Prefiled testimony
Witness: Melissa Whited
Files3
Synapse - Eversource COS and Rate Design Testimony Final.pdf
PDF · 829 KB · 48 pagesText searchable
Download Synapse - Eversource COS and Rate Design Testimony Final.pdfRead the text of Synapse - Eversource COS and Rate Design Testimony Final.pdf
MW-2- Synapse Attachment.pdf
PDF · 4.6 MB · 276 pagesText searchable
Download MW-2- Synapse Attachment.pdfRead the text of MW-2- Synapse Attachment.pdf
MW-1 - Synapse Attachment.pdf
PDF · 734 KB · 13 pagesText searchable
Download MW-1 - Synapse Attachment.pdfRead the text of MW-1 - Synapse Attachment.pdf
Page 101 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 99 restructuring surcharges have continued into 2019, in some opportunity purchases, or to carry power from new wind and cases as a credit. solar generating resources.80 This is a very different use and Lastly, community choice aggregation has raised a provides very different economic benefits to consumers. similar set of issues in California, in part because a choice Some transmission lines are disused due to generation of energy supplier is not allowed more generally, and the retirement. Although the inclusion of these costs in the rate utilities have procured long-term supply resources for a base of the owning enterprise is a revenue requirement issue, variety of reasons. Locales that form community choice the classification and allocation of any cost allowed by the aggregators, primarily counties, are allowed to contract regulator is a cost allocation issue. Some transmission lines directly with generators for power supply, which may vary may become economically obsolete due to the deployment from the resource characteristics of the utility’s standard of DERs within the service territory, obviating the need for supply. In the meantime, market supply costs have declined, some distant generation and its associated transmission lines. especially for renewables, and the migration of customer In this situation, the rate analyst is faced with the question of generation requirements from the utility to the aggregators how to classify and allocate the fully or partly stranded costs. can result in some stranded power costs, at least according Some lines may be repurposed from providing firm ser- to the utilities. California has selected a complex solution, vice from baseload resources to providing seasonal economic imposing a power charge indifference adjustment, a type service without a clear connection to peak demand. In this of exit fee with annual updates, on the community choice situation, the costs may still be fully justified as economic and aggregators to recover the difference between actual utility in the public interest, but a change in allocation method may costs and market prices. Rather than having a single charge be justified. An hourly assignment method will ensure that for all customers to cover above-market costs, California has these costs are recovered in the hours when the economic created a highly controversial process to set a charge for the energy is flowing. customers of the aggregators and the direct marketers. The California experience illustrates the benefits of consistent allocation across customers, as opposed to the development of special rates for special groups of customers. Distribution There have been very few regulatory disallowances of any magnitude for distribution plant, in part because the mass Any charge for stranded assets or costs should be accounting methods do not identify specific segments. For temporary, only until the specific costs regulators allow are example, when a large industrial facility closes, the invest- recovered. ment in distribution facilities serving it typically remains in the regulated revenue requirement and continues to be Transmission There is less history with transmission abandoned costs, but many lines are now being repurposed. Originally classified and allocated in traditional ways. But technological evolution may result in higher rates of retirement or repurposing. they were built to connect distant coal or nuclear baseload Some assets will be disused at many hours, due to generating resources to urban load centers. Many of these deployment of DERs. Some CHP facilities will be entirely were classified and allocated in the same manner as the self-sufficient much of the time, with reliance on grid- baseload generation, with at least a portion of the cost supplied energy only during maintenance outages or periods classified as demand-related and allocated on some measure of economical options. Distribution lines originally designed of peak demand. Today, with new natural gas generation being sited close to load centers and older coal and nuclear baseload units retired, these lines are being repurposed to transport economic energy from distant markets, including 80 Clear examples of this are found in the desert Southwest, where retirement of coal units in New Mexico, Arizona and Utah that formerly served California utilities is freeing up transmission that is being repurposed for moving variable renewables. State legislation mandated the retirements; economic conditions are driving the repurposing of these facilities.Page 102 of 276
