  1. Page 110 of 276

    108 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® 9. Generation in Embedded Cost of Service Studies T his chapter addresses the allocation of generation adequacy of generation supply to meet loads). Energy use is costs, including investment-related costs, operation sometimes broken into TOU periods, so that different types and maintenance costs and fuel costs. As noted of costs are spread over the hours in which they are used, as in Section 6.1, equivalent changes in the allocation of a discussed further in Section 9.2 and Chapter 17. cost category among classes can be achieved by changing When there are multiple cost-based approaches for functionalization, classification or the choice of allocation estimating a classification or allocation factor, a compromise factor.83 That section discusses the relevant issues at a high among the results may be appropriate. For example, various level, and this chapter delves more deeply into the underlying measures of reliability risk (emergency purchases, operation concepts and analytical techniques. of peakers, interruption of load, inadequate operating This chapter is not generally relevant to cost allocation reserve) may be distributed differently across the months, for utilities that have restructured and no longer procure and the regulator may reasonably select a generation demand generation resources, as long as the generation prices allocator averaging across the results of those measures. suppliers offer (directly to customers or to the utility for Similar conditions might apply for varying estimates of the default service) are differentiated by rate class. High-level firm-capacity equivalent for wind plants or other inputs. cost allocation issues with respect to generation and default service are discussed in Section 7.2. As discussed in Chapter 3, utilities acquire and maintain Some cost of service studies identify other classifications of generation costs, such as ancillary services. These components are generally very small compared with total different types of generation resources, with distinct generation costs, and some ancillary services (automatic operating capabilities, to meet a range of needs including generation control, black start capability, uplift) can be low-cost energy, reliability, load following and environmental difficult to relate to class load characteristics. compliance. Different classification and allocation methods may be necessary to equitably allocate the costs of different types of generation resources. In more recent years, energy efficiency, expanded demand response, distributed generation and energy storage — all of which can be located where load relief is most valuable — have expanded the utility’s options to meet load growth or reduce demands on aging assets without building transmission, distribution or central generation facilities. Fuel costs, purchased power and dispatch O&M costs, such as the short-run variable cost of pollution controls, are typically classified as energy-related. The other categories of generation costs have generally been classified as being driven 9.1 Identifying and Classifying Energy-Related Generation Costs Many regulators have recognized that energy needs are a significant driver of generation capital investments and nondispatch O&M costs. In modern utility systems, generation facilities are built both to serve demand (i.e., to meet capacity and reliability requirements) and to produce energy economically. The amount of capacity is largely determined by reliability considerations, but the selection of generation technologies and thus the cost of the capacity are by some combination of energy (total energy requirements to serve customers, plus losses) and demand (some measure of loads in the hours that contribute to concerns about the 83 As mentioned previously, the third step is usually called allocation, which is the same as the name of the entire process. Some analysts refer to this third step as factor allocation in an attempt to prevent confusion.
