  1. Page 151 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 149 customers used power at a 100% load factor, while other costs costs over $850 and charges actual costs for extensions are incurred to upsize the system to meet local peak demands. over 1,000 feet (Minnesota Power, 2013, p. 6). Xcel The same approach may have a place in electric distribution Energy’s Colorado subsidiary gives on-site construction system classification and allocation, with something over allowances of $1,659 for residential customers, $2,486 half the basic infrastructure (poles, conductors, conduit and for small commercial, $735 per kW for other secondary transformers) classified to energy to reflect the importance of nonresidential and $680 per kW for primary customers energy use in justifying system coverage and the remainder to (Public Service Company of Colorado, 2018, Sheet R226). demand to reflect the higher cost of sizing equipment to serve The company describes these allowances as “based on a load that isn’t uniform. two and three-quarters (2.75) times estimated annual Nearly every electric utility has a line extension policy non-fuel revenue” — a simplified version of the revenue approach.156 that dictates the circumstances under which the utility or a new customer must pay for an extension of service. Most of • The credit is determined by distance. Xcel Energy’s these provide only a very small investment by the utility in Minnesota subsidiary includes the first 100 feet of line shared facilities such as circuits, if expected customer usage is extension for a residential customer into rate base, with very small, but much larger utility investment for large added the customer bearing the cost for any excess length load. Various utilities compute the allowance for line exten- (Northern States Power Co.-Minnesota, 2010, Sheet sions in different ways, which are usually a variant of one of 6-23). Green Mountain Power applies a credit equal to the following approaches: the cost of 100 feet of overhead service drop but no costs • The credit equals a multiple of revenue. For example, for poles or other equipment (Green Mountain Power, Otter Tail Power Co. in Minnesota will invest up to 2016, Sheet 148). The portion of the line extensions paid three times the expected annual revenue, with the by the utility might be thought of as customer-related, customer bearing any excess (Otter Tail Power Co., 2017, with some caveats. First, the amount of the distribution Section 5.04). Xcel Energy’s Minnesota subsidiary uses system that was built out under this provision is almost 3.5 times expected annual revenue for nonresidential certainly much less than 100 feet times the number of customers (Northern States Power Co.-Minnesota, 2010, residential customers. Second, these allowances are often Sheet 6-23). Other utilities base their credits on expected determined as a function of expected revenue, as in the nonfuel revenue or the distribution portion of the tariff; Xcel Colorado example, and thus are usage-related. on different periods of revenue; and on either simple If the line extension investment is tied to revenue total revenue or present value of revenue.155 These are (and most revenue is associated with usage-related costs, clearly usage-related allowances that, in turn, determine such as fuel, purchased power, generation, transmission how much cost for distribution circuits is reflected in and substations), then the resulting investment should be the utility revenue requirement. Applying this logic, all classified and allocated on a usage basis. The cost of service shared distribution plant should thus be classified as study should ensure that the costs customers prepay are usage-related, and none of the shared distribution system netted out (including not just the costs but the footage of should be customer-related. lines or excess costs of poles and transformers if a minimum The credit is the actual extension cost, capped at a fixed system method is used) before classifying any distribution value. For example, Minnesota Power pays up to $850 costs as customer-related. • for the cost of extending lines, charges $12 per foot for 155 California sets electric line extension allowances at expected net distribution revenue divided by a cost of service factor of roughly 16% (California Public Utilities Commission, 2007, pp. 8-9). 156 The company also has the option of applying the 2.75 multiple directly (Public Service Company of Colorado, 2018, Sheet R212).
