Prefiled testimony
Witness: Melissa Whited
Files3
Synapse - Eversource COS and Rate Design Testimony Final.pdf
PDF · 829 KB · 48 pagesText searchable
Download Synapse - Eversource COS and Rate Design Testimony Final.pdfRead the text of Synapse - Eversource COS and Rate Design Testimony Final.pdf
MW-2- Synapse Attachment.pdf
PDF · 4.6 MB · 276 pagesText searchable
Download MW-2- Synapse Attachment.pdfRead the text of MW-2- Synapse Attachment.pdf
MW-1 - Synapse Attachment.pdf
PDF · 734 KB · 13 pagesText searchable
Download MW-1 - Synapse Attachment.pdfRead the text of MW-1 - Synapse Attachment.pdf
Page 114 of 276
112 | ELECTRIC COST ALLOCATION FOR A NEW ERA 9.1.2 Classification Approaches REGULATORY ASSISTANCE PROJECT (RAP)® The system load factor, and hence the average-and-peak Many utilities and regulators acknowledge that a large approach more generally, varies over time independent of the portion of generation investment and nondispatch O&M mix of the utility’s generation resources and does not respond costs is incurred to serve energy requirements. There are two to changes in that mix unless those changes are accompanied categories of methods to classifying these costs as energy- by retail pricing that follows the cost structure. related and demand-related. First, average-and-peak is a In addition to changing as loads change, the average-and- top-down approach that uses high-level data on system loads peak approach ignores the mix of resources and costs. This and costs. Second, there is a range of bottom-up approaches approach would produce the same classification of plant for that examine the drivers for costs on a plant-specific basis: a system that was entirely composed of gas-fired combustion • Base-peak and related methods. turbines (with low capital costs and high fuel costs) or of • Equivalent peaker method. coal-fired plants (with high capital costs to produce lower • Operational characteristics methods. fuel costs). As a general matter, the bottom-up approaches are Thus, while the average-and-peak method for generation preferable for classifying generation costs. The average-and- costs may sometimes fall in the range of reasonable results, peak approach is well suited for shared distribution system it is neither logical nor consistent. costs, as discussed in Section 11.2. Average-and-Peak Method The average-and-peak approach can be applied Base-Peak Methods Various utilities and other analysts have proposed to subfunctionalize generation resources (in the simplest case, in classification, when classifying a portion of costs as between baseload and peaking plants) and classify each energy-related and the remainder as demand-related, or category of generation in a different manner. For example, in developing a generation capacity allocator that reflects peakers may be classified 100% as demand-related, while both energy and demand. When using this approach as a baseload resources are classified 75% to demand and 25% to classification method, the system load factor percentage is energy, or some other location- and situation-specific ratio. classified as energy-related and the remainder as demand- More advanced analyses have subfunctionalized related.88 When used as an allocation factor, the average- generation among base, intermediate and peak categories, and-peak factor for each class is:89 known as BIP classification. The base generation might be defined as all nuclear and coal plants, with the intermediate being gas-fired steam and combined cycle plants and the Where A = annual average load = energy ÷ 8,760 peak units being combustion turbines, storage and demand P = peak load response. Alternatively, base plants might be any unit that C = class operated at more than a certain capacity factor (for example, S = system 60%), peakers those that ran at less than 5%, and intermediate SLF = system load factor = (annual energy) ÷ (peak load × 8,760) anything between those 5% and 60% capacity factors. Or, rather than using capacity factor (which can be low due to forced outages, maintenance or economic dispatch), the 88 This method is sometimes called the system load factor approach. It has also been called “average and excess” because a fraction of cost equal to the system load factor is allocated on energy and the excess of costs on a measure of peak loads (Coyle, 1982, pp. 51-52). 