Prefiled testimony
Witness: Melissa Whited
Files3
Synapse - Eversource COS and Rate Design Testimony Final.pdf
PDF · 829 KB · 48 pagesText searchable
Download Synapse - Eversource COS and Rate Design Testimony Final.pdfRead the text of Synapse - Eversource COS and Rate Design Testimony Final.pdf
MW-2- Synapse Attachment.pdf
PDF · 4.6 MB · 276 pagesText searchable
Download MW-2- Synapse Attachment.pdfRead the text of MW-2- Synapse Attachment.pdf
MW-1 - Synapse Attachment.pdf
PDF · 734 KB · 13 pagesText searchable
Download MW-1 - Synapse Attachment.pdfRead the text of MW-1 - Synapse Attachment.pdf
Page 39 of 48
Docket No. 26-05-10 Prefiled Direct Testimony of Melissa Whited 1 VI. ECONOMIC DEVELOPMENT RATE PROPOSAL 2 Q Please summarize Eversource’s proposed Economic Development Rate. 3 A Eversource proposes an EDR rider that would establish discounted rates for incremental 4 load growth of at least 1 MW from new and existing large commercial and industrial 5 (Rate 57 and Rate 58) customers.69 The EDR is structured as a percentage discount that 6 applies to the customer’s incremental distribution demand and energy charges and that 7 declines over a 5-year term, with the specific discount level determined through direct 8 negotiation with the customer.70 Additionally, the discount is anchored to the customer’s 9 marginal cost of service and subject to a cap tied to the incremental distribution revenues 10 from the new load, and the customer is still responsible for interconnection, system 11 upgrade, and make-ready costs.71 12 Q Do you have concerns with the Company’s proposed EDR? 13 A Yes. While a well-designed EDR with strong safeguards around ratepayer impacts can 14 help incentivize incremental load that helps both support economic development and 15 system utilization, I have three concerns with the Company’s proposal. First, the proposal 16 lacks sufficient detail on safeguards against the potential impacts of hyperscale data 17 center load. Second, the rate does not sufficiently encourage customers on the EDR to 18 utilize the system in an efficient manner. Third, the Company’s proposed approach to 19 determining the discount level would add administrative complexity and regulatory 20 burden, and it is not transparent. For these reasons, I recommend that the Authority reject 21 Eversource’s proposed EDR and instead approve a modified EDR that I describe below. 69 Exh. CLP-RATES-1, at 24:19-25:1. Exh. CLP-RATES-1, at 28:3-22; Eversource Response to OCC-458. 71 Exh. CLP-RATES-1, at 28:5-7, 29:4-9. 70 37Page 40 of 48
Docket No. 26-05-10 Prefiled Direct Testimony of Melissa Whited 1 2 A. The EDR proposal lacks sufficient safeguards against the potential ratepayer impacts of hyperscale data center load 3 Q What are the potential ratepayer impacts of hyperscale data center load? 4 A Utilities around the country are receiving an unprecedented amount of load requests from 5 the data center industry.72 Unlike traditional industrial loads, which mainly represent 6 manufacturing sectors, these new large loads from data centers, which are driven by 7 demand for artificial intelligence computing, are larger in size and have higher load 8 factors. These characteristics present unique challenges to utility system operations and 9 planning, with potential for significant adverse impacts on other utility customers. The 10 magnitude of the load required by data centers at each site often requires new system 11 investments, including for generation, transmission, and distribution capacity, which can 12 increase costs for the system and for existing ratepayers. Additionally, data center 13 developers also submit many load requests to different utilities without planning to 14 develop projects in all utility service territories, making these large loads difficult to 15 forecast and plan for.73 If a utility makes system investments to accommodate an 16 anticipated large load that ultimately does not materialize, existing customers will be 17 saddled with the costs of those investments. Recognizing these risks, many states across 18 the country have adopted or are in the process of adopting large load tariffs to manage the 19 costs associated with such loads and protect existing ratepayers from potential cost 72 Goldman Sachs. 2026. US Data Center Power Demand Projected to Double by 2027. https://www.goldmansachs.com/insights/articles/us-data-center-power-demand-projected-to-double-by-2027 73 Energy Systems Integration Group (ESIG). 2026. Historical and Modern Large Loads: Characteristics, Context, and Industry Actions to Meet grid and Customer Needs. https://www.esig.energy/wpcontent/uploads/2026/03/ESIG-Historical-vs-Modern-Large-Loads-white-paper-2026.pdf 38Page 41 of 48
