    140 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® The hours of maximum transmission loads may be (6) A transmission planning region may choose to different from the hours of maximum generation stress. For use a different cost allocation method for different types example, the power lines from remote baseload units to the of transmission facilities in the regional plan, such as load centers may be most heavily loaded at moderate demand transmission facilities needed for reliability, congestion levels. At high load levels, more of the low-cost remote relief or to achieve public policy requirements established generation may be used by load closer to the generator, while by state or federal laws or regulations (Federal Energy higher-cost generation in and near the load centers increases, Regulatory Commission, 2011, ¶ 586). reducing the long-distance transmission line loading. In addition, generator maintenance does not necessarily smooth The FERC guidance clearly anticipates differential out transmission reliability risk across months in the same treatment of transmission facilities built for different way that it spreads generation shortage risk. If transmission purposes. Aligning costs with benefits may require allocation loads peak in winter, when carrying capacity is higher, then of transmission costs to most or all hours in which a transmission peaks may not match even the maximum transmission facility provides service.133 transmission stress period. Demand-related transmission costs may be allocated In its Order 1000, establishing regional transmission to hours in proportion to the usage of the lines or to the planning and cost allocation principles, FERC includes the high-load hours in which transmission capacity may be following cost allocation principles, which recognize that tight following a contingency (the failure of some part of transmission is justified by multiple drivers and that different the system) or two. The high-load hours may be chosen as allocation approaches may be justified for different types of a more or less arbitrary number of the highest hours, as in transmission facilities: Manitoba, or as the hours in which loads on a particular line (1) The cost of transmission facilities must be or substation are high enough that the worst-case planning allocated to those … that benefit from those facilities in contingency (such as the loss of two lines) would leave the a manner that is at least roughly commensurate with transmission system with no more reserve than it has on the estimated benefits. In determining the beneficiaries of system peak with no contingencies.134 transmission facilities, a regional transmission planning process may consider benefits including, but not limited to, the extent to which transmission facilities, individually or in the aggregate, provide for maintaining reliability and sharing reserves, production cost savings and congestion relief, and/or meeting public policy requirements established by state or federal laws or regulations that may drive transmission needs. … (5) The cost allocation method and data requirements for determining benefits and identifying beneficiaries for a transmission facility must be transparent with adequate documentation to allow a stakeholder to determine how they were applied to a proposed transmission facility. 133 Attributing transmission to hours is more complicated than assigning generation costs by hours, because of the flow of electricity in a network. Once a transmission line is in service, power will flow over it any time there is a voltage differential between the ends of the line, whether or not the line was in any way needed to meet load in that hour. 10.4 Summary of Transmission Allocation Methods and Illustrative Examples The discussion above has indicated why transmission investments must be carefully scrutinized in the cost allocation process. Different transmission facilities provide different services and are thus appropriately allocated by different allocation methods. Table 28 on the next page lists some types of transmission facilities and identifies appropriate methods for each. Transmission is a very difficult challenge for the cost analyst because each transmission segment may have a 134 The latter definition would require load flow modeling for each transmission line or a representative sample; the practicality of this approach will depend on the extent of transmission modeling undertaken for system planning.