89 This average-and-peak allocator should not be confused with the averageand-excess demand allocator described in the 1992 NARUC Electric Utility Cost Allocation Manual, which allocates a portion of costs in proportion to average load and the excess in proportion to each class’s excess of peak load over its average use. That legacy average-and-excess allocator is essentially just a peak allocator (Meyer, 1981).Page 115 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 113 generation classes can be defined using operating factor (the output renewable resources, additional storage and economic ratio of output to equivalent availability). At an extreme, each demand response reduces the accuracy of those simple generation type, or even each unit, can be classified separately. models. Resources like wind and solar do not fit neatly into While the base-peak classification approach and related the BIP categories, providing service in distinct time patterns methods are highly flexible, that is both their greatest strength that may not be related to system loads. At the same time, and a great weakness. The strength is that the method can many utilities have access to much more granular detail on be modified to accommodate the diversity of generation hourly consumption by customer.91 The BIP method can be resources; the weakness is that the method requires a set of expanded to reflect conditions (output by several classes of decisions about the definition of the generation classes and conventional generation, solar, wind and storage; energy the classification percentage for each class. The base-peak use for storage; usage by class) in as many time periods (or method is connected to actual utility planning only at the load levels, or bins combining consumption and generation highest conceptual level and provides limited guidance for the conditions) as desired, even down to an hourly allocation nitty-gritty details of traditional classification. method. Usage and hence costs could thus be assigned One of the challenges of the base-peak approach relates to the changing usage of generation resources. directly to the classes using power at the times that each resource provides service.92 For example, several units that were built to burn coal in baseload operation have been converted to burn natural gas Equivalent Peaker Method and thus run mostly on high-load summer days.90 These The equivalent peaker method,93 discussed at length units operate as peak or intermediate resources (depending in the 1992 NARUC Electric Utility Cost Allocation Manual, on the definitions used in the particular analysis), but most attributes as demand-related the portion of investment in of the capital costs are attributable to the original baseload each resource that would have been incurred to secure a design. This problem may be ameliorated by removing those peaking resource, such as demand response or a combustion additional costs from the base-peak or BIP computation and turbine.94 Peaking resources are usually treated as 100% directly classifying them as energy-related. demand-related, while intermediate and baseload plants are Recent technological changes pose additional challenges and opportunities for expanding the base-peak approach classified as partly energy and partly demand. If only peak load had been higher (and other needs were from two generation profiles, or the three profiles of the BIP already satisfied) in the years in which the utility made the method, to a full analysis of the use of generation resources. bulk of its generation construction decisions, it would have Decades ago, it was reasonably accurate to treat generation likely met that increased load by adding peaker capacity.95 resources as being stacked neatly under the load duration Utilities historically have justified building baseload capacity curve in order of variable costs. The growing role of variable by relying on these plants’ long hours of use and lower fuel 90 Some coal plants that once ran as baseload resources have been taken out of service in low-load months to reduce O&M costs. This includes Nova Scotia Power’s Lingan 1 and 2 (Barrett, 2012), Luminant’s Monticello and Martin Lake (Henry, 2012) and the Texas Municipal Power Agency’s Gibbons Creek (Institute for Energy Economics and Financial Analysis, 2019). way: 34% (the ratio of minimum to peak load) to energy; 36% (the 90% ratio of winter peak to summer peak, minus the 34% energy allocation, or 56%, times the 65% of the peak-period hours that occur in winter) to the winter peak demand; and the remaining 30% to the summer peak demand (Seelye, 2016, Exhibit WSS-11). This approach has no cost basis. 93 In some jurisdictions, this is called the peak credit method. 91 Most utilities have long known the hourly generation by unit. 92 Some utilities refer to their classification method as BIP, even though it does not reflect the differences in costs among the various types of generation. For example, the Louisville Gas & Electric and Kentucky Utilities 2018 “BIP” computation classified nondispatch generation costs this 94 This approach is sketched out in Johnson (1980, pp. 33-35) and described in more detail in Chernick and Meyer (1982, pp. 47-65). 95 To some extent, the peakier load would likely allow for development of more demand response and load management. Estimating the potential and costs for these resources under hypothetical load shapes may be difficult.Page 116 of 276
