Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Files3

Search terms highlighted
Eversource rate increase is on 6 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
5 pages match
Words on different pages
  1. Page 119 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 117 Table 15. Equivalent peaker method analysis using 2017 gross plant in service Excess over combustion turbine Plant in service Capacity (MWs) Combustion turbine Energy-related share of cost Cost Cost per kW Cost Cost per kW 1,114 $291,000,000 $261 N/A N/A 0% Nuclear 1,657 $3,448,000,000 $2,081 $3,016,000,000 $1,820 87% Coal 2,390 $2,156,000,000 $902 $1,532,000,000 $641 71% Combined cycle 1,266 $939,000,000 $742 $609,000,000 $481 65% All resources 6,427 $6,834,000,000 $1,063 $5,157,000,000 $802 75% Resource type Data source: Federal Energy Regulatory Commission Form 1 database records for Northern States Power Co.-Minnesota by a utility filing cost data (Madison Gas and Electric’s Nine usually ignores the higher accumulated depreciation of Springs) entered service in 1964. The paucity of earlier data peakers compared with the accumulated depreciation for complicates the use of the equivalent peaker method for other generation resources of the same vintage (which tends classifying the costs of older plants. This problem is gradually to overstate the demand-related portion of generation rate fading away, as all pre-1970 nuclear is gone and much of the base), it is also generally symmetrical to classify generation pre-1970 fossil-fueled steam capacity has been retired or depreciation expense as proportional to the demand-related is nearing retirement, but the issue remains for classifying portion of gross plant (which will tend to understate the hydro plant costs and the few remaining old fossil fuel plants demand-related portion). If classification of one of these cost (U.S. Energy Information Administration, 1992). components is refined to reflect the difference in depreciation One solution to the problem of classifying the rates, the other cost component should be similarly adjusted. investment in very old, little-used steam plants is to treat As is true for plant in service, the nonfuel O&M costs that cost as entirely demand-related. Since these units often of steam plants are generally much higher than the nonfuel represent a very small portion of generation rate base, this O&M costs of combustion turbines. Typical O&M costs per solution may be reasonable. kW-year are $1 to $10 for combustion turbines, $10 to $15 for A full equivalent peaker analysis would compare the combined cycle plants, $10 to $20 for oil- and gas-fired steam product of the actual depreciation charges for the nonpeaking plants, $40 to $80 for coal plants and more than $100 for plants with the product of the peaker depreciation rate nuclear plants. Table 16 shows how the capacity-related O&M and the peaker-equivalent gross investment for the same for conventional generation might be classified between reliability contribution. Since the classification of rate base energy and demand, using the utility’s actual nonfuel O&M Table 16. Equivalent peaker method classification of nonfuel operations and maintenance costs Resource type Capacity (MWs) Nonfuel operations and maintenance Cost per kW-year Cost Excess over combustion turbine Cost Cost per kW-year Energy-related share of cost Combustion turbine 1,114 $4,170,000 $3.74 N/A N/A 0% Nuclear 1,657 $215,880,000 $130.28 $209,680,000 $126.54 97% Coal 2,390 $33,490,000 $14.01 $24,550,000 $10.27 73% Combined cycle 1,266 $16,380,000 $12.94 $11,650,000 $9.20 71% Data source: Federal Energy Regulatory Commission Form 1 database records for Northern States Power Co.-Minnesota
  2. Page 120 of 276