  2. Page 143 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 141 Table 28. Summary of transmission classification and allocation approaches Element Example methods Comments Hourly allocation Typically above 150 kV Mostly bidirectional Operates in all hours Allocate in proportion to usage or hours needed Bulk transmission Classification: To energy* — costs to allow centralized generation and economic dispatch; cost due to heating Energy allocator: All energy Demand allocator: Highest 100 hours • • • Integration of remote generation Classification: To energy* — costs to connect remote energy resources Energy allocator: All energy Demand allocator: Highest 100 hours Treat same as connected remote resources Allocate in same manner as remote resources Economy interconnections Classification: Energy and demand Depends on purpose and use of connection • Local network Classification: To energy* — cost due to heating Energy allocator: On-peak energy Demand allocator: 4 CP to 12 CP • • Allocate in proportion to usage or hours needed Transmission substations As lines** May also have distribution functions Typically below 150 kV Mostly radial • Allocate reliability value as equivalent peaker Allocate energy value in proportion to use As lines** * “To energy” = portion classified as energy-related ** “As lines” = in proportion to the classification or allocation of the lines served by each substation different history and purpose and that purpose may have particular types of transmission costs, including purchased changed over time. For example, a line originally built transmission service from another utility, a transmission- to connect a baseload generating unit that has since owning entity or an ISO. The illustrative data for the 1 CP been retired is repurposed to facilitate economic energy and equivalent peaker methods are from tables 5 through 7 interchange with nearby utilities. In Table 29, we use in Chapter 5, and the hourly allocation factor is derived in only three methods, which may or may not be relevant to Table 27 in Chapter 9. Table 29. Illustrative allocation of transmission costs by different methods Residential Secondary commercial Primary industrial 1 CP (legacy) $16,667,000 $20,000,000 $13,333,000 $0 $50,000,000 Equivalent peaker $16,237,000 $16,903,000 $15,403,000 $1,457,000 $50,000,000 Hourly $16,565,000 $17,555,000 $15,015,000 $866,000 $50,000,000 Note: Numbers may not add up to total because of rounding. Street lighting Total
  3. Page 144 of 276

    142 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® 11. Distribution in Embedded Cost of Service Studies D istribution costs are all incurred to deliver energy system (a primary line, a line transformer or a to customers and are primarily investment-related secondary line or network). costs that do not vary in response to load in the • Meters, which measure each customer’s energy short term. Different rate analysts approach these costs in use by month, TOU period or hour and sometimes very different ways. These costs are often divided into two by maximum demand in the month.135 Advanced categories. meters can also provide other capabilities, including 1. Shared distribution, which typically includes at least: measurement of voltage, remote sensing of outages, • and remote connection and disconnection.136 Distribution substations, both those that step power down from transmission voltages to distribution can be directly assigned to the corresponding rate distribution voltage (such as 25 kV) to a lower voltage classes. to other substations and to customer premises, serving only one customer. monitoring equipment. • 2. In some systems with low customer spatial density, a significant portion of primary lines and transformers underground conduit) and various control and • • Primary feeders, which run from the substations including the conductors, supports (poles and • Street lighting and signal equipment, which usually voltages and those that step it down from a higher (such as 12 kV). • • 11.1 Subfunctionalizing Distribution Costs Most line transformers, which step the primary One important issue in cost allocation is the deter- voltage down to secondary voltages (under 600 V, mination of the portion of distribution cost that is related and mostly in the 120 V and 240 V ranges) for use by to primary service (the costs of which are allocated to all customers. customers, except those served at transmission voltage) as A large portion of the secondary distribution lines, opposed to secondary service (the costs of which are borne which run from the line transformers to customer solely by the secondary voltage customers — residential, service lines or drops. some C&I customers, street lighting, etc.). The supervisory control and data acquisition Some plant accounts and associated expenses are equipment that monitors the system operation and easily subfunctionalized. Substations (which are all primary records system data. This is a network of sensors, equipment) have their own FERC accounts (plant accounts communication devices, computers, software and 360 to 362, expense accounts 582 and 592). In addition, typically a central control center. distribution substations take power from transmission lines Customer-specific costs, which include: and feed it into the distribution system at primary voltage. • Service drops connecting a customer (or multiple All distribution substations deliver only primary power and customers in a building) to the common distribution therefore should be subfunctionalized as 100% primary. 135 The Uniform System of Accounts treats meters as distribution plant and the costs of keeping the meters operable as distribution expenses, even though all other metering and billing costs are treated as customer accounts or A&G plant or expenses. Traditional meters that tally only customer usage are not really necessary for the operation of the distribution system, only for the billing function. As a result, references to meters in this chapter are quite limited, and the costs of meters are discussed with meter reading and billing in the next chapter. 136 These capabilities require additional supporting technology, some of which is also required to provide remote meter reading. These costs should be spread among a variety of functions, including distribution and retail services, as discussed in Section 11.5.