114 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® costs.96 This incremental capital cost (often called capitalized reliability-related portion of the cost of each generation unit energy or “steel for fuel”) is attributable to energy require- is estimated as the cost per kW of a peaker (usually a simple- ments, not demand. The investment-related costs of baseload cycle combustion turbine) installed in the same period, times resources above and beyond the cost of peaking units are the effective capacity of that unit, adjusted for the equivalent incurred to serve energy load, not demand. Treating these availability of a peaker.98 The cost of the unit in excess of the costs as demand-related overstates the cost of meeting equivalent gas turbine capacity is energy-related. demand and understates the costs incurred to meet energy However, the simple version of this calculation typically requirements. This phenomenon has been understood since will overstate the reliability-related portion of plant cost be- the 1970s and 1980s: cause it assumes a steam plant supports as much firm demand [T]he extra costs of a coal plant beyond the cost as would the same capacity of (smaller) combustion turbines. necessary to build a combustion turbine should all be Due to higher forced outage rates, lengthy maintenance shut- allocated [on] energy. The rationale for this allocation is downs and the size of units, a kilowatt of steam plant capacity that the marginal cost of capacity in the long run is just typically supports less firm load than a kilowatt of capacity the lowest-cost technology required to meet peak load, from a small peaker. A system with a peak load of about which is typically a combustion turbine. Choosing to 6,500 MWs and a 65% load factor could achieve the same invest beyond this level [of combustion turbine capital level of reliability with 80 units of 100 MWs (8,000 MWs, cost] is justified not on capacity grounds, but on energy or a 23% reserve) or 19 units of 600 MWs (11,400 MWs, or grounds. That is, the extra capital cost of a coal plant a 75% reserve), assuming the units all have a 6% equivalent allows the utility to use a low-cost fuel and avoid forced outage rate and that the load shape can accommodate higher-cost fuels (Kahn, 1988). all required maintenance off-peak. Increasing the equivalent forced outage rate to 10% would increase the required reserve However, there are several additional issues with this for the 100-MW units to about 40% and for the 600-MW units concept in the modern electric system. First, the method to 90%. Even with the 6% equivalent forced outage rate, if the does not adapt well to wind and solar, where the capital load factor were 96%, the reserve requirement would rise to investment is primarily justified by avoiding fuel costs 30% with 100-MW units and 90% with 600-MW units. but the installed capital cost per nameplate MW may be Figure 32 on the next page shows the gross plant per little different from the cost of a peaker. An intermediate kW for combustion turbines as of 2011, from FERC Form 1 or baseload plant that is not much more expensive than data (Federal Energy Regulatory Commission, n.d.). These a contemporaneous peaking resource would be classified values include the original cost of the units, plus capital as mostly demand-related, while very expensive plants are additions since the plants entered service, minus the cost classified as mostly energy-related. And often, peaker units of any equipment retired. This tabulation includes all non- are used to provide energy when baseload units are not CHP simple-cycle combustion turbines for which cost data operating or to provide power for off-system sales.97 were available.99 Some of the later combustion turbines in Under the equivalent peaker method, the demand- or this sample may not be pure peakers, since manufacturers 96 Similar reasoning applies to the decision to add renewable resources, substituting investment for fuel costs. See footnote 120. demand response cost or storage peak output capacity, without an increase in energy generating capability. The reference peaker should always be the least-cost option for providing reliability. 97 During the 2000-2001 California energy crisis, oil-fired peakers in the Pacific Northwest operated at high monthly capacity factors because they were exempt from both gas supply constraints and California emissions regulations. U.S. Energy Information Administration Form 906 for 2000 and 2001 demonstrates the incremental oil burn in 2000 and 2001, particularly for Puget Sound Energy. 98 In the future, the reference peaking capacity might be an increase in 99 Municipal and cooperative utilities and non-utility generators (both those under contract with utilities and those operating in the merchant markets) do not file FERC Form 1 reports, so their units are not included in this analysis. The municipal and cooperative utilities typically retain financial and operating records that are compatible with the FERC system of accounts, allowing comparison of the data for a specific utility’s nonpeaking resources with national data on contemporaneous peaker costs.Page 117 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 115 Figure 32. Cost of combustion turbine plant in service in 2011 $600 Gross plant cost per kilowatt of capacity Average for year $500 Five-year rolling average $400 $300 $200 $100 $0 1960 1965 1970 1975 1980 1985 1990 1995 Plant in-service year Data source: Federal Energy Regulatory Commission Form 1 