Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Files3

Search terms highlighted
Eversource rate increase is on 6 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
5 pages match
Words on different pages
  1. Page 128 of 276

    126 | ELECTRIC COST ALLOCATION FOR A NEW ERA Renewable Energy Renewable energy, generated from wind, solar, biomass, REGULATORY ASSISTANCE PROJECT (RAP)® much energy it takes from the power producer, as long as the supplier meets contracted requirements for availability; hydro, geothermal and other technologies, is becoming a and variable charges per MWh that the buyer pays for the larger part of the electric supply mix and hence the cost energy it takes. The charges may reflect the projected cost of allocation challenge. Renewable resources may have very a single unit or plant (traditionally fossil fueled, increasingly different cost characteristics than conventional resources, renewable) at the time the contract was signed, or the actual and the decision to invest in them may be driven by policy cost of service for a unit or a portfolio of resources. that may not consider peak demand at all. As discussed in Subsection 7.1.2, renewable energy may be Another large set of power purchase agreements — including PURPA contracts, some dating back to the 1980s, added — even though the utility does not need the capacity and most 21st century renewable projects — pay the provider at peak hours — to reduce fuel costs, comply with portfolio a rate per kWh delivered (perhaps with different rates by requirements (which often require that a specified percentage time of delivery). This cost structure fits well into an hourly of energy consumption is supplied by renewable generation) allocation framework, although it is also possible to extract a or meet environmental targets, particularly reducing demand component of the resource’s value for inclusion in a the atmospheric effects of fossil energy generation. This traditional demand/energy framework. substitution of capital investment for fuel is widely accepted Many utilities classify the monthly guaranteed as an important approach in 21st century utility planning, as portion of payments to independent power producers as shown in examples from Colorado, Iowa and Indiana.120 demand-related, using the archaic perspective that any In the classification of costs between capacity and energy, generation cost that is committed for the rate year should renewable costs that are driven by energy consumption, be considered fixed and therefore demand-related, thus either directly or indirectly, should be classified as energy- leading to great controversy in choosing the appropriate related. For renewable resources that provide some demand- basis for allocation of demand-related costs. In reality, the related benefits, the costs can be classified between demand utility may have agreed to the payment structure because and energy based on the equivalent peaker, average-and-peak of the low-cost energy provided by the deal, with that or other methods, as long as the demand-related portion is financial commitment having value to the resource owner in discounted to reflect the effective load-carrying capacity of obtaining financing. the renewable resource. Variable renewable resources fit well Others classify purchased power to mimic the in a time-based allocation (such as a detailed POD allocation) classification of generation plant, as if the purchase were the because their costs can be allocated directly to the hours in equivalent of plant capital, without fuel.121 This treatment which they provide energy to the system. is similarly inconsistent with cost causation. Many power purchase agreements are structured to recover the costs of Purchased Power Many power purchase agreements with utilities or non- a baseload or intermediate resource, such as by charging a relatively high nonbypassable capacity charge and a low utility generators (especially fossil-fueled generation) have energy charge based on the usage of the resource. These been structured with two types of charges: predetermined contracts are typically not the lowest-cost way to meet peak monthly charges the utility must pay regardless of how loads. The only rational reason to enter into these contracts 120 Xcel Energy touted its renewable energy investments as “steel for fuel,” in which “capital recovery costs [are] offset by lower fuel and O&M costs” and wind “displaces coal and natural gas fuel,” resulting in “significant customer savings” (2018). MidAmerican Energy justified its aggressive wind generation plan on eliminating exposure to fossil fuel costs (Hammer, 2018). Northern Indiana Public Service Co. found that replacing its coal plants’ fuel and operating costs with wind and solar would reduce customer costs, uncertainty and risk (2018, p. 6). 121 The contract may require the purchaser to take all of the available energy, so even a rate denominated in MWhs can be thought of as investmentrelated and thus similar to generation plant costs. In reality, the purchase contract replaces both the investment-related and variable costs of a comparable resource built by the purchasing utility.