  2. Page 152 of 276

    150 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Figure 40. San Diego Gas & Electric circuit peaks Percentage of circuits experiencing peak 20% 20 15% 12 10% 9 9 11 10 9 7 5% 0% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Hour of day Source: Fang, C. (2017, January 20). Direct testimony on behalf of San Diego Gas & Electric. California Public Utilities Commission Application No. 17-01-020 11.3 Distribution Demand Allocators In any traditional study, a significant portion of distribution plant is classified as demand-related. A newer hourly allocation method may omit this step, assigning distribution costs to all hours when the asset (or a portion of the cost of the asset) is required for service. For demand-related costs, class NCP is commonly, but often inappropriately, used for allocation. This allocator would be appropriate if each component overwhelmingly served a single class, if the equipment peaks occurred roughly at the time of the class peak, and if the sizing of distribution equipment were due solely to load in a single hour. But to the contrary, most substations and many feeders serve several tariffs, in different classes, and many tariff codes.157 11.3.1 Primary Distribution Allocators Customers in a single class, in different areas and served by different substations and feeders, may experience peak loads at different times. Figure 40 shows the hours when each of San Diego Gas & Electric’s distribution circuits experienced peak loads (Fang, 2017, p. 21). The peaks are clustered between the early afternoon (on circuits that are mostly commercial) and the early evening (mostly residential), while other circuits experience their peaks at a wide variety of hours. Figure 41 on the next page shows the distribution of substation peaks for Delmarva Power & Light over a period of one year (Delmarva Power & Light, 2016). The area of each bubble is proportional to the peak load on the station. Clearly, no one peak hour (or even a combination of monthly peaks) is representative of the class contribution to substation peaks. The peaks for substations, lines and other distribution equipment do not necessarily align with the class NCPs. Indeed, even if all the major classes are summer peaking, some of the substations and feeders may be winter peaking, and vice versa. Even within a season, substation and feeder peaks will be distributed to many hours and days. Although load levels drive distribution costs, the maximum load on each piece of equipment is not the only important load. As explained in Subsection 5.1.3, increased 157 Some utilities design their substations so that each feeder is fed by a single transformer, rather than all the feeders being served by all the transformers at the substation. In those cases, the relevant loads (for timing and class mix) are at the transformer level, rather than the entire substation.
  3. Page 153 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 151 Figure 41. Month and hour of Delmarva Power & Light substation peaks in 2014 24 Substation peak. Size of circle is proportional to peak load 22 20 18 Hour of day 16 14 12 10 8 6 4 2 r r be D ec em N ov em be er O ct ob Se p te m be r us t Au g ly Ju Ju ne ay M ril Ap ar ch M y ar ru Fe b Ja nu ar y 0 Source: Delmarva Power & Light. (2016, August 15). Response to the Office of the People’s Counsel data request 5-11, Attachment D. Maryland Public Service Commission Case No. 9424 energy use, especially at high-load hours and prior to those contributes to the potential for overloads. That allocation hours, can also affect the sizing and service life of transform- could be constructed by assigning costs to hours or by ers and underground lines, which is thus driven by the energy constructing a special demand allocator for each category of use on the equipment in high-load periods, not just the distribution equipment. If a detailed allocation is too com- maximum demand hour. The peak hourly capacity of a line plex, the allocators for costs should still reflect the underlying or transformer depends on how hot the equipment is prior reality that distribution costs are driven by load in many to the peak load, which depends in turn on the load factor hours. in the days leading up to the peak and how many high-load The resulting allocator should reflect the variety hours occur prior to the peak. More frequent events of load of seasons and times at which the load on this type of approaching the equipment capacity, longer peaks and hotter equipment experiences peaks. In addition, the allocator equipment going into the peak period all contribute to faster should reflect the near-peak and prepeak loads that insulation deterioration and cumulative line sag, increasing contribute to overheating and aging of equipment. Selecting the probability of failure and accelerating aging. the important hours for distribution loads and the weight to Ideally, the allocators for each distribution plant type should reflect the contribution of each class to the hours when load on the substation, feeder or transformer be given to the prepeak loads may require some judgments. Class NCP allocators do not serve this function. Rocky Mountain Power allocates primary distribution
  4. Page 154 of 276

    152 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® on monthly coincident distribution peak, weighted by the high-load period for the equipment, the class contribution to percentage of substations peaking in each month (Steward, coincident peak or possibly class NCP, but only if that NCP 2014, p. 7). Under this weighting scheme, for example: is computed with respect to the peak load of the customers • A small substation has as much effect on a month’s weight- sharing the equipment. Although most substations and ing factor as a large substation. The month with the largest feeders serving industrial and commercial customers will number of large substations seriously overloaded could be also serve some residential customers, and most residential the highest-cost month yet may not receive the highest substations and feeders will have some commercial load, weight since each substation is weighted equally. some percentage of distribution facilities serve a single class. • The month’s contribution to distribution demand costs The NCP approximation is not a reasonable