  4. Page 145 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® However, many other types of distribution investments ELECTRIC COST ALLOCATION FOR A NEW ERA | 143 and the breadth of the cross arms, again due to primary pose more difficult questions. The FERC accounts do not lines).138 Equipment used in holding secondary lines has a differentiate lines, poles or conduit between primary and very low cost compared with those used for primary lines. If secondary equipment, and many utilities do not keep records the poles currently used for both secondary and primary lines of distribution plant cost by voltage level. This means any had been designed without secondary lines, the reduction in subfunctionalization requires some sort of special analysis, costs would be very small. Thus, the costs of the joint poles such as the review of the cost makeup of distribution in areas are essentially all due to primary distribution. constituting a representative sample of the system. Although nearly all poles carry primary lines, a utility Traditionally, most cost of service studies have function- sometimes will use a pole just to carry secondary lines, such alized a portion of distribution poles as secondary plant, to be as to reach from the last transformer on a street to the last allocated only to classes taking service at secondary voltage. house, or to carry a secondary line across a wide road to serve This approach is based on misconceptions regarding the joint a few customers on the far side. Secondary-only poles are and complementary nature of various types of poles. Although usually shorter and skinnier and thus less expensive than distribution poles come in all sorts of sizes and configurations, primary poles and do not require cross arms and other pri- the important distinction for functionalization is what sorts of mary equipment. Some cost of service studies functionalize a lines the poles carry: only primary, both primary and second- portion of pole costs to secondary, based on the population of ary or only secondary. The proper functionalization of the secondary-only poles (either from an actual inventory or an first category — poles that carry only primary lines — is not estimate) or of short poles (less than 35 feet, for example), on controversial; they are required for all distribution load, the the theory that these short poles must carry secondary. sum of load served at primary and the load for which power is subsequently stepped down to secondary.137 For the second category — poles carrying both primary The assumption that all short poles carry secondary is not correct; some utility poles carry no conductor but rather are stubs used to counterbalance the stresses on heavily and secondary lines — some cost of service studies have loaded (mostly primary) poles, as illustrated in Figure 39 on treated a portion of the pole cost as being due to all distribu- the next page. Depending on the nature of the distribution tion load and the remainder as being due to secondary loads, system and the utility’s design standards, the number of stub to be allocated only to classes served at secondary voltage. poles may rival the number of secondary-only poles. There is no cost basis for allocating any appreciable portion of Where only secondary lines are needed, the utility these joint poles to secondary. The incremental pole cost for typically saves on pole costs due to the customer taking sec- adding secondary lines to a pole carrying primary is generally ondary service, rather than requiring primary voltage service negligible. The height of the pole is determined by the voltage and a bigger pole. Some kind of pole would be needed in that of the primary circuits it carries, the number of primary location regardless of the voltage level of service. Hence, the phases and circuits and the local topography. Much of the primary customers are better off paying for their share of the equipment on the poles (cross arms, insulators, switches and secondary poles than if the customers using those poles were other monitoring and control equipment) is used only for the to require primary service. It does not seem fair to penalize primary lines. The required strength of the pole (determined customers served at secondary for the fact that the utility is by the diameter and material) is determined by the weight of able to serve some of them using a type of pole that is less the lines and equipment and by the leverage exerted by that expensive than the poles required for primary service. weight (which increases with the height of the equipment As a result, the vast majority of pole costs (other than for 137 The class loads should be measured at primary voltage, including losses, which will be higher for power metered at secondary. may require a stronger pole, which would be a secondary distribution cost. A highly detailed analysis of pole subfunctionalization might thus result in a portion of the cost of those few poles being treated as an extra cost of secondary service, offset to some extent by the savings from some poles being designed to carry only secondary lines. 138 There is one situation in which secondary distribution can add to the cost of poles. A very large pole-mounted transformer (perhaps over 75 kVA)
  5. Page 146 of 276

