Prefiled testimony
Witness: Melissa Whited
Files3
Synapse - Eversource COS and Rate Design Testimony Final.pdf
PDF · 829 KB · 48 pagesText searchable
Download Synapse - Eversource COS and Rate Design Testimony Final.pdfRead the text of Synapse - Eversource COS and Rate Design Testimony Final.pdf
MW-2- Synapse Attachment.pdf
PDF · 4.6 MB · 276 pagesText searchable
Download MW-2- Synapse Attachment.pdfRead the text of MW-2- Synapse Attachment.pdf
MW-1 - Synapse Attachment.pdf
PDF · 734 KB · 13 pagesText searchable
Download MW-1 - Synapse Attachment.pdfRead the text of MW-1 - Synapse Attachment.pdf
Page 9 of 48
Docket No. 26-05-10 Prefiled Direct Testimony of Melissa Whited 1 3. Efficiency: rates should provide efficient price signals and discourage 2 wasteful usage. 3 4. Customer acceptability: rates should be relatively stable, predictable, simple, 4 and easily understandable. 5 IV. COST OF SERVICE STUDY 6 Q What is the purpose of a COSS? 7 A A COSS estimates how much of the utility’s revenue requirement each customer class 8 causes. It assigns that revenue requirement to rate classes based on the costs each class 9 imposes on the system. 10 Q How is a COSS performed? 11 A An allocated cost of service (“ACOS”) study typically follows three steps. First costs are 12 functionalized, which means that the utility plant and expenses are separated according to 13 the primary functions served. Second, the functionalized rate base and operating costs are 14 classified by their main cost driver, primarily demand, energy, or customer. Finally, the 15 costs are either directly assigned to customers or allocated among customer classes using 16 allocation factors based on their classification. Allocation factors primarily consist of 17 various measures of peak demand, energy usage, or the number of customers. 18 Q 19 20 How do analysts determine the appropriate approaches to cost classification and allocation? A When selecting classification factors or allocators, the goal is to fairly allocate costs 21 among different customer classes based on cost causation. Cost causation reflects the 22 notion that the customer or set of customers that caused a cost should pay for the cost. To 7Page 10 of 48
Docket No. 26-05-10 Prefiled Direct Testimony of Melissa Whited 1 determine cost causation, analysts often rely on economic theory and power system 2 engineering considerations. These judgments are rarely clear-cut. Reasonable analysts 3 can and do reach different conclusions about what drives a given cost. 4 Q How should the Authority use a COSS in this proceeding? 5 A The Authority should exercise judgement when using a COSS because it is an imprecise 6 tool. The analyst makes many subjective choices about functionalization, classification, 7 and allocation, and each one can change the results substantially. A COSS should 8 therefore be one of several things that guide revenue allocation and rate design, not the 9 deciding factor. 10 Q In your view, has the Company selected appropriate ACOS methods? 11 A No. I have three primary concerns with the Company’s ACOS methods: 12 1) The Company’s meter classification does not reflect AMI cost causation; 13 2) The Company classifies portions of the distribution system as partially “customer- 14 related” based on a flawed minimum system methodology; and 15 3) The Company’s demand allocation method for distribution system infrastructure 16 does not reflect localized variance in cost causation. 17 A. The Company’s classification of AMI meter costs fails to reflect their system benefits 18 Q Describe the extent of AMI deployment in the Company’s territory. 19 A Currently, nearly all Eversource meters in Connecticut use Automated Meter Reading 20 (“AMR”) technology, which means that data collection depends on a company vehicle 21 driving within range of the meter.8 Eversource is currently in a transition period from 8 Exh. CLP-ELP-4, at 349. 8Page 11 of 48