  2. Page 129 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | would be to access lower-priced energy and higher efficiency. compressed air, flywheels and gravity (moving weights The classification process should look beyond the contract upward to store energy, using the potential energy to pricing terms to ascertain the true cost causation factors and drive a generator as needed). where the benefits accrue. Within the centrally dispatched power pools (such as the New England, New York, California and Midcontinent ISOs), • 127 Thermal storage as molten salt in solar thermal plants, ice or hot water at customer premises. Batteries will be an increasingly important part of utility utilities and other load-serving entities purchase energy on systems, and therefore of cost allocation studies, because an hourly basis to meet their loads. The transactions are of their flexibility and the rapid and continuing decline in priced at the marginal costs of the supply bids to the system their costs. Batteries can be installed (1) at the location of operator and cover some investment-related costs for most generation to stabilize or optimize output to the transmission generators. The cost of those purchases should be classified as system; (2) at substations to avoid transmission and energy and allocated to loads on a time-differentiated basis.122 distribution costs; or (3) throughout the system, on the utility Costs for purchased power can be classified in most of or customer side of the meter to avoid transmission and the same ways that the costs of utility-owned generation are distribution costs and to provide customer emergency power. classified, including the probability-of-dispatch, equivalent Batteries can provide a range of services, including peaker and average-and-peak methods and many others. In contributing to bulk supply reliability, ancillary services (load many cases, the purchase will be from a specific plant whose following, reserves and automatic generator control), energy investment and nondispatch O&M costs can be allocated in arbitrage, transmission load relief, distribution load relief and the same manner as the costs of similar resources the utility customer emergency supply. To the extent that the allocation owns. In other cases, such as system power, the classification study can reflect these various services, it should classify the and allocation of power purchase costs will need to be based costs of the batteries in proportion to their value. That classi- on the cost characteristics of the purchase.123 Where possible, fication may be based on the frequency with which the storage the most straightforward classification approach would be to is used for each purpose, on the anticipated mix of benefits treat as energy-related the excess of the purchase costs over the that justified the installation, or on the incremental cost capacity costs of a contemporaneous gas turbine peaking plant. incurred to achieve the additional purpose.124 Batteries may be very valuable for providing second-contingency support to the Energy Storage transmission system (avoiding the installation of redundant Energy storage takes many forms, including: equipment), even if they may never actually be dispatched • Water held in conventional hydro reservoirs. for that purpose. Where utilities purchase some attributes • Pumped storage hydro facilities. of behind-the meter batteries, such as ancillary services, the • A variety of battery technologies, which may be services they purchase should drive the cost allocation. co-located with generation, transmission or distribution • Storage operates as both a load and a supply resource and facilities or be behind the customer’s meter. thus may operate at very different times than conventional A host of other electricity storage technologies, including generation. As a result, storage fits well into hourly allocation 122 Some utilities in these pools own generation, which is sold into the regional market. The revenue from those sales can be credited against the costs of the generator before those costs are allocated to classes. 123 Since costs for purchased power may be recovered through both base rates and a power cost recovery mechanism, and the allocation of these costs may be reflected in both base rates and the power-cost mechanism, some care should be taken to ensure that the allocation is applied only once, just as the costs are recovered only once. For example, the costs for purchased power may be included in the cost of service study, with the anticipated purchased-power revenues from each class subtracted from the allocated costs. Alternatively, the purchase costs may be excluded from the base rate cost of service study and allocated separately on an appropriate basis in the fuel and purchased power cost recovery mechanism. 124 Renewable incentives and tax policy may encourage co-location of storage with centralized renewable generation. Moving the storage to support transmission, distribution or customer resilience would typically increase both the value and the cost of the resource; those incremental costs should be classified as due to the incremental service.