    144 | ELECTRIC COST ALLOCATION FOR A NEW ERA Figure 39. Stub pole used to guy a primary pole REGULATORY ASSISTANCE PROJECT (RAP)® larger and additional primary conductors) and increasing primary distribution line capacity. Capacitors can be functionalized as some mix of generation, transmission Insulator and primary distribution; in any case they should be functionalized separately from line transformers. Overhead and underground conductors as well as conduit must be subfunctionalized between primary and secondary using special studies of the composition of the utility’s distribution system, since secondary conductors are mostly incremental to primary lines. Estimates of the percentage of these investments that are secondary equipment typically range from 20% to 40%. Within the primary conductor category, utilities use dedicated poles directly assigned to street lighting or similar three-phase feeders for areas with high loads and single-phase services) generally should be treated as serving all distri- (or occasionally two-phase) feeders in areas with lower loads. bution customers.139 For many cost of service studies, that The additional phases (and hence additional conductors) are would result in the costs being subfunctionalized as primary due to load levels and the use of equipment that specifically distribution, which is then allocated to classes in proportion requires three-phase supply (such as some large motors), to their contribution to demand at the primary voltage level. which is one reason that primary distribution is overwhelm- Line transformers dominate two FERC accounts (plant ingly load-related and should be so treated in classification. account 368 and expense account 595), but those accounts Some utilities subfunctionalize single- and three-phase also include the costs of capacitors and voltage regulators. conductors, treating the single-phase lines as incremental These three types of equipment should be subfunctionalized to the three-phase lines (see, for example, Peppin, 2013, in three different manners: pp. 25-26). Classes that use a lot of single-phase lines are • Secondary line transformers (which compose the bulk of allocated both the average cost of the three-phase lines and these accounts) are needed only for customers served at the average cost of the single-phase lines. This treatment secondary voltage and thus can be subfunctionalized as of single-phase service as being more expensive than three- 100% secondary. phase service gets it backward. If load of a single-phase Voltage regulators are devices on the primary system customer or area changed in a manner that required three- that adjust voltage levels along the feeder to keep phase service, the utility’s costs would increase; if anything, delivered voltage within the design range. The number classes disproportionally served with single-phase primary and capacity of voltage regulators is determined by should be assigned lower costs than those requiring three- the distribution of load along the feeder, regardless of phase service. The classification of primary conductor as whether that load is served at primary or secondary. load-related will allocate more of the three-phase costs to the The regulator costs should be subfunctionalized as classes whose loads require that equipment. • primary distribution and classified in the same manner as substations and primary conductors. • Capacitors improve the power factor on distribution lines at primary voltage, thus reducing line losses (reducing generation, transmission and distribution costs), reducing voltage drop (avoiding the need for 139 As noted above, some utilities may be able to attribute some upgrades in pole class to line transformers; that increment is appropriately functionalized to secondary service. On the other hand, the secondary classes may be due a small credit to reflect the fact that they allow the use of some less expensive poles.
  6. Page 147 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® 11.2 Distribution Classification The classification of distribution infrastructure has been one of the most controversial elements of ELECTRIC COST ALLOCATION FOR A NEW ERA | 145 Newly evolving methods can fairly allocate a substantial portion of distribution costs on an energy basis. utility cost allocation for more than a half-century. Bonbright devoted an entire section to a discussion of why The basic customer method for classification counts none of the methods then commonly used was defensible only customer-specific plant as customer-related and the (1961, pp. 347-368). In any case, traditional methods have entire shared distribution network as demand- or energy- divided up distribution costs as either demand-related or related. For relatively dense service territories, in cities customer-related, but newly evolving methods can fairly and suburbs, this would be only the traditional meter and allocate a substantial portion of these costs on an energy basis. a portion of service drop costs.140 For very thinly settled Distribution equipment can be usefully divided into territories, particularly rural cooperatives, customer-specific three groups: plant may include some portion of transformer costs and • Shared distribution plant, in which each item serves the percentage of the primary system that consists of line multiple customers, including substations and almost all extensions to individual customers. Many jurisdictions have spans of primary lines. mandated or accepted the basic customer classification Customer-related distribution plant that serves only one approach, sometimes including a portion of transformers in customer, particularly traditional meters used solely for the customer cost. These jurisdictions include Arkansas,141 billing. California,142 Colorado,143 Illinois,144 Iowa,145 Massachusetts,146 A group of equipment that may serve one customer Texas147 and Washington.148 • • in some cases or many customers in others, including transformers, secondary lines and service drops. 140 Alternatively, all service drops may be treated as customer-related and the sharing of service drops can be reflected in the allocation factor. As discussed in Section 5.2, treating multifamily housing as a separate class facilitates crediting those customers with the savings from shared service drops, among other factors. 141 The Arkansas Public Service Commission found that “accounts 364-368 should be allocated to the customer classes using a 100% demand methodology and … that [large industrial consumer parties] do not provide sufficient evidence to warrant a determination that these accounts reflect a customer component necessary for allocation purposes” (2013, p. 126). 