  2. Page 111 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 109 largely determined by energy requirements.84 For variable from competitive wholesale markets. This is followed by four renewables, particularly wind and solar, the effective capacity different classification approaches and two joint classification (in terms of the reliability contribution) of the generators is and allocation approaches, then a discussion of other much smaller than their nameplate capacity, and the costs technologies and issues. are mostly undertaken to provide energy without fuel costs or air emissions. Energy storage systems provide both energy benefits (by shifting energy from low-cost to high-cost hours) and reliability benefits, while demand response is used primarily to increase reliability. 9.1.1 Insights and Approaches From Competitive Wholesale Markets The ISOs/RTOs that operate energy (and in some cases, capacity) markets — specifically ISO-NE, NYISO, PJM, As discussed in the text box on pages 78-79, some older ERCOT, MISO and the SPP — provide examples of how the cost of service studies classified a wide range of capital and recovery of capital investment and nondispatch O&M costs nondispatch O&M costs as demand-related on the grounds naturally splits between energy and demand. The pricing that the costs were in some manner fixed, without regard for in these markets can provide both a competitive proxy for cost causation. This approach, known as straight fixed/vari- classifying generation costs and a benchmark to check the able, is anachronistic and does not reflect cost causation.85 reasonableness of other techniques. Table 12 shows the capital and O&M costs estimated for ERCOT has no capacity market, and all costs are new conventional generation units from the 2018 Lazard’s recovered through time-varying energy charges. Those energy Levelized Cost of Energy Analysis report.86 Although the origi- charges are heavily weighted toward a small number of hours, nal costs and current plant in service and O&M costs of older which do not tend to have particularly high loads; the highest- units will vary, the general relationships have been consistent. load hours are not the highest-cost hours. Figure 30 on the This section first discusses the insights on this issue next page shows the hourly load and Houston Hub prices Table 12. Cost components of conventional generation, 2018 midpoint estimates Technology Combustion turbine Capital cost (per kW) Fixed Variable operations and operations and maintenance maintenance (per kW-year) (per MWh) $825 $12.50 $7.40 Combined cycle $1,000 $5.75 $2.80 Coal $3,000 $40.00 $2.00 Nuclear $9,375 $125.00 $0.80 Source: Lazard. (2018). Lazard’s Levelized Cost of Energy Analysis — Version 12.0 84 “Citing both past operating experience and future resource planning, the Division [the PSC intervention staff] notes that resources with higher energy availability are chosen over those with lower energy availability. Since energy plays a role in the selection of least-cost resources, the Division concludes that some weight needs to be given to energy in planning for new capacity, and the current weight of 25 percent is reasonable. We find the qualitative argument offered by the Division to be … convincing.” (Utah Public Service Commission, 1999, p. 82). See also Washington Utilities and Transportation Commission (1993, pp. 8-9). 85 The term “straight fixed/variable” is imported from FERC’s rate design method for wholesale gas supply, where utilities, marketers and very large customers contract for capacity in a portfolio of individual pipeline and storage facilities. As is true for many electric wholesale purchased for 2017 (Electric Reliability Council of Texas, 2018, for load data; ENGIE Resources, n.d., for pricing data). Prices generally trend upward with load, but the highestpriced hours are spread nearly evenly across load levels. In 2017, the highest-priced 1% of hours (with prices over $160 per MWh) would have provided 18% of the annual net margin for a baseload plant with no variable cost, 53% of the margin for a plant with a variable cost of $20 per MWh (perhaps a combined cycle unit), and 77% of the margin for a plant with a $30-per-MWh variable cost (such as a recently built combustion turbine), assuming ideal dispatch and no power contracts, these gas contracts require that the buyers pay for investment-related costs regardless of how they use the resources and pay for variable costs in proportion to their usage. This approach is workable at the wholesale level but is not applicable to retail cost allocation, where the utility bundles a portfolio of generation assets for all of its customers. 86 The coal cost in the table is Lazard’s low end, since the high-end cost “incorporates 90% carbon capture and compression” (Lazard, 2018, p. 2), which is in use on only one existing utility coal unit, SaskPower’s Boundary Dam. The $3,000/kW value is also consistent with the costs of the last three coal plants completed by U.S. regulated utilities (Turk, Virginia City and Rogers/Cliffside 6, all completed in 2012). Actual current costs of various vintages of resources will vary for each utility.