100 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® to provide continuous service may be used only for a limited the consumers actually using the power when it is generated, number of hours. The rate analyst must consider which is rather than being apportioned to the generators or to appropriate: applying the same methods used before DERs customers not receiving power at certain hours. were installed or a different classification and allocation method in light of the changed circumstances. Cross-Functional Repurposing In some areas of Hawaii, distribution circuits are back- There are myriad examples of utility resources once feeding to the transmission system at midday; these lines are needed for a particular function being repurposed for an now serving a power supply integration function for many entirely different function. For example, a former power plant hours of each day. site may become a location for a distribution warehouse. The flow may be bidirectional. Power will flow into the The power plant was functionalized as generation and lines from distant generation or storage during hours of allocated based on demand and energy factors. The darkness and into the grid for redelivery during high solar distribution warehouse is a component of general plant, and hours. The cost may be entirely prudent, but the traditional the allocation method may be very different. One challenge allocation methods may not accurately assign costs to for the rate analyst is tracking changes in how assets are the beneficiaries. An hourly allocation method may be being used, to keep the allocation framework consistent appropriate for these circumstances, with the costs flowing to with the utilization of the assets.Page 103 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 101 8. Choosing Appropriate Costing Methods I n general, facilities shared among multiple users, are not costs that are subject to a “technically correct” as well as expenses and investments benefiting all allocation.81 Pragmatically, these costs can be fairly divided ratepayers, should be apportioned based on measures of among classes based on a measure of usage or even revenue shared usage. Facilities that are uniquely serving individual since there is not necessarily a link between system cost customers should be sized to their individual needs, and the drivers and these costs. costs should be directly associated with those customers. The first task in choosing a cost allocation method is to Overhead costs, such as A&G expenses and general plant, ascertain the objective of the study: Is it focused on short-run Many factors influence cost allocation method selection The appropriate choice of a detailed allocation approach • How do the utility’s customers break down into classes and the most appropriate method may be affected by such and subclasses that have significantly different cost factors as: characteristics? • Are the utility’s loads growing, shrinking or stagnant? • Does the utility have a mix of different types of supply resources to serve varying load levels? • Does the utility rely on transmission facilities to deliver power from remote baseload, hydro or renewable energy resources? • Is generation mostly spread among load centers, or is supply concentrated within certain portions of the service territory? • Does the utility’s supply mix include variable renewable resources, such as wind and solar? • Does the utility have sufficient load density to support • Does the utility have reasonably reliable hourly load data, by class? • Does the utility have demand response resources that can help meet extreme peak requirements? • Does the utility have storage resources that can shift generation or loads among time periods? • Does the utility’s load peak in the winter, in the summer or both? • Do different customer classes peak at different times of the day or different seasons of the year? Each of these questions bears on the most appropriate cost allocation approach. A mix of resources requires a method the distribution system with energy sales, or is the load that appropriately treats that variety of resources differently so sparse that other revenues are required to pay for in classification and allocation. Variable resources require a distribution (as is the case for some cooperatives)? method that assigns their costs to the hours in which they • Are peaking resources located inside the service territory produce benefits. The location of supply resources deter- near loads, or are they dependent on transmission from mines whether the method must apportion transmission distant sources? costs among multiple purposes. 