142 California classifies all lines (accounts 364 through 367) as demandrelated for the calculation of marginal costs, while classifying transformers (Account 368) as customer-related with different costs per customer for each customer class, reflecting the demands of the various classes. 143 In 2018, the state utility commission affirmed a decision by an administrative law judge that rejected the zero-intercept approach and classified FERC accounts 364 through 368 as 100% demand-related (Colorado Public Utilities Commission, 2018, p. 16). 144 “As it has in the past, … the [Illinois Commerce] Commission rejects the minimum distribution or zero-intercept approach for purposes of allocating distribution costs between the customer and demand functions in this case. In our view, the coincident peak method is consistent with the fact that distribution systems are designed primarily to serve electric demand. The Commission believes that attempts to separate the costs of connecting customers to the electric distribution system from the The basic customer method for classification is by far the most equitable solution for the vast majority of utilities. costs of serving their demand remain problematic” (Illinois Commerce Commission, 2008, p. 208). 145 According to 199 Iowa Administrative Code 20.10(2)e, “customer cost component estimates or allocations shall include only costs of the distribution system from and including transformers, meters and associated customer service expenses.” This means that all of accounts 364 through 367 are demand-related. Under this provision, the Iowa Utilities Board classifies the cost of 10 kVA per transformer as customer-related but reduces the cost that is assigned to residential and small commercial customers to reflect the sharing of transformers by multiple customers. 146 “Plant items classified as customer costs included only meters, a portion of services, street lighting plant, and a portion of labor-related general plant” (La Capra, 1992, p. 15). See also Gorman, 2018, pp. 13-15. 147 Texas has explicitly adopted the basic customer approach for the purposes of rate design: “Specifically, the customer charge shall be comprised of costs that vary by customer such as metering, billing and customer service” (Public Utility Commission of Texas, 2000, pp. 5-6). But it has followed this rule in practice for cost allocation as well. 148 “The Commission finds that the Basic Customer method represents a reasonable approach. This method should be used to analyze distribution costs, regardless of the presence or absence of a decoupling mechanism. We agree with Commission Staff that proponents of the Minimum System approach have once again failed to answer criticisms that have led us to reject this approach in the past. We direct the parties not to propose the Minimum System approach in the future unless technological changes in the utility industry emerge, justifying revised proposals” (Washington Utilities and Transportation Commission, 1993, p. 11).
  7. Page 148 of 276

    146 | ELECTRIC COST ALLOCATION FOR A NEW ERA For certain rural utilities, this may be reasonable under the REGULATORY ASSISTANCE PROJECT (RAP)® 1. Much of the cost of a distribution system is required to conceptual view that the size of distribution components cover an area and is not sensitive to either load or cus- (e.g., the diameter of conductors or the capacity of trans- tomer number. The distribution system is built to cover formers) is load-related, but the number and length of some an area because the total load that the utility expects to types of equipment is customer-related. In some rural service serve will justify the expansion into that area. Serving territories, the basic customer cost may require nearly a mile many customers in one multifamily building is no more of distribution line along the public way as essentially an expensive than serving one commercial customer of the extended service drop. same size, other than metering. The shared distribution However, more general attempts by utilities to include cost of serving a geographical area for a given load is a far greater portion of shared distribution system costs as roughly the same whether that load is from concentrated customer-related are frequently unfair and wholly unjustified. commercial or dispersed residential customers along a These methods include straight fixed/variable approaches circuit of equivalent length and hence does not vary with where all distribution costs are treated as customer-related customer number.149 Bonbright found that there is “a very (analogous to the misuse of the concept of fixed costs in weak correlation between the area (or the mileage) of a classifying generation discussed in Section 9.1) and the more distribution system and the number of customers served nuanced minimum system and zero-intercept approaches by the system.” He concluded that “the inclusion of the included in the 1992 NARUC cost allocation manual. costs of a minimum-sized distribution system among the customer-related costs seems … clearly indefensible. The minimum system method attempts to calculate the cost (in constant dollars) if the utility’s installed units [Cost analysts are] under impelling pressure to fudge their (transformers, poles, feet of conductors, etc.) were each the cost apportionments by using the category of customer minimum-sized unit of that type of equipment that would costs as a dumping ground” (1961, p. 348). ever be used on the system. The analysis asks: How much 2. The minimum system approach erroneously assumes would it have cost to install the same number of units (poles, that the minimum system would consist of the feet of conductors, transformers) but with the size of the same number of units (e.g., number of poles, feet of units installed limited to the current minimum unit normally conductors) as the actual system. In reality, load levels installed? This minimum system cost is then designated help determine the number of units as well as their size. as customer-related, and the remaining system cost is Utilities build an additional feeder along the route of designated as demand-related. The ratio of the costs