  3. Page 112 of 276

    110 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Figure 30. ERCOT load and real-time prices in 2017 $2,250 Hourly price per megawatt-hour $2,000 $1,750 $1,500 $1,250 $1,000 $750 $500 $250 $0 -$250 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 60,000 65,000 70,000 Hourly load in megawatts Sources: Electric Reliability Council of Texas. (2018). 2017 ERCOT Hourly Load Data; ENGIE Resources. Historical Data Reports outages. Those 88 hours representing the costliest 1% occurred estimated that the net revenues available to pay the capital in every month and almost the whole range of annual loads. investment and nondispatch O&M costs of a typical recently In contrast, the 1% of highest-load hours would have built gas combined cycle unit would have been about provided 5.1% of the margin for the baseload plant, 2.4% for 25% to 60% from the energy market and the remainder the intermediate plant and 2% for the combustion turbine. from the capacity market, depending on the year (Patton, This cost pattern suggests that, at least in some systems, LeeVanSchaick and Chen, 2017, p. 13). The comparable values generation costs should be time-differentiated but that load for nuclear units were almost all from the energy market is not a good proxy for the highest-price periods. Classes with (Patton et al., 2017, p. 17). the ability to shape load to low-cost periods (with demand The PJM independent market monitor reports the response or storage) may be much less expensive to serve capacity revenues and the net energy revenues (i.e., energy than those with inflexible load patterns. revenue in excess of fuel and variable O&M) for a variety of Regardless of how the top hours are chosen, the ERCOT plant types (Monitoring Analytics, 2014, pp. 219-222, 2019, data indicate that most of the long-term power supply costs pp. 335-339). These are the revenues available to pay for the are not recovered from the few peak hours and thus should capital investment and nondispatch O&M costs and thus not be considered demand-related. For a load shaped like the represent the market allocation of these costs for the plants. ERCOT average load, only about 3% of the generation costs Figure 31 on the next page shows the portion of these costs were associated with the 1% of highest-load hours, and about recovered through capacity payments for four types of new 20% were associated with the 1% of highest-price hours. plants (gas-fired combustion turbine and combined cycle In New England, the ISO-NE external market monitor units, and hypothetical new coal and nuclear) in each year
  4. Page 113 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 111 Figure 31. Capacity revenue percentage in relation to capacity factor in PJM 100% Capacity revenue as percentage of total revenue Combustion turbine 90% Combined cycle Coal 80% Nuclear Trend 70% 60% 50% 40% 30% 20% 10% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Capacity factor Data sources: Monitoring Analytics. (2014 and 2019). 2013 State of the Market Report for PJM, 2018 State of the Market Report for PJM 2009 through 2017 (Monitoring Analytics, 2014, 2019).87 prices, while the Hudson Valley and New York City have very The concept displayed here is that units with a high high capacity prices, and Long Island has intermediate prices. capacity factor tend to make more of their revenue from Both capacity and energy revenues vary among zones within energy markets instead of from the capacity market. In this each of these three areas, between load pockets within zones set of PJM data, energy revenues cover 14% to 60% of the and among combustion turbine types. combustion turbine costs, 38% to 74% of combined cycle costs, 56% to 73% of baseload coal plant costs, about Table 13. Energy portion of 2017 net revenue for New York ISO 34% of the costs of economically dispatched coal units, Generator type and 77% to 89% of nuclear costs over the nine-year period. The values for 2017 were 39% for modern combustion Zone Combustion turbines turbines, 87% for combined cycle units, 65% for coal and Upstate 72% to 80% 71% to 79% 42% to 55% 20% for nuclear. Current values for PJM or the relevant load Long Island 52% to 70% 62% to 76% 21% to 57% Hudson Valley and 31% to 49% New York City 34% to 55% 6% to 29% zones could be used as the demand classification percentages for vertically integrated utilities in PJM (e.g., IOUs in Kentucky, Virginia and West Virginia, and municipal and cooperative utilities in several states). The market monitoring unit of the NYISO provided similar analyses for the various pricing zones of that RTO, as shown in Table 13 (Patton, LeeVanSchaick, Chen and Palavadi Naga, 2018, Table A-14, with additional calculations by the authors). The upstate zones have relatively low capacity Combined cycle Steam Sources: Patton, D., LeeVanSchaick, P., Chen, J., and Palavadi Naga, R. (2018). 2017 State of the Market Report for the New York ISO Markets; additional calculations by the authors 87 The independent market monitor assumed that a nuclear plant would operate at a 75% capacity factor and made the same assumption for the coal plant through 2015; the capacity factors for the gas-fired plants and for coal in 2016 and 2017 are determined from the economic operation of the units.