    118 | ELECTRIC COST ALLOCATION FOR A NEW ERA costs; the data are 2017 numbers from FERC Form 1, Page 402, for Northern States Power Co.-Minnesota (Federal Energy Regulatory Commission, n.d.). Table 16 does not include the company’s wind resources, REGULATORY ASSISTANCE PROJECT (RAP)® 9.1.3 Joint Classification and Allocation Methods Although most cost of service studies classify capital investments and capacity-related O&M as either demand- which average about $30 per kW-year in O&M, since MISO related or energy-related, classify power and short-term credits wind with unforced capacity value at only about variable costs as energy-related, and then allocate 15% of rated capacity, or about 17% of the value of an installed energy-related and demand-related costs in separate MW of typical conventional generation. The demand-related steps, two approaches accomplish both at once. These are portion of the wind capacity is thus less than $1 per kW-year, the probability-of-dispatch (POD) and decomposition and the wind O&M is almost all energy-related.104 approaches. Operational Characteristics Methods Probability of Dispatch The operational characteristics methods classify The POD approach is the better of the two.105 Methods generation resources (units, resource types, purchases) based using this approach are generically referred to as probability on their capacity factors or operating factors. Newfoundland of dispatch, even for versions that do not explicitly Hydro classifies as energy-related a portion of the cost of incorporate probability computations.106 A simplified each oil-fueled steam plant equal to the plant’s capacity illustrative example of power plant dispatch is shown in factor (Parmesano, Rankin, Nieto and Irastorza, 2004, p. 22). Figure 33 on the next page, under the utility load duration At first blush, this approach appears to roughly follow the use curve. The example uses only four types of generation: of the resource, with plants that are used rarely being treated nuclear, coal, gas combined cycle and a peaking resource as primarily demand-related and those used in most hours consisting of a mix of demand response, storage and classified as predominantly energy-related. Unfortunately, combustion turbines. An actual POD analysis might break the use of capacity factor effectively classifies more of the the generation data down to the plant or even unit level and cost to demand as the reliability of the resource declines. may need to include load management and demand response A better approach would be to use the resource’s as resources. This simplified example also does not illustrate operating factor, which is the ratio of its output to its equivalent availability (that is, its potential output, if it were maintenance, forced outages or ramping constraints. Off-system sales and purchases can be added or used whenever available). This approach would classify any subtracted from the load duration curve when they occur, or resource that is dispatched whenever it is available (e.g., they can be subtracted or added to the generation available in nuclear, wind and solar) as essentially 100% energy-related. each hour or period. Similar adjustments may be needed to That may be seen as an overstatement, since those resources reflect the charging of storage and operation of behind-the- generally provide some demand-related benefits and are meter generation. sometimes built to increase generation reliability, as well as to produce energy with little or no fuel cost. Figure 34 shows the composition of demand in each hour for the same illustrative system, divided among three customer classes. In this example, the residential class peak load occurs when load is high but not near the system peak. 104 The nonfuel O&M costs per kW for Northern States Power’s two small waste-burning plants and its small run-of-river hydro plant are even higher than the nuclear O&M and hence are effectively entirely energy-related, even if the hydro plant provides firm capacity. 105 The Massachusetts Department of Public Utilities explained its preference for this method as follows: “The modified peaker POD results in a fair allocation of embedded capacity costs because this method recognizes the factors that cause the utility to incur power plant capital costs and because this method allocates to the beneficiaries of fuel savings the capitalized energy costs that produce those savings” (1989, p. 113). 106 For an example of the POD method, see La Capra (1992).