Docket No. 26-05-10 Prefiled Direct Testimony of Melissa Whited 1 shifts.74 Given that the primary objective of the EDR rider is to improve affordability, 2 extending the discount to data center loads would be counter to the stated objective.75 3 Q 4 5 Would providing the EDR to hyperscale data center loads induce incremental load that otherwise would not materialize? A No. In contrast to traditional manufacturing industries, which operate with lower profit 6 margins and therefore are more sensitive to electricity prices, recent data center 7 developments tend to prioritize “speed to power” over cost.76 This means that the 8 availability of a rate discount is unlikely to drive investment decisions. Thus, making the 9 EDR available to this customer type would not induce incremental load that otherwise 10 would not be added. 11 Q Does Eversource propose to allow data center loads to participate in the EDR? 12 A The Company explains that data center customers are “not categorically excluded… nor 13 are they categorically eligible;” instead, any customers interested in the EDR must meet 14 the rider’s eligibility requirements.77 Additionally, the Company states that data center 15 loads “raise broader policy questions” and that it will work with the state on potential 16 data center-specific rates if there are future load requests from these large computational 17 loads.78 18 Q What do you recommend? 19 A I recommend that the Authority adopt an explicit exclusion of data center loads from 20 EDR participation. I also recommend that the Authority open a separate generic 74 Smart Electric Power Alliance. DELTa: Database of Emerging Large-Load Tariffs. https://sepapower.org/largeload-tariffs-database/ 75 Eversource Response to OCC-457. 76 Center for Strategic & International Studies. 2025. The Electricity Supply Bottleneck on U.S. AI Dominance. https://www.csis.org/analysis/electricity-supply-bottleneck-us-ai-dominance 77 Eversource Response to OCC-464. 78 Ibid. 39Page 42 of 48
Docket No. 26-05-10 Prefiled Direct Testimony of Melissa Whited 1 proceeding to determine what customer protections should be included in any future data 2 center tariffs. 3 4 5 B. The lack of meaningful time-varying rates for EDR customers will reduce the ability of incremental load to support more efficient system utilization Q 6 7 Why is it important for EDR customers to receive price signals that encourage load flexibility? A New load being added to the system can only improve system efficiency if the revenues 8 the utility receives from that new load are greater than its marginal cost to serve. This 9 depends on the customer’s load shape: new load added primarily to peak hours may 10 necessitate new investments in distribution capacity to accommodate higher peak loads as 11 well as increase the utility’s cost responsibility for transmission and generation. While 12 the Company proposes to ensure that revenues collected from the customer are greater 13 than their marginal cost to serve, this determination is only based on the Company’s 14 marginal distribution cost of service study, which does not account for impacts on 15 transmission and supply costs.79 These costs impact all ratepayers and could diminish the 16 benefits from the increased sales. On the other hand, the benefits of new load to the 17 system and existing ratepayers are maximized when that new load is added primarily to 18 off-peak hours, when the grid can absorb additional load with existing system capacity 19 and when wholesale market prices are low. Therefore, to ensure that new EDR load can 20 improve system efficiency, EDR customers should receive price signals that encourage 21 off-peak usage and discourage on-peak usage. Time-varying rates can provide these price 22 signals. 79 Eversource Response to OCC-459. 40Page 43 of 48
Docket No. 26-05-10 Prefiled Direct Testimony of Melissa Whited 1 Q 2 3 Do the rates under which EDR customers take service provide time-varying price signals? A Yes, but the price signals are weak. The Company proposes that the EDR rider would be 4 available to customers taking service under Rate 57 (Large Time-of-Day – 5 Manufacturers) and Rate 58 (Large Time-of-Day – Non-Manufacturers).80 Despite both 6 tariffs having “Time-of-Day” in their names, the only time-differentiated rate component 7 is the transmission demand charge, which only applies to customer demand during on- 8 peak hours, while distribution and generation charges are not differentiated or only 9 minimally differentiated between on-peak and off-peak hours.81 Additionally, the on- 10 peak period is eight hours long, which can make it difficult for customers to manage 11 around and does not precisely target the hours when system costs are the highest (as 12 discussed in Section V.29C above). Under these rate structures, customers do not receive 13 meaningful and actionable price signals to shift load from on-peak hours to off-peak 14 hours. 