  3. Page 130 of 276

    128 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® schemes. Storage usually delivers power into the grid at load and supply and optimizing dispatch may vary depending high-cost hours, so assigning the capital and operating costs, on the amount of weather-related load, the existence of large including the costs of charging storage, to those hours usually loads and large generators that may suddenly trip off line, will result in an equitable tracking of costs to benefits. the extent of integration with other utilities, the length of But storage also provides some services while it is time required for major plants to start up and the amount of charging, including operating reserves. A 200-MW pumped variable renewable generation. Some dispatch costs would storage unit can typically transition from being a 200-MW be required, even if the utility only needed to dispatch pumping load to a 200-MW supply within minutes, providing generation on a few peak hours, while others are required 400 MWs of net operating reserves at no incremental cost for multiday planning, 24-hour operation and other energy- during low-cost hours, allowing avoidance of fuel costs for related factors. load-following resources. Storage may also provide other These costs might most reasonably be classified as ancillary services while charging. If the cost of service study is partly demand-related and partly energy-related. Reasonable sophisticated enough to classify and allocate ancillary services approaches would include classification of dispatch costs in separately from demand and energy, some of the storage costs proportion to the classification of long-term generation costs, can be classified to ancillary service, reflecting the increased using the average-and-peak method or a 50/50 split between reserves available during charging. energy and demand. In addition, some utility systems experience high ramp rates in net load at times that variable renewable generation is declining and load is rising, such as an evening-peaking utility with a large amount of solar generation in the midday 9.1.5 Summary of Generation Classification Options Table 19 on the next page summarizes some attributes period. To be able to ramp up output from other generation of the generation classification options described above. quickly enough to offset the drop in renewable output and These descriptions are highly simplified and should be read meet the rising load, the system may require the construction in context of the discussion prior, including the discussion of of additional resources and the uneconomic operation of special situations in Subsection 9.1.4. thermal generators at low-load times to ensure they are available when the ramping need arises. Storage-charging load in the period of minimum net load (which is also likely to be a period of low or even negative short-run marginal 9.2 Allocating Energy-Related Generation Costs Energy-classified generation costs are often allocated costs) raises the minimum load and reduces the ramp rate. to all classes in proportion to total annual class energy These benefits flow to the loads during the ramping period, consumption. Alternatively, energy-related costs can not just during the discharge period, so some of the costs of be calculated by time period and allocated to classes in storage should be allocated to those loads. proportion to their usage in each time period. Assigning costs to time periods is usually straightforward for fuel and System Control and Dispatch The costs of scheduling, committing and dispatching generation units, recorded in FERC Account 556, are fixed in the short term but vary with the generation mix, load shapes and variability and other considerations. Costs of forecasting 125 One possible complication with time differentiation is that some steam plants must be operated in low-load hours, when they are not really needed, so that they will be available when needed in higher-load hours. The costs of fuel and reagents used in low-load hours may be required to dispatch O&M.125 For systems with high penetration of variable renewables, such as wind and solar, then TOU or BIP allocation of energy-related costs is the most equitable. The energy-related capital investment and nondispatch O&M costs can be allocated to classes in proportion to serve high-load hours, but the plants may also be supplying energy in the low-load hours; sorting out generation and fuel use among periods within a week or day can be very complicated.
  4. Page 131 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 129 Table 19. Attributes of generation classification options Data and computational intensity Accuracy of cost causality Allows joint classification/ allocation Applicability Very low Very low No Peaker-only systems Competitive proxy Low Medium No In or near regional transmission organizations that perform revenue computations Average and peak Low Low No Hydro systems Simple base-intermediate-peak Low to medium Medium No Simple systems: limited hydro, solar, wind, storage Complex base-intermediate-peak High High Yes Broad Equivalent peaker (peak credit) Low High No Broad Operational characteristics (capacity value, capacity factor, operating factor) Generally low Low to medium No Limited Probability of dispatch Medium to high Highest Yes Broad Very high Low Yes Rarely Method Straight fixed/variable Decomposition energy or assigned among time periods in proportion to the many more periods (perhaps even hourly data), include all fuel and dispatch O&M. Table 20 provides an illustration of resource types and compute usage by generation unit, rather the development of energy-classified costs per MWh (both than category. dispatch- and investment-related) over three time periods. Manitoba Hydro, which has an almost all-hydro system, Table 21 on the next page shows an illustrative example assigns energy-classified capital investment costs among four applying these costs per MWh to usage for three customer seasons and three time periods (for a total of 12 periods) in classes by time period to allocate costs. proportion to the MISO market prices for exports in those The comparable computation for most utilities could use periods, reflecting the reality that there are hours in which Table 20. Illustrative example of energy-classified cost per MWh by time of use Period (and annual hours) Energy-related cost per MWh Capacity (MWs) Peak (50) Midpeak (2,000) Off-peak (6,710) Total $30 500 $750,000 $28,500,000 $90,585,000 $119,835,000 Coal $40 1,500 $3,000,000 $84,000,000 $161,040,000 $248,040,000 Combined cycle $35 1,000 $1,750,000 $35,000,000 $0 $36,750,000 Peaking $100 300 $1,500,000 $12,000,000 $0 $13,500,000 Demand response $250 100 $1,250,000 $0 $0 $1,250,000 Subtotal of all resources $8,250,000 $159,500,000 $251,625,000 $419,375,000 Consumption (MWhs) 170,000 4,170,000 7,045,500 11,385,500 Cost per MWh $48.53 $38.25 $35.71 $36.83 Resource type Nuclear Note: Numbers may not add up to total because of rounding. The illustration assumes that all resources are fully utilized in the peak period, with reductions in capacity factor between periods by 5 percentage points for nuclear, 30 points for coal, 50 points for combined cycle and 80 for peaking.