  5. Page 114 of 276

    112 | ELECTRIC COST ALLOCATION FOR A NEW ERA 9.1.2 Classification Approaches REGULATORY ASSISTANCE PROJECT (RAP)® The system load factor, and hence the average-and-peak Many utilities and regulators acknowledge that a large approach more generally, varies over time independent of the portion of generation investment and nondispatch O&M mix of the utility’s generation resources and does not respond costs is incurred to serve energy requirements. There are two to changes in that mix unless those changes are accompanied categories of methods to classifying these costs as energy- by retail pricing that follows the cost structure. related and demand-related. First, average-and-peak is a In addition to changing as loads change, the average-and- top-down approach that uses high-level data on system loads peak approach ignores the mix of resources and costs. This and costs. Second, there is a range of bottom-up approaches approach would produce the same classification of plant for that examine the drivers for costs on a plant-specific basis: a system that was entirely composed of gas-fired combustion • Base-peak and related methods. turbines (with low capital costs and high fuel costs) or of • Equivalent peaker method. coal-fired plants (with high capital costs to produce lower • Operational characteristics methods. fuel costs). As a general matter, the bottom-up approaches are Thus, while the average-and-peak method for generation preferable for classifying generation costs. The average-and- costs may sometimes fall in the range of reasonable results, peak approach is well suited for shared distribution system it is neither logical nor consistent. costs, as discussed in Section 11.2. Average-and-Peak Method The average-and-peak approach can be applied Base-Peak Methods Various utilities and other analysts have proposed to subfunctionalize generation resources (in the simplest case, in classification, when classifying a portion of costs as between baseload and peaking plants) and classify each energy-related and the remainder as demand-related, or category of generation in a different manner. For example, in developing a generation capacity allocator that reflects peakers may be classified 100% as demand-related, while both energy and demand. When using this approach as a baseload resources are classified 75% to demand and 25% to classification method, the system load factor percentage is energy, or some other location- and situation-specific ratio. classified as energy-related and the remainder as demand- More advanced analyses have subfunctionalized related.88 When used as an allocation factor, the average- generation among base, intermediate and peak categories, and-peak factor for each class is:89 known as BIP classification. The base generation might be defined as all nuclear and coal plants, with the intermediate being gas-fired steam and combined cycle plants and the Where A = annual average load = energy ÷ 8,760 peak units being combustion turbines, storage and demand P = peak load response. Alternatively, base plants might be any unit that C = class operated at more than a certain capacity factor (for example, S = system 60%), peakers those that ran at less than 5%, and intermediate SLF = system load factor = (annual energy) ÷ (peak load × 8,760) anything between those 5% and 60% capacity factors. Or, rather than using capacity factor (which can be low due to forced outages, maintenance or economic dispatch), the 88 This method is sometimes called the system load factor approach. It has also been called “average and excess” because a fraction of cost equal to the system load factor is allocated on energy and the excess of costs on a measure of peak loads (Coyle, 1982, pp. 51-52). 89 This average-and-peak allocator should not be confused with the averageand-excess demand allocator described in the 1992 NARUC Electric Utility Cost Allocation Manual, which allocates a portion of costs in proportion to average load and the excess in proportion to each class’s excess of peak load over its average use. That legacy average-and-excess allocator is essentially just a peak allocator (Meyer, 1981).