database developed more expensive and more efficient designs, • Comparing recent or current net plant (gross plant minus accumulated depreciation) costs for nonpeaking generators including steam injection. with the corresponding net plant costs of contempora- For comparison, coal plants built in this period generally cost from several hundred dollars per kW to more than neous peakers. This comparison is theoretically the most $2,000 per kW; the latest vintage coal plants cost as much appropriate basis for classifying generation rate base, which as $3,000 per kW. Steam plants fired by gas and oil (and not is based on net plant. Unfortunately, net plant is not gener- converted from coal) tend to have a wide range of gross plant ally publicly reported by plant or unit, so most cost analysts costs, from the prices of contemporaneous combustion will have a difficult time implementing this approach. turbines to perhaps twice those costs. Nuclear plants In addition, many utilities have depreciated peakers at a generally have gross plant costs well above $1,000 per kW, faster rate than steam plants, resulting in lower net plant up to $8,000 per kW. Combined cycle plants have usually for a peaker than for a steam plant with the same initial been 20% to 50% more expensive than contemporaneous cost, additions and retirements. This results in a higher combustion turbines.100 percentage of the steam plant costs being classified as energy-related based on net plant than gross plant. It is not The capital costs of various types of generating capacity can be compared with the costs of peakers in several ways, obvious whether the additional classification to energy is including the following: more equitable than the result of the gross plant allocation. • Comparing recent or current gross plant costs for other • Comparing the cost of building the actual mix of generators with the corresponding cost of peakers, as generation today with the cost of building a peaking-only discussed above. system today.101 This approach avoids the problem of 100 These cost ratios are provided to explain the importance of identifying the demand-related portion of generation investment. Any application of the equivalent peaker method should compare the costs of the utility’s existing plants to the costs of contemporaneous peakers, using the most comparable estimates of the costs of peakers, reflecting geographical and other differences. 101 The peaking-only system might include combustion turbines, demand response and storage resources.Page 118 of 276
116 | ELECTRIC COST ALLOCATION FOR A NEW ERA estimating the cost of building peakers at various times in the past. But many existing plants could not be built REGULATORY ASSISTANCE PROJECT (RAP)® Table 14. Equivalent peaker method analysis using replacement cost estimates today as they currently exist — a new coal plant may Cost per kW Capacityrelated share of cost Peaking $770 100% 0% gas-fired boiler units, no longer make economic sense Nuclear $3,689 20.9% 79.1% and would not be built today. Determining the cost of Fossil* $1,976 39.0% 61.0% building a new 1970s-style coal plant or a gas-fired steam Combined cycle $1,020 75.4% 24.6% plant may be much more difficult than determining the Hydro $4,519 17.0% 83.0% require scrubbers, nitrogen oxide reduction, closedsystem cooling and other features that the existing coal plant does not have.102 Other plant types, such as oil- and cost of peakers in the 1970s. And for some technologies, the costs of new construction do not meaningfully reflect the costs of the plants currently embedded in rates. For example, as expensive as the nuclear units of the 1980s were, the nuclear units currently under construction Resource type Energyrelated share of cost *The “fossil” resource type appears to be coal- or gas-fired steam. Source: Peppin, M. (2013, November 4). Direct testimony on behalf of Northern States Power Co.-Minnesota. Minnesota Public Utilities Commission Docket No. E002/GR-13-868 This is not a very realistic comparison, for reasons are much more expensive. Conversely, the costs of discussed above. Many of the plants could not be built wind turbines have fallen dramatically since the 1980s. today, and some have complicated histories of retrofits and Comparing today’s costs for those resources to the costs repowering. The nuclear replacement cost appears to be of new peakers would probably overstate the energy- particularly optimistic compared with the cost of nuclear related portion of the costs of an old nuclear unit and power plants under construction today. understate the energy-related portion of the costs of an Table 15 on the next page shows an alternative analysis old wind farm. based on the Xcel Energy Minnesota subsidiary’s actual Whether the comparison uses gross plant in service, net investments in each plant type at the end of 2017, from plant in service or hypothetical new construction, the data Page 402 of its FERC Form 1 report (Federal Energy sources should be as consistent as possible. It would not be Regulatory Commission, n.d.). appropriate to compare the current book value of an actual The results of the two analyses are generally consistent, plant with the cost of a hypothetical plant in today’s dollars except for the classification of the combined cycle resources. (Nova Scotia Utility and Review Board, 1995, p. 18). These plants are of more recent vintage than the others; a Table 14 shows the equivalent peaker method analysis fairer comparison, using peaker costs contemporaneous with that Northern States Power Co.