  5. Page 132 of 276

    130 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Table 21. Illustrative example of time-of-use allocation of energy-classified costs Period (and annual hours) Peak (50) Midpeak (2,000) Off-peak (6,710) Consumption (MWhs) 170,000 4,170,000 7,045,500 11,385,500 Cost per MWh $48.53 $38.25 $35.71 $36.83 Class Residential Consumption (MWhs) Allocated costs 69,250 $3,360,662 2,080,000 $79,558,753 2,818,200 $100,650,000 4,967,450 $183,569,415 Commercial Consumption (MWhs) Allocated costs 85,000 $4,125,000 1,460,000 $55,844,125 2,113,650 $75,487,500 3,658,650 $135,456,625 Industrial Consumption (MWhs) Allocated costs 15,750 $764,338 630,000 $24,097,122 2,113,650 $75,487,500 2,759,400 $100,348,961 Total Note: Numbers may not add up to total because of rounding. transmission constraints preclude additional exports. That • (3 CP or 4 CP). approach recognizes that using energy in some time periods is more expensive for Manitoba Hydro (in terms of lost export revenues) than consumption in other time periods. 9.3 Allocating Demand-Related Generation Costs As discussed in Subsection 9.1.3, some classification The class contributions to three or four seasonal peaks • The average of the class contributions to multiple highload hours, such as: • The 12 monthly peaks (12 CP). • All hours with loads greater than a threshold, such as 80% to 95% of annual peak. • Peak capacity allocation factor (PCAF), a technique methodologies, such as probability of dispatch and more developed in California that weights high-usage hours granular hourly variants, simultaneously develop cost by based on how close each hour is to the peak hour. period and the associated allocation factors driven by use • Hours with some expectation for loss of energy. by period. This section describes methods for developing • Hours in which the system is stressed allocation factors for demand-related costs developed by legacy demand/energy classification methods. Typically, utilities allocate demand-related generation (e.g., operating reserves are below target levels). As discussed in Chapter 5, generation capacity requirements have always been driven by more than a few based on some form of class contribution to system peak hourly loads. Moreover, with peak loads being offset by loads, referred to as coincident peak. The loads that solar generation and expanding demand response available determine how much capacity a utility requires may be to serve the highest-load or highest-cost hours, capacity concentrated in a few hours a year, a few hours in each requirements are driven by an even broader group of hours, month, the highest 50 or 100 hours in the year, or some other which should be reflected in the development of the demand measure of the loads stressing system reliability. allocation factors. Broader allocation factors also have the • Frequently used demand allocators include: virtue of limiting the instability resulting from the use The class contributions to the annual system coincident of a limited number of peak hours. For example, ERCOT peak (1 CP). experienced an annual peak in 2017 at approximately
  6. Page 133 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 131 69,500 MWs on July 28 at 5 p.m. However, there were the average of the four monthly peaks in the high-load 13 other hours within 2% of that annual peak in 2017, in the summer season, the average of some number of summer and hours ending at 3 p.m. to 7 p.m. (Electric Reliability Council winter monthly peaks, a defined number of peak hours when of Texas, 2018, and calculations by the authors). Changes in peaking resources are expected to operate, or the average of temperature or cloud cover could shift the peak load to any the 12 monthly peaks.128 The number of months included in of those hours. The peak timing in the load data can be very the computations of the demand allocator often reflects the important in determining the allocators. The residential following factors: class typically will have a greater share of a peak load • occurring at 7 p.m. than one occurring at 3 p.m. or 4 p.m.126 Utilities have sometimes allocated generation demand experience its annual peak load. • costs on the class NCP at the system level.127 This approach may have been roughly appropriate for some utilities serving The number of months in which the system may Whether high loads occur in both summer and the winter. • Whether requirements for maintenance outages reduce distinct classes with peak demands in different seasons, such available capacity in off-peak months enough that as winter-peaking ski resorts and summer-peaking irrigation available reserves in those months are comparable to the pumping, with both seasons contributing to the need for reserves in the peak months. generation capacity. The class NCP would not recognize A more comprehensive approach to these factors would whatever load the ski resorts’ summer operations contribute develop the demand allocator from all the hours identified to the pumping-dominated peaks and would