  3. Page 121 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 119 Figure 33. Simplified generation dispatch duration illustrative example 7,000 Demand response/storage/combustion turbines Combined cycle 6,000 System total megawatts Coal 5,000 Nuclear 4,000 3,000 2,000 1,000 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 Hour of the year, sorted by load Higher load Lower load This situation might arise for a winter-peaking residential industrial class might peak in the morning, the secondary class in a summer-peaking system, or an evening-peaking commercial class at 1 p.m., and the residential class in the residential class in a midday-peaking system. evening. Large commercial buildings typically experience Note that the three customer classes need not peak at the same time. On a high-load summer day, the primary their peak load in the summer, since large buildings require cooling in most climates. If a large percentage of home Figure 34. Illustrative customer class load in each hour 7,000 Residential Secondary commercial 6,000 Primary industrial Total megawatts 5,000 4,000 3,000 2,000 1,000 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 Hour of the year, sorted by load Higher load Lower load
  4. Page 122 of 276

    120 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® outages, hydro output, natural gas price, off-system purchases Table 17. Class share of each generation type under probability-of-dispatch allocation and sales), actual hourly output (reflecting planned and random outages and unit ramping constraints) and other Generation source Nuclear Coal 34% 34% 32% 31% available data to match costs with usage as realistically as Secondary commercial 28% 29% 39% 42% possible. 38% 37% 29% 27% Customer class Residential Primary industrial Peaking resources variants. The POD method is thus one approach to hourly Combined cycle allocation. Ideally, dispatch and class loads should use the The POD approach has some limitations. Most importantly, it does not consider the reason that investments were heating is electric, the residential class is likely to experience incurred, only the way they are currently used. The costs its highest load in the winter, even in places like Florida. The of an expensive coal plant no longer needed for baseload industrial class loads may peak in a variety of seasons, driven service and converted to burn natural gas and operating at by vacation and maintenance schedules, variation in inputs a 10% capacity factor to meet peak loads might be allocated (e.g., agricultural products) and demand, and other factors. in exactly the same way as the costs of a much less expensive The system peak may occur at a time different from all of the combustion turbine operating at 10% capacity factor.108 The customer class NCP demands. excess costs of the converted coal plant are due to its historical Table 17 shows how the costs of each generation resource role of providing large amounts of energy at then-attractive would be allocated to the classes in the illustrative example fuel costs; those costs were not incurred for the 10% of hours in Figure 34. In the lowest-load hours, when nuclear is with highest demand. The same considerations arise for other serving 80% of the energy load, the industrial class uses half steam plants that operate at much lower capacity factors than the system energy and hence half the nuclear output; in the they were planned for and justified by. Some hydro plants highest-load hours, when nuclear is serving about 29% of the have also changed operating patterns from their original load, the industrial class uses about 27% of the system energy. use, either running for more hours to maintain downstream Averaged over the year, the industrial class uses 38% of the flow or for fewer hours due to reduced water supply. Peaking nuclear output. In the hours that the combustion turbines capacity is used to provide a range of ancillary services at are running, the industrial class uses only 27% of the peaking many load levels, including upward ramping services (when resources’ output, since the residential and commercial load surges during the day or wind and solar output falls) and classes dominate loads in that period. operating reserves (especially to back up large generation and The commercial class is responsible for the largest share transmission facilities). Reflecting these considerations may of the summer peak and hence of the combustion turbine require modification of the inputs to the POD analysis, which costs but the smallest part of the low-load hours and hence considers only current use, not historical causation. the lowest share of the nuclear and coal costs. Every class pays for a share of each type of generation.107 The POD method has been applied with a wide range of Second, the POD method spreads the cost of each resource equally to all hours or energy output, assigning the same cost of a totally baseload plant (with a 100% capacity detail. The generation “dispatch” over the year may represent factor) to the lowest-load off-peak hour as to the system peak historical or forecast operation, equivalent availability or hour. That approach comports with some concepts of equity capacity factor, seasonal variation (due to maintenance and cost responsibility: The cost of each resource is allocated 107 If this example had included a street lighting class, that class might not have been allocated any combustion turbine costs if the lights would not be on in the summer peak hours. In a more realistic example, including outages of the baseload plants, the combustion turbines probably would operate in some hours with street lighting loads and the lighting class would be allocated some combustion turbine costs. 108 In the simpler forms of POD, the costs of both plants would be spread over the top 10% of hours. In more sophisticated approaches that map generation to actual operating hours, the steam plant would generate in many hours with load lower than the top 10%, while missing some of the top 10%, due to limits on load following.