of the an existing feeder (or even on the same poles); loop a minimum system to the actual system (in the same year’s second feeder to the end of an existing line to pick up dollars) produces a percentage of plant that is claimed to be some load from the existing line; build an additional customer-related. feeder in parallel with an existing feeder to pick up the This minimum system analysis does not provide load of some of its branches; and upgrade feeders from a reliable basis for classifying distribution investment single-phase to three-phase. As secondary load grows, the and vastly overstates the portion of distribution that is utility typically will add transformers, splitting smaller customer-related. Specifically, it is unrealistic to suppose customers among the existing and new transformers.150 that the mileage of the shared distribution system and the Some other feeder construction is designed to improve number of physical units are customer-related and that only reliability (e.g., to interconnect feeders with automatic the size of the components is demand-related, for at least switching to reduce the number of customers affected by eight reasons. outages and outage duration). 149 As noted above, for some rural utilities, particularly cooperatives that extend distribution without requiring that the extension be profitable, a portion of the distribution system may effectively be customer-specific. 150 Adding transformers also reduces the length of the secondary lines from the transformers to the customers, reducing losses, voltage drop or the required gauge of the secondary lines.
  8. Page 149 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® 3. 6. 147 costs. And the shared distribution investment on a block well. When load increases, electric distribution systems with four large customers is essentially the same as for are often relocated from overhead to underground a block with 20 small customers with the same load (which is more expensive) because the weight of lines characteristics. If an additional service is added into an required to meet load makes overhead service infeasible. existing street with electrical service, there is usually Voltages may also be increased to carry more load, no need to add poles, and it would not be reasonable to requiring early replacement of some equipment with assume any pole savings if the number of customers had more expensive equipment (e.g., new transformers, been half the actual number. 7. Most utilities limit the investment they will make for low higher voltage or additional circuits). Thus, a portion of projected sales levels, as we also discuss in Section 15.2, the extra costs of moving equipment underground or of where we address the relationship between the utility newer equipment may be driven in part by load. line extension policy and the utility cost allocation The “minimum system” would still meet a large methodology. The prospect of adding revenues from a few portion of the average residential customer’s demand commercial customers may induce the utility to spend requirements. Using a minimum system approach much more on extending the distribution system than it requires reducing the demand measure for each class would invest for dozens of residential customers. or otherwise crediting the classes with many customers 5. | Load can determine the type of equipment installed as increased insulation, higher poles to accommodate 4. ELECTRIC COST ALLOCATION FOR A NEW ERA 8. Not all of the distribution system is embedded in rates, for the load-carrying capability of the minimum system since some customers pay for the extension of the (Sterzinger, 1981, pp. 30-32). system with contributions in aid of construction, as Minimum system analyses tend to use the current discussed in Section 15.2. Factoring in the entire length minimum-sized unit typically installed, not the of the system, including the part paid for with these minimum size ever installed or available. The current contributions, overstates the customer component of minimum unit is sized to carry expected demand ratepayer-funded lines. for a large percentage of customers or situations. Thus, the frequent assumption that the number of As demand has risen over time, so has the minimum feet of conductors and the number of secondary service size of equipment installed. In fact, utilities usually lines is related to customer number is unrealistic. A piece stop stocking some less expensive small equipment of equipment (e.g., conductor, pole, service drop or meter) because rising demand results in very rare use of the should be considered customer-related only if the removal small equipment and the cost of maintaining stock is no of one customer eliminates the need for the unit. The longer warranted.151 However, the transformer industry number of meters and, in most cases, service drops is could produce truly minimum-sized utility transformers, customer-related, while feet of conductors and number the size of those used for cellular telephone chargers, of poles are almost entirely load-related. Reducing the if there were a demand for these. number of customers, without reducing area load, will only Adding customers without adding peak demand or rarely affect the length of lines or the number of poles or serving new areas does not require any additional poles transformers. For example, removing one customer will avoid or conductors. For example, dividing an existing home into two dwelling units increases the customer count but likely adds nothing in utility investment other than a second meter. Converting an office building from one large tenant to a dozen small offices similarly increases customer number without increasing shared distribution 151 For example, in many cases, utilities that make an allocation based on a minimum system use 10-kVA transformers, even though they installed 3-kVA or 5-kVA transformers in the past. Some utilities also have used conductor sizes and costs significantly higher than the actual minimum conductor size and cost on their systems.