approxima- is assumed to occur entirely at the hour of the monthly tion for finer disaggregation of class loads. For example, there distribution peak, even though most of the substation are many residential areas that contain a mix of single-family capacity that peaks in the month may have peaked in a and multifamily housing and homes with and without variety of different hours. electric space heating, electric water heating and solar panels. A month would receive a weight of 100% whether each The primary distribution plant in those areas must be sized substation’s maximum load was only 1 kVA more than for the combined load in coincident peak periods, which its maximum in every other month or four times its may be the late afternoon summer cooling peak, the evening maximum in every other month. winter heating and lighting peak or some other time — but it This approach could be improved by reflecting the capac- will be the same time for all the customers in the area.158 ity of the substations, the actual timing of the peak hours and Many utilities have multiple tariffs or tariff codes for • the number of near-peak hours of each substation in each residential customers (e.g., heating, water heating, all-electric month. The hourly loads might be weighted by the square and solar; single-family, multifamily and public housing; or some other power of load or by using a peak capacity low-income and standard), for commercial customers (small, allocation factor for the substation, to reflect the fact that the medium and large; primary and secondary voltage; schools, contribution to line losses and equipment life falls rapidly as dormitories, churches and other customer types) and for load falls below peak. various types of industrial customers, in addition to street Many utilities will need to develop additional infor- lighting and other services. In most cases, those subclasses mation on system loads for cost allocation, as well as for will be mixed together, resulting in customers with gas and planning, operational and rate design purposes. Specifically, electric space heat, gas and electric water heat, and with and utilities should aim to understand when each feeder and without solar in the same block, along with street lights. The substation reaches its maximum loads and the mix of rate substation and feeder will be sized for the combined load, not classes on each feeder and distribution substation. for the combined peak load of just the electric heat customers In the absence of detailed data on the loads on line transformers, feeders and substations, utilities will be limited to cruder aggregate load data. For primary equipment, the best available proxy may be the class energy usage in the expected 158 Distribution conductors and transformers have greater capacity in winter (when heat is removed quickly) than in summer; even if winter peak loads are higher, the sizing of some facilities may be driven by summer loads. 159 The division of the residential class into subclasses for calculation of the class NCP has been an issue in several recent Texas cases. In Docket No. 43695, at the recommendation of the Office of Public Utility Counsel, the Public Utility Commission of Texas reversed its former method for Southwestern Public Service to use the NCP for a single residential or the combined peak of the customers with solar panels159 or the street lighting peak. Unless there is strong geographical differentiation of the subclasses, any NCP allocator should be computed for the class (instead of separate subclasses for residential customers with and without electric heat), which reduced the costs allocated to residential customers as a whole (Public Utility Commission of Texas, 2015, pp. 12-13 and findings of fact 277A, 277B and 339A). The issue was also raised in dockets 44941 and 46831 involving El Paso Electric Co. El Paso Electric proposed separate NCP allocations for residential customers with and without solar generation, which the Office of Public Utility Counsel and solar generator representatives opposed. Both of these cases were settled and did not create a precedent.
  5. Page 155 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 153 combined load of the customer classes, with the customer for secondary lines and transformers, for various numbers class NCP assigned to rate tariffs in proportion to their of customers. Figure 42 on the next page provides an example estimated contribution to the customer class peak. of the diversity curve from El Paso Electric Co. (2015, p. 24). Even identical houses with identical equipment may 11.3.2 Relationship Between Line Losses and Conductor Capacity In some situations, conductor size is determined by the routinely peak at different times, depending on household composition, work and school schedules and building orientation. The actual peak load for any particular house economics of line losses rather than by thermal overloads may occur not at typical peak conditions but because or voltage drop. Even at load levels that do not threaten of events not correlated with loads in other houses. For reliability, larger conductors may cost-effectively reduce line example, one house may experience its maximum load losses, especially in new construction.160 The incremental when the family returns from vacation to a hot house in cost of larger capacity can be entirely justified by loss reduc- the summer or a very cold one in the winter, even if neither tion (which is mostly an energy-related benefit), with higher temperatures nor time of day would otherwise be consistent load-carrying capability as a free additional benefit. with an annual maximum load. The house next door may experience its maximum load after a water leak or interior 11.3.3 Secondary Distribution Allocators Each piece of secondary distribution equipment generally painting, when the windows are open and fans, dehumidifiers and the heating or cooling system are all in use. serves a smaller number of customers than a single piece of Accounting for diversity among different types of primary distribution equipment. On a radial system, a line residential customers, the load coincidence factors would be transformer may serve a single customer (a large commercial even lower. A single transformer may serve some homes with customer or an isolated rural residence) or 100 