  6. Page 115 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 113 generation classes can be defined using operating factor (the output renewable resources, additional storage and economic ratio of output to equivalent availability). At an extreme, each demand response reduces the accuracy of those simple generation type, or even each unit, can be classified separately. models. Resources like wind and solar do not fit neatly into While the base-peak classification approach and related the BIP categories, providing service in distinct time patterns methods are highly flexible, that is both their greatest strength that may not be related to system loads. At the same time, and a great weakness. The strength is that the method can many utilities have access to much more granular detail on be modified to accommodate the diversity of generation hourly consumption by customer.91 The BIP method can be resources; the weakness is that the method requires a set of expanded to reflect conditions (output by several classes of decisions about the definition of the generation classes and conventional generation, solar, wind and storage; energy the classification percentage for each class. The base-peak use for storage; usage by class) in as many time periods (or method is connected to actual utility planning only at the load levels, or bins combining consumption and generation highest conceptual level and provides limited guidance for the conditions) as desired, even down to an hourly allocation nitty-gritty details of traditional classification. method. Usage and hence costs could thus be assigned One of the challenges of the base-peak approach relates to the changing usage of generation resources. directly to the classes using power at the times that each resource provides service.92 For example, several units that were built to burn coal in baseload operation have been converted to burn natural gas Equivalent Peaker Method and thus run mostly on high-load summer days.90 These The equivalent peaker method,93 discussed at length units operate as peak or intermediate resources (depending in the 1992 NARUC Electric Utility Cost Allocation Manual, on the definitions used in the particular analysis), but most attributes as demand-related the portion of investment in of the capital costs are attributable to the original baseload each resource that would have been incurred to secure a design. This problem may be ameliorated by removing those peaking resource, such as demand response or a combustion additional costs from the base-peak or BIP computation and turbine.94 Peaking resources are usually treated as 100% directly classifying them as energy-related. demand-related, while intermediate and baseload plants are Recent technological changes pose additional challenges and opportunities for expanding the base-peak approach classified as partly energy and partly demand. If only peak load had been higher (and other needs were from two generation profiles, or the three profiles of the BIP already satisfied) in the years in which the utility made the method, to a full analysis of the use of generation resources. bulk of its generation construction decisions, it would have Decades ago, it was reasonably accurate to treat generation likely met that increased load by adding peaker capacity.95 resources as being stacked neatly under the load duration Utilities historically have justified building baseload capacity curve in order of variable costs. The growing role of variable by relying on these plants’ long hours of use and lower fuel 90 Some coal plants that once ran as baseload resources have been taken out of service in low-load months to reduce O&M costs. This includes Nova Scotia Power’s Lingan 1 and 2 (Barrett, 2012), Luminant’s Monticello and Martin Lake (Henry, 2012) and the Texas Municipal Power Agency’s Gibbons Creek (Institute for Energy Economics and Financial Analysis, 2019). way: 34% (the ratio of minimum to peak load) to energy; 36% (the 90% ratio of winter peak to summer peak, minus the 34% energy allocation, or 56%, times the 65% of the peak-period hours that occur in winter) to the winter peak demand; and the remaining 30% to the summer peak demand (Seelye, 2016, Exhibit WSS-11). This approach has no cost basis. 93 In some jurisdictions, this is called the peak credit method. 91 Most utilities have long known the hourly generation by unit. 92 Some utilities refer to their classification method as BIP, even though it does not reflect the differences in costs among the various types of generation. For example, the Louisville Gas & Electric and Kentucky Utilities 2018 “BIP” computation classified nondispatch generation costs this 94 This approach is sketched out in Johnson (1980, pp. 33-35) and described in more detail in Chernick and Meyer (1982, pp. 47-65). 95 To some extent, the peakier load would likely allow for development of more demand response and load management. Estimating the potential and costs for these resources under hypothetical load shapes may be difficult.
  7. Page 116 of 276

    114 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® costs.96 This incremental capital cost (often called capitalized reliability-related portion of the cost of each generation unit energy or “steel for fuel”) is attributable to energy require- is estimated as the cost per kW of a peaker (usually a simple- ments, not demand. The investment-related costs of baseload cycle combustion turbine) installed in the same period, times resources above and beyond the cost of peaking units are the effective capacity of that unit, adjusted for the equivalent incurred to serve energy load, not demand. Treating these availability of a peaker.98 The cost of the unit in excess of the costs as demand-related overstates the cost of meeting equivalent gas turbine capacity is energy-related. demand and understates the costs incurred to meet energy However, the simple version of this calculation typically requirements. This phenomenon has been understood since will overstate the reliability-related portion of plant cost be- the 1970s and 1980s: cause it assumes a steam plant supports as much firm demand [T]he extra costs of a coal plant beyond the cost as would the same capacity of (smaller) combustion turbines. necessary to build a combustion turbine should all be Due to higher forced outage rates, lengthy maintenance shut- allocated [on] energy. The rationale for this allocation is downs and the size of units, a kilowatt of steam plant capacity that the marginal cost of capacity in the long run