15 Q What do you recommend? 16 A I recommend that the Authority require the Company to file TOU rates for industrial 17 customers within six months of the Authority’s decision in this proceeding and require 18 EDR customers to take service under those rates. The TOU rates should include time- 19 differentiated distribution, transmission, and generation charges, and should include a 20 shorter on-peak period. 80 81 Exh. CLP-RATES-1, at 24:20-25:1. Rate 57, https://www.eversource.com/docs/default-source/rates-tariffs/ct-electric/rate-57ct.pdf?sfvrsn=ecf85333_29; Rate 58, https://www.eversource.com/docs/default-source/rates-tariffs/ctelectric/rate-58-ct.pdf?sfvrsn=9135fd38_29 41Page 44 of 48
Docket No. 26-05-10 Prefiled Direct Testimony of Melissa Whited 1 2 C. Determining the EDR via negotiations with individual customers would add administrative complexity and would not be transparent 3 4 Q What factors influence the discount level negotiated with each EDR customer? 5 A Eversource explains that the base discount schedule the Company will use to initiate 6 negotiations is a 25 percent discount in year 1, with 5 percent decrements in each of the 4 7 subsequent years and terminating after 5 years.82 From this starting point, the discounts 8 and the term could be adjusted as part of the negotiations, taking into account the 9 economic value and contribution to fixed costs provided by each customer while still 10 ensuring revenue sufficiency.83 11 Q 12 13 What are your concerns with the proposed approach to determine the discount level? A The Company’s proposed approach is administratively burdensome and not transparent. 14 There are no clear guidelines on how different amounts of economic and/or ratepayer 15 benefits would correspond to different discount levels, meaning that the negotiations can 16 result in different discount levels and varying levels of ratepayer benefits for similar EDR 17 customers. Allowing the Company to provide the customer with whatever discount level 18 agreed upon between the two parties would mean forgoing sufficient regulatory review of 19 whether the negotiated discount level is optimal from existing ratepayers’ perspective. On 20 the other hand, requiring the Authority to review each negotiated discount schedule with 21 individual EDR customers could place additional administrative burden on the Authority, 22 the Company, EDR applicants, OCC, and other stakeholders. This additional regulatory 23 review would also stretch out the timeline between when a customer submits their EDR 82 83 Eversource Response to OCC-933. Eversource Responses to OCC-929, 930, 932, and 933. 42Page 45 of 48
Docket No. 26-05-10 Prefiled Direct Testimony of Melissa Whited 1 application and when they are enrolled in the EDR, delaying the potential economic and 2 ratepayer benefits of the EDR. 3 Q What do you recommend? 4 A I recommend that the Authority reject Eversource’s proposal to determine the EDR 5 discount schedule via direct negotiations with each customer. Instead, the Authority 6 should adopt an EDR that mirrors the one approved for UI in Docket No. 22-08-08. In 7 that docket, the Authority approved fixed discount levels for UI’s EDR rider, including a 8 15 percent base discount and a 20 percent discount for customers located in Distressed 9 Municipalities and Environmental Justice Communities. Rather than approve a discount 10 that declined each year, the Authority found that “a fixed rate discount over the term of 11 the EDR Rider is the least-cost method of administering the EDR Rider” and that “the 12 EDR Rider should broadly promote economic development in underserved locations.”84 13 The Authority also adopted a total discount cap of 50 percent of the total incremental 14 distribution revenue from the incremental load to ensure that existing ratepayers receive 15 at least 50 percent of the benefits from the incremental load.85 16 I recommend that the Authority approve a similar EDR for Eversource. This EDR 17 would have fixed discount levels (i.e., not declining over time), divided into two tiers: 84 85 CT PURA Decision, p. 249-251. August 25, 2023. Docket No. 22-08-08. Ibid. 43Page 46 of 48