apartments; electric heat, peaking in the winter, and some with fossil fuel a secondary line may serve a few customers or a dozen, heat, peaking in the summer. depending on the density of load and construction. Older The average transformer serving residential customers urban neighborhoods often have secondary lines that are con- may serve a dozen customers, depending on the density of nected to several transformers, and some older large cities such the service territory and the average customer NCP, which as Baltimore have full secondary networks in city centers.161 for the example in Figure 42 suggests that the customers’ In contrast, a primary distribution feeder may serve thousands average contribution to the transformer peak load would be of customers, and a substation can serve several feeders. about 40% of the customers’ undiversified load. Thus, the Thus, loads on secondary equipment are less diversified residential allocator for transformer demand would be the than loads on primary equipment. Hence, cost of service class NCP times 40%. Larger commercial customers generally studies frequently allocate secondary equipment on load have very little diversity at the transformer level, since each measures that reflect customer loads diversified for the transformer (or bank of transformers) typically serves only number of customers on each component. Utilities often use one or a few customers. assumed diversity factors to determine the capacity required The same factors (household composition, work and 160 The same is true for increased distribution voltage. Seattle City Light upgraded its residential distribution system from 4 kV to 26 kV in the early 1980s based on analysis done in the Energy 1990 study, prepared in 1976, which focused on avoiding new baseload generation. The line losses justified the expenditure, but the result was also a dramatic increase in distribution system circuit capacity. The Energy 1990 study was discussed in detail in a meeting of the City Council Utilities Committee (Seattle Municipal Archives, 1977). lines that feed all the customers on the network (See Behnke et al., 2005, p. 11, Figure 8). In secondary networks, the number of transformers and the investment in secondary lines are driven by the aggregate load of the entire network or large parts of the network. The loss of any one feeder and one transformer, or any one run of secondary line, will not disconnect any customer. The existence of the network, the number of transformers and the number and length of primary and secondary lines are entirely load-related. Similar arrangements, called spot networks, are used to serve individual large customers with high reliability requirements. A single spot network customer may thus have multiple transformers, providing redundant capacity. 161 In high-load areas, such as city centers, utilities often operate secondary distribution networks, in which multiple primary feeders serve multiple transformers, which then feed a network of interconnected secondary
  6. Page 156 of 276

    154 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Figure 42. Typical utility estimates of diversity in residential loads Coincident demand per residence in kilowatts 40 35 3,001 to 4,500 square feet 2,001 to 3,000 square feet 30 1,201 to 2,000 square feet 1,200 square feet or less 25 Less than 1,000 square feet without refrigerated air 20 15 10 5 0 1 5 10 15 20 25 30 35 40 Residences Source: El Paso Electric Co. (2015, October 29). El Paso Electric Company’s Response to Office of Public Utility Counsel’s Fifth Request for Information. Public Utility Commission of Texas Docket No. 44941 school schedules, unit-specific events) apply in multifamily ratios vary from about 1 transformer per residential customer housing as well as in single-family housing. But the effects of for a few very rural co-ops to about 8 residential customers orientation are probably even stronger in multifamily housing per transformer for Chugach Electric, which serves part of than in single-family homes. For example, units on the east Anchorage as well as rural areas. side of a building are likely to have summer peak loads in the Utilities can often provide detailed current data from morning, while those on the west side are likely to experience their geographic information systems. Table 30 on the next maximum loads in the evening and those on the south in the page shows Puget Sound Energy’s summary of the number middle of the day. of transformers serving a single residential customer and Importantly, Figure 42 represents the diversity of similar the number serving multiple customers (Levin, 2017, neighboring single-family houses. Diversity is likely to be pp. 8-9). More than 95% of customers are served by shared still higher for other applications, such as different types transformers, and those transformers serve an average and vintages of neighboring homes, or the great variety of of 5.3 customers. Using the method described in the previous customers who may be served from the shared transformers paragraph, an estimated average of 4.9 Puget Sound Energy and lines of a secondary network. residential customers would share a transformer, which is Until 2001, the major U.S. electric utilities were required close to the actual average of 4.5 customers per transformer to provide the number and capacity of transformers in service shown in Table 30 (Levin, 2017, and additional calculations on their FERC Form 1 reports. Assuming an average of one by the authors). transformer per commercial and industrial customer, these The customers who have their own transformer may reports typically suggest a ratio ranging from 3 to more than be too far from their neighbors to share a transformer, or 20 residential customers per transformer, with the lower local load growth may have required that the utility add ratios for the most rural IOUs and the highest for utilities a transformer. In many cases, residential customers with with dense urban service territories and many multifamily consumers.162 Only about a dozen electric co-ops filed a FERC Form 1 with the transformer data in 2001, and their 162 Ratios computed using Form 1, p. 429, transformer data (Federal Energy Regulatory Commission, n.d.) and 2001 numbers from utilities’ federal Form 861 (U.S. Energy Information Administration, n.d.-a, file 2).