  9. Page 150 of 276

    148 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® overhead distribution equipment only under several unusual substations and line transformers) and hence the life of circumstances.152 These circumstances represent a very small the equipment. A transformer that is very heavily loaded part of the shared distribution cost for the typical urban or for a couple of hours a year and lightly loaded in other suburban utility, particularly since many of the most remote hours may last 40 years or more until the enclosure rusts customers for these utilities might be charged a contribution away. A similar transformer subjected to the same annual in aid of construction. These circumstances may be more peaks, but also to many smaller overloads in each year, prevalent for rural utilities, principally cooperatives. may burn out in 20 years. The related zero-intercept method attempts to extrapolate • All energy in high-load hours, and even all hours on from the cost of actual equipment (including actual minimum- high-load days, adds to heat buildup and results in sized equipment) to the cost of hypothetical equipment that sagging overhead lines, which often defines the thermal carries zero load. The zero-intercept method usually involves limit on lines; aging of insulation in underground lines statistical regression analysis to decompose the costs of and transformers; and a reduction the ability of lines and distribution equipment into customer-related costs and costs transformers to survive brief load spikes on the same day. that vary with load or size of the equipment, although some • Line losses depend on load in every hour (marginal utilities use labor installation costs with no equipment. The line losses due to another kWh of load greatly exceed idea is that this procedure identifies the amount of equipment the average loss percentage in that hour, and losses at required to connect existing customers that is not load-related peak loads dramatically exceed average losses).153 To the (a zero-kVA transformer, a zero-ampere conductor or a pole extent that a utility converts a distribution line from that is zero feet high). The zero-intercept regression analysis is single-phase to three-phase, selects a larger conductor or so abstract that it can produce a wide range of results, which increases primary voltage to reduce losses, the costs are vary depending on arcane statistical methods and the choice of primarily energy-related. types of equipment to include or exclude from an equation. • Customers with a remote need for power only a few As a result, the zero-intercept method is even less realistic than hours per year, such as construction sites or temporary the minimum system method. businesses like Christmas tree lots, will often find The best practice is to determine customer-related costs non-utility solutions to be more economical. But when using the basic customer method, then use more advanced those same types of loads are located along existing techniques to split the remainder of shared distribution distribution lines, they typically connect to utility service system costs as energy-related and demand-related. Energy if the utility’s connection charges are reasonable. use, especially in high-load hours and in off-peak hours on A portion of distribution costs can thus be classified to high-load days, affects distribution investment and outage energy, or the demand allocation factor can be modified to costs in the following ways: reflect energy effects. • • The fundamental reason for building distribution The average-and-peak method, discussed in Section 9.1 systems is to deliver energy to customers, not simply to in the context of generation classification, is commonly used connect them to the grid. by natural gas utilities to classify distribution mains and other The number and extent of overloads determines the life shared distribution plant.154 This approach recognizes that of the insulation on lines and in transformers (in both a portion of shared distribution would be needed even if all 152 These circumstances are: (1) if the customer would have been the farthest one from the transformer along a span of secondary conductor that is not a service drop; (2) if the customer is the only one served off the last pole at the end of a radial primary feeder, a pole and a span of secondary, or a span of primary and a transformer; and (3) if several poles are required solely for that customer. 153 For a detailed analysis of the measurement and valuation of marginal line losses, see Lazar and Baldwin (2011). 154 See Gas Distribution Rate Design Manual from the National Association of Regulatory Utility Commissioners (1989, pp. 27-28) as well as more recent orders from the Minnesota Public Utilities Commission describing the range of states that use basic customer and average-and-peak methods for natural gas cost allocation (2016, pp. 53-54) and the Michigan Public Service Commission affirming the usage of the average-and-peak method (2017, pp. 113-114).