is just typically supports less firm load than a kilowatt of capacity the lowest-cost technology required to meet peak load, from a small peaker. A system with a peak load of about which is typically a combustion turbine. Choosing to 6,500 MWs and a 65% load factor could achieve the same invest beyond this level [of combustion turbine capital level of reliability with 80 units of 100 MWs (8,000 MWs, cost] is justified not on capacity grounds, but on energy or a 23% reserve) or 19 units of 600 MWs (11,400 MWs, or grounds. That is, the extra capital cost of a coal plant a 75% reserve), assuming the units all have a 6% equivalent allows the utility to use a low-cost fuel and avoid forced outage rate and that the load shape can accommodate higher-cost fuels (Kahn, 1988). all required maintenance off-peak. Increasing the equivalent forced outage rate to 10% would increase the required reserve However, there are several additional issues with this for the 100-MW units to about 40% and for the 600-MW units concept in the modern electric system. First, the method to 90%. Even with the 6% equivalent forced outage rate, if the does not adapt well to wind and solar, where the capital load factor were 96%, the reserve requirement would rise to investment is primarily justified by avoiding fuel costs 30% with 100-MW units and 90% with 600-MW units. but the installed capital cost per nameplate MW may be Figure 32 on the next page shows the gross plant per little different from the cost of a peaker. An intermediate kW for combustion turbines as of 2011, from FERC Form 1 or baseload plant that is not much more expensive than data (Federal Energy Regulatory Commission, n.d.). These a contemporaneous peaking resource would be classified values include the original cost of the units, plus capital as mostly demand-related, while very expensive plants are additions since the plants entered service, minus the cost classified as mostly energy-related. And often, peaker units of any equipment retired. This tabulation includes all non- are used to provide energy when baseload units are not CHP simple-cycle combustion turbines for which cost data operating or to provide power for off-system sales.97 were available.99 Some of the later combustion turbines in Under the equivalent peaker method, the demand- or this sample may not be pure peakers, since manufacturers 96 Similar reasoning applies to the decision to add renewable resources, substituting investment for fuel costs. See footnote 120. demand response cost or storage peak output capacity, without an increase in energy generating capability. The reference peaker should always be the least-cost option for providing reliability. 97 During the 2000-2001 California energy crisis, oil-fired peakers in the Pacific Northwest operated at high monthly capacity factors because they were exempt from both gas supply constraints and California emissions regulations. U.S. Energy Information Administration Form 906 for 2000 and 2001 demonstrates the incremental oil burn in 2000 and 2001, particularly for Puget Sound Energy. 98 In the future, the reference peaking capacity might be an increase in 99 Municipal and cooperative utilities and non-utility generators (both those under contract with utilities and those operating in the merchant markets) do not file FERC Form 1 reports, so their units are not included in this analysis. The municipal and cooperative utilities typically retain financial and operating records that are compatible with the FERC system of accounts, allowing comparison of the data for a specific utility’s nonpeaking resources with national data on contemporaneous peaker costs.
  8. Page 117 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 115 Figure 32. Cost of combustion turbine plant in service in 2011 $600 Gross plant cost per kilowatt of capacity Average for year $500 Five-year rolling average $400 $300 $200 $100 $0 1960 1965 1970 1975 1980 1985 1990 1995 Plant in-service year Data source: Federal Energy Regulatory Commission Form 1 database developed more expensive and more efficient designs, • Comparing recent or current net plant (gross plant minus accumulated depreciation) costs for nonpeaking generators including steam injection. with the corresponding net plant costs of contempora- For comparison, coal plants built in this period generally cost from several hundred dollars per kW to more than neous peakers. This comparison is theoretically the most $2,000 per kW; the latest vintage coal plants cost as much appropriate basis for classifying generation rate base, which as $3,000 per kW. Steam plants fired by gas and oil (and not is based on net plant. Unfortunately, net plant is not gener- converted from coal) tend to have a wide range of gross plant ally publicly reported by plant or unit, so most cost analysts costs, from the prices of contemporaneous combustion will have a difficult time implementing this approach. turbines to perhaps twice those costs. Nuclear plants In addition, many utilities have depreciated peakers at a generally have gross plant costs well above $1,000 per kW, faster rate than steam plants, resulting in lower net plant up to $8,000 per kW. Combined cycle plants have usually for a peaker than for a steam plant with the same initial been 20% to 50% more expensive than contemporaneous cost, additions and retirements. This results in a higher combustion turbines.100 percentage of the steam plant costs being classified as energy-related based on net plant than gross plant. It is not The capital costs of various types of generating capacity can be compared with the costs of peakers in several ways, obvious whether the additional classification to energy is including the following: more equitable than the result of the gross plant allocation. • Comparing recent or current gross plant costs for other • Comparing the cost of building the actual mix of generators with the corresponding cost of peakers, as generation today with the cost of building a peaking-only discussed above. system today.101 This approach avoids the problem of 100 These cost ratios are provided to explain the importance of identifying the demand-related portion of generation investment. Any application of the equivalent peaker method should compare the costs of the utility’s existing plants to the costs of contemporaneous peakers, using the most comparable estimates of the costs of peakers, reflecting geographical and other differences. 101 The peaking-only system might include combustion turbines, demand response and storage resources.