  7. Page 157 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | and Account 595 for transformers) should be classified and Table 30. Residential shared transformer example allocated in the same manner as associated equipment. Other With multiple residences per transformer With single residence per transformer Total drops (accounts 583, 584, 593 and 594) or include services to Number of transformers 197,503 47,699 245,202 a range of equipment (accounts 580 and 590). These costs Number of customers 1,054,296 47,699 1,101,995 5.3 1 4.5 Customers per transformer 155 accounts serve both primary and secondary lines and service normally should be classified and allocated in proportion Sources: Levin, A. (2017, June 30). Prefiled response testimony on behalf of NW Energy Coalition, Renewable Northwest and Natural Resources Defense Council. Washington Utilities and Transportation Commission Docket No. UE-170033; additional calculations by the authors individual transformers may need to pay to obtain service that is more expensive than their line extension allowances (see Section 11.2 or Section 15.2). Small customers will have similar, but lower, diversity to the plant in service, for the plant accounts they support, subfunctionalized as appropriate. For example, typical utility tree-trimming activities are almost entirely related to primary overhead lines, with very little cost driven by secondary distribution and no costs for protecting service lines (see, for example, Entergy Corp., n.d.). 11.3.5 Multifamily Housing and Distribution Allocation One common error in distribution cost allocation is treating the residential class as if all customers were in single- on secondary conductors, which generally serve multiple family structures, with one service drop per customer and a customers but not as many as a transformer. A transformer relatively small number of customers on each transformer.163 that serves a dozen customers may serve two of them directly For multifamily customers, one or a few transformers may without secondary lines, four customers from one stretch of serve 100 or more customers through a single service line.164 secondary line and six from another stretch of secondary line Treating multifamily customers as if they were single-family running in the opposite direction or across the street. customers would overstate their contribution to distribution Where no detailed data are available on the number of customers per transformer in each class, a reasonable costs, particularly line transformers and secondary service lines.165 approximation might be to allocate transformer demand This problem can be resolved in either of two ways. costs on a simple average of class NCP and customer NCP The broadest solution is to separate residential customers for residential and small commercial customers and just into two allocation classes: single-family residential and customer NCP for larger nonresidential customers. multifamily residential, as we discuss in Section 5.2.166 Alternatively, the allocation of transformer and service costs 11.3.4 Distribution Operations and Maintenance Allocators Distribution O&M accounts associated with a single type to a combined residential class (as well as residential rate design) should take into account the percentage of customers who are in multifamily buildings, and only components that of equipment (FERC accounts 582, 591 and 592 for substations are not shared should be considered customer-related. 163 One large service drop is much less expensive than the multiple drops needed to serve the same number of customers in single-customer buildings. Small commercial customers may also share service drops, although probably to a more limited extent than residential customers. 165 Allocating transformer costs on demand eliminates the bias for that cost category. 164 Similarly, if the cost of service study includes any classification of shared distribution plant as customer-related (such as from a minimum system), each multifamily building should be treated as a single location, rather than a large number of dispersed customers. For utilities without remote meter reading, the labor cost for that activity per multifamily customer will be lower than for single-family customers. 166 If any sort of NCP allocator is used in the cost of service study, the multifamily class load generally should be combined with the load of the type of customers that tend to surround the multifamily buildings in the particular service territory, which may be single-family residential or medium commercial customers.