81 Bonbright described some distribution costs as strictly unallocable: “But if the hypothetical cost of a minimum-sized distribution system is properly excluded from the demand-related costs for the reason just given, while it is also denied a place among the customer costs for the reason stated previously, to which cost function does it then belong? The only defensible answer, in my opinion, is that it belongs to none of them. Instead, it should be recognized as a strictly unallocable portion of total costs. And this is the disposition that it would probably receive in an estimate of long-run marginal costs” (1961, p. 348). The same “unallocable” characteristic may apply to other system costs in an evolving industry.Page 104 of 276
102 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® equity considerations or rather on efficiency considerations? are low; with deficient capacity (or fuel or water shortages), Is the system an optimal system or a suboptimal system power costs are high. One problem with establishing cost for today’s needs? Most advocates of using embedded cost allocation on the basis of short-run marginal costs is that few studies point to the direct link with the revenue requirement costs other than power supply vary significantly in the short and spreading that revenue requirement among multiple run. Although utilities do reduce staffing during a recession customers. Although there is a wide range of embedded and may defer maintenance, these are minor cost savings. cost methods, all of them apportion the existing revenue Therefore, the costs considered are only a very small fraction requirement, and rates based on the results should produce of the revenue requirement. the allowed amount of total revenue. Within this broad sense of equity, however, the methods During periods of energy shortage, such as the California energy crisis of 2000-2001, regulators may believe that short- selected may result in vastly different results. For example, term deviations from traditionally used long-run marginal in one docket, the Washington Utilities and Transportation cost theory are appropriate. In California’s case, the commis- Commission considered the results of several approaches to sion approved both higher thresholds for energy efficiency embedded cost of service studies, presented by the utility, investments and very sharply increased tailblock rates. the commission staff and intervenors. The commission did One issue that has been raised with respect to various not rigorously follow any of them but found that the range short-run and NERA-style marginal cost studies is that they of these studies defined an appropriate range in which the capture only a limited window in time, when utility resources revenue allocation should be based. may be imperfectly matched to utility customer needs. This is Another goal of cost allocation is long-run efficiency discussed in detail in Part IV. to guide consumer consumption based on where costs are A market that has short-run marginal costs that are equal going, not where they are.82 The use of long-run marginal to long-run marginal costs is said to be in equilibrium. When costs attempts to do this in the cost allocation phase of in equilibrium, the cost of producing one more unit of output rate-making, and indeed this was the position that some with existing resources is relatively expensive, because all of advocates took in the hearing era after passage of PURPA. the low-cost resources are already fully deployed, resulting in Their position was that all costs should be forward-looking to short-run costs that exactly match the cost of building and encourage long-run efficiency and that past costs cannot be operating new resources. For electric generation, this might “saved,” so there is no point using them for cost allocation or mean running a peaker to provide energy in many hours rate design. because available lower-cost units are fully deployed. In this But marginal costs are not the same as current costs making up the revenue requirement, and some method is situation, there would be no difference between marginal cost studies using different time horizons. needed to reconcile (up or down) the results of a marginal But electric utilities are almost never in equilibrium, for cost study with the revenue requirement. The methods to several reasons: do this include proportionality (adjusting all class revenue • Forecast and actual loads, costs, technologies and requirements by the same percentage) and various methods resource availability change faster than the system can of focusing on certain aspects of cost in adjusting allowed be reconfigured, leaving systems with capacity excess or revenues in consideration of marginal cost. These methods deficiency and resources that are poorly suited to current have been highly controversial, as discussed in detail in Part III. needs. In the short run, it is