Docket No. 26-05-10 Prefiled Direct Testimony of Melissa Whited 1 legacy AMR technology to AMI9 and has proposed a six-year implementation plan for 2 deploying AMI meters across the state.10 3 Q How does the Company propose to classify and allocate AMI costs? 4 A The Company states that it “is proposing to recover eligible AMI capital costs through 5 the proposed Performance Based Multi-Year Rate Plan (“PBMRP”) capital funding 6 mechanism,” and that costs would be allocated to rate classes on the basis of class 7 distribution revenue (class allocation factors) described in the tariff.11 However, in the 8 next rate case, AMI costs would presumably be moved to base rates, and the Company 9 has not indicated that it would deviate from its standard approach of classifying metering 10 and related costs as customer-related.12 11 Q 12 13 Do you have concerns with the classification of AMI meter costs as entirely customer-related? A Yes. Classifying traditional meters as customer-related is reasonable, because their 14 primary function is to measure each customer’s usage for billing. AMI meters have much 15 greater capabilities, including supporting time-varying rates, providing granular voltage 16 and load data, and enabling voltage optimization. Those additional capabilities provide 17 energy and demand savings to the system as a whole, rather than just serving as a 18 customer billing tool. Because the Company is about to replace meters across its entire 19 territory, now is the time to provide guidance to ensure that AMI costs are classified 20 appropriately. 9 In contrast, Eversource in Massachusetts began broad AMI deployment beginning in 2025. As of October 2026, Eversource’s Massachusetts website indicates 500,000 smart meters installed, representing approximately onethird of its 2028 deployment goal. https://www.mass.gov/info-details/grid-modernization-and-ami-resources 10 Exh. CLP-AMI-2, pp. 9-12. 11 Response to OCC-740. 12 Exh. CLP-ACOS-1, at 4:5-7. 9Page 12 of 48
Docket No. 26-05-10 Prefiled Direct Testimony of Melissa Whited 1 Q 2 3 Has the classification of advanced meter costs been addressed in cost allocation literature? A Yes. The Regulatory Assistance Project addresses the issue directly. It explains that the 4 main purpose of meters was once customer billing, but that “advanced meters serve a 5 broader range of functions, including demand management, which in turn provides 6 system capacity benefits, and line loss reduction, which provides a system energy 7 benefit.” It concludes that “the benefits of these meters flow beyond individual 8 customers, and logically so should responsibility for the costs.”13 9 Q 10 11 Does Eversource’s own analysis show that AMI enables services beyond customerrelated functions? A Yes. Among the benefits listed in the Company’s benefit categories in its Benefit Cost 12 Analysis of AMI are system cost avoidance, volt/var optimization (“VVO”), and time 13 varying rates.14 The Company therefore expects AMI to: 14 • 15 reduce peak demand by enabling more sophisticated time-varying rates, thereby avoiding or deferring system costs that would otherwise increase with peak load; and • 16 17 reduce distribution losses and energy consumption through voltage optimization, using voltage data from AMI meters. 18 These operational improvements that Eversource recognized in its benefit cost analysis 19 clearly extend the role of AMI beyond traditional metering, which provides none of these 13 Lazar, J. et al., Electric Cost Allocation for a New Era: A Manual. Montpelier, VT: Regulatory Assistance Project (2020), at 18. 14 CLP-AMI-2, Figure 22, p. 91. 10Page 13 of 48
Docket No. 26-05-10 Prefiled Direct Testimony of Melissa Whited 1 functions. Its cost classification should therefore recognize that the investment is 2 “largely justified by services other than billing.”15 3 Q How do you recommend that Eversource classify AMI meter costs? 4 A AMI meter costs should be classified in proportion to the net present value of the benefits 5 the Company has quantified, with each benefit assigned according to what drives the cost 6 it avoids. I recommend that benefits from metering, billing, and customer account 7 functions be classified as customer-related, benefits from voltage optimization and 8 reduced line losses as energy-related, and benefits from peak reduction, avoided VVO 9 line sensors, and improved outage restoration as demand-related. 10 Q 11 12 What percentage of AMI meter costs should be classified as demand-related and energy related? A The Company provides the present value of AMI benefits in Exhibit CLP-AMI-3. I have 13 reproduced these benefits in the table below, excluding carbon reduction, which is not a 14 utility system benefit, and system costs avoidance, which is primarily the avoided cost of 15 the customer information system and does not depend on the AMI meters themselves. 15 Lazar, J. et al., Electric Cost Allocation for a New Era: A Manual. Montpelier, VT: Regulatory Assistance Project (2020), at 157. 11Page 14 of 48