  8. Page 158 of 276

    156 | ELECTRIC COST ALLOCATION FOR A NEW ERA 11.3.6 Direct Assignment of Distribution Plant Direct cost assignment may be appropriate for equip- REGULATORY ASSISTANCE PROJECT (RAP)® analysis of the specific lines in use for each class. Many utilities have performed bottom-up analyses, selecting a typical customer or an arguably representative ment required for particular customers, not shared with sample of customers in each class, pricing out those custom- other classes, and not double-counted in class allocation of ers’ service lines and extrapolating to the class. Since the costs common costs. Examples include distribution-style poles are estimated in today’s dollars, the result of these studies is that support streetlights and are not used by any other class; the ratio of each class’s cost of services to the total cost, or a the same may be true for spans of conductor to those poles. set of weights for service costs per customer. Either approach Short tap lines from a main primary voltage line to serve a should reflect the sharing of services in multifamily buildings. single primary voltage customer’s premises may be another example, as they are analogous to a secondary distribution service drop. Beyond some limited situations, it is not practical or useful to determine which distribution equipment (such as 11.5 Classification and Allocation for Advanced Metering and Smart Grid Costs Traditional meters are often discussed as part of the lines and poles) was built for only one class or currently serves distribution system but are primarily used for billing only one class and to ensure that the class is properly credited purposes.167 These meters typically record energy and, for for not using the other distribution equipment jointly used by some classes, customer NCP demand for periodic manual other classes in those locations. or remote reading and generally are classified as customer- 11.4 Allocation Factors for Service Drops The cost of a service drop clearly varies with a number related. Meter costs are then typically allocated on a basis that reflects the higher costs of meters for customers who take power at higher voltage or three phases, for demandrecording meters, for TOU meters and for hourly-recording of factors that vary by class: customer load (which affects energy meters. The weights may be developed from the the capacity of the service line), the distance from the current costs of installing the various types of meters, but as distribution line to the customer, underground versus technology changes, those costs may not be representative of overhead service, the number of customers sharing a service the costs of equipment in rates. (or the number of services required by a single customer) and whether customers require three-phase service. Some utilities, including Baltimore Gas & Electric, In many parts of the country, this traditional metering has been replaced with advanced metering infrastructure. AMI investments were funded in many cases by the attempt to track service line costs by class over time American Recovery and Reinvestment Act of 2009, the (Chernick, 2010, p. 7). This approach is ideal but economic stimulus passed during the Great Recession, complicated. Although assigning the costs of new and but in other cases ratepayers are paying for them in full replacement service lines just requires careful cost in the traditional method. In many jurisdictions, AMI has accounting, determining the costs of services that are retired been accompanied by other complementary “smart grid” and tracking changes in the class or classes in a building (which may change over time from manufacturing to office space to mixed residential and retail) is much more complex. Other utilities allocate service lines on the sum of customer maximum demands in each class. This has the advantage of reflecting the fact that larger customers require larger (and often longer) service lines, without requiring a detailed 167 Some customers who are small or have extremely consistent load patterns are not metered; instead, their bills are estimated based on known load parameters. The largest group of these customers is street lighting customers, but some utilities allow unmetered loads for various small loads that can be easily estimated or nearly flat loads with very high load factors (such as traffic signals). An example of an unmetered customer from the past was a phone booth. Unmetered customers should not be allocated costs of traditional metering and meter reading.
