding guardrails. The Company requests a 16 10.25 percent return on equity, would authorize capital recovery up to roughly 40 17 percent above its recent historical average, and could earn PIM rewards on top of 18 its authorized return. It has not shown that customers would be better off under its 19 plan than under either the framework the Authority developed in the reopeners or 20 conventional cost-of-service ratemaking. In my opinion, customers would likely be 155 Phase 1 Decision, at pages 14-16; Conn. Gen. Stat. § 16-244aa(b)(1). 68
  5. Page 72 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 69 of 90 1 worse off. By the Company’s own estimate, collecting a return on new capital 2 before prudence is established would cost customers $124.1 million more over the 3 plan term than the CT-Bar. That figure does not include the effects of funding 4 capital up to a forecast that has not been independently reviewed, or of a revenue 5 cap formula that applies little productivity discipline. Without that showing, the 6 Company has not carried its burden, and the plan should not be approved. 7 The Company’s proposed Consumer Dividend does not change this conclusion. Its 8 consultant’s benchmarking shows the Company’s OM&A costs averaging 11.9 9 percent above the model-predicted benchmark from 2015 through 2024, and 31.5 10 percent above it in 2024. 156 From 2021 through 2024, the Company’s OM&A costs 11 were 16.4 percent above the benchmark, and over the full 2015-2024 period it 12 ranked 54th of 88 utilities in the study. 157 Given the magnitude of risk the Company 13 is attempting to shift onto ratepayers, its proposed consumer dividend is far too 14 small to meaningfully address that shifted risk. 15 The Company agrees that a utility whose OM&A costs are materially above 16 benchmark “would generally warrant a higher Consumer Dividend.” 158 Yet it 17 proposes a Consumer Dividend of 0.30 percent, in the lower half of the 0.15 to 0.60 18 percent range its consultant identifies. 159 The Company acknowledges that it did 19 not derive its proposed 0.30 percent Consumer Dividend from its own consultant’s 156 157 158 159 Exhibit CLP-PBR-1, at page 56. OCC-559, at pages 3-4. OCC-539(a), at page 1. Exhibit CLP-PBR-1, at page 58-59; Exhibit CLP-PBR-3, Figure 16. 69
  6. Page 73 of 121Match