desirable to optimize the incurrence of variable costs such as fuel, labor and purchased energy. Consideration of short-run marginal costs focuses on exactly this. If systems have excess generating capacity, power costs • Utilities maintain reserve margins for reliability, which often results in energy dispatch costs that are lower than 82 Canadian hockey great Wayne Gretzky is widely quoted as having said: “I skate to where the puck is going to be, not where it has been.”Page 105 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® • • | 103 the fixed and variable costs of a new efficient generating will severely affect large-volume customer classes; if a surplus unit. A system with marginal running costs high enough exists, it will severely affect residential and small commercial to justify new construction will tend to have a relatively customers. low reserve margin. • ELECTRIC COST ALLOCATION FOR A NEW ERA In the following chapters, we address in detail how each In other markets, short-run costs can be allowed to rise, type of cost should be considered in different approaches to with the tightening available supply rationed by pricing, cost allocation. The methods will be different for every utility and the short-run cost becomes the price of outbidding because every utility has a different history and a different other users. For electricity, that approach would lead to mix of resources, loads, costs, issues and opportunities. The blackouts. appropriate method for each utility may be slightly different. Transmission and distribution do not have short-run It is driven by the mix of customers, the nature of the service marginal costs comparable to the long-run costs of new territory, the type of resources employed and the underlying equipment. Short of allowing overloads until lines and history that guided the evolution of the system. No single transformers fail, there is no way to bring a T&D system method is appropriate for every utility, and no single method into equilibrium. is likely to produce a noncontroversial result. Many regulators As energy generation transitions from fossil generation will seek consistent methods to be applied to all utilities in with high running costs to zero-carbon resources with their state, which may require compromise from the most low running costs and high capital costs, it will be harder appropriate method for each individual utility. In Chapter 27, to match short-run and long-run costs. we discuss how regulators can use the results of quantitative A state of disequilibrium can severely affect some cost studies to actually determine a fair allocation of costs customer classes if a marginal cost study is based on short- to medium-term costs. If a shortage of power supply exists, it among classes.Page 106 of 276
104 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Works Cited in Part II Austin Energy (2017). Residential electric rates & line items [Webpage]. Retrieved from https://austinenergy.com/ae/rates/residential-rates/residential-electric-rates-and-line-items Bonbright, J. (1961). Principles of public utility rates. New York, NY: Columbia University Press. Bureau of Reclamation. (1991). Permissible loading of oil-immersed transformers and regulators. Denver, CO: Author. Retrieved from https://www.usbr.gov/power/data/fist/fist1_5/vol1-5.pdf California Public Utilities Commission. (n.d.). Net energy metering (NEM) [Webpage]. Retrieved from https://www.cpuc.ca.gov/general.aspx?id=3800 California Public Utilities Commission. (2016, January 28). Decision adopting successor to net energy metering tariff. Decision No. 16-01-044. Retrieved from http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M158/ K181/158181678.pdf Denholm, P., Margolis, R., and Milford, J. (2008). Production cost modeling for high levels of photovoltaics penetration (TP-581-42305). Golden, CO: National Renewable Energy Laboratory. Retrieved from https://www.nrel.gov/docs/fy08osti/42305.pdf Electric Reliability Council of Texas. (2019). 2018 ERCOT hourly load data [Data set]. Retrieved from http://www.ercot.com/gridinfo/load/load_hist/ Federal Energy Regulatory Commission. (n.d.). Form No. 714 — Annual balancing authority area and planning area report [Webpage]. Retrieved from https://www.ferc.gov/docs-filing/forms/form-714/data.asp Federal Energy Regulatory Commission. (1979, September 28). Order 48: Final regulations in Docket RM79-6. Retrieved from https://elibrary.ferc.gov/idmws/file_list.asp?document_id=14005118 Flex-Core. (n.d.). Energy metering using potential and current transformers [Webpage]. Retrieved from https://www.flex-core.com/engineering-resources/application-whitepapers/energy-metering-using-potentialcurrent-transformers/ Hawaiian Electric Company. (2014, April 30). Minimum day time load calculation and screening. Distributed Generation Interconnection Collaborative (DGIC) webinar. Retrieved from https://www.energy.gov/sites/prod/ files/Hawaiian%20Electric%202014-04-30_minimum-day-time-load-calculation-and-screening.pdf Hledik, R., and Lazar, J. (2016). Distribution system pricing with distributed energy resources. Golden, CO: Lawrence Berkeley National Laboratory. Retrieved from https://www.osti.gov/servlets/purl/1375194 Hogan, M. (2016). Hitting the mark on missing money: How to ensure reliability at least cost to consumers. Montpelier, VT: Regulatory Assistance Project. Retrieved from https://www.raponline.org/knowledge-center/ hitting-mark-missing-money-ensure-reliability-least-cost-consumers/ International Telecommunication Union. (2009). Regulatory accounting guide. Retrieved from https://www.itu.int/ ITU-D/finance/Studies/Regulatory_accounting_guide-final1.1.pdf Kahn, A. (1970 and 1971). The economics of regulation: Principles and institutions (vols. 1 and 2). New York, NY: John Wiley & Sons.Page 107 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA Lazar, J. (2016). Teaching the “duck” to fly (2nd ed.). Montpelier, VT: Regulatory Assistance Project. Retrieved from https://www.raponline.org/knowledge-center/teaching-the-duck-to-fly-second-edition/ Lazar, J., and Baldwin, X. (2011). Valuing the contribution of energy efficiency to avoided marginal line losses and reserve requirements. Montpelier, VT: Regulatory Assistance Project. Retrieved from https://www.raponline.org/ knowledge-center/valuing-the-contribution-of-energy-efficiency-to-avoided-marginal-line-losses-and-reserverequirements/ Lefkowitz, K. (2016, April). Direct testimony on behalf of Potomac Electric Power Co. (Pepco). Application of Potomac Electric Power Co. for adjustments to its retail rates for the distribution of electric energy (Vol. 1). Maryland Public Service Commission Case No. 9418. Retrieved from https://www.psc.state.md.us/searchresults/?keyword=9418&x.x=34&x.y=18&search=all&search=case Moody’s Investor Service. (2017, June 23). Rating methodology, regulated electric and gas utilities. National Association of Regulatory Utility Commissioners. (1992). Electric utility cost allocation manual. Washington, DC: Author. Retrieved from https://pubs.naruc.org/pub/53A3986F-2354-D714-51BD-23412BCFEDFD National Economic Research Associates. (1977). A framework for marginal cost-based time-differentiated pricing in the United States. Palo Alto, CA: Electric Power Research Institute. New York Public Service Commission. (2017, March 9). Order on net energy metering transition, Phase One of value of distributed energy resources, and related matters. Case No. 15-E-0751. Retrieved from http://documents.dps.ny.gov/ public/Common/ViewDoc.aspx?DocRefId={5B69628E-2928-44A9-B83E-65CEA7326428} Nicholas, M., and Hall, D. (2018). Lessons learned on early electric vehicle fast-charging deployments. Washington, DC: The International Council on Clean Transportation. Retrieved from https://www.theicct.org/ sites/default/files/publications/ZEV_fast_charging_white_paper_final.pdf Potter, J., George, S., and Jimenez, L. (2014). SmartPricing options final evaluation. Sacramento, CA: Sacramento Municipal Utility District. Retrieved from https://www.smartgrid.gov/files/SMUD-CBS_Final_Evaluation_Submitted_ DOE_9_9_2014.pdf Pyper, J. (2018, August 29). Xcel to replace 2 Colorado coal units with renewables and storage. Greentech Media. Retrieved from https://www.greentechmedia.com/articles/read/xcel-retire-coal-renewable-energy-storage Rissman, J. (2017). The future of electric vehicles in the U.S. San Francisco, CA: Energy Innovation. Retrieved from https://energyinnovation.org/wp-content/uploads/2017/10/2017-09-13-Future-of-EVs-Research-Note_FINAL.pdf Seattle City Light. (n.d.). City Light rates: Tariffs and rules [Webpage]. Retrieved from https://www.seattle.gov/light/ rates/ratedetails.asp Shirley, W. (2001). Distribution system cost methodologies for distributed generation (Vol. 2, Appendices). Montpelier, VT: Regulatory Assistance Project. Retrieved from https://www.raponline.org/knowledge-center/distributionsystem-cost-methodologies-for-distributed-generation-volume-ii-appendices/ Slusarewicz, J., and Cohan, D. (2018). Assessing solar and wind complementarity in Texas. Renewables: Wind, Water and Solar (5)7. Retrieved from https://jrenewables.springeropen.com/articles/10.1186/s40807-018-0054-3 Trabish, H. (2017, November 2). In new trend, utilities propose separate rate classes for solar customers without rate increase. Utility Dive. Retrieved from https://www.utilitydive.com/news/in-new-trend-utilities-propose-separaterate-classes-for-solar-customers-w/508393/ | 105Page 108 of 276