Docket No. 26-05-10 Prefiled Direct Testimony of Melissa Whited 1 1) a 20 percent discount level for facilities sited in an Environmental Justice 2 Community, as designated by the Department of Energy & Environmental 3 Protection,86 and 4 2) a 15 percent discount level for facilities sited in other communities. 5 The higher Tier 1 discount will help incentivize investments in economically 6 distressed communities, where the economic benefits (including jobs) of new load are 7 most impactful. Other limitations on the discount level proposed by Eversource should 8 still apply, including a discount period of 5 years as well as a cap based on the customer’s 9 marginal cost to serve and incremental distribution revenues. Specifically, the Authority 10 should adopt a discount cap equal to 50 percent of the net present value of the 11 incremental distribution revenues, accounting for the cost of connecting the customer and 12 any other electric infrastructure investments made to serve the incremental load. 13 Q Why is your recommended approach superior to Eversource’s proposal? 14 A Adopting fixed discount rates for all EDR customers would reduce the costs and 15 administrative burden by eliminating the need for potentially complex negotiations and 16 lengthy regulatory review for each rate discount, while still ensuring that EDR customers 17 provide benefits to existing ratepayers. It would also be simpler to understand than a 18 declining discount and provide greater transparency and certainty for customers 86 Connecticut Department of Energy & Environmental Protection. Learn More About Environmental Justice Communities. https://portal.ct.gov/deep/environmental-justice/05-learn-more-about-environmental-justicecommunities. An Environmental Justice Community is 1) a distressed municipality, or 2) a census block group where 30% of the population is living below 200% of the federal poverty level. 44Page 47 of 48
Docket No. 26-05-10 Prefiled Direct Testimony of Melissa Whited 1 considering locating in Eversource’s territory. Finally, it would promote fairness by 2 ensuring that similar customers receive similar discounts. 3 VII. CONCLUSION 4 Q Please summarize your conclusions. 5 A I recommend that the Authority: 6 • Reject the Company’s minimum system method and direct the Company to classify 7 distribution costs using the basic customer method in which only meters, services, 8 meter reading, and billing costs are classified as customer-related, until more granular 9 analysis can be performed to capture customer density. 10 • Direct the Company to develop a customer density approach to classification, similar 11 to the one approved by the Ontario Energy Board. Customer-related percentages 12 would vary by density category (urban, mixed, and rural), measured in customers per 13 circuit mile. This analysis should be submitted with its next rate case application. 14 • If the Authority approves the minimum system method, it should direct the Company 15 to reduce each class’s non-coincident peak demand by the load-carrying capability of 16 the minimum system. This is consistent with the Authority’s determination in Docket 17 No. 24-10-04 and avoids charging the residential class twice for the same capacity. 18 • Direct the Company to classify AMI meter costs as 38 percent customer-related, 47 19 percent demand-related, and 15 percent energy-related, rather than 100 percent 20 customer-related. This classification is based on the present value of AMI benefits 21 quantified in the Company’s own benefit-cost analysis, excluding Carbon Reduction 22 and System Costs Avoidance. 45Page 48 of 48
Docket No. 26-05-10 Prefiled Direct Testimony of Melissa Whited • 1 Direct the Company to develop distribution allocators based on AMI data for its next 2 base rate case. Specifically, the Company should retain hourly AMI interval data in a 3 form that can be aggregated by substation, feeder, and line transformer; and file an 4 equipment-level allocation study alongside its conventional cost of service study. The 5 study would allocate substations on class contributions to substation peaks, primary 6 lines on class contributions to feeder peaks, and line transformers on class 7 contributions to transformer peaks. 8 With respect to the Company’s rate design proposals, I recommend that the Authority: 9 • Reject the Company’s proposed Rate 6 and instead adopt a cost-based, seasonal opt- 10 in TOU rate that includes time-differentiated distribution, transmission, and supply 11 charges. • 12 Reject the Company’s proposed EDR rider and instead adopt one based on UI’s EDR 13 with additional modifications. Specifically, the EDR should: 14 o Exclude data center loads from qualifying for the rate; 15 o Require EDR customers to take service on an enhanced TOU rate, to be filed 16 by Eversource within six months of the Authority’s decision in this 17 proceeding; 18 o Adopt fixed discount levels, including a 20 percent discount for facilities sited 19 in an Environmental Justice Community and a 15 percent discount for 20 facilities sited in other communities, with a discount cap of 50 percent of the 21 net present value of incremental revenues. 22 Q Does this conclude your testimony? 23 A Yes, it does. 46
As listed on the current system