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 70 of 90 1 benchmarking results. 160 Nor does the dividend respond to that benchmarking: it 2 rises above its 0.30 percent floor only if the Company outperforms an inflation- 3 adjusted benchmark of its own controllable O&M costs per customer, so it does not 4 increase because the Company’s costs are above its peers’. 161 The tiered approach 5 described in the RE01 PFD, by contrast, would assign a larger stretch factor to 6 utilities shown to be less efficient than their peers. 162 Net of the Company’s 7 negative X-Factor, the dividend reduces OM&A revenue growth by only about 0.27 8 percent per year below inflation, and it does nothing to offset the $124.1 million 9 return the Company would collect on new capital before prudence is established. 163 10 VIII. EVERSOURCE’S JUSTIFICATIONS DO NOT CARRY ITS BURDEN, 11 AND APPROVING ITS PROPOSAL WOULD HARM THE PUBLIC 12 INTEREST BEYOND THIS CASE. A. The Company Has Not Shown That Its Proposal Serves Customers or 13 the Priority Outcomes 14 15 Q. IS YOUR POSITION THAT EVERSOURCE SHOULD NOT BE 16 PERMITTED TO PROPOSE ANY REFINEMENTS TO THE RE01, RE02, 17 OR RE03 RECORD IN ITS RATE CASE? 18 A. 19 No. I do not oppose refinements to an evolving framework. Where the Authority has already developed specific mechanics through the RE01, RE02, and RE03 160 161 162 163 OCC-559 (c), at page 3; OCC-559, at page 4 (reproducing OCC-443). Exhibit CLP-PBR-1, at page 64; CLF-AC-005, at page 1, OCC-539(b), at page 2. RE01 PFD, at pages 22-23 & App. A n.50. Exhibit CLP-PBR-1, at pages 42, 64; OCC-435, at page 1, Table 1. 70
  7. Page 74 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 71 of 90 1 process, a rate case proposal that builds on those mechanics, or proposes a targeted, 2 justified modification to them, may be reasonable. What is not reasonable is a 3 proposal that replaces those mechanics outright with a company-preferred 4 alternative, without showing that the alternative better serves customers. 5 Eversource has done that with respect to the revenue adjustment mechanism, the 6 capital funding mechanism, and the PIMs portfolio. Its Targeted System 7 Performance Plan also falls well short of the IDSP framework developed in the 8 RE03 PFD No. 2. Nothing prevented the Company from proposing its own design 9 in this rate case. But that design must stand on its own merits, and it does not. As I 10 explain in Sections IV through VII, it would not produce just and reasonable rates 11 or advance the priority outcomes adopted in the Phase 1 Decision, and the Company 12 has not shown otherwise. The Authority should not adopt it. 13 Q. MECHANISMS IMPROVE ON THE REOPENER FRAMEWORKS? 14 15 HAS EVERSOURCE SHOWN THAT ITS ALTERNATIVE A. No. A different mechanism is an improvement only if it better serves the goals 16 and priority outcomes the Authority adopted in the Phase 1 Decision, which 17 govern all of the reopeners. The Company has not shown that its mechanisms do 18 so. Its proposal would benefit the Company while weakening the priority 19 outcomes it most directly affects: 20 • Business Operations and Investment Efficiency: it removes capital from the 21 revenue cap formula and pays a return on new capital before prudence is 22 shown. 71
  8. Page 75 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 72 of 90 1 • Affordable Service: by the Company’s own estimate, the F-Factor would add 2 $124.1 million in capital costs over the plan term compared with the CT- 3 Bar. 164 4 • Comprehensive and Transparent System Planning: it replaces the 5 proposed IDSP with a capital plan the Company prepared on its own without 6 any stakeholder involvement. 7 • 8 shareholders onto customers. B. Approving Company’s Proposal Would Create Risks for Future Rate 9 Cases and Weaken the Statewide PBR Framework 10 11 Q. HOW WOULD APPROVING THE COMPANY’S PROPOSAL IN THIS RATE CASE CREATE RISKS BEYOND THIS CASE? 12 13 Risk Distribution: it shifts the risk of imprudent capital spending from A. The Take Back Our Grid Act directed the Authority to “initiate a proceeding to 14 investigate, develop and adopt a framework for implementing performance-based 15 regulation of each electric distribution company.” From a regulatory policy 16 perspective, a framework developed in one proceeding and then applied to each 17 company promotes consistency and gives all stakeholders the same opportunity to 18 shape it. Eversource’s rate case does not implement any Authority-led framework; 19 it proposes the Company’s preferred framework. Adopting company-designed, 20 first-generation PBR mechanisms in a rate case before the statewide framework is 164 OCC-423, at page 7. 72
  9. Page 76 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 73 of 90 1 final would let one company’s litigation position shape questions that affect both 2 distribution companies (Public Act 20-5, §§ 1(b), 3(b)). 3 Q. CAN ONLY BE ADJUDICATED IN A RATE CASE? 165 4 5 DO YOU AGREE WITH EVERSOURCE THAT A SPECIFIC PBR PLAN A. No. Eversource conflates two distinct questions: (1) what the PBR framework 6 should be, and (2) how that framework should be applied to a specific utility’s 7 specific revenue requirement. The second question appropriately belongs in a rate 8 case. An EDC’s actual PBMRP, tailored to its own capital plan, cost structure, and 9 circumstances, must be adjudicated with company-specific evidence. The first 10 question, the design of a Revenue Cap Formula, the structure and guardrails of a 11 capital funding mechanism, and the composition and asymmetry of a PIMs 12 portfolio, benefits from a record built through years of multi-stakeholder 13 participation that a single rate case cannot replicate. That is the record developed 14 in Docket No. 21-05-15 and its reopeners. This is also why my primary 15 recommendation does not ask the Authority to design a new framework in this case. 16 Instead, I recommend that the Authority apply the design developed on the reopener 17 record to Eversource’s company-specific facts, which is the question that 18 appropriately belongs in a rate case. Whatever the Authority decides here, it should 165 Eversource claims that implementing a performance-based ratemaking framework “is a critical issue that can occur only in the context of a rate proceeding,” and that because the PBR reopener dockets were uncontested, PURA “was only ever going to be able to implement PBR in a contested rate proceeding” (Docket No. 26-05-10, September 9, 2026 Eversource Response to Motion No. 43, at pages 1-2). Eversource also acknowledges, however, that PURA's decisions in those dockets “would inform the docket in future rate proceedings,” and that “sufficient work was done in those dockets to inform this proceeding from a policy perspective” (id., at pages 2-3). 73
  10. Page 77 of 121

    Docket No. 26-05-10 Direct Testimony of Lindsay J. Griffin October 21, 2026 Page 74 of 90 1 state explicitly that its decision does not set precedent for the design of multi-year 2 rate plans for Eversource or any other Connecticut electric distribution company. 3 Q. WHAT ARE THE TIMING CONSEQUENCES OF APPROVING A 4 COMPANY-DESIGNED PBMRP BEFORE THE STATEWIDE 5 FRAMEWORK IS FINAL? 6 A. They are significant. If the Authority approves a PBMRP for Eversource in this 7 docket, the Company’s mechanisms would presumably govern its rates for the full 8 plan term. Incorporating the eventual outcomes of RE01, RE02, and RE03 into that 9 already-approved plan would likely require a multi-year lag and a subsequent 10 proceeding to true it up. 11 Q. WHY SHOULD THE AUTHORITY CONSIDER THE RECORD 12 DEVELOPED IN THE PBR REOPENER DOCKETS WHEN 13 EVALUATING THE COMPANY’S PROPOSAL? 14 A. Many of the organizations that invested years of staff time in Docket No. 21-05-15 15 and the RE01, RE02, and RE03 reopeners are Connecticut-based nonprofits, 16 frontline and consumer advocacy organizations, and other parties with limited 17 resources. Their staff live and work in the communities Eversource serves, the same 18 communities that experience the outages, the bill impacts, and the affordability 19 pressures these dockets ultimately seek to address. Their recommendations in the 20 reopeners were informed by direct, on-the-ground experience with how the 21 Company’s rates and performance affect Connecticut customers. 74

As listed on the current system

Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Lindsay J. Griffin [26-05-10]

This filing on the current system (opens in a new tab)