  5. Page 123 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 121 proportionately to the classes that use it. On the other hand, whether classes are paying for enough capacity to cover their it can be argued that the hours with higher marginal energy energy and reliability requirements. costs contribute more of the rationale for investing in that In the context of resources stacked under a load resource and that, in a sense, each kWh of usage at high-load duration curve, such as that shown in Figure 33 on Page 119, times should bear more of the resource’s investment-related the decomposition approach allocates the resource mix costs than should each kWh in the off-peak hours. This horizontally, rather than the vertical allocation used in the concern can be addressed by weighting the energy over the POD method. Figure 35 on the next page illustrates the hours, such as in proportion to some measure of hourly decomposition approach. market price. Third, it is important that the load and dispatch data be In essence, the decomposition method treats the utility as if it were multiple separate utilities. In the case of Figure 35, representative of the cost causation or resource usage the utility system is decomposed into an all-nuclear system in the years for which the cost allocation will be in place. with enough capacity to meet the industrial peak load, and For example, a baseload plant may have operated at only a utility with a little nuclear and all the other resources to 40% capacity factor in the most recent year because of major serve all other load. Whether the industrial customers would maintenance or availability of economic energy imports. support this allocation would usually depend on the cost of Or load and dispatch in the last 12 months of data may the nuclear resources compared with the system average. be atypical because of an extremely cold winter and mild The decomposition approach conflicts with reality in summer. The POD allocation should be based on weather- many ways, including: normalized dispatch and load, just as the rate case costs 1. The reserve requirements for the decomposed systems allowed by the regulator and included in the cost of service would be driven by their noncoincident class peaks or study should reflect weather-normalized load. high loads (if they are assumed to be fully free-standing), requiring additional hypothetical capacity for utilities Decomposition that are not already extensively overbuilt. If the decom- Class obligations for generation costs have occasionally position assumes that the multiple class-specific systems been addressed by dividing the generation resource into would operate in a power pool, contribution to the separate generation systems serving hypothetical loads for system peaks would drive capacity requirements. portions of the utility’s customers, such as just the residential 2. A system with a high load factor and relatively few customers, just the commercial customers and just the large units would require a very high reserve margin industrial customers. For example, industrial customers in (as discussed in Subsection 5.1.1) to cover fixed outages Nova Scotia have argued that their high-load-factor demands and even maintenance outages. The reserve units would could be served by the capacity and energy of some set of operate in many hours (since the system load would baseload plants, where those costs are lower than the average always be near the allocated baseload capacity). generation cost per kWh (Drazen and Mikkelsen, 2013, 3. A baseload-only system would require a large amount of pp. 11-16). The industrial advocates for this approach assume backup supply energy, either from hypothetical units or that the flat industrial load would be served exclusively by as purchases from the other classes. baseload plants and that all other costs should be allocated to other classes.109 A similar approach might inappropriately 4. The decomposition approach is usually designed to assign the lowest-cost resources to the industrial class, be suggested to justify allocating the highest-cost resources to customers with behind-the-meter solar generation and lower-cost resources to nonsolar customers whose load does not dip in midday. The method might also be used to test 109 A decomposition method that accounts for all relevant factors may not show an advantage for industrial customers. In Alberta, a related method to the decomposition method was presented to demonstrate that baseload power for industrial customers would be considerably more expensive than the demand-based cost allocation of the existing system for the industrial class (Marcus, 1987).