Docket No. 26-05-10 Prefiled Direct Testimony of Melissa Whited 1 Table 1. Classification of AMI Costs According to System Impacts Benefits (NPV $M) $21.20 $160.30 $32.20 $5.70 $74.50 Benefit Category Meter Reading Avoided Meter Capital Remote Connect/Disconnect No Trouble Found Calls Reduced Bad Debt Recommended Classification Customer Customer Customer Customer Customer Reduced Soft Close Loss $24.30 Customer VVO Time-Varying Rates Asset Optimization Advanced Engineering Analysis Avoided Connectivity Survey Improved Restoration – Significant Storms Improved Restoration – Blue Sky Reduced Theft and Non-Technical Line Loss $163.80 $23.90 $96.40 $38.70 $6.70 $162.40 $2.50 Energy $106.2 / Demand $57.6 Demand Demand Demand Demand Demand Demand $16.50 Energy Customer-related Demand-related Energy-related $318.20 $388.20 $122.70 38% 47% 15% 2 Source: Avoided costs from Exhibit CLP-AMI-3, Figure 7. Classification is my own. 3 Thus, AMI meter costs should be classified as 38 percent customer-related, 47 percent 4 demand-related, and 15 percent energy-related. 5 Q Have other Commissions approved similar AMI meter classifications? 6 A Yes. The Maryland Public Service Commission approved “a benefits approach for 7 allocating AMI costs among rate classes” in 2016, when it approved a proposal to assign 8 25% of AMI costs using a customer-based allocator, 37.5% using a demand-based 9 allocator, and 37.5% using an energy-based allocator in Pepco’s distribution rate case.16 16 In the Matter of the Application of Potomac Electric Power Company for Adjustments to its Retail Rates for the Distribution of Electric Energy (Hereafter, “MD PSC, Case No. 9418”). Order No. 87884. November 15, 2016. https://psc.maryland.gov/wp-content/uploads/Order-No.-87884-Case-No.-9418-Pepco-Rate-Case-1.pdf at 105106. 12Page 15 of 48
Docket No. 26-05-10 Prefiled Direct Testimony of Melissa Whited 1 The approved proposal was based on the fact that an early report on AMI benefits 2 assigned just over 75% of the benefits to energy and demand management outcomes, 3 justifying a customer-, demand-, and energy-based allocation.17 The PSC concluded that 4 the “hybrid approach most fairly spreads the costs and related benefits of AMI 5 throughout the Pepco service territory.”18 6 7 B. The Company’s minimum system method to classify distribution system costs does not reflect cost causation 8 Q What is a minimum system study? 9 A A minimum system study, or minimum system method, is a cost analysis that estimates 10 what the cost of the distribution system would be if the total system inventory was 11 composed of the smallest equipment size. 12 Q 13 14 How does the Company use the Minimum System Method to classify distribution costs? A The Company’s Minimum Distribution System (“MDS”) Study separates the costs of 15 distribution facilities into customer-related and demand-related components.19 Under this 16 approach, Eversource first identifies the cost of the hypothetical minimum sized system 17 (including minimum sized poles, conductors and conduits, and transformers) required to 18 connect customers. It then classifies the portion of distribution costs representing the 19 minimum system as customer-related, while the difference between total system costs 20 and customer-related costs is classified as demand-related.20 Table 2 below provides the 17 MD PSC, Case No. 9418. Direct Testimony of Shelley Norman. July 6, 2016. https://webpscxb.pscmaryland.com/DMS/case/9418 Item No. 33. At 21-23. 18 MD PSC, Case No. 9418. Order No. 87884. November 15, 2016. At 106. 19 Exhibit CLP-ACOS-1, p. 4. 20 Exh. CLP-ACOS, at 4:14-5:13. 13Page 16 of 48