allocate in a loss-of-energy expectation study, after accounting for demand costs to other classes based on their summer or maintenance scheduling. Depending on the system, that winter peaks — but not their contributions to either of the may be several hours or several hundred hours. If data are seasons’ high-load hours. Since reliability computations and not available for a comprehensive loss-of-energy expectation the need for generation capacity are driven by combined analysis, a demand allocator based on all hours within a system load, some measure of the combined loads on specified percentage of the peak (e.g., 80% to 95%) or based the system is relevant. With the hourly data collection on a significant number of the highest hours in the year technologies now available, this class NCP approximation is (e.g., 100) is preferable to a coincident peak analysis. In sum, no longer necessary. averaging or weighting a small number of coincident peaks Traditionally, without access to the kind of sophisticated incorrectly assumes that the need for capacity is a simple hourly data we can obtain today, utilities have tended to function of the amount of the system monthly peak, even allocate demand costs on a single annual coincident peak, though capacity requirements are driven by many hours, 126 The range of loads in these 14 hours was only about 1,400 MWs, roughly the size of one large nuclear unit or two large coal units. The differences in loads over those hours are of little significance in terms of reliability. 128 FERC has a set of guidelines for determining whether wholesale demandclassified costs should be allocated on 3 CPs or 12 CPs (for example, see Federal Energy Regulatory Commission, 2008, pp. 30-35). FERC’s approach does not contemplate that any other number of months (such as four or eight) might be responsible for the need for capacity. 127 In some jurisdictions, the class NCP is referred to as the maximum class peak, maximum diversified demand or something similar, and “NCP” is used to designate the sum of the individual customer noncoincident peaks within each class. We refer to class NCP and customer NCP in this manual to distinguish between the two methods.
  7. Page 134 of 276

    132 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Table 22. Attributes of generation demand allocation options Data and computational intensity Accuracy of cost causality Allows joint classification/ allocation Applicability Very low Very low No Rare 3 CP; 4 CP Low Low No One-season peak; needle peaks 12 CP Low Low to medium No Multiple seasonal peaks; extensive maintenance requirements; class load shapes near peak similar Multiple hours near peak (e.g., top 100 hours) Low to medium Medium No Broad, but loss-of-energy expectation gives more robust results if data exist to calculate them Loss-of-energy expectation High High No Broad Complex base-intermediate-peak High High Yes Broad Medium to high High Yes Broad Method 1 CP Probability of dispatch depending on load; the amount of generation capacity O&M costs to energy usage rather than to demand. Table 23 that is available, not just installed; and the scheduling of presents a simplified view of appropriate classification results maintenance outages. by plant type. Table 22 summarizes some characteristics of the As variable renewable capacity (mostly wind and solar) on allocation methods described in this section, along with the a system increases, the role for baseload capacity decreases. POD method described in Subsection 9.1.3 and the more At some point, in hours with low load and high renewable complex variants of the BIP method from Subsection 9.1.2. output, traditional baseload resources will run only if they cannot shut down and restart on a timely basis. 9.4 Summary of Generation Allocation Methods and Illustrative Examples Cost of service studies can also combine features of the various classification approaches, such as classifying peakers as 100% demand-related; classifying fuel conversion costs, As demonstrated in many ways in the previous sections, it is appropriate to classify some of the long-term investment and environmental costs and generation without firm transmission as 100% energy-related; and applying the average-and-peak Table 23. Summary of conceptual generation classification by technology Resource type Function Classification Nuclear, some hydro and best coal Baseload Primarily energy Modern combined cycle, best gas-fired steam and mediocre coal Intermediate Energy and demand Combustion turbines, mediocre fossil-fueled steam and combined cycle Peaking and operating reserves Primarily demand or on-peak energy Storage and flexible hydro Peaking and energy shifting Demand or on-peak energy Wind and solar Energy and some capacity Primarily energy Note: “Best” refers to resources with the lowest variable costs, “mediocre” to those with higher variable costs. Resources that are worse than mediocre are likely candidates for retirement. “Intermediate” refers to generation that is neither baseload nor peaking.