  6. Page 124 of 276

    122 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Figure 35. Illustration of decomposition approach to allocating resource mix Demand response/storage/combustion turbines 7,000 Combined cycle Other-class generation allocation Coal System total megawatts Nuclear 5,000 Maximum industrial load Industrial load 4,000 3,000 2,000 1,000 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 Industrial generation allocation 6,000 Hour of the year, sorted by load Higher load 5. Lower load shifting all the costs of mistakes and market changes onto needed to deal with allocating nonhydro renewable costs; the other classes. That includes excess capacity (even a few utilities already have significant costs for nonhydro excess baseload and capacity made excess by decline storage (mostly batteries) and most will need to deal with in industrial loads), the costs of fuel conversion and those costs in the future. As technologies change, new the high costs of plants built as baseload but currently cost allocation challenges will arise — for new resources, operated as peakers. repurposed existing assets and newly obsolete resources. It is not clear how variable renewables and other unconventional resources would be incorporated into Fuel Switching and Pollution Control Costs Many fuel conversion investments have been the decomposed utility systems. It is possible (if not certain) that the decomposition undertaken to reduce fuel costs or increase the reliability approach could be expanded and revised to create a viable of fuel supply for high-capacity-factor power plants. classification and allocation method, but at this point no This category includes: such model has been developed. • Conversion of oil-fired steam plants to burn coal in the 1970s and 1980s (most of which have since been retired). 9.1.4 Other Technologies and Issues • when the supply of gas was limited. Several types of generation costs do not fit neatly into the classification methods discussed in the previous sections. Conversion of gas-fired plants to burn oil in the 1970s, • Conversion of oil-fired plants to co-firing or dual firing Some of those costs, such as hydro resources and purchased with gas since the 1990s to achieve environmental power, have been part of utility cost structures since before compliance and reduce fuel costs. the development of formal cost of service studies. Others, • on gas to achieve environmental compliance. such as excess capacity and uneconomic investments, became prominent in recent decades. More recently, utilities have Conversion of coal-fired plants to partial or full operation • Conversion of coal-fired plants to partial or full
  7. Page 125 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® • ELECTRIC COST ALLOCATION FOR A NEW ERA | 123 operation on biomass to achieve environmental capacity has vanished and the value of its energy output has compliance and RPS credit.110 decreased dramatically. One or both of those outcomes befell Conversion of coal-fired plants to partial or full operation many of the nuclear plants and some coal plants in the late on petroleum coke, tire-derived fuel or other waste to 1970s and 1980s. The long lead times are generally the result reduce fuel costs. of choices to build plants to produce large amounts of energy These investments and resulting longer-term operating at low variable costs; in those cases, there is a reasonable costs may reasonably be classified as 100% energy-related. Most pollution control retrofit costs are incurred to comply with regulatory requirements to reduce the presumption that the costs of the excess capacity are due to anticipated or actual energy requirements.112 Excess capacity can be priced at the costs of environmental effects of fossil-fueled plants and to allow contemporaneous peaking capacity and allocated among them to continue burning low-cost fuel at high capacity classes in proportion to the differences between projected factors. Peaking units that are needed only in a few high-load class contribution to peak loads (at the time commitments hours annually can afford to burn expensive clean fuels and were undertaken) and actual current class loads. Excess are often allowed to have higher emissions rates since they capitalized energy costs (net of equivalent peaking capacity operate so little. Hence, the need for the pollution control costs and any fuel savings) similarly can be allocated in is driven primarily by the energy-serving function of the proportion to the differences between class projected energy nonpeaking fossil plants. These environmental costs are requirements and their actual energy requirements. most often related to emissions standards for air pollutants, Table 18 on the next page provides an illustration of but some substantial costs are driven by the need to protect the allocation of excess capacity among classes to reflect water quality and aquatic life and to meet other health responsibility for the excess. In this illustration, the actual and environmental standards. As a result, the identifiable load in the rate case test year is 600 MWs lower than the capital investment and nondispatch O&M costs of pollution load forecast at the time the utility committed to the excess controls may reasonably be classified as 100% energy-related capacity. Because of other adjustments in supply planning, or allocated in proportion to class usage of energy during the the utility has about 480 MWs of excess capacity, which times that the plant is operated, to recognize the causes of the would support about 400 MWs more load than the actual environmental retrofits.111 need. That 400-MW excess is allocated among the classes in proportion to their shortfalls in load.113 Excess Capacity and Excess Costs Utilities sometimes add generation that is not needed to This adjusted peak load could be used in allocating peaking resources or the peaking-equivalent portion of maintain adequate reliability. Some of that excess capacity all generation resource costs. A similar approach could be may result from the lumpiness of generation additions or applied to allocate the additional costs of having a baseload- declining load, with no clear connection to the classification heavy resources mix resulting from actual energy use being of the additional costs. Other times the excess is the result of lower than the forecast usage. the long lead times for certain baseload generation (especially Another source of excess capacity is the addition of clean nuclear, but also some coal and hydro facilities), which resources to allow the reduced use of dirty older generation, can result in a plant being completed after the need for its which thus allows the utility to meet environmental 110 In principle, biomass conversion might also reduce fuel costs, although that is not necessarily the case. 112 Accounting for a suboptimal system resource mix (and other inefficiencies) is also discussed in detail in Chapter 18. 111 Nova Scotia Power uses this adjustment to the average-and-peak approach (Nova Scotia Power, 2013a, p. 37). 113 Any load shortfall due to increased utility efficiency efforts since the commitment to build the capacity should generally be excluded from the shortfall.