  9. Page 118 of 276

    116 | ELECTRIC COST ALLOCATION FOR A NEW ERA estimating the cost of building peakers at various times in the past. But many existing plants could not be built REGULATORY ASSISTANCE PROJECT (RAP)® Table 14. Equivalent peaker method analysis using replacement cost estimates today as they currently exist — a new coal plant may Cost per kW Capacityrelated share of cost Peaking $770 100% 0% gas-fired boiler units, no longer make economic sense Nuclear $3,689 20.9% 79.1% and would not be built today. Determining the cost of Fossil* $1,976 39.0% 61.0% building a new 1970s-style coal plant or a gas-fired steam Combined cycle $1,020 75.4% 24.6% plant may be much more difficult than determining the Hydro $4,519 17.0% 83.0% require scrubbers, nitrogen oxide reduction, closedsystem cooling and other features that the existing coal plant does not have.102 Other plant types, such as oil- and cost of peakers in the 1970s. And for some technologies, the costs of new construction do not meaningfully reflect the costs of the plants currently embedded in rates. For example, as expensive as the nuclear units of the 1980s were, the nuclear units currently under construction Resource type Energyrelated share of cost *The “fossil” resource type appears to be coal- or gas-fired steam. Source: Peppin, M. (2013, November 4). Direct testimony on behalf of Northern States Power Co.-Minnesota. Minnesota Public Utilities Commission Docket No. E002/GR-13-868 This is not a very realistic comparison, for reasons are much more expensive. Conversely, the costs of discussed above. Many of the plants could not be built wind turbines have fallen dramatically since the 1980s. today, and some have complicated histories of retrofits and Comparing today’s costs for those resources to the costs repowering. The nuclear replacement cost appears to be of new peakers would probably overstate the energy- particularly optimistic compared with the cost of nuclear related portion of the costs of an old nuclear unit and power plants under construction today. understate the energy-related portion of the costs of an Table 15 on the next page shows an alternative analysis old wind farm. based on the Xcel Energy Minnesota subsidiary’s actual Whether the comparison uses gross plant in service, net investments in each plant type at the end of 2017, from plant in service or hypothetical new construction, the data Page 402 of its FERC Form 1 report (Federal Energy sources should be as consistent as possible. It would not be Regulatory Commission, n.d.). appropriate to compare the current book value of an actual The results of the two analyses are generally consistent, plant with the cost of a hypothetical plant in today’s dollars except for the classification of the combined cycle resources. (Nova Scotia Utility and Review Board, 1995, p. 18). These plants are of more recent vintage than the others; a Table 14 shows the equivalent peaker method analysis fairer comparison, using peaker costs contemporaneous with that Northern States Power Co.-Minnesota (a subsidiary of the in-service dates of each of the other resources, probably Xcel Energy) used in its 2013 rate case filing (Peppin, 2013, would result in a lower energy classification of the combined Schedule 2, p. 4).103 The capacity portion for each plant type cycle resources and higher energy classification for the coal is the ratio of the peaking cost ($770 per kW) to the plant and nuclear units. type cost. For example, the peaking cost is 20.9% of the cost The equivalent peaker method does have limitations. of the nuclear plant, so 20.9% of the nuclear investment is Perhaps most importantly, it requires cost comparisons of treated as capacity-related. The company uses its estimates of individual generation units with peakers of the same vintage. the replacement costs of each type of generation and applies Utilities installed combustion turbines as far back as the early the results to each capital cost component (gross plant, 1950s, but the technology was widely installed only in the accumulated depreciation, deferred taxes, etc.). late 1960s. The oldest remaining combustion turbine owned 102 Many hydroelectric projects could not be licensed if they were proposed today. 103 The company calls this a plant stratification analysis.