-Minnesota (a subsidiary of the in-service dates of each of the other resources, probably Xcel Energy) used in its 2013 rate case filing (Peppin, 2013, would result in a lower energy classification of the combined Schedule 2, p. 4).103 The capacity portion for each plant type cycle resources and higher energy classification for the coal is the ratio of the peaking cost ($770 per kW) to the plant and nuclear units. type cost. For example, the peaking cost is 20.9% of the cost The equivalent peaker method does have limitations. of the nuclear plant, so 20.9% of the nuclear investment is Perhaps most importantly, it requires cost comparisons of treated as capacity-related. The company uses its estimates of individual generation units with peakers of the same vintage. the replacement costs of each type of generation and applies Utilities installed combustion turbines as far back as the early the results to each capital cost component (gross plant, 1950s, but the technology was widely installed only in the accumulated depreciation, deferred taxes, etc.). late 1960s. The oldest remaining combustion turbine owned 102 Many hydroelectric projects could not be licensed if they were proposed today. 103 The company calls this a plant stratification analysis.Page 119 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 117 Table 15. Equivalent peaker method analysis using 2017 gross plant in service Excess over combustion turbine Plant in service Capacity (MWs) Combustion turbine Energy-related share of cost Cost Cost per kW Cost Cost per kW 1,114 $291,000,000 $261 N/A N/A 0% Nuclear 1,657 $3,448,000,000 $2,081 $3,016,000,000 $1,820 87% Coal 2,390 $2,156,000,000 $902 $1,532,000,000 $641 71% Combined cycle 1,266 $939,000,000 $742 $609,000,000 $481 65% All resources 6,427 $6,834,000,000 $1,063 $5,157,000,000 $802 75% Resource type Data source: Federal Energy Regulatory Commission Form 1 database records for Northern States Power Co.-Minnesota by a utility filing cost data (Madison Gas and Electric’s Nine usually ignores the higher accumulated depreciation of Springs) entered service in 1964. The paucity of earlier data peakers compared with the accumulated depreciation for complicates the use of the equivalent peaker method for other generation resources of the same vintage (which tends classifying the costs of older plants. This problem is gradually to overstate the demand-related portion of generation rate fading away, as all pre-1970 nuclear is gone and much of the base), it is also generally symmetrical to classify generation pre-1970 fossil-fueled steam capacity has been retired or depreciation expense as proportional to the demand-related is nearing retirement, but the issue remains for classifying portion of gross plant (which will tend to understate the hydro plant costs and the few remaining old fossil fuel plants demand-related portion). If classification of one of these cost (U.S. Energy Information Administration, 1992). components is refined to reflect the difference in depreciation One solution to the problem of classifying the rates, the other cost component should be similarly adjusted. investment in very old, little-used steam plants is to treat As is true for plant in service, the nonfuel O&M costs that cost as entirely demand-related. Since these units often of steam plants are generally much higher than the nonfuel represent a very small portion of generation rate base, this O&M costs of combustion turbines. Typical O&M costs per solution may be reasonable. kW-year are $1 to $10 for combustion turbines, $10 to $15 for A full equivalent peaker analysis would compare the combined cycle plants, $10 to $20 for oil- and gas-fired steam product of the actual depreciation charges for the nonpeaking plants, $40 to $80 for coal plants and more than $100 for plants with the product of the peaker depreciation rate nuclear plants. Table 16 shows how the capacity-related O&M and the peaker-equivalent gross investment for the same for conventional generation might be classified between reliability contribution. Since the classification of rate base energy and demand, using the utility’s actual nonfuel O&M Table 16. Equivalent peaker method classification of nonfuel operations and maintenance costs Resource type Capacity (MWs) Nonfuel operations and maintenance Cost per kW-year Cost Excess over combustion turbine Cost Cost per kW-year Energy-related share of cost Combustion turbine 1,114 $4,170,000 $3.74 N/A N/A 0% Nuclear 1,657 $215,880,000 $130.28 $209,680,000 $126.54 97% Coal 2,390 $33,490,000 $14.01 $24,550,000 $10.27 73% Combined cycle 1,266 $16,380,000 $12.94 $11,650,000 $9.20 71% Data source: Federal Energy Regulatory Commission Form 1 database records for Northern States Power Co.-MinnesotaPage 120 of 276