  10. Page 151 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 149 customers used power at a 100% load factor, while other costs costs over $850 and charges actual costs for extensions are incurred to upsize the system to meet local peak demands. over 1,000 feet (Minnesota Power, 2013, p. 6). Xcel The same approach may have a place in electric distribution Energy’s Colorado subsidiary gives on-site construction system classification and allocation, with something over allowances of $1,659 for residential customers, $2,486 half the basic infrastructure (poles, conductors, conduit and for small commercial, $735 per kW for other secondary transformers) classified to energy to reflect the importance of nonresidential and $680 per kW for primary customers energy use in justifying system coverage and the remainder to (Public Service Company of Colorado, 2018, Sheet R226). demand to reflect the higher cost of sizing equipment to serve The company describes these allowances as “based on a load that isn’t uniform. two and three-quarters (2.75) times estimated annual Nearly every electric utility has a line extension policy non-fuel revenue” — a simplified version of the revenue approach.156 that dictates the circumstances under which the utility or a new customer must pay for an extension of service. Most of • The credit is determined by distance. Xcel Energy’s these provide only a very small investment by the utility in Minnesota subsidiary includes the first 100 feet of line shared facilities such as circuits, if expected customer usage is extension for a residential customer into rate base, with very small, but much larger utility investment for large added the customer bearing the cost for any excess length load. Various utilities compute the allowance for line exten- (Northern States Power Co.-Minnesota, 2010, Sheet sions in different ways, which are usually a variant of one of 6-23). Green Mountain Power applies a credit equal to the following approaches: the cost of 100 feet of overhead service drop but no costs • The credit equals a multiple of revenue. For example, for poles or other equipment (Green Mountain Power, Otter Tail Power Co. in Minnesota will invest up to 2016, Sheet 148). The portion of the line extensions paid three times the expected annual revenue, with the by the utility might be thought of as customer-related, customer bearing any excess (Otter Tail Power Co., 2017, with some caveats. First, the amount of the distribution Section 5.04). Xcel Energy’s Minnesota subsidiary uses system that was built out under this provision is almost 3.5 times expected annual revenue for nonresidential certainly much less than 100 feet times the number of customers (Northern States Power Co.-Minnesota, 2010, residential customers. Second, these allowances are often Sheet 6-23). Other utilities base their credits on expected determined as a function of expected revenue, as in the nonfuel revenue or the distribution portion of the tariff; Xcel Colorado example, and thus are usage-related. on different periods of revenue; and on either simple If the line extension investment is tied to revenue total revenue or present value of revenue.155 These are (and most revenue is associated with usage-related costs, clearly usage-related allowances that, in turn, determine such as fuel, purchased power, generation, transmission how much cost for distribution circuits is reflected in and substations), then the resulting investment should be the utility revenue requirement. Applying this logic, all classified and allocated on a usage basis. The cost of service shared distribution plant should thus be classified as study should ensure that the costs customers prepay are usage-related, and none of the shared distribution system netted out (including not just the costs but the footage of should be customer-related. lines or excess costs of poles and transformers if a minimum The credit is the actual extension cost, capped at a fixed system method is used) before classifying any distribution value. For example, Minnesota Power pays up to $850 costs as customer-related. • for the cost of extending lines, charges $12 per foot for 155 California sets electric line extension allowances at expected net distribution revenue divided by a cost of service factor of roughly 16% (California Public Utilities Commission, 2007, pp. 8-9). 156 The company also has the option of applying the 2.75 multiple directly (Public Service Company of Colorado, 2018, Sheet R212).