  10. Page 119 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 117 Table 15. Equivalent peaker method analysis using 2017 gross plant in service Excess over combustion turbine Plant in service Capacity (MWs) Combustion turbine Energy-related share of cost Cost Cost per kW Cost Cost per kW 1,114 $291,000,000 $261 N/A N/A 0% Nuclear 1,657 $3,448,000,000 $2,081 $3,016,000,000 $1,820 87% Coal 2,390 $2,156,000,000 $902 $1,532,000,000 $641 71% Combined cycle 1,266 $939,000,000 $742 $609,000,000 $481 65% All resources 6,427 $6,834,000,000 $1,063 $5,157,000,000 $802 75% Resource type Data source: Federal Energy Regulatory Commission Form 1 database records for Northern States Power Co.-Minnesota by a utility filing cost data (Madison Gas and Electric’s Nine usually ignores the higher accumulated depreciation of Springs) entered service in 1964. The paucity of earlier data peakers compared with the accumulated depreciation for complicates the use of the equivalent peaker method for other generation resources of the same vintage (which tends classifying the costs of older plants. This problem is gradually to overstate the demand-related portion of generation rate fading away, as all pre-1970 nuclear is gone and much of the base), it is also generally symmetrical to classify generation pre-1970 fossil-fueled steam capacity has been retired or depreciation expense as proportional to the demand-related is nearing retirement, but the issue remains for classifying portion of gross plant (which will tend to understate the hydro plant costs and the few remaining old fossil fuel plants demand-related portion). If classification of one of these cost (U.S. Energy Information Administration, 1992). components is refined to reflect the difference in depreciation One solution to the problem of classifying the rates, the other cost component should be similarly adjusted. investment in very old, little-used steam plants is to treat As is true for plant in service, the nonfuel O&M costs that cost as entirely demand-related. Since these units often of steam plants are generally much higher than the nonfuel represent a very small portion of generation rate base, this O&M costs of combustion turbines. Typical O&M costs per solution may be reasonable. kW-year are $1 to $10 for combustion turbines, $10 to $15 for A full equivalent peaker analysis would compare the combined cycle plants, $10 to $20 for oil- and gas-fired steam product of the actual depreciation charges for the nonpeaking plants, $40 to $80 for coal plants and more than $100 for plants with the product of the peaker depreciation rate nuclear plants. Table 16 shows how the capacity-related O&M and the peaker-equivalent gross investment for the same for conventional generation might be classified between reliability contribution. Since the classification of rate base energy and demand, using the utility’s actual nonfuel O&M Table 16. Equivalent peaker method classification of nonfuel operations and maintenance costs Resource type Capacity (MWs) Nonfuel operations and maintenance Cost per kW-year Cost Excess over combustion turbine Cost Cost per kW-year Energy-related share of cost Combustion turbine 1,114 $4,170,000 $3.74 N/A N/A 0% Nuclear 1,657 $215,880,000 $130.28 $209,680,000 $126.54 97% Coal 2,390 $33,490,000 $14.01 $24,550,000 $10.27 73% Combined cycle 1,266 $16,380,000 $12.94 $11,650,000 $9.20 71% Data source: Federal Energy Regulatory Commission Form 1 database records for Northern States Power Co.-Minnesota
1 page match

As listed on the current system

Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Melissa Whited [26-05-10]