118 | ELECTRIC COST ALLOCATION FOR A NEW ERA costs; the data are 2017 numbers from FERC Form 1, Page 402, for Northern States Power Co.-Minnesota (Federal Energy Regulatory Commission, n.d.). Table 16 does not include the company’s wind resources, REGULATORY ASSISTANCE PROJECT (RAP)® 9.1.3 Joint Classification and Allocation Methods Although most cost of service studies classify capital investments and capacity-related O&M as either demand- which average about $30 per kW-year in O&M, since MISO related or energy-related, classify power and short-term credits wind with unforced capacity value at only about variable costs as energy-related, and then allocate 15% of rated capacity, or about 17% of the value of an installed energy-related and demand-related costs in separate MW of typical conventional generation. The demand-related steps, two approaches accomplish both at once. These are portion of the wind capacity is thus less than $1 per kW-year, the probability-of-dispatch (POD) and decomposition and the wind O&M is almost all energy-related.104 approaches. Operational Characteristics Methods Probability of Dispatch The operational characteristics methods classify The POD approach is the better of the two.105 Methods generation resources (units, resource types, purchases) based using this approach are generically referred to as probability on their capacity factors or operating factors. Newfoundland of dispatch, even for versions that do not explicitly Hydro classifies as energy-related a portion of the cost of incorporate probability computations.106 A simplified each oil-fueled steam plant equal to the plant’s capacity illustrative example of power plant dispatch is shown in factor (Parmesano, Rankin, Nieto and Irastorza, 2004, p. 22). Figure 33 on the next page, under the utility load duration At first blush, this approach appears to roughly follow the use curve. The example uses only four types of generation: of the resource, with plants that are used rarely being treated nuclear, coal, gas combined cycle and a peaking resource as primarily demand-related and those used in most hours consisting of a mix of demand response, storage and classified as predominantly energy-related. Unfortunately, combustion turbines. An actual POD analysis might break the use of capacity factor effectively classifies more of the the generation data down to the plant or even unit level and cost to demand as the reliability of the resource declines. may need to include load management and demand response A better approach would be to use the resource’s as resources. This simplified example also does not illustrate operating factor, which is the ratio of its output to its equivalent availability (that is, its potential output, if it were maintenance, forced outages or ramping constraints. Off-system sales and purchases can be added or used whenever available). This approach would classify any subtracted from the load duration curve when they occur, or resource that is dispatched whenever it is available (e.g., they can be subtracted or added to the generation available in nuclear, wind and solar) as essentially 100% energy-related. each hour or period. Similar adjustments may be needed to That may be seen as an overstatement, since those resources reflect the charging of storage and operation of behind-the- generally provide some demand-related benefits and are meter generation. sometimes built to increase generation reliability, as well as to produce energy with little or no fuel cost. Figure 34 shows the composition of demand in each hour for the same illustrative system, divided among three customer classes. In this example, the residential class peak load occurs when load is high but not near the system peak. 104 The nonfuel O&M costs per kW for Northern States Power’s two small waste-burning plants and its small run-of-river hydro plant are even higher than the nuclear O&M and hence are effectively entirely energy-related, even if the hydro plant provides firm capacity. 105 The Massachusetts Department of Public Utilities explained its preference for this method as follows: “The modified peaker POD results in a fair allocation of embedded capacity costs because this method recognizes the factors that cause the utility to incur power plant capital costs and because this method allocates to the beneficiaries of fuel savings the capitalized energy costs that produce those savings” (1989, p. 113). 106 For an example of the POD method, see La Capra (1992).Page 121 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 119 Figure 33. Simplified generation dispatch duration illustrative example 7,000 Demand response/storage/combustion turbines Combined cycle 6,000 System total megawatts Coal 5,000 Nuclear 4,000 3,000 2,000 1,000 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 Hour of the year, sorted by load Higher load Lower load This situation might arise for a winter-peaking residential industrial class might peak in the morning, the secondary class in a summer-peaking system, or an evening-peaking commercial class at 1 p.m., and the residential class in the residential class in a midday-peaking system. evening. Large commercial buildings typically experience Note that the three customer classes need not peak at the same time. On a high-load summer day, the primary their peak load in the summer, since large buildings require cooling in most climates. If a large percentage of home Figure 34. Illustrative customer class load in each hour 7,000 Residential Secondary commercial 6,000 Primary industrial Total megawatts 5,000 4,000 3,000 2,000 1,000 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 Hour of the year, sorted by load Higher load Lower loadPage 122 of 276