Docket No. 26-05-10 Prefiled Direct Testimony of Melissa Whited 1 resulting split between customer-related and demand-related costs resulting from this 2 method.21 3 Table 2. Minimum system study classification factors 4 5 Q How does the Company define customer-related costs? 6 A The Company defines customer-related costs as those that vary with the number of 7 customers on the system and are independent of the customer’s usage. The Company also 8 asserts that customer-related costs include a portion of the distribution system identified 9 with the Minimum Distribution System.22 10 Q Is it appropriate to classify the Minimum Distribution System as customer-related? 11 A No. While these costs are not directly related to customer demand, they are similarly not 12 directly related to the number of customers on the system. Rather, these costs are 13 primarily driven by the geographic dispersion of customers. As Professor Bonbright 14 explains, the primary justification put forward for classifying the costs of this “phantom, 15 minimum-sized distribution system” as customer related is that these costs vary directly 16 with the area of the distribution system or the lengths of the distribution lines and thus are 17 thought to vary indirectly with the number of customers.23 However, he noted that the 21 Exh. CLP-ACOS-1 at 5, Table 1. Exh. CLP-ACOS-1 at 4:3-7. 23 James Bonbright. 1961. Principles of Public Utility Rates, pp. 347-348. 22 14Page 17 of 48
Docket No. 26-05-10 Prefiled Direct Testimony of Melissa Whited 1 correlation between the area (or mileage) of a distribution system and the number of 2 customers is “very weak,” because “it makes no allowance for the density factor 3 (customers per linear mile or per square mile),” and that “an increase in number of 4 customers does not necessarily betoken any increase whatever in the costs of a minimum- 5 sized distribution system.”24 6 In other words, using customer counts as the allocator for the minimum system 7 does not capture the higher cost of serving sprawling or remote populations relative to 8 dense urban centers. For example, if the Company adds a new residential customer with a 9 negligible level of demand in a populated area, the additional distribution costs to serve 10 that customer—aside from dedicated customer infrastructure—would generally also be 11 negligible, because the system has already been constructed to serve customers in that 12 area. In contrast, a new customer located in a rural area may require investments in 13 additional distribution system poles and wires to extend service to the customer’s 14 residence. These hypotheticals illustrate that distribution system costs associated with 15 connecting a new customer to the grid tend to vary more with geographic density than the 16 number of customers. 17 Q 18 19 How did Professor Bonbright recommend minimum distribution system costs be classified? A 20 Professor Bonbright argued that the costs of the minimum system should be excluded from demand-related costs, but also that classifying them as customer-related is “clearly 24 Id., at 348. 15Page 18 of 48
Docket No. 26-05-10 Prefiled Direct Testimony of Melissa Whited 1 indefensible.”25 Instead, in Bonbright’s opinion, these costs “should be recognized as a 2 strictly unallocable portion of total costs.”26 3 Q 4 5 Are there any alternative methods that would better account for customer density in cost of service models? A Yes. The Ontario Energy Board approved the use of a density factor, calculated as 6 customers per kilometer of line,27 to inform categorization of customer-related and 7 demand-related costs. The Ontario Energy Board’s examination identified low, medium, 8 and high customer density “bins” to establish the percentage of customer-related costs. 9 Transformers were part of the cost pool subjected to the minimum plant categorization 10 based on customer density.28 This method could also be applied to Eversource’s system 11 in the future. 12 Q Do you have any other concerns regarding the minimum system method? 13 A Yes. The minimum system includes poles, conductors, and transformers that are capable 14 of serving some amount of demand. In some cases, the “minimum system” as defined by 15 the utility may even be capable of serving most or all of a typical residential customer’s 16 peak demand. This infrastructure is classified as customer-related, while the remaining 17 demand-related costs are allocated using each class’s full non-coincident peak demand, 18 including the portion the minimum system already serves. Unless each class’s demand 19 allocator is reduced to account for the load-carrying capability of the minimum system, 20 classes with many small customers will be charged twice for the same capacity: once 21 through the customer classification and again through the demand allocator. The 25 Ibid. Ibid. 27 Ontario Energy Board, EB-2007-0667, Board Staff Discussion Paper, p. 12. 28 Ibid. 26 16
As listed on the current system
Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Melissa Whited [26-05-10]