106 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® U.S. Department of Energy. (n.d.). Charging at home [Webpage]. Retrieved from https://www.energy.gov/eere/ electricvehicles/charging-home U.S. Energy Information Administration. (2019). Annual energy outlook 2019. Table 9. Washington, DC: Author. Retrieved from https://www.eia.gov/outlooks/aeo/data/browser/#/?id=9-AEO2019&cases=ref2019&sourcekey=0 Vermont Public Service Board. (2007, June 20). Investigation into least-cost integrated resource planning for Vermont Electric Power Company’s transmission system. Docket No. 7081. Retrieved from https://epuc.vermont.gov/?q=node/104/16200 Vermont System Planning Committee. (n.d.). Planning for the future of Vermont’s electric power grid [Webpage]. Retrieved from https://www.vermontspc.com/ Wood Mackenzie Power & Renewables and Solar Energy Industries Association. (2019, March). U.S. solar market insight. Retrieved from https://www.seia.org/research-resources/solar-market-insight-report-2018-year-reviewPage 109 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA Part III: Embedded Cost of Service Studies | 107Page 110 of 276
108 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® 9. Generation in Embedded Cost of Service Studies T his chapter addresses the allocation of generation adequacy of generation supply to meet loads). Energy use is costs, including investment-related costs, operation sometimes broken into TOU periods, so that different types and maintenance costs and fuel costs. As noted of costs are spread over the hours in which they are used, as in Section 6.1, equivalent changes in the allocation of a discussed further in Section 9.2 and Chapter 17. cost category among classes can be achieved by changing When there are multiple cost-based approaches for functionalization, classification or the choice of allocation estimating a classification or allocation factor, a compromise factor.83 That section discusses the relevant issues at a high among the results may be appropriate. For example, various level, and this chapter delves more deeply into the underlying measures of reliability risk (emergency purchases, operation concepts and analytical techniques. of peakers, interruption of load, inadequate operating This chapter is not generally relevant to cost allocation reserve) may be distributed differently across the months, for utilities that have restructured and no longer procure and the regulator may reasonably select a generation demand generation resources, as long as the generation prices allocator averaging across the results of those measures. suppliers offer (directly to customers or to the utility for Similar conditions might apply for varying estimates of the default service) are differentiated by rate class. High-level firm-capacity equivalent for wind plants or other inputs. cost allocation issues with respect to generation and default service are discussed in Section 7.2. As discussed in Chapter 3, utilities acquire and maintain Some cost of service studies identify other classifications of generation costs, such as ancillary services. These components are generally very small compared with total different types of generation resources, with distinct generation costs, and some ancillary services (automatic operating capabilities, to meet a range of needs including generation control, black start capability, uplift) can be low-cost energy, reliability, load following and environmental difficult to relate to class load characteristics. compliance. Different classification and allocation methods may be necessary to equitably allocate the costs of different types of generation resources. In more recent years, energy efficiency, expanded demand response, distributed generation and energy storage — all of which can be located where load relief is most valuable — have expanded the utility’s options to meet load growth or reduce demands on aging assets without building transmission, distribution or central generation facilities. Fuel costs, purchased power and dispatch O&M costs, such as the short-run variable cost of pollution controls, are typically classified as energy-related. The other categories of generation costs have generally been classified as being driven 9.1 Identifying and Classifying Energy-Related Generation Costs Many regulators have recognized that energy needs are a significant driver of generation capital investments and nondispatch O&M costs. In modern utility systems, generation facilities are built both to serve demand (i.e., to meet capacity and reliability requirements) and to produce energy economically. The amount of capacity is largely determined by reliability considerations, but the selection of generation technologies and thus the cost of the capacity are by some combination of energy (total energy requirements to serve customers, plus losses) and demand (some measure of loads in the hours that contribute to concerns about the 83 As mentioned previously, the third step is usually called allocation, which is the same as the name of the entire process. Some analysts refer to this third step as factor allocation in an attempt to prevent confusion.
As listed on the current system
Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Melissa Whited [26-05-10]