120 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® outages, hydro output, natural gas price, off-system purchases Table 17. Class share of each generation type under probability-of-dispatch allocation and sales), actual hourly output (reflecting planned and random outages and unit ramping constraints) and other Generation source Nuclear Coal 34% 34% 32% 31% available data to match costs with usage as realistically as Secondary commercial 28% 29% 39% 42% possible. 38% 37% 29% 27% Customer class Residential Primary industrial Peaking resources variants. The POD method is thus one approach to hourly Combined cycle allocation. Ideally, dispatch and class loads should use the The POD approach has some limitations. Most importantly, it does not consider the reason that investments were heating is electric, the residential class is likely to experience incurred, only the way they are currently used. The costs its highest load in the winter, even in places like Florida. The of an expensive coal plant no longer needed for baseload industrial class loads may peak in a variety of seasons, driven service and converted to burn natural gas and operating at by vacation and maintenance schedules, variation in inputs a 10% capacity factor to meet peak loads might be allocated (e.g., agricultural products) and demand, and other factors. in exactly the same way as the costs of a much less expensive The system peak may occur at a time different from all of the combustion turbine operating at 10% capacity factor.108 The customer class NCP demands. excess costs of the converted coal plant are due to its historical Table 17 shows how the costs of each generation resource role of providing large amounts of energy at then-attractive would be allocated to the classes in the illustrative example fuel costs; those costs were not incurred for the 10% of hours in Figure 34. In the lowest-load hours, when nuclear is with highest demand. The same considerations arise for other serving 80% of the energy load, the industrial class uses half steam plants that operate at much lower capacity factors than the system energy and hence half the nuclear output; in the they were planned for and justified by. Some hydro plants highest-load hours, when nuclear is serving about 29% of the have also changed operating patterns from their original load, the industrial class uses about 27% of the system energy. use, either running for more hours to maintain downstream Averaged over the year, the industrial class uses 38% of the flow or for fewer hours due to reduced water supply. Peaking nuclear output. In the hours that the combustion turbines capacity is used to provide a range of ancillary services at are running, the industrial class uses only 27% of the peaking many load levels, including upward ramping services (when resources’ output, since the residential and commercial load surges during the day or wind and solar output falls) and classes dominate loads in that period. operating reserves (especially to back up large generation and The commercial class is responsible for the largest share transmission facilities). Reflecting these considerations may of the summer peak and hence of the combustion turbine require modification of the inputs to the POD analysis, which costs but the smallest part of the low-load hours and hence considers only current use, not historical causation. the lowest share of the nuclear and coal costs. Every class pays for a share of each type of generation.107 The POD method has been applied with a wide range of Second, the POD method spreads the cost of each resource equally to all hours or energy output, assigning the same cost of a totally baseload plant (with a 100% capacity detail. The generation “dispatch” over the year may represent factor) to the lowest-load off-peak hour as to the system peak historical or forecast operation, equivalent availability or hour. That approach comports with some concepts of equity capacity factor, seasonal variation (due to maintenance and cost responsibility: The cost of each resource is allocated 107 If this example had included a street lighting class, that class might not have been allocated any combustion turbine costs if the lights would not be on in the summer peak hours. In a more realistic example, including outages of the baseload plants, the combustion turbines probably would operate in some hours with street lighting loads and the lighting class would be allocated some combustion turbine costs. 