  8. Page 135 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 133 Table 24. Summary of generation allocation approaches Resource type Legacy Classification and allocation methods Modern Evolving Nuclear Classification: Average and peak Energy allocator: All energy Demand allocator: 12 CP Classification: Equivalent peaker Energy allocator: All energy Demand allocator: Loss-of-energy expectation All hours Baseload coal Classification: Average and peak Energy allocator: All energy Demand allocator: 12 CP Probability of dispatch Hours dispatched Combined cycle Classification: Average and peak Energy allocator: All energy Demand allocator: 12 CP Probability of dispatch Hours dispatched or used for reserve Gas-fired steam Classification: Average and peak Energy allocator: On-peak energy Demand allocator: 4 CP* Probability of dispatch Hours dispatched or used for reserve Peaker Classification: 100% demand Demand allocator: 4 CP or 12 CP Probability of dispatch Hours dispatched or used for reserve Hydro Classification: Average and peak Energy allocator: All energy Demand allocator: 12 CP* Probability of dispatch Hours dispatched or used for reserve Wind Classification: 100% energy Energy allocator: All energy Classification: Equivalent peaker Energy allocator: All energy Demand allocator: Loss-of-energy expectation Hours of output Solar Classification: Average and peak Energy allocator: On-peak energy Demand allocator: 4 CP Classification: Equivalent peaker Energy allocator: All energy Demand allocator: Loss-of-energy expectation Hours of output Storage Classification: Average and peak Energy allocator: All energy Demand allocator: 12 CP Probability of dispatch Hours dispatched, used for reserve or reducing ramp rate Demand response Classification: 100% demand Demand allocator: 3 CP to 12 CP** Classification: 100% demand Hours dispatched or used for reserve Demand allocator: 3 CP to 12 CP** * Depends on use of resource ** Depends on program type and technology approach to the remaining costs. A hybrid approach is only that might be applied to the capital and nondispatch O&M as equitable as the component techniques but may be useful costs for various types of generation resources, whether where particular classification decisions can be made before utility-owned or purchased.129 This summary is, by its very the application of a generic approach to the residual costs. nature, highly simplified, ignoring many of the complexities Table 24 summarizes examples of allocation factors discussed in sections 9.1, 9.2 and 9.3. 129 The probability-of- dispatch and hourly approaches can also be applied to the short-run variable costs of the resources.