  9. Page 159 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 157 Table 31. Smart grid cost classification Legacy approach Smart grid element Equivalent cost FERC account Classification Smart grid classification Meters 370 Customer Demand, energy and customer Station equipment and devices 362, 365, 367 Demand Demand and energy Data collection system Meter readers 902 Customer Demand, energy and customer Meter data management system Customer accounting and general plant 903, 905, 391 Customer and overhead Demand, energy and customer Smart meters Distribution control devices investments. On the whole, these investments include: • • Smart meters, which are usually defined to include the • factor and phase balancing. • Reduced energy costs due to load shifting. measure voltage and power factor, and allow for remote • Reliability benefits, saving time and money on service connection and disconnection of the customer. restoration after outages, since the utility can determine Distribution system improvements, such as equipment to which meters do not have power and can determine remotely monitor power flow on feeders and substations, whether a customer’s loss of service is due to a problem open and close switches and breakers and otherwise inside the premises or on the distribution system. • Voltage control equipment on substations to allow modulation of input voltage in response to measured • Distribution line loss savings from improved power ability to record and remotely report granular load data, control the distribution system. • • Allowing utilities to determine maximum loads on individual transformers. • Retail service benefits, by reducing meter reading costs voltage at the end of each feeder. compared with manual meter reads and even automated Power factor control equipment to respond to signals meter reading and by reducing the cost of disconnecting from the meters. and reconnecting customers.168 Data collection networks for the meters and line The installations have also been very expensive, running monitors. into the hundreds of millions of dollars for some utilities, and Advanced data processing hardware and software to the cost-effectiveness of the AMI projects has been a matter handle the additional flood of data. of dispute in many jurisdictions. Since these new systems are Supporting overhead costs to make the new system work. much more expensive than the older metering systems and The potential benefits of the smart grid, depending are largely justified by services other than billing, their costs on how it is designed and used, include reduced costs for must be allocated over a wider range of activities, either by generation, transmission, distribution and customer service, functionalizing part of the costs to generation, distribution as described in Subsection 7.1.1. A smart meter is much more and so on or reflecting those functions in classification or the than a device to measure customer usage to assure an accu- allocation factor. • • rate bill — it is the foundation of a system that may provide Special attention must be given to matching costs and some or all of the following: benefits associated with smart grid deployment. The expected • Benefits at every level of system capacity, by enabling benefits spread across the entire spectrum of utility costs, peak load management since the communication from lower labor costs for meter reading to lower energy system can be used to control compatible end uses, and because customer response to calls for load reduction can be measured and rewarded. 168 The data systems can also be configured to provide systemwide Wi-Fi internet access, although they usually are not. See Burbank Water and Power (n.d.).
  10. Page 160 of 276

    158 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Table 32. Summary of distribution allocation approaches Element Method Comments Hourly allocation Substations Functionalization: Entirely primary Classification: Demand and energy Allocator: Loads on substations in hours at or near peaks Reflect effect of energy near peak and preceding peak on sizing and aging Allocate by substation cost or capacity, then to hours that stress that substation with peak and heating Poles Functionalization: Entirely primary Classification: Demand and energy* Energy allocator: Energy or revenue Demand allocator: Loads in hours at or near peaks Pole costs driven by revenue expectation As primary lines Primary conductors Functionalization: Entirely primary Classification: Demand and energy* Energy allocator: Energy or revenue Demand allocator: Loads in hours at or near peaks • • Line transformers Functionalization: Entirely secondary Classification: Demand and energy* Energy allocator: Secondary energy Demand allocator: Diversified secondary loads in peak and near-peak hours Reflect diversity Distribution of transformer peaks and high-load hours Secondary conductors Functionalization: Entirely secondary Classification: Demand and energy* Energy allocator: Energy or revenue Demand allocator: Loads in hours at or near peaks Energy is more important for underground than overhead Distribution of line peaks and highload hours Meters Functionalization: Advanced metering infrastructure to generation, transmission and distribution, as well as metering Allocator for customer-related costs: Weighted customer Allocation of generation, transmission and distribution components depends on use of advanced metering infrastructure N/A • Distribution network is installed due to revenue potential Sizing determined by loads in and near peak hours • Cost associated with revenuedriven line extension to all hours Cost associated with peak loads and overloads on distribution of line peaks and high-load hours * Except some to customer, where a significant portion of plant serves only one customer costs due to load shifting and line loss reduction. Legacy methods for allocating metering costs as primarily customerrelated would place the vast majority of these costs onto the residential rate class, but many of the benefits are typically shared across all rate classes. In other words, the legacy method would give commercial and industrial rate classes substantial benefits but none of the costs. Table 31 identifies some of the key elements of smart grid cost and how these would be appropriately treated in an embedded cost of service study. These approaches match smart grid cost savings to the enabling expenditures. 11.6 Summary of Distribution Classification and Allocation Methods and Illustrative Examples The preceding discussion identifies a variety of methods used to functionalize, classify and allocate distribution plant. Table 32 summarizes the application of some of those methods, including the hourly allocations that may be applicable for modern distribution systems with: • A mix of centralized and distributed resources, conventional and renewable, as well as storage. • The ability to measure hourly usage on the substations and feeders. • The ability to estimate hourly load patterns on transformers and secondary lines.
1 page match

As listed on the current system

Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Melissa Whited [26-05-10]

This filing on the current system (opens in a new tab)