  8. Page 126 of 276

    124 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Table 18. Allocation of 400 MWs excess capacity to reflect load risk Allocated excess (MWs) Load for allocation (MWs) 0% 0 1,500 -300 43% 171 2,171 2,300 -400 57% 229 2,529 5,800 +600 100% 400 6,200 Forecast load (MWs) Actual load (MWs) Load differential Residential 1,400 1,500 +100 Secondary commercial 2,300 2,000 Primary industrial 2,700 Total 6,400 Share of load shortfall requirements, reduce fuel costs or meet portfolio standards.114 the plant, long before the plant’s costs and benefits were clear. Even though these new clean resources may raise the Many nuclear plants were canceled after the utility spent reliability of generation supply (usually above an existing more on the plant than the entire original expected cost, adequate level), their costs were incurred as a result of energy most recently the Summer plant in South Carolina. A number loads; in these cases, the excess capacity should be recognized of coal plants were also canceled after the commitment of as energy-related.115 substantial funds. Aside from excess capacity, changing economic, technological and regulatory conditions can result in a facility providing a service different from its original purpose. For Hydroelectric Generation The classification of hydroelectric generation presents example, a previously baseload generation plant may run on some issues that differ from those of thermal generation.117 only a few days annually or may house a distribution service First, many large generation facilities installed prior to 1960 center. The plant may still have unrecovered capital costs, are still in operation, so their costs are difficult to classify environmental cleanup obligations or other burdens. If the using the equivalent peaker method. Most of them could full cost of the repurposed facility exceeds its value in its new not be built today, given environmental siting constraints, use, the excess costs should be allocated based on its former so comparing new construction costs with new peaker costs use as a baseload generating plant.116 may not be practical. Second, each conventional hydro Finally, the amortization of a canceled generation plant facility consists of turbines and dams (and other civil works), is attributable to the reason the utility spent the money on which have different and varying effects on the energy and 114 MidAmerican Energy, for example, will have added over 6,000 MWs of wind in the period 2004-2020 to reduce fuel costs to its retail customers but has kept most of its fossil generation in operation (Hammer, 2018). This could result in a MISO-recognized reserve margin of 26% in unforced capacity terms in certain areas (Hammer, 2018, Table 3). This is nearly three times the typical MISO-required unforced capacity reserve around 8% (Midcontinent Independent System Operator, 2018, p. 23). 116 Excess costs can also be associated with underutilized or repurposed facilities. For example, a retired steam power plant may be used to warehouse distribution equipment; the generator may be operated as a synchronous condenser to support the transmission system; or a portion of the plant site may remain in service to house a combustion turbine, a transmission switching station or a control center. Sometimes this is intentionally done to avoid (or evade) a rate base disallowance for a unit retired prior to being fully depreciated. Most of those costs continue to be attributable to the original purpose of the steam plant and hence to energy and demand. Similarly, the utility may face cleanup costs for a former coal gasification site or any site contaminated by hazardous materials (e.g., heavy metals, waste lubricating oil or PCB-contaminated transformer oil). Regardless of how that site is used today or was most recently used, the cleanup costs are attributable to the activity that generated the contamination, not the current use. 115 Texas and Iowa established their initial renewable portfolio standards in terms of installed capacity, rather than the more common energy percentage requirement, and several jurisdictions have established targets for specific renewables (e.g., solar, offshore wind). See Texas Utilities Code § 39.904 and Iowa Code Ch. 476 §§ 41-44. The motivations for these targets, however they are formulated, have been primarily related to reducing fuel costs and emissions. Both Texas and Iowa have exceeded their requirements and continue to add renewables to reduce fuel and other energy costs. 117 The treatment of pumped storage, where water is pumped uphill off-peak and released to produce electricity during peak periods, is addressed with other storage technologies in Subsection 9.1.4.