108 In the simpler forms of POD, the costs of both plants would be spread over the top 10% of hours. In more sophisticated approaches that map generation to actual operating hours, the steam plant would generate in many hours with load lower than the top 10%, while missing some of the top 10%, due to limits on load following.Page 123 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 121 proportionately to the classes that use it. On the other hand, whether classes are paying for enough capacity to cover their it can be argued that the hours with higher marginal energy energy and reliability requirements. costs contribute more of the rationale for investing in that In the context of resources stacked under a load resource and that, in a sense, each kWh of usage at high-load duration curve, such as that shown in Figure 33 on Page 119, times should bear more of the resource’s investment-related the decomposition approach allocates the resource mix costs than should each kWh in the off-peak hours. This horizontally, rather than the vertical allocation used in the concern can be addressed by weighting the energy over the POD method. Figure 35 on the next page illustrates the hours, such as in proportion to some measure of hourly decomposition approach. market price. Third, it is important that the load and dispatch data be In essence, the decomposition method treats the utility as if it were multiple separate utilities. In the case of Figure 35, representative of the cost causation or resource usage the utility system is decomposed into an all-nuclear system in the years for which the cost allocation will be in place. with enough capacity to meet the industrial peak load, and For example, a baseload plant may have operated at only a utility with a little nuclear and all the other resources to 40% capacity factor in the most recent year because of major serve all other load. Whether the industrial customers would maintenance or availability of economic energy imports. support this allocation would usually depend on the cost of Or load and dispatch in the last 12 months of data may the nuclear resources compared with the system average. be atypical because of an extremely cold winter and mild The decomposition approach conflicts with reality in summer. The POD allocation should be based on weather- many ways, including: normalized dispatch and load, just as the rate case costs 1. The reserve requirements for the decomposed systems allowed by the regulator and included in the cost of service would be driven by their noncoincident class peaks or study should reflect weather-normalized load. high loads (if they are assumed to be fully free-standing), requiring additional hypothetical capacity for utilities Decomposition that are not already extensively overbuilt. If the decom- Class obligations for generation costs have occasionally position assumes that the multiple class-specific systems been addressed by dividing the generation resource into would operate in a power pool, contribution to the separate generation systems serving hypothetical loads for system peaks would drive capacity requirements. portions of the utility’s customers, such as just the residential 2. A system with a high load factor and relatively few customers, just the commercial customers and just the large units would require a very high reserve margin industrial customers. For example, industrial customers in (as discussed in Subsection 5.1.1) to cover fixed outages Nova Scotia have argued that their high-load-factor demands and even maintenance outages. The reserve units would could be served by the capacity and energy of some set of operate in many hours (since the system load would baseload plants, where those costs are lower than the average always be near the allocated baseload capacity). generation cost per kWh (Drazen and Mikkelsen, 2013, 3. A baseload-only system would require a large amount of pp. 11-16). The industrial advocates for this approach assume backup supply energy, either from hypothetical units or that the flat industrial load would be served exclusively by as purchases from the other classes. baseload plants and that all other costs should be allocated to other classes.109 A similar approach might inappropriately 4. The decomposition approach is usually designed to assign the lowest-cost resources to the industrial class, be suggested to justify allocating the highest-cost resources to customers with behind-the-meter solar generation and lower-cost resources to nonsolar customers whose load does not dip in midday. The method might also be used to test 109 A decomposition method that accounts for all relevant factors may not show an advantage for industrial customers. In Alberta, a related method to the decomposition method was presented to demonstrate that baseload power for industrial customers would be considerably more expensive than the demand-based cost allocation of the existing system for the industrial class (Marcus, 1987).