  9. Page 136 of 276

    134 | ELECTRIC COST ALLOCATION FOR A NEW ERA For simplicity, we show an illustration only for generation investment-related costs. REGULATORY ASSISTANCE PROJECT (RAP)® Table 25. Illustrative annual generation data Net generation (MWhs) Annual nonfuel revenue requirement Annual nonfuel cost per MWh Baseload 1,860,000 $74,400,000 $40 Peaker 534,000 $42,720,000 $80 Solar 1,056,000 $31,680,000 $30 where 80% of baseload costs are considered Storage 62,000 $6,200,000 $100 to be energy-related. The illustrative load Total 3,512,000 $155,000,000 $44 Table 25 shows the amount of investment in each category, which we will then divide using multiple allocation methods. Table 26 shows two currently used methods: a legacy 1 CP system measure and a more modern method, equivalent peaker, data and allocation factors are from tables 5 through 7 in Chapter 5. Table 27 shows the calculation of an hourly allocation model, where baseload costs are apportioned to all hours, peaking and intermediate costs to midpeak hours, Disposition of net generation Storage input and delivery losses Sales to customers 412,000 3,100,000 Note: Numbers may not add up to total because of rounding. and storage only to the 2% of usage at the most extreme hours. Table 26. Allocation of generation capacity costs by traditional methods Residential Secondary commercial Primary industrial Street lighting 1 CP (legacy) $51,667,000 $62,000,000 $41,333,000 $0 Equivalent peaker $50,333,000 $52,400,000 $47,750,000 $4,517,000 Total $155,000,000 $155,000,000 Note: Numbers may not add up to total because of rounding. Table 27. Modern hourly allocation of generation capacity costs Residential Secondary commercial Primary industrial Street lighting Baseload (all hours) $24,000,000 $24,000,000 $24,000,000 $2,400,000 $74,400,000 Peaker (midpeak) $14,424,000 $15,735,000 $12,326,000 $236,000 $42,720,000 Solar (daytime) $10,560,000 $12,320,000 $8,800,000 $0 $31,680,000 Storage (critical peak) $2,366,000 $2,366,000 $1,420,000 $47,000 $6,200,000 Total hourly allocation $51,350,000 $54,421,000 $46,545,000 $2,683,000 $155,000,000 33% 35% 30% 2% 100% Composite hourly factor Note: Numbers may not add up to total because of rounding. Total
  10. Page 137 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 135 10. Transmission in Embedded Cost of Service Studies A s discussed in Chapter 3, investments in transmission does not claim authority over (based on voltage, configura- lines and substations are needed and valuable for a tion, direction of power flow and other factors) is regulated wide assortment of purposes, including integrating by the state or consumer-owned utility governing body. inherently remote generation, allowing economic dispatch of If those subfunctions were classified and allocated in generation over large areas and providing backup reliability. the same manner, the division of the facilities by voltages Any particular transmission line and the substations to which would not matter. Unfortunately, some cost of service it is connected may perform multiple functions under varying studies allocate only the EHV facilities to certain customers load and generation conditions. Because the purposes for directly served from these facilities, with customers served constructing transmission and the use of the facilities vary so at subtransmission or distribution voltages being charged for widely, the allocation methods used may need to distinguish both the EHV system and the subtransmission. For example, among several categories of transmission. in 2013, Nova Scotia Power proposed to functionalize The generation-related portions of transmission 23% of transmission costs to subtransmission and excuse equipment — including switching stations, substations and from those costs the largest industrial customers, served transmission lines required to tie generators into the general at 138 kV (Nova Scotia Power, 2013b). Similarly, Manitoba transmission network and reinforcements of the transmis- Hydro functionalizes its 66-kV and 33-kV transmission lines sion system required by remote generation locations and by as subtransmission, which is allocated to all classes except economic dispatch — are often functionalized as generation. for the industrial customers served at voltages above 66 kV In regions with FERC-regulated ISOs or RTOs, state regulators may not have authority to determine the amount (Manitoba Public Utility Board, 2016). This approach is inequitable and fails to reflect of bulk transmission cost a local distribution utility must cost causality. The various voltages of transmission pay. The states may choose to allocate costs among classes in serve complementary functions. In general, customers a manner similar to that FERC uses to allocate costs among and distribution substations that are served from utilities and other parties. States also retain the authority to subtransmission would be more expensive to serve from allocate that cost using a different method than FERC uses EHV transmission. Subtransmission is a lower-cost for wholesale market allocation. alternative to EHV where the higher capacity of the EHV facilities is not required. 10.1 Subfunctionalizing Transmission As noted in Chapter 3, transmission of different voltage levels often serves similar functions. Nonetheless, some utilities have subfunctionalized transmission between extra-high-voltage (EHV) facilities (perhaps over 100 kV) and subtransmission (at lower voltages), sometimes called network transmission as it connects the different substations inside the utility service territory. Subtransmission that FERC For some systems, the subtransmission and EHV systems may seem to be serving different functions since the EHV lines may be more often networked or looped, while the subtransmission lines are often radial. This pattern is due to the higher load-carrying capacity of the EHV lines, which results in their being used in high-load backbone configurations. These lines are usually networked for greater reliability, not due to some inherent difference in the capabilities of the technologies. Higher-voltage lines
1 page match

As listed on the current system

Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Melissa Whited [26-05-10]

This filing on the current system (opens in a new tab)