  9. Page 127 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | demand values of the facility. Adding a turbine may increase In selecting classification and allocation methods it the facility’s capacity at peak load times without increasing is important to recognize the usage of each type of hydro energy output, since total energy output is limited by the resource. Some are run-of-river, with each hour’s output amount of water flowing in the river. At another hydro determined by the amount of water flowing through the facility, adding an additional turbine will not increase the system. Other hydro resources have limited flexibility in output in periods of peak need (usually summer and winter) dispatch due to environmental constraints. Both of these because there is not enough water to run the additional categories of hydro resources should be treated as variable, turbine, but it may increase energy output in the spring similar to wind and solar. 125 flood; this energy has value, even if it does not contribute to Other categories of hydro resources have some storage meeting peak load. Adding additional water storage (such as capacity, allowing the operator to optimize dispatch over a in an upstream reservoir to hold water from the spring flood) day, a week or even a year.118 These resources are generally may allow the plant to operate longer hours each day but may operated under a reliability-constrained economic dispatch not increase the contribution in peak hours. Increasing the regime, but since the variable cost is zero or minimal, they height of a dam may increase capacity by raising the hydraulic are dispatched to maximize the value of their limited energy head and also increase energy output because of both the supply rather than in merit dispatch order. For example, a greater head and the increased storage volume. hydro resource may be able to generate 100 MWhs in the Hydro is distinct in that the fuel supply (water) is limited, hour ending at 2 a.m. at no cost, but the dispatcher is likely and although the units usually can be dispatched to cover to prefer to keep the water in the reservoirs to be used for higher-cost hours, doing so precludes using the units at operating reserves, load following and avoidance of fuel costs lower-cost hours. Utilities have often recognized this dual in higher-cost hours later in the day. function of hydro investments by classifying hydro plant costs The difference between the dispatch of hydro and to both energy and capacity. For example: thermal resources requires some adaptation in classification • BC Hydro in British Columbia classifies hydro generation and allocation approaches. In some applications of the BIP as 45% energy-related (BC Hydro, 2014, p. 9). classification approach, for example, resources are stacked Newfoundland and Labrador Hydro has proposed under the load duration curve starting with the resources classification of 80% energy for a new hydro project with the lowest variable costs. In a system with a significant (Newfoundland and Labrador Hydro, 2018, p. 6). hydro contribution, the method must be modified to reflect Manitoba Hydro has long classified its generation as the value (not cost) in time periods (ideally hours) in which 100% energy-related, but this was modified in 2016 to an hydro energy is actually provided, whether that is due to average-and-peak classification approach with a broad run-of-river, minimum flow or economic dispatch. • • peak demand allocation measure (Manitoba Public Utility It may be appropriate to recognize that some hydro Board, 2016, pp. 47-53). resources are justified primarily by avoiding fuel costs in high- Other utilities, including Idaho Power, Hydro-Québec, load hours, resulting in allocation of the investment-related and Newfoundland and Labrador Hydro, use the average- hydro costs in proportion to some measure of hourly market and-peak approach for legacy hydro. or marginal energy costs.119 118 Many of these resources will also operate with little or no flexibility in the spring flood, with minimum flow constraints (which may change by season) and with requirements for flow variation for streambed maintenance, recreational activities, flood control and other factors. 119 Many hydro resources bear the costs of providing services unrelated to electric generation, such as flood control, recreation, water supply and environmental protection. Other resources, especially those built in recent decades, may also bear the costs of endangered species protection, conservation easements, access to open space, aesthetic screening around a plant or payments in lieu of taxes. If the non-energy benefits are conditions of a license or permit, those are simply the costs of building or running the plant.
  10. Page 128 of 276

    126 | ELECTRIC COST ALLOCATION FOR A NEW ERA Renewable Energy Renewable energy, generated from wind, solar, biomass, REGULATORY ASSISTANCE PROJECT (RAP)® much energy it takes from the power producer, as long as the supplier meets contracted requirements for availability; hydro, geothermal and other technologies, is becoming a and variable charges per MWh that the buyer pays for the larger part of the electric supply mix and hence the cost energy it takes. The charges may reflect the projected cost of allocation challenge. Renewable resources may have very a single unit or plant (traditionally fossil fueled, increasingly different cost characteristics than conventional resources, renewable) at the time the contract was signed, or the actual and the decision to invest in them may be driven by policy cost of service for a unit or a portfolio of resources. that may not consider peak demand at all. As discussed in Subsection 7.1.2, renewable energy may be Another large set of power purchase agreements — including PURPA contracts, some dating back to the 1980s, added — even though the utility does not need the capacity and most 21st century renewable projects — pay the provider at peak hours — to reduce fuel costs, comply with portfolio a rate per kWh delivered (perhaps with different rates by requirements (which often require that a specified percentage time of delivery). This cost structure fits well into an hourly of energy consumption is supplied by renewable generation) allocation framework, although it is also possible to extract a or meet environmental targets, particularly reducing demand component of the resource’s value for inclusion in a the atmospheric effects of fossil energy generation. This traditional demand/energy framework. substitution of capital investment for fuel is widely accepted Many utilities classify the monthly guaranteed as an important approach in 21st century utility planning, as portion of payments to independent power producers as shown in examples from Colorado, Iowa and Indiana.120 demand-related, using the archaic perspective that any In the classification of costs between capacity and energy, generation cost that is committed for the rate year should renewable costs that are driven by energy consumption, be considered fixed and therefore demand-related, thus either directly or indirectly, should be classified as energy- leading to great controversy in choosing the appropriate related. For renewable resources that provide some demand- basis for allocation of demand-related costs. In reality, the related benefits, the costs can be classified between demand utility may have agreed to the payment structure because and energy based on the equivalent peaker, average-and-peak of the low-cost energy provided by the deal, with that or other methods, as long as the demand-related portion is financial commitment having value to the resource owner in discounted to reflect the effective load-carrying capacity of obtaining financing. the renewable resource. Variable renewable resources fit well Others classify purchased power to mimic the in a time-based allocation (such as a detailed POD allocation) classification of generation plant, as if the purchase were the because their costs can be allocated directly to the hours in equivalent of plant capital, without fuel.121 This treatment which they provide energy to the system. is similarly inconsistent with cost causation. Many power purchase agreements are structured to recover the costs of Purchased Power Many power purchase agreements with utilities or non- a baseload or intermediate resource, such as by charging a relatively high nonbypassable capacity charge and a low utility generators (especially fossil-fueled generation) have energy charge based on the usage of the resource. These been structured with two types of charges: predetermined contracts are typically not the lowest-cost way to meet peak monthly charges the utility must pay regardless of how loads. The only rational reason to enter into these contracts 120 Xcel Energy touted its renewable energy investments as “steel for fuel,” in which “capital recovery costs [are] offset by lower fuel and O&M costs” and wind “displaces coal and natural gas fuel,” resulting in “significant customer savings” (2018). MidAmerican Energy justified its aggressive wind generation plan on eliminating exposure to fossil fuel costs (Hammer, 2018). Northern Indiana Public Service Co. found that replacing its coal plants’ fuel and operating costs with wind and solar would reduce customer costs, uncertainty and risk (2018, p. 6). 121 The contract may require the purchaser to take all of the available energy, so even a rate denominated in MWhs can be thought of as investmentrelated and thus similar to generation plant costs. In reality, the purchase contract replaces both the investment-related and variable costs of a comparable resource built by the purchasing utility.
1 page match

As listed on the current system

Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Melissa Whited [26-05